Work Breakdown Structure (100kW Solar Power Plant @ CPU)

Phase 1: Feasibility
Feasibility Study
Risk Analysis
-develop a risk response plan
Electrical Load Analysis
Phase 2: Planning & Design
General Requirements
-overhead, paint, concrete & fence/modification of the roof
-structural (materials & labor)
-electrical (batteries, solar panel & cables/wires)
RFQ (request for quotation)
-invite suppliers into a bidding process to bid on specific products or services
Write Contract
-review & sign the contract
Work Schedule and Cost Estimate
-plan & make the schedule as well as the cost estimate of the project
Phase 3: Constructing & Building
Structural & Electrical upgrades
Install Solar Panel & Electrical Hook-ups
-the installation of atleast 300 solar panels at the location
Build battery shelter
Install Batteries/Bank
Install Transformers & Inverters
Phase 4: Training
Operations & Maintenance Manuals for batteries/bank
Operations & Maintenance Manuals for Solar Panels
-conduct a training on how it works as well as the safety precautions &
distribution of manuals
Phase 5: Turnover
Review of the Documents including the payment of the investors