TESTING & COMMISSIONING CHECK LIST FOR SPLIT UNIT


(KIM TRA & NGHIM THU MY LNH HAI CC)
Project:
Tn d n:
Contractor:
Nh Thu:
Client :
Ch u t

Ref No.:
S tham chiu:
Contract package:
Gi thu:
Project Management:
T vn QLDA:

QA-F-VN-PCMT&C_Checklist_For_Split_Unit-Rev A

ARCHETYPE

Description of item(s):
(M t hng mc)
According to Drawing No.:
(Da theo bng v s):
Owners Inspection Report
(Bin bn kim tra ca Ch u t)
Description
Din gii
Operating Results
(Kt qua hoat ng)

1.
2.
3.

Power supply (Ngun cp):

4.
5.

Suction pressures (Evap. Press.) (Ap sut hut):


Condensing medium air Inlet (Vao):
Outlet (Ra):
temp. (Nhit gio tai
dan ngng)
t
Inlet (Vao):
Evaporating medium
Outlet (Ra):
air temp. (Nhit gio
tai dan lanh)
t

6.
7.
8.
9.

Date:

(Ngy)
Accept
No
Chp nhn
Khng
Design/Name plate
(inh mc theo thit
k)
V/P/Hz

PSI

PSI

PSI

C
C
0
C
0
C
0
C
0
C

Suction gas Temp. (Nhit hi u hut):

Saturated temp. of section pressure (Nhit


bao hoa tai u hut):

12.
13.

V/P/Hz

PSI

11.

Measured
(o lng thc t)
A

Discharge gas Temp. (Nhit hi u y):

Liquid temperature before capillary tube,


expansion valve (Nhit long trc van tit
lu)
10.
Saturated temp. of discharge pressure
(Nhit bao hoa tai u y)

(Gi)
N.A
Khng p dng

Running current (Dong in hoat ng):


Discharge pressures (Cond. Press.) (Ap sut
y):

Time:

Amount of superheat (Tng qua nhit):

Amount of sub cool (Tng cng sut lanh):

C
C
0
C
0
C
0
C
0
C
C
C
C
C
C
C
C

Owners Supervisor comment ( kin i din Ch u t):

QA-F-VN-PCM-T&C_Checklist_For_Split_Unit-Rev A

Page 1/2

Note (Ghi ch):

Your submission for approval is subject to following conditions: (n trnh ph duyt co kt


qua nh sau):
Approved
(Chp thun)
Not approved as noted
(Khng chp thun vi ghi chu sau)

Approved on condition as noted


(Chp thun vi iu kin ghi chu sau)
Amend and resubmit
(Sa va trnh lai)

Note (Ghi ch): Accepting the T & C works in this inspection SHALL not relieve the contractors responsibilities from his
contract agreements. /Vic chp nhn kit qua kim tra vn hanh va th nghim trong bin ban nghim thu nay s
khng lam giam trach nhim ca nha thu theo nhng iu khoan rang buc trong hp ng.

Contractor
(Nh thu):

Project Management
Consultant
(T vn Qun L D
n):

Client's
Representatives
(i din Ch u t):

Signature (Ch k):

Signature (Ch k):

Signature (Ch k):

Name (Tn):_______________

Name (Tn):_______________

Name (Tn):_______________

Position (Chc v):__________

Position (Chc v):__________

Position (Chc v):__________

Date (Ngay):_______________

Date (Ngay):_______________

Date (Ngay):_______________

QA-F-VN-PCM-T&C_Checklist_For_Split_Unit-Rev A

Page 2/2