Part A (10x2 20) : M.E. Mechanical Engineering Advanced Operations Research
Part A (10x2 20) : M.E. Mechanical Engineering Advanced Operations Research
MECHANICAL ENGINEERING
ADVANCED OPERATIONS RESEARCH
PART A
(10x2=20)
Answer all the questions
(5x16=80)
Answer all the questions
(OR)
14) The daily production schedule at the Rainbow company includes batches of white(W),
yellow(Y), red (R), and black (B) paints . The production facility must be cleaned
between successive batches which is given as below
15) JOBCO manufactures two products on two machines. A unit of product 1 requires 2
.hours on machine 1 and 1 hour on machine 2. For product 2, one unit requires 1 hour on
machine and, 3 hours on machine 2. The revenues per unit of products 1 and 2 are $30
and $20, respective; The total daily processing time available for each machine is 8
hours.
(OR)
16) Determine the critical path for the project network in Figure
17) A Company needs to determine the optimal replacement policy for a current 3-year-old
machine over the next 4 years (n= 4).A 6-year-old machine must be replaced. The cost of
a new machine is $100,000. The following table gives the data of the problem.
(OR)
18) Acme Manufacturing produces two products. The daily capacity of the manufacturing
process is 430 minutes. Product 1 requires 2 minutes per unit, and product 2 requires 1
minute per unit. There is no limit on the amount produced of product 1, but the maximum
daily demand for product 2 is 230 units. The unit profit of product 1 is $2 and that of
product 2 is $5. Find the optimal solution by DP.
20)