CLIENT

THE HASHEMITE KINGDOM OF JORDAN

AS SAMRA WASTE WATER TREATMENT PLANT


EXPANSION BOT PROJECT
AUTHORITY ENGINEER

PROJECT COMPANY

SAMRA WASTEWATER TREATMENT PLANT COMPANY LTD


CONSORTIUM

Civil Guide Drawing PHASE 2

PRIMARY SETTLING TANK

Openings and concrete blocks list

ALL RIGHTS RESERVED FOR ALL COUNTRIES

SIZE
A4

NOT TO SCALE

DATE

DRAWN UP

CHECKED

APPROVED

CONTRACT NUMBER

29/8/2012

T.RAJESH

JF GUEUDET

C GUIGNARD

B-000131

REVISION VERSION

STATUS

ISSUER

ZONE

LINE

DGT

242

TYPE

SUBJECT

DG CW

NUM

APPENDIX

001

IFI

AS SAMRA WASTE WATER TREATMENT


PLANT
EXPANSION BOT PROJECT

PRIMARY SETTLING TANK

NOTA

AREA 242

25/01/2013

ISSUE OF PHASE 2 CIVIL GUIDE DRAWING

T.RAJESH

JF GUEUDET C GUIGNARD

7/11/2012

ISSUE FOR IMPLEMENTATION

T.RAJESH

JF GUEUDET C GUIGNARD

29/8/2012

FIRST ISSUE

T.RAJESH

JF GUEUDET C GUIGNARD

Rev

Date

Aim of revision

Issued by

CONTRACT N

LIST N :

Date

B-000131

DGT-242-0-DG-CW-001

29/8/2012

Checked by

Revision
C

Apporved by

Page
2/7

AS SAMRA WASTE WATER TREATMENT PLANT


EXPANSION BOT PROJECT

PRIMARY SETTLING TANK

NOTA

AREA 242

REFERENCE DRAWINGS :

DGT-242-0-DG-CW-002

PRIMARY SETTLING TANK - TOP PLAN VIEW

DGT-242-0-DG-CW-003

PRIMARY SETTLING TANK - PLAN VIEW AT LVL.


580.47

DGT-242-0-DG-CW-004

PRIMARY SETTLING TANK - DETAILS 1 & 2

DGT-242-0-DG-CW-005

PRIMARY SETTLING TANK - DETAILS 3 & 4

DGT-242-0-DG-CW-006
DGT-242-0-DG-CW-007

PRIMARY SETTLING TANK - DETAILS 5,6,7,8,9 &


10
PRIMARY SETTLING TANK - SECTION A-A,B-B,CC,D-D & E-E

Civil Guide Drawing -PHASE -1 PRIMARY SETTLING TANK - SECTION 1-1 TO 9-9

IDENTIFICATION SYSTEM :

MARK

R01

SERIAL NUMBER ( 01 to 99 )
TYPE

IDENTIFICATION TYPE
R

CIVIL WORKS HOLES

ELECTRICAL HOLES

ACCESS HOLES

CONCRETE BASES

GENERAL NOTES ;
1 - ALL LEVELS DIMENSIONS ARE IN METERS
2 - HOLES DIMENSIONS ARE IN mm
3 - EXCEPT AS NOTED, ALL SEALINGS ARE WATERTIGHT
4 - * ; TO BE CONFIRMED
5 - "CW" ON THE CIVIL DRAWING MEANS "CIVIL WORKS"
6 - MAXIMUM DIFFERENTIAL SETTLEMENT BETWEEN ANY TWO POINTS OF A GIVEN UNIT SEPARATED BY DISTANCE (L) 1 / 300 < 30mm
( 1 / 300 th OF THE DISTANCE BETWEEN THEM)
DIFFERENTIAL SETTLEMENT BETWEEN TWO UNITS < 30 mm
7 - GROUND LOCAL CONDITIONS (GEOLOGIE, EARTHQUAKE CRITERIA, AND OTHERS CONDITIONS) TO BE DETERMINED BY CIVIL WORKS CONTRACTOR.

CONTRACT N

LIST N :

DATE

REVISION

PAGE

B-000131

DGT-242-0-DG-CW-001

29/8/2012

3 / 7

AS SAMRA WASTE WATER TREATMENT PLANT


EXPANSION BOT PROJECT

PRIMARY SETTLING
TANK

R - CIVIL WORKS HOLES

AREA 242

A : BOXOUT WITH SMOOTH FINISHING


Type A

Type B

Type C

Type D

B : BOXOUT TO BE STOPPERED AFTER EQUIPMENT INSTALLATION, WITHOUT


WATERTIGHT SEALING
C : BOXOUT TO BE STOPPERED AFTER EQUIPMENT INSTALLATION, WITH WATERTIGHT
SEALING
D : EMBEDDED PIPE WITH WATERTIGHT SEALING

REV.

