LAHORE ELECTRIC SUPPLY COMPANY LIMITED

TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: BANK GUARANTEE IN LIEU OF CASH PAYMENT OF SECURITY


CHARGES RS. 68,434,400/- IN RESPECT OF MUGHAL STEEL 17-KM
SHEIKHUPURA ROAD LAHORE

Ref: Your letter 12-10-2012.


Beneath
It is intimated that subject consumer was advised vide this office letter No.
3503-07 dated 25-9-2012 to furnish Bank Guarantee from only those Banks which are on
the approved list of LESCO.

As name of your Bank Branch not exists on the approved list of LESCO,
hence original Bank Guarantee received vide your memo under reference is returned
herewith being not acceptable.

DA / Original Bank Guarantee


Chief Engineer (P&D)
( Engr. Navid Mumtaz)

To: Manager Trust Investment Bank Ltd.


6th Floor M.M. GTower, 28-A/K Gulberg-II, Lahore.

Info: 1. M/s Mughal Steel 17-KM Sheikhupura Road, Lahore.


2. Master file.

No.___________/DRW/174/Ist Dated_____/11/2012

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: # 99204820 – 30, Ph: 99204818 FAX: 99204819
E-mail: srmanpd@lesco.gov.pk

Subject: IMPLEMENTATION OF WAFAQI MOHTASIB FINDINGS IN


COMPLAINT NO. L/2275/2009

Reference: Your office letter No. 4651-52 dated 20-11-2012.

In this regard please refer to this office letter No. 5393-94 dated 7-11-2012
vide which you have already been directed to implement the Orders / Decision of
Honourable President of Pakistan and connections be processed as per usual practice.
The needful may be done accordingly.

Chief Engineer (P&D)


(Engr: Navid Mumtaz)

To: Addl. Manager/XEN RaviRoad,


Division, LESCO.

Info: 1. Manager (Op.) Northern Circle LESCO.


2. Master file.

No.__________/DRW/1383/LESCO Dated