Professional Documents
Culture Documents
Productivity in Mining: Delivering Quantifiable Results
Productivity in Mining: Delivering Quantifiable Results
au
Productivity in mining
Delivering quantifiable results
140
140
120
140
140
120
120
140
120
120
140
140
140
140
120
120
Labour Labour
productivity
productivity
index index
2012 = 100
2012 = 100
100
100
120
120 100
140
140
100
100
100
80
80
80
100
100
120
120
80
80
80
80
60
60
60
80
80
60
60
60
60
100
100
40
40
40
60
60
40
40
40
40
80
20
20
80 20
40
40
20
20
20
20
0
0
0
60
60
2002
2004
2006
2008
2010
2012
2002
2004
2006
2008
2010
2012
2002
2004
2006
2008
2010
2012
20
0
0
20
0
0
2002
2004
2008
2010
2012
2004
2010
2012 Capital
Miningproductivity
Miningproductivity
40 2006
2002 Labour2002
2004
2006
2008
2010
2002
2006
Labour
Mining
productivity
All 40 2006
Capital 2008
productivity
Labour
2012
Mining Mining
Labour 2004
productivity
All
productivity
All
0
0
Labour productivity Mining
Labour productivity
Labour
productivity All
Capital productivity
Mining Mining
Labour
productivity
All
Capital productivity Mining
All
All
productivity
All
202002
202002 Capital2004
2004
2006
2008
2010
2012
2006
2008
2010
2012
Source: ABS
Source: ABS
Labour
productivity Mining
Labour
productivity
All
0
Capital productivity All
0 Capital productivity Mining
ource: ABS
Source:
ABS
2002
2004
2006
2008
2010
2012
2002
2004
2006
2008
2010
2012
100
56% 13%
The mining industry is generating
We have an
experienced team
We have strong
implementation
capability
We have a proven
methodology
We deliver sustainable
improvements
We are committed
to our clients
success
We bridge operational
and financial outcomes
120
100
80
60
40
20
0
20
200C
Cost Reduction
Process Improvement
Value of productivity
improvement
Solution
Focus Area
Capital
Productivity
Improvement
Cost to build
Cost Reduction
Review
Optimise processes
$70m
savings delivered
in 4 months
Time to build
Cost to operate
Trade OPEX for CAPEX
De-layering: optimise number
of managers
Sourcing and
Procurement
Review
Operational
Effectiveness
Capital Productivity
Contractors
Labour Hire
Production
Process
Operational Effectiveness
Optimisation
18% below industry best practice,
equating to an equivalent of 7.6
trucks being ineffective,
35% of the site fleet
$21m
increased
effectiveness by 35%
Heavy equipment
Fuel
Processing equipment
Work Force
Optimisation
Right-size headcount
Optimise labour rates
Operational
Effectiveness
OEE
Improvement
Targeted review of major downtime
categories reduced equipment
downtime
47%
downtime reduction
Partner
Brisbane
Stephen Loadsman
Productivity Lead
m: +61 418 634 397
stephen.loadsman@au.pwc.com
Partner
Melbourne
Director
Brisbane
Franz Wentzel
Operational Excellence
and Asset Management
m: +61 418 126 217
franz.wentzel@au.pwc.com
Partner
Brad McBean
Procurement, Sourcing
and Supply Chain
m: +61 414 487 109
brad.mcbean@au.pwc.com
Perth
Perth
Mark Bosnich
Perth
Aleksey Podkhyneychenko
Capital Productivity and Cost Reduction
m: +61 428 233 067
aleksey.podkhynechenko@au.pwc.com
A consistently rewarding
relationship that is especially
valuable in times of greater
need.
Principal
Darren Smith
Director
Sydney
Matt Guthridge
Partner
Client
Testimonials
Senior Manager
Perth
Fritz Bezuidenhout
Operational Excellence
m: +61 411 553 822
fritz.bezuidenhout@au.pwc.com
2013 PricewaterhouseCoopers. All rights reserved. PwC refers to the Australia member firm, and may sometimes refer
to the PwC network. Each member firm is a separate legal entity. Please see www.pwc.com/structure for further details.
This content is for general information purposes only, and should not be used as a substitute for consultation with professional
advisors. Liability limited by a scheme approved under Professional Standards Legislation.