Vendor: M/s, Dynamic SS Engg.

Item: Electric Gantry Str for Slewing Stacker, MKD NO:D ,


Drg.NO: 012117-M-BM-EQ-GA-3124,R-1
1)
2)
3)
4)
5)

Dimensions for Assy Found satisfactory


Assy Level checked and found 6 mm
NDT for all Butt joints (UT,MPI) not done
E-Gantry Supporting Leg not fitted with Assy.
E.P Preparation (V Groove) not made for all connecting members

6) Gap Between ISMC and MB joints found about 5 mm at full penetration


Site joints

7) Approval to be obtained for Joint orientation for IT No:49,50


8) Bend noticed on It No:49 to be removed
9) Leftover welding, Visual works to be done
Conclusion: Assy can be dismantled after completion of above points.

Drg. No: 013074-M-BM-EQ-GA-4203, R-0


Item: Buffer Mounting Arrangement for 4 wheel bogies, Qty-3 Nos
1) Inline of bore marking checked with water column and found satisfactory.
2) Dimensions 405 (bogie connecting point) found 400 to 401 to be rectified
prior to machining.
3) As per Drg.It No: 8 stated as HOLD whereas the item was welded and
drilled with main item. Confirm the same with LT-Engg.
4) Other dimn. Found satisfactory
5) Visual work to be completed

Drg. No: 6059, R-0


Item: Tubular Drive shaft, Qty-6 Nos
1) Deep arc strike noticed on the Pipe

2) Weld joint between Pipe with end shaft to be checked w.r.t Category -C
3) Other dimensions found satisfactory.
4) Visual work to be completed