Measurement of Building Work A
Measurement of Building Work A
Task -01
1.1 Any construction work measurement is getting an important place. So we should know
important and principles of measurements. We want to get correct and accurate
measurement for this we use SMM7 this standard method of measurement provides a
uniform basis for measuring building works and ombidies the essentials of good practice.
Bills of quantity shall fully describe and accurately represent the quantity and quality of
the works to be carried out. More detailed information than is required by these rules
shall be given where necessary in order to define the precise nature and extent of the
required work.
SMM7s including following type of information
Use of the tabulate rules
1. Generally
2.Classification table
Quantities
1. Supplementary rules
Descriptions
Drawing information
Catalogued or standard components
Work of special types
Procedure where the drawn and specification information required by these rules in
not available
Fixing, base and background
Composite item
Work not covered
Symbols and abbreviations
Work to existing buildings
General definition
For this information we can take measurement easily and quickly so SMM7 is more
important for building works.
Principles of measurement practices
For the measurement quantity surveyor using by following stationeries this are called as
surveyors stationeries.
(1) Query sheet
Size- A4
Use- Some dimensions are not including on plan that time asking question for architecture
we use this sheet,
ModalBCAS
Page 1
ANSWER
(2)Dimension sheet
Size- A4
Use- Get measurement
Modal9m
14m
15mm 16mm
m
m
D
S
T
55mm
Dis
14mm
T
b.
b. Binding margin
T Timesing column
D Dimension column
S Squaring column
Des Description column
BCAS
Page 2
15mm
D
16mm
S
56mm
Des
Description
500m
Bk.Wall
1.00
0.50
1000mm
12mm Spacing
3000m
mm
Fr. Wk
125m
0.13
0.13
3.00
125m
Description
225
112.
200
2/225
250
450
2000
2500
112.5
External length
2/225
5062.5
450
3000
External width
3450
(3).Order of dimension
All dimensions are entering in meters with two decimals in dimension column. Dimension is
entered in following order.
BCAS
Page 3
Horizontal length
Horizontal width or breadth
Vertical height or depth
Description
L-Length
W-Width/breadth
H-Height/Depth
02-Number
L
W
H
02
(4).Timsing
T
2//
T
Description
2100
5.25
2.10
11.025
210
0
5250
5250
Area =
5.252.10
10.00
0.85
1.00
11.764
(5).Grouping of dimension
Description
BCAS
1.00
1.50
1.50
2.00
Disposal load
1.50
3.00
4.50
Page 4
10000
Tr. Excn.
&
Disposal of exct. Mat.
1000
A1
1500
1500
A2
2000
Bk.Wall
(6).Alternative of dimension
T
D
XXX
XXX
XXX
XXX
1.50
1.50
/
BCAS
/
2.00
1.50
6.00
1.50
0.23
0.23
2.00
S
NIL
-
Description
BK.Wall. NIL
xxx
3.00
r
150
0
9.00
A
2000
Page 5
2.05
r=1500
A=r2
2000
r=225
V=r2h
150
0
4000
A=(A+B)H
Task-01
1.3 Indentify and describe the major part of a bill of quantities (P3)
After entering Abstract sheet next we use bill page so BOQ has major 5patrs these are
follows 1). Preliminaries
Preliminaries Items we separate two parts.
Not specific to work section
This items not specific to work section but
that has cost.
Eg:- 1.Tendering process
2.Contractual requirements for
insurances
3.Site facilities for the employers
representative and payments to
the local
Authorities.
Page 6
200000
00
1500000
BCAS
Page 7
00
2. Provisional Sums
Where the work cannot be descried and given in accordance with SMM (SL) rules, It shall
be given as a provisional sum and identified as for either defined or undefined work. In
defined work items a description and indication of the amount of work. Can be given and the
contractor will be deemed to have made due allowance in programming, planning and
pricing the preliminaries. Whore these details cannot be supplied the work is classified as
undefined and the contractor will be deemed not to have made any allowance in
programming, planning and pricing the preliminaries. Work by local authorities and statutory
undertaking are the subject of provisional sums.
A Allow the general provisional sum of Rupees
100000 to cover the cost of any unforeseen
Works. This sum is to be expanded the
discretion of the Architect/Engineer.
100000
00
5).General summary.
There general summary is to provide monetary collection at the end of each group of work
sections such as D-Ground works, F-Masonry the total of which are then trans tarred to the
final summary.
1. General summary.
D-Ground work
Rs($)
Cts(P)
XXX
XXX
E-In-suit concrete
F-Masonry
G-Creasing timber
H-Covering
Total carried to final summary
BCAS
Page 8
Cts(P)
XXX
XXX
ITE
M
DESCRIPTION
UNI
T
Bill No:-1
A50-Nominated suppliers
Preambles.
