TESTING AND COMMISSIONING AIR BALANCING


(KIM TRA V NGHIM THU CN BNG GI)
Project:
Tn d n:
Contractor:
Nh Thu:
Client :
Ch u t

Ref No.:
S tham chiu:
Contract package:
Gi thu:
Project Management:
T vn QLDA:

QA-F-VN-PCMT&C_For_Air_Balancing-Rev A

ARCHETYPE

Description of item(s):
(M t hng mc)
According to Drawing No.:
(Da theo bng v s):
Owners Inspection Report
(Bin bn kim tra ca Ch u t)

Date:
(Ngy)

Time:
(Gi)

Measured (Kt qu o)
Size (Kch thc)

Description
(Din gii)

Size of Duct
(Kch thc
ming gi)

Design (Thit k)

Free
Area
(Din
tch thi)

Air
volume
(Lu
lng
gi)

Air
velocity
(Tc
gi)

( m2 )

( CMH )

( M/S )

Air Velocity
m/s (Tc
gi)

Air Velocity
Average (m3/s)
(Tc gi
trung bnh)

Air Volume
(CMH) (Lu
lng gi)

Error %
(Li %)

Remarks (Ghi
Ch)

AHU-Canteen
Supply Air (SA)

2000 x 600

1,2

10.4

Return Air (RA)

1500 x 600

0,9

6,55

7,28

N/A

N/a

3,85

N/A

Fresh Air Supply

QA-F-VN-PCM-T&C_For_Air_Balancing-Rev A

8,7

10.89

7,6

6,84

4,05

N/a

By Calculated of SA RA=
=10.89-6,84=4.04
(m3/s)

Page 1/3

Note (Ghi ch):

Your submission for approval is subject to following conditions: (n trnh ph duyt c kt qu nh sau):
Approved
(Chp thun)
Not approved as noted
(Khng chp thun vi ghi ch sau)

Approved on condition as noted


(Chp thun vi iu kin ghi ch sau)
Amend and resubmit
(Sa v trnh li)

Note (Ghi ch): Accepting the T & C works in this inspection SHALL not relieve the contractors responsibilities from his contract agreements. /Vic chp nhn kit qu kim tra vn hnh
v th nghim trong bin bn nghim thu ny s khng lm gim trch nhim ca nh thu theo nhng iu khon rng buc trong hp ng.

Contractor
(Nh thu):

QA-F-VN-PCM-T&C_For_Air_Balancing-Rev A

Project Management Consultant


(T vn Qun L D n):

Client's Representatives
(i din Ch u t):

Page 2/3

Signature (Ch k):

Signature (Ch k):

Signature (Ch k):

Name (Tn):_______________

Name (Tn):_______________

Name (Tn):_______________

Position (Chc v):__________

Position (Chc v):__________

Position (Chc v):__________

Date (Ngy):_______________

Date (Ngy):_______________

Date (Ngy):_______________

QA-F-VN-PCM-T&C_For_Air_Balancing-Rev A

Page 3/3

You might also like