CAPACITY MANAGEMENT

FOR A TOLL PLAZA

AGENDA
Introduction

Present Problems

Service Level Agreement

Proposed Solutions

Alternative Solutions

Estimated Cost

INTRODUCTION

Atoll

road, also known as atoll plaza, is a public or privateroadwayfor


which afee(ortoll) is assessed for passage. It is a form ofroad
pricingtypically implemented to help recuperate the cost ofroad
constructionandmaintenance, which (onpublic roads) amounts to a
form oftaxation.
E.g. Pune Mumbai Expressway spans a distance of 93km (58miles)
connectingMumbai withPune.
Any Expressway typically reduces the travel time between the cities
considerably.

Speed Limit on all the Expressway is 80 Km.

E.g.
The
Delhi-Gurgaon
connectingDelhi.

Expresswayis

28km

expressway

PRESENT
PROBLEMS

Traffic

Congestion

Bottle

necks

Lane

Idle

Indiscipline

Time

SERVICE LEVEL
AGREEMENT

Traffic Management needs to be improved : max 100 sec of turn


around time.

Capital Investment should be recovered within a period of 10 years


approx.

The system should accept All payment modes: Credit, Debit, Smart
Cards, ETC / RFIDs (Monthly Pass and Pre-Paid Cards)

Collection of cash from the every toll booths every 1 hour during peak
hours and every 4 hrs during off-peak hours.

The CCTV Cameras should capture all vehicles Number plate.

Tender change to customers.

PROPOSED
SOLUTIONS

Toll Lane Standards

Hydraulic Lane Managers

This would help manage Lane Traffic & Lane Jumping


effectively during peak hours.

Dedicated Short Range


Communication Technology
(D.S.R.C.)

ALTERNATE
SOLUTION

Smart Tags linked via Bank Accounts


Smart

Tags are assigned to vehicles

Cameras

will record passage through Toll Plaza

Toll

deduction conducted automatically & dynamically through Virtual


Wallets

Incase

Payment not received, Physical Letter sent to the Vehicle


Owners Address.

Toll Gate without Barrier


Smart

Incase

Tags will be used to Collect the payment of Toll

the users Smart Card is running out of currency, automated


letter are sent to the Drivers.

ESTIMATED COST

Particulars

No Of
Lanes

Reader Unit

1,00,000

12

Electronic Tag 5.8 Ghz.

500

50,000

CCTV Camera

10000

12

Electric Powered Hydrolic Gates

9,00,000

na

Sub Total

CCTV Recorder

ETC Server & S/W System

Total

Total
1200000
25000000
120000
9,00,000
2,72,20,000

1,00,000
4,00,000
2,77,20,000

THANK YOU !