M/A-COM Technology Solutions Inc.

CONFIDENTIAL INFORMATION SUBJECT TO NDA


The information contained in this document or material is
the valuable and confidential property of M/A-COM
Technology Solutions Holdings, Inc. and/or its subsidiaries
or affiliates (collectively MACOM), provided to you subject
to a non-disclosure agreement between you and MACOM
solely for use in supporting MACOMs business as and to
the extent MACOM authorizes in writing from time to time.
This information shall be held in strictest confidence and
shall not be reproduced, published, disclosed to others, or
used for any purpose except as and to the extent
specifically authorized by MACOM in a separate written
agreement. If permission is granted for reproduction, this
legend must be included in any and all copies. This
document or material shall be promptly returned to MACOM
or destroyed upon request, completion of the use for which
it was made available to recipient, or termination of
MACOMs relationship with recipient, whichever first occurs.

ATTENTION
USER OF THIS DOCUMENT
IS RESPONSIBLE FOR
DETERMINING CURRENT
REVISION LEVEL BEFORE
USING DOCUMENT.

M/A-COM TECH ASIA INC

Originated By:

Rick Chen
RF Test Engineer

Date

2015/1/30

Approved By:

Wilson Hsu
Quality supervisor

Date

2015/1/30

Approved By:

Anson Cheng
Technical Manager

Date

2015/1/30

Title
MTA_Setup Procedure For R7181-38

Document No.:

Rev.:

MFG-1232
Page:

1 OF 27

Document No.:

Title :

Rev.:

MTA_Setup Procedure For R7181-38

MFG-1232
Page:

2 OF 17

REVISION HISTORY
Revision
-

Change Description
New release

CO NO.

Date

CO-015167

2015/1/30

Title :
MTA_Setup Procedure For R7181-38

1.0

Purpose
Define setup procedure for package product R7181-38

2.0

Scope
R7181-38

3.0

Reference documents
R7181-38-WF-001
R7181-38-WF-002

4.0

Definitions
N/A

5.0

Procedure
5.1 Equipment setting

Document No.:

Rev.:

MFG-1232
Page:

3 OF 17

Document No.:

Title :
MTA_Setup Procedure For R7181-38

Rev.:

MFG-1232

Page:

4 OF 17

5.2. DST4 tester power on flow


5.2.1 Press Space bar 3 times upon encountering Figure 1 below.
5.2.2 Press Y upon encountering figure 2 below. Then Follow DST4 Program Loading
Procedure on the succeeding instructions.

Press Space bar 3

times

Figure 1

Press Y

Figure 2

5.3. DST4 Program Loading Procedure


5.3.1 The main DST4 menu with latest revision will appear. From this menu choose RUN
TEST pROGRAM using the up/down arrow keys and hit <enter>.

Document No.:

Title :

Rev.:

MTA_Setup Procedure For R7181-38

MFG-1232
Page:

5 OF 17

5.3.2 Enter the correct production Test Program Name, i.e.R7181AI, and hit <enter>.

R7181AI

5.3.3 From the next menu choose pRODUCTION TEST for Final Test or qA TEST for
QA gate using the up/down arrow keys and hit <enter>.

Document No.:

Title :
MTA_Setup Procedure For R7181-38

Rev.:

MFG-1232
Page:

6 OF 17

5.3.4 For the first Production Run sequence you must choose dUAL SITE - for dual site ITA
board or sINGLE SITE -for single site ITA board from the menu option, using the
up/down arrow keys and hit <enter>.

5.3.5 Next, you must select HALT ON fAIL from the next menu option.

Document No.:

Title :
MTA_Setup Procedure For R7181-38

Rev.:

MFG-1232
Page:

7 OF 17

5.3.6 Next, enter the dash number marked on the device packages/ listed on Test LTC you
are testing, i.e. 38.

5.3.7 Next, enter the Lot Number as listed on the device package/ Test LTC.

Title :
MTA_Setup Procedure For R7181-38

Document No.:

Rev.:

MFG-1232
Page:

8 OF 17

5.3.8 Next, enter the re-test number, 0 is for 1st pass and 1 is for the re-test of failures.

Flow for Re-test Number:

5.3.9 Next, enter the Employee Number of operator.

Document No.:

Title :
MTA_Setup Procedure For R7181-38

Rev.:

MFG-1232
Page:

9 OF 17

5.3.10 Next, select the correct Temperature from the menu as indicated on Test LTC. Make
sure that the thermocouple temperature reading is 75C when testing at Hot Temperature.
Thermocouple should not be attached when Testing Room Temperature and Cold
Temperature

Note : PLEASE SEE Section 5.4 for Details.

5.3.11 Enter DUT number for socket but please make sure that the DUT number for the two
socket is not the same and if you choose SINGLE TEST for item 4.4 only one socket
number to be ask.(Ex.DUT#1 - 0 and DUT#2 - 1)

Document No.:

Title :
MTA_Setup Procedure For R7181-38

Rev.:

MFG-1232
Page:

10 OF 17

5.3.12 You will now be asked to verify the information you entered, which is displayed on the
screen. If all the information is correct then enter Y.

5.3.13 If the information is not correct then do the following: enter N and using the up/down
arrow keys select the data field that needs to be changed. Hit <enter> and update it
accordingly. Hit the <enter> button to confirm the change. To leave this menu and start
testing hit the <ESC> key.

Document No.:

Title :

Rev.:

MTA_Setup Procedure For R7181-38

MFG-1232
Page:

11 OF 17

5.3.14 Next, you will be prompted to start testing.


5.3.15 Load the device to be Re-tested into the left-hand socket only.

5.3.16 Make sure the device is oriented correctly: device marking is upside down in reference
to the front of the tester, as shown below.

