For PGP1 Students
Process
Input
Process
Output
"Process" may refer to the complete production process, such as doing a load of
laundry or making bread from start to finish, or to a segment of the complete
process, such as the wash cycle or the baking process
Activities: equipment
Club Kaizen
IIM-Indore
Types of Process
Single Stage Process
Input
Stage 1
Output
Multi-Stage Process
Input
Club Kaizen
IIM-Indore
Stage 1
Stage 2
Stage 3
Symbols used in
a PFD
Club Kaizen
IIM-Indore
Process Concepts
Capacity
Process Concepts
Cycle time for a single washer for one load of clothes is 30 min
for a single load.
Club Kaizen
IIM-Indore
Then, for a large laundry operation with 10 washers, cycle time would be??
Process Concepts
Bottleneck: The production resource that limits the capacity of the overall
process. This is usually the production equipment at the step with the lowest
overall capacity, i.e., the longest cycle time. In some situations, the
bottleneck resources may be labour available at a particular step or steps.
In the example above, washing can start only when load has been put in, drier
can start operation only after the load has been washed, and clothes can be
folded only after drying. In the figure above, once our 'line' is full, which
operation will decide (i.e., limit) the speed at which we can do our laundry? The
dryer will, because it will still be drying the first load when the washer finishes its
cycle on the second load. Generally, the step with the longest cycle time will be
the bottleneck.
Club Kaizen
IIM Indore
Process Concepts
Idle Time: The time when useful work is not being performed. For an example,
Sometimes you only need to do one load of laundry, but because the steps in the
process are dependent, two machines (including you the folder) will be idle part of
the time.
Club Kaizen
IIM-Indore
Process Concepts
Work-in-Process: Number of units in the process at any point in time. If the process
includes buffer inventories between steps, they the work-in-process is the total
number of units being worked upon as well as waiting in the inventory between steps.
The units in inventory are usually referred to as Work-in-process inventory, to
distinguish them from raw materials inventory or finished goods inventory.
Club Kaizen
IIM-Indore
Process Concepts
Club Kaizen
IIM-Indore
Process Concepts
Manufacturing Lead Time (MLT): The amount of time each unit spends in the
manufacturing process (sometimes called Throughput Time). This includes time
spent actively being worked upon at each step of the process as well as any time
spend waiting between steps. The concept of a lead time applies to the total time
spent in any process in which the start and finish are well-defined events. We can
talk about lead times, for example, in service operations, or in the entire order-todelivery process.
In the example shown, the load would spend one cycle (45 minutes) in the washer,
including idle time, another cycle in the dryer (90 minutes total), and then two-thirds
of a cycle being folded (120 minutes). From laundry bag to clean and folded will
take an average of two hours. Note that because folding took place after our
bottleneck (drying), the load didn't have to stay there for a full cycle.
Club Kaizen
IIM Indore
Process Concepts
There is a simple formula, known as Little's Law, which can help estimate the
Manufacturing Lead Time. Little's Law states that:
Manufacturing Lead Time = Cycle Time * Work-in-Process
This simple rule makes sense if you imagine the path a new set of inputs (like a
load of laundry) must follow in order to pass through the operation. As each unit
of WIP moves forward, the new set of inputs takes its place. Each move occurs
once per cycle, so multiplying cycle time times WIP will give us our total leadtime.
In our laundry example, we had 2 2/3 loads of WIP. Multiplying 2 2/3 times our
cycle time of 45 minutes gives us 120 minutes.
Club Kaizen
IIM-Indore
Lot Size (also called Batch Size): Number of units of a particular product type that are
produced before beginning production of another product type.
Utilization: Ratio of the input actually used over the amount of the input available. Labour
utilization is the ratio of the actual labour time spent processing to the total amount of labour
time available. Differences between the two can be due to inefficiencies in the process that lead
to lost working time, as well as to imbalances in the cycle times at each step of the process that
lead to idle time of workers at some steps while those at others are working. Capacity utilization
is the ratio of the capacity actually used (i.e., the output of the process) to the total capacity
available.
Blocking: It occurs when the activities in a stage must stop because there is no place to
deposit the item just completed. If there is no room for the load to be kept after washing stage,
the load has to wait before it can move to the drying stage thereby blocking the operation.
Starving: Occurs when the activities in a stage must stop because there is no work. If the
washer is free and there is no new load for it to wash it will have no load to work upon.
Pacing: Refers to the fixed timing of the movement of items through the process.
Club Kaizen
IIM-Indore
Productivity = Output
Input
Utilization =
Time Activated
Time Available
Club Kaizen
IIM Indore
IIM-Indore
Throughput time = Average time for a unit to move through the system. Also called Lead time
Productivity = Output
Input
Utilization =
Time Activated
Time Available
Throughput rate =
1
.
Cycle time
Efficiency =
Actual output
Club Kaizen
IIM Indore
Standard Output
Scheduling
Various techniques are applied for scheduling, like FCFS (First come first serve),
Johnsons Rule, Shortest processing time.
Club Kaizen
IIM-Indore
Planning
Setting goals & objectives
Meet demand within the limits
of available resources at the least cost
Determining steps to achieve goals
Hire more workers
Setting start & completion dates
Club Kaizen
IIM-Indore
Types of Plans
Management Level
High
Operations
Managers
Short-Range
Low Dispatching
Today
Club Kaizen
IIM-Indore
Long-Range
Facility location
Top
Executives
Intermediate-Range
Aggregate plans
3 months
Supervisors
1 year
18 months
5 years
Aggregate Planning
Production quantity & timing of production for
intermediate future
Usually 3 to 18 months into future
Club Kaizen
IIM-Indore
Forecast to scheduling
Forecast &
Firm Orders
Material
Requirements
Planning
Aggregate
Production
Planning
Resource
Availability
Work force
Inventory
Subcontractors
Master
Production
Scheduling
Realistic?
Yes
Shop
Floor
Schedules
Aggregate to Master
Production Schedule
Aggregate Schedule:
Month
Jan Feb
No. of Chips 600 650
Mar
620
Apr
630
May
640
Mar
310
310
Apr
300
330
Club Kaizen
IIM-Indore
May
340
300
60
50
40
30
20
10
0
0
2
demand
4
Production
Chase strategy
Hire / Fire workers to make production capacity
meet necessary
60
production
50
40
Month vs. cum. Production
30
20
10
0
Club Kaizen
IIM-Indore
2
demand
4
Production
Supply Chain
All facilities, functions, activities, associated with flow and transformation of goods and
services from raw materials to customer, as well as the associated information flows
Information
Procurement
Source
Club Kaizen
IIM-Indore
Production
Make
Distribution
Deliver
Club Kaizen
IIM-Indore
Bullwhip effect
Phenomenon of variability magnification as we move from the
customer to producer ion the supply chain
Club Kaizen
IIM-Indore
Risk-hedging
supply chain
Responsive
supply chain
Agile Supply
chain
Club Kaizen
IIM-Indore
Capacity Planning
Horizons of capacity Planning
Buildings, equipment
and facilities
Adjustments to
eliminate variances
between planned and
actual output
Club Kaizen
IIM-Indore
Lean Production
High volume production using minimum inventory of raw materials, WIP and
FG
Nothing will be produced until it is needed. Production need is created by
actual demand for the product
Club Kaizen
IIM-Indore
Lean concepts
JIT(Just in Time ): Producing or procuring what is needed when
needed and no more. Anything over the minimum amount necessary is
viewed as waste as effort and resource expended on it cannot be
utilized now
Quality at source: Do it right the first time and when something goes
wrong stop the process eg. Andon card