Professional Documents
Culture Documents
M&E Contractor
Logo
Ref No.:
S tham chiu:
Contract package:
Gi thu:
Project Management:
T vn QLDA:
QA-F-VN-PCMT&C_Checklist_For_Split_Unit-Rev A
ARCHETYPE
Description of item(s):
(M t hng mc)
According to Drawing No.:
(Da theo bng v s):
Owners Inspection Report
(Bin bn kim tra ca Ch u t)
Description
Din gii
Operating Results
(Kt qua hoat ng)
1.
2.
3.
4.
5.
6.
7.
8.
9.
Date:
(Ngy)
Accept
No
Chp nhn
Khng
Design/Name plate
(inh mc theo thit
k)
V/P/Hz
PSI
PSI
PSI
C
C
0
C
0
C
0
C
0
C
12.
13.
V/P/Hz
PSI
11.
Measured
(o lng thc t)
A
(Gi)
N.A
Khng p dng
Time:
C
C
0
C
0
C
0
C
0
C
C
C
C
C
C
C
C
QA-F-VN-PCM-T&C_Checklist_For_Split_Unit-Rev A
Page 1/2
Note (Ghi ch): Accepting the T & C works in this inspection SHALL not relieve the contractors responsibilities from his
contract agreements. /Vic chp nhn kit qua kim tra vn hanh va th nghim trong bin ban nghim thu nay s
khng lam giam trach nhim ca nha thu theo nhng iu khoan rang buc trong hp ng.
Contractor
(Nh thu):
Project Management
Consultant
(T vn Qun L D
n):
Client's
Representatives
(i din Ch u t):
Name (Tn):_______________
Name (Tn):_______________
Name (Tn):_______________
Date (Ngay):_______________
Date (Ngay):_______________
Date (Ngay):_______________
QA-F-VN-PCM-T&C_Checklist_For_Split_Unit-Rev A
Page 2/2