5.3.17 Begin testing by either depressing the space bar, or the test button on the front panel of
the DST4 tester.

NOTE: See Section 5.5 for Details.

Document No.:

Title :
MTA_Setup Procedure For R7181-38

Rev.:

MFG-1232
Page:

12 OF 17

PASS/FAIL Observations:
FAIL

When the testing completes and the screen shows FAIL, and the red LED on the front of the DST4 ITA
is illuminated, hit the re-test button on the front of the DST4 tester, or hit r on the keyboard, to re-test
the device. Only do this once. If the screen shows FAIL, and the red LED on the front of the DST4 ITA
is illuminated again, remove the device from the left-hand socket and place it in the bin for all failing
devices.
After Test, separate REJECT parts with a red sticker /clip tray with proper label as rejects.

PASS

When the testing completes and the screen shows PASS, and the green LED is illumated, put the
device from the left-hand socket in the bin for all passing devices.
After Test, separate GOOD from REJECT parts with a green sticker / clip tray and properly label
as BIN1.

Document No.:

Title :
MTA_Setup Procedure For R7181-38

Rev.:

MFG-1232
Page:

13 OF 17

5.4. R7181 test flow and conditions:


5.4.1 HOT TESTING
5.4.1.1 E/L TEST 2 (QS02-043)
- Handler/ Temp : Manual / 75 +/-3 deg C
- Good Bin : Bin 1
- Tester/ Test Program : DST4 / Refer to LTC
- Yield and O/S Limit : Refer to LTC
- 1x Mandatory Retest : If Final Test Yield is not met
- Rejects Requirements : Scrap rejects if PASSED yield requirements

Oven Heating Procedure


5.4.1.1.1 Place the units to be tested inside the oven.
5.4.1.1.2 Set the Oven at 75 deg C +/- 3.0
5.4.1.1.3 After 30 minutes, get 1 tray of units and place it above a Hot Plate preset at
75 +/- 3 deg C.
5.4.1.1.4 Start Testing.
Note : Get only 1 tray from the oven at a time to prevent sudden cool down Of units.

5.4.1.2 E/L TEST 3 (QS02-043) HOT TESTING CONDITION


- Handler/ Temp : Manual / 75 +/-3 deg C
- Good Bin : Bin 1
- Tester/ Test Program : DST4 / Refer to LTC
- Yield and O/S Limit : Refer to LTC
- 1x Mandatory Retest : If Final Test Yield is not met
- Rejects Requirements : Scrap rejects if PASSED yield requirements

Title :
MTA_Setup Procedure For R7181-38

Document No.:

Rev.:

MFG-1232
Page:

14 OF 17

5.4.2 COLD TESTING


5.4.2.1 Freezer Cooling Procedure
5.4.2.1.1 Place the units to be tested inside the freezer.
5.4.2.1.2 Preset the freezer at - 6 deg C +/- 3.0
5.4.2.1.3 After 45 minutes, get units to be tested and place it on the socket.
5.4.2.1.4 Start Testing. Testing should commence within the span of 1 minute.
Note :Get only units to be tested from the freezer at a time to maintain unit temperature. No
RETEST should be done. Failed units should be put back to freezer for Cooling prior
retest.

5.4.2.2 E/L TEST 4 (QS02-043) COLD TESTING CONDITION


- Handler/ Temp : Manual / 0 +/- 3 deg C
- Good Bin : Bin 1
- Tester/ Test Program : DST4 / Refer to LTC
- Yield and O/S Limit : Refer to LTC
- 1x Mandatory Retest : If Final Test Yield is not met
- Rejects Requirements : Scrap rejects if PASSED yield requirements

5.4.3 AMBIENT / ROOM TESTING


5.4.3.11 Place the units for test on Room Temperature condition and start Testing.
5.4.3.2 E/L TEST 4 (QS02-043) AMBIENT / ROOM CONDITION
- Handler/ Temp : Manual / ROOM
- Good Bin : Bin 1
- Tester/ Test Program : DST4 / Refer to LTC
- Yield and O/S Limit : Refer to LTC
- 1x Mandatory Retest : If Final Test Yield is not met
- Rejects Requirements : Scrap rejects if PASSED yield requirements
Note :Change the Unit / DUT upon encountering 2X failures, Put the failed parts to Reject tray
for retest if yield requirement is not met.

Title :
MTA_Setup Procedure For R7181-38

Document No.:

Rev.:

MFG-1232
Page:

15 OF 17

5.5 DST4 Operations


5.5.1 With Switch Sensor

5.5.1.1 To start testing using the sensor, Place the thumb on the top slot shown on the Above
Figure labeled A) Motion Sensor for Test.
5.5.1.2 To perform a retest , Place the thumb on the bottom slot shown on the above Figure
labeled B) Motion Sensor to Re-Test.

Document No.:

Title :
MTA_Setup Procedure For R7181-38

Rev.:

MFG-1232
Page:

5.5.2 Without Switch Sensor


5.5.2.1 Set the Omniview to the corresponding DST4 slot Number in reference to the
Connection at the back of the Omniview. Please see below figures.

FRONT VIEW

BACK VIEW

16 OF 17

Title :
MTA_Setup Procedure For R7181-38

Document No.:

Rev.:

MFG-1232
Page:

17 OF 17

5.5.2.2 Press SPACE BAR to start the testing of the corresponding DST4 set on the above
Omniview setting. Press R for Re-Test

6.0

Appendix
N/A