You are on page 1of 1

MACAWBER BEEKAY PVT. LTD.

BRANCH OFFICE :

KB 25, 4th. Floor


SECTOR III, Salt Lake City
Kolkata 700 098

JOINT VENTURE WITH


CLYDE BERGEMANN MATERIALS HANDLING LIMITED, U.K.

FAX
: +91-33-2335-4164
PHONE : +91-33-2335 4162, 4163

e-mail : Aloke.Banerjee@mbl.in
Website :www.mbl.in

TRANSMITTAL FOR DRAWING & DOCUMENT


To
M.N. Dastur & Co. (P) Ltd. (Dasturco)
Consulting Engineers
`Engineering Centre
480, Anna Salai, Nandanam
Chennai 600 035

Date: 22/01/2010
Our Ref.:C-961/KOL/1.3/40/6848

Kind Attn.: Mr. T. Mahendran, Project Manager


Subject:

Approval of Drawings for AHP m& LCS for 2x135 MW TPP of SEPL at Tamminapatnam,
SPSR Nellor, AP

Your Ref.:

LOI NO. MPL/MBL/AHP-LCS/09-10/007, Dt. 17/06/2009

We are enclosing herewith four (6) copies each of the following drgs/doc.
for the above mentioned project for your under mentioned action.
Action Code

A.

Review and Comments

D.

Memo Attached

B.

Preliminary Planning

E.

Reference and Records.

C.

Approval

F.

Released for Construction / Fabrication

S.No.

Drawing / Doc. No.

Rev

138 SFJ-0900D/G/CM

01

Title
F.C. Steel Gate Valve, CL.800 (Make: Leader)

135 FNP-0900D/G/CM

01

QA/AS/157/01

01

Qty. Code
6

Cast Iron Gate Valve CL-125 (Make: Leader)

Quality Assurance Plan for Leader Valves

For MACAWBER BEEKAY PVT. LTD.


Aloke K. Banerjee
General Manager (Project)

Cc : Mr. G. Balaji Divakar, GM (Energy Divn) / Mr. Raja Rao, GM (Projects) 8 Set each
Madhucon Projects Limited (MPL)
Greenlands Madhucon
th
6-3-866/2, 5 . Floor, Begumpet
Hyderabad 500 016

Encl: As above.

Kindly accord your approval and return us one copy of the above drg./ doc. duly stamped, for our record
& necessary action.
REGD. OFFICE : BEEKAY HOUSE, L-8, GREEN PARK EXTN., NEW DELHI 110 016, INDIA
PHONE : +91-11-4222 4222 FAX : +91-11-4222 4333, 4222 4444 Website : www.mbl.in
IN COLLABORATION WITH
Company

C LYDE U.K.

An ISO 9001

You might also like