You are on page 1of 2

_______________________________________________________________________

Checklist for CMTS Visual Inspection


Date & Time
Name
Name of Engineer
Venue

Normal performance indicators


Sl #
1

Description

Yes/ No

Remarks

CMTS Status
- Power supply LED Input OK green
- Power Supply LED output OK
Green
- Sys stat LED is green
- Power ok LED is green
- DS0 or DS1 back panel green (port
which is connected with cable to be
monitored)
- US0 US7 on the back panel green
(only the ports which are connected
with cable should be monitored)
- GIGE Port link should be green for
ports connected.

________________________________________________________________________
On-site checklist for HCL On-site team to support CWG 2010

_______________________________________________________________________

Front view of the CMTS


Upstream= US0 ---US7
DownStream = DS0 ,DS1

CMTS Rear view

________________________________________________________________________
On-site checklist for HCL On-site team to support CWG 2010

You might also like