MARK

Qty

DIMENSIONS

DESCRIPTION

LEVEL

TYPE

CL 575.81

WxH

R01

2150x2150

ND 1800 INLET PIPE FROM DISTRIBUTION STRUCTURE

R02

42

200x200

OPENING FOR WATER INLET

R03

12

500x850

OUTLET CHANNEL OPENING

R04

2150x2150

ND 1800 OUTLET PIPE TO DISTRIBUTION STRUCTURE

CL 575.58

R05

1900x1900

ND 1500 PIPE TO BY PASS PIT

CL 575.66

R06

1900x1900

ND 1500 PIPE TO BY PASS PIT

CL 575.66

R07

1900x1900

ND 1500 PIPE TO BY PASS PIT

CL 575.43

CL 571.595

BOTTOM LVL.
579.40
BOTTOM LVL.
579.70

A
A

R08

1900x1900

ND 1500 PIPE FROM BY PASS PIT TO EXISTING BY


PASS CONNECTING PIT

R09

650x650

ND 400 PIPE FOR SCUM OUTLET FROM TANK

BELOW SLAB*

R10

600x600

ND 350 PIPE FOR PRIMARY SLUDGE EXTRACTION

CL 576.09

R11

DIA 100

FOR PENSTOCK SPINDLE

TOP SLAB
581.59

R12

1900x1900

ND 1500 PIPE TO BY PASS PIT

CL 575.43

R13

300x300

ND 200 PIPE TO PRIMARY SLUDGE INLET CHAMBER

ON SLAB 581.44

R14

200x200

R15

550x550

R16

100x100

ND 100 ODOUR CONTROL PIPE IN PRIMARY SETTLING


ON SLAB 581.44
TANK OUTLET CHANNEL
ND 400 PIPE FROM DRAINAGE PUMPING STATIONON SLAB 581.44
370A
ND 40 SERVICE WATER PIPE FROM NETWORK

B
B

ON SLAB 581.44

CONTRACT N

LIST N :

DATE

REVISION

B-000131

DGT-242-0-DG-CW-001

29/8/2012

PAGE
4

AS SAMRA WASTE WATER TREATMENT PLANT


EXPANSION BOT PROJECT

PRIMARY SETTLING
TANK

E - ELECTRICAL HOLES

AREA 242

A : BOXOUT WITH SMOOTH FINISHING


Type A

Type B

Type C

Type D

B : BOXOUT TO BE STOPPERED AFTER EQUIPMENT INSTALLATION, WITHOUT


WATERTIGHT SEALING
C : BOXOUT TO BE STOPPERED AFTER EQUIPMENT INSTALLATION, WITH WATERTIGHT
SEALING
D : EMBEDDED PIPE WITH WATERTIGHT SEALING

REV.

MARK

Qty

DIMENSIONS

DESCRIPTION

LEVEL AXIS

TYPE

WxH

CONTRACT N

LIST N :

DATE

REVISION

B-000131

DGT-242-0-DG-CW-001

29/8/2012

PAGE
5 / 7

AS SAMRA WASTE WATER TREATMENT PLANT


EXPANSION BOT PROJECT

PRIMARY SETTLING
TANK

T - ACCESS HOLES FIXED TO CIVIL WORKS

AREA 242

A : CHECKERED PLATE HATCH


Type A

Type C

Type B

B : GRATING HATCH
C : CONCRETE SLAB HATCH

REV.

MARK

Qty

DIMENSIONS

DESCRIPTION

SLAB LEVEL

TYPE

WxL
MANHOLE FOR CHAMBER,PIT & CHANNEL WITH ANTI
ON SLAB 581.44
FALLING BARS

T01

1000x1000

T02

450x1950

FOR PENSTOCK HANDLING

ON SLAB 581.59

T03

450x1640

FOR STOPLOG HANDLING

ON SLAB
581.44

T04

800x800

FOR ELECTRICAL PIT

SEE DWG

CONTRACT N

LIST N :

DATE

REVISION

B-000131

DGT-242-0-DG-CW-001

29/8/2012

PAGE
6 / 7

REV.

MARK

Qty

DIMENSIONS

AS SAMRA WASTE WATER TREATMENT PLANT


EXPANSION BOT PROJECT

PRIMARY SETTLING TANK

M - CONCRETE BASE

AREA 242

DESCRIPTION

STATIC LOAD

DYNAMIC LOAD

daN

daN

WxLxH

CONTRACT N

LIST N :

DATE

REVISION

B-000131

DGT-242-0-DG-CW-001

29/8/2012

PAGE
7 / 7