1. Iron mongaries give by ABC
nominated sub contractors.
2. All iron mongaries made by
pure steel and brash.
BCAS
Page 9
QUANTITY
RATE
AMOUNT
1.
2.
Nominated suppliers
Allow a pc sum of Rs 200000
supplying of necessary iron
mongaries a.b.d.
Pc
sum
Sum
15
ITEM
BCAS
DESCRIPTION
UNIT
Page 10
QUANTITY
RATE
AMOUNT
1.
1.1
1.2
1.3
2.
3.
SITE PREPARATION
Cutting down trees.
Girth 600-1500
Girth 1500-3000
Girth >3000
Nr
Nr
Nr
5
7
4
Nr
M2
4.
5.
6.
7.
8.
9.
10.
BCAS
EXCAVATION
150mm top soil
Pit max depth 2000
Pit max depth 1000
Tranch max depth 1000
EARTH WORK SUPPORTE
Side of excavation max depth
1000
Distance between opposing faces
2000
DISPOSAL
Surface water
Excavated materials a.b.d
M2
M3
M3
M3
M2
I
M2
Page 11
136
136
23
01
19
88
Item
62
DESCRIPTION
UNI
T
QUANTITY
11.
FILLING TO EXCAVATION
Thick > 0.25m a.b.d
M3
09
12.
M3
19
BCAS
Page 12
RATE
AMOUNT
13.
14.
SURFACE TREATMENT
Compacting bottoms of excavation
a.b.d
Trimming sides of cuttings
M2
M2
56
88
DESCRIPTION
UNI
Page 13
QUANTITY
RATE
AMOUNT
T
Bill No:-3
E10-Mixing/Curing/Curing in-situ
concrete
Preambles.
1. Mechanical or manually
mixing shall use as mixing
concrete.
2. 1:3:6 mass concrete shall
use for foundation.
3. Concrete shall cure by
manually.
4. Concrete shall compact
manually.
5. Grade 25 reinforced concrete
shall use.
1.
2.
3.
4.
5.
ISOLATED FOUNDATIONS
Foundations a.b.d
Bed foundation thick 150 a.b.d
Concrete in slab thick 150-450mm
a.b.d
Concrete in columns DPC to 1st floor
a.b.d
Concrete in stair case DPC to 1st
floor a.b.d
M3
M3
M3
M3
07
12
18
02
M3
02
1.
2.
3.
4.
5.
6.
7.
BCAS
Preambles.
1. 25mm thick 2nd class
plywood shall use for
formwork.
SIDES OF FOUNDATIONS
Sides of foundation ht 250 a.b.d
Column base ht 1000
Formwork for sides soffits of slab ht
to soffits<3000, Thick 200
Soffits of landings a.b.d
Edges of suspended slab height
250 a.b.d
Sides of column dpc to 1st floor
a.b.d
Stair case 1000mm width,
Page 14
M
M2
27
18
M2
M2
M2
136
02
68
M2
M2
40
11
DESCRIPTION
UNI
T
QUANTITY
t
t
t
02
0.2
01
BCAS
BAR
Y-12 bar reinforcement a.b.d
R-12 bar reinforcement a.b.d
Y-16 bar reinforcement a.b.d
Page 15
RATE
AMOUNT
ITE
M
DESCRIPTION
UNI
T
QUANTITY
Bill No:-4
F10-Brick / Block walling
Preambles.
1. 215x102.5x65 common brick
shall use for brick wall.
2. 1:6 cement: motar shall use.
3. Bricks are bonded with English
bond.
.
1.
2.
WALLS
225mm thick wall dpc to 1st floor
a.b.d
112.5mm thick wall a.b.d
m2
m2
130
04
m2
48
BCAS
WALLS
450mm thick wall a.b.d
Page 16
RATE
AMOUNT
1.
Preambles.
1. 20mm thick dpc for shall use
2. Apply 2 cots of hat dpc tar
planted with find sand.
3. 1:4 cement: sand shall use
for dpc
.
Damp proof courses
Dpc width >300 a.b.d
F31- Precast concrete sills / Lintels /
Copings / Features.
m2
27
Preambles.
1. PCC lintel shall use.
2. Lintels include 4Nos Y10 bar
reinforcement.
3. R6 reinforcement Links shall
use.
UNIT QUANTITY
LINTELS
1.
2.
3.
4.
5.
6.
