Professional Documents
Culture Documents
Project
pez
Drainage Design
Design:
calculation
ref.
Fana
Checked
date:
Sheet:
Rev:
Ir.Veera
output
Table 1.1
i=k
(d + )
where :
i=
T=
d=
,k,, =
Appendix 2.B
Table 2.B2
i=
Eqn 2.3
The avarage rainfall intensity (mm/hr) for selected ARI (T) and storm duration (d);
average recurrence interval, ARI (years);
storm duration (hours); 0.20 < d < 72 and
fitting constants dependent on the raingauge location
Location &
Station ID
ARI,T
(years)
Storm
duration d
kuantan,
Pahang
10
0.333
45.999
126.73
Derived parameter
k
0.210
0.074
mm/h
0.590
=
126.73 mm/h
Q = C.I.A
360
where :
Q=
C=
I=
A=
Q5 = 76.4812880821
360
=
0.85
= 126.72956 mm/h
=
0.71
ha
=
0.21
0.015
Assuming:
Drain longitudinal slope
Width, B
Side slope, Z
=
=
=
0.2
0.6
0
m3/s
%(1 in 250)
No.Project
date:
Sheet:
Rev:
output
pez
Drainage Design
ref.
Design:
calculation
Zer
Checked
Ir.Veera
Q =vxA
where :
Section
14.2.4.2
A (m2)
0.180
0.240
0.270
0.360
P (m)
1.20
1.40
1.50
1.80
0.22 (m3/s)
R (m)
0.15
0.17
0.18
0.20
>
v (m/s)
0.84
0.92
0.95
1.02
Q (m3/s)
0.152
0.221
0.257
0.367
Q5
OK
50
mm
0.4
=
=
=
=
0.6
0.4
0.25
0.3
m
m
m/s
m3/s
The drain dimensions are 0.60m wide X 0.40m deep, which is within the recommended limits.
Check flow velocity for lined drain, v
0.25 m/s
(0.6 <v <2 m/s)
NOT OK