Drilling
26-04-2005
10:33
Pagina 27
Two fixed steam heaters (4 MMBTU each) plus two portable steam heaters (252,000 Kcal/hr each)
and two TIOGA burners (1.2 MMBTU each), enclosed areas rig substructure, rig floor, engines,
mud pumps, mud tanks, choke manifold, racking board
DRILLING EQUIPMENT
DRAWWORKS
IDECO E 2100 (max input 2,000 hp) driven by two GE 752 R 1,000 hp electric motors,
complete with Elmagco 7040 auxiliary electrical brake
Drilling line 1 3/8 breaking strength 87.1 tons
MUD PUMPS
Three NATIONAL 12-P-160 triple, each driven by two GE 752R 800 hp el. motors
MUD SYSTEM
SOLID CONTROL
One Double Scalping shale shaker BRANDT dual tandem plus two single shale shakers DERRICK FLC 2000
BOP SYSTEM
29 1/2
18 3/4
13 5/8
annular diverter
annular bag preventer
ram preventer single
ram preventer double
annular bag preventer
single ram preventer
double ram preventer
HYDRIL MSP
CAMERON DL
CAMERON TL
CAMERON TL
HYDRIL GK
CAMERON U
CAMERON U
500
5,000
5,000
5,000
5,000
10,000
10,000
PSI
PSI
PSI
PSI
PSI
PSI
PSI
CAMERON 4 1/16 10,000 x 5,000 PSI with one power choke valve 3 1/16 10,000 PSI
and one manual choke valve 3 1/16 10,000 PSI
DP
5 O.D.
3 1/2 O.D.
4,000
3,000
3,500
3,500
m
m
m
m
grade
grade
grade
grade
G105
S135
S135
G105
19.50#
19.50#
15.50#
15.50#
POWER
(for total 4,200 hp installed)
Five CAT D 399 diesel engines each driving one Kato 1,500 KVA electric generator
TOP DRIVE
VARCO IDS-1, 500 tons x 5,000 PSI, driven by one GE 752HT electric motor,
max output torque 40,700 lbs at 180 RPM
ROTARY TABLE
IDECO LR-375 (37 1/2 opening) independent unit driven by one GE 752R electric motor
MAST
PYRAMID 142 plus 30 raised floor cantilever mast of 1,000,000 static hook capacity
with twelve lines to travelling block
SUBSTRUCTURE
CROWN BLOCK
PYRAMID with seven 60 sheaves grooved for 1 3/8 O.D. drilling line
TRAVELLING BLOCK
VARCO integrated travelling block load rating tons 450 with six 60 sheaves
02.05
CHOKE MANIFOLD
One
One
One
One
One
One
One