Nr
Nr
Nr
Nr
Nr
Nr
BCAS
Page 17
01
03
01
05
01
02
RATE
AMOUNT
UNIT QUANTITY
Preambles.
1. 1st class timber shall use for
roofing
2. Wall plate shall fixed with on
the wall
3. Other plates are fixed on the
post.
4. Valance board shall for gutter
board.
BCAS
Page 18
RATE
AMOUNT
PLATE
75x100 wall plate a.b.d
50x175 ridge platea.b.d
100x100 post a.b.d
50x125 parlin a.b.d
50x100 rafters a.b.d
25x225 velancy board fix to
wooden surface.
m
m
m
m
m
m
Page 19
39
02
03
20
275
46
UNIT QUANTITY
RATE
AMOUNT
roof covering.
2.50x50 batten shall use
3.600m canters spacing shall
use
4.4000x1000 sheet shall use.
M2
ROOF COVERING
21 pitch sheet a.b.d
71
UNIT QUANTITY
Page 20
RATE
AMOUNT
.
1.
BCAS
m2
Page 21
71
ITEM DESCRIPTION
Bill No:-8
K40- Demountable suspended
ceiling.
UNIT QUANTITY
Preambles.
1. 15mm thick smooth soffit
plywood shall use for ceiling.
2. 1st class plywood shall use.
3. Plywood shall fix with wooden
surface.
1.
BCAS
CEILLING
Plywood ceiling a.b.d
m2
Page 22
79
RATE
AMOUNT
ITEM DESCRIPTION
Bill No:-9
L10- Windows / Roof light /
screens / covers.
UNIT QUANTITY
Preambles.
1. Windows and window frames
are made by 1st class timber.
2. Window frames fixed with wall
surface.
3. Casements fixed with wooden
frames.
4. Windows including 300mm
trellis.
1.
2.
3.
4.
Nr
Nr
02
03
Nr
Nr
01
02
Nr
Nr
03
01
Preambles.
1. 1st class treated timber shall
use for door frame.
2. Decorated ply wood door shall
use for front door.
3. Timber panelled door shall use
4. PVC door shall use for toilet.
1.
1.1
1.2
BCAS
DOORS
1230x2040 plywood door a.b.d
1550x1990 door a.b.d
Page 23
RATE
AMOUNT
Nr
01
2.
2.1
2.2
2.3
Nr
Nr
Nr
21
07
02
ITEM DESCRIPTION
Total brought from previous page
UNIT QUANTITY
1
STANDARAD PLAIN GLASS
Plain glass a.b.d
BCAS
Page 24
RATE
AMOUNT
UNIT QUANTITY
Preambles.
1. 20mm thick smooth bed shall
do the internal plastering.
2. 20mm thick semi rough bed
do the external plastering.
3. Plastered against brick
surface.
4. 1:1:5 Cement, lime, mortar
shall use for plastering.
5. Material shall mix with
manually.
6. Plastered for dpc to 1st floor.
1.
2.
m2
m2
WALLS
Internal width >300 a.b.d
External width >300 a.b.d
M40- Stone/ Concrete/ Quarry
/Ceramic tilling/ Mosaic.
Preambles.
BCAS
Page 25
203
83
RATE
AMOUNT
1
1.1
1.2
2
2.1
m2
m2
81
02
05
FLOORS
Floor tiles a.b.d
Landing a.b.d
TREADS
Stair case
4
4.1
4.2
SKIRTINGS
Skirting a.b.d
Ridge tile a.b.d
Page 26
UNIT QUANTITY
05
m
m
150
02
RATE
AMOUNT
1.
1.1
1.2.
General surface
Internal painting dpc to 1st floor
a.b.d
External painting a.b.d
m2
m2
390
106
2.
2.1
GLAZED WINDOWS
Span area a.b.d
m2
30
UNIT QUANTITY
Preambles.
1. Decorated hand rails shall
make.
2. Hand rails made with steel.
1.
BCAS
06
RATE
AMOUNT
P21- Ironmongery
Preambles.
1. Ironmongeries fixed only
wooden surface.
1
2
3
4
5
6
7
8
Page 28
Nr
15
Nr
Nr
Nr
Nr
Nr
Nr
Nr
02
29
29
05
01
44
01
UNIT QUANTITY
RATE
AMOUNT
1.
2.
3.
4.
5.
BCAS
PIPES
Down pipe a.b.d
Extra over a.b.d sp jts to pipes.
100mm sqd pvc gutter fixed with
pvc gutter brackets in 200center
a.b.d
E.o pvc bend
E.o pvc running had to gutters.
Page 29
L
Nr
L
14
02
46
Nr
Nr
04
02
BCAS
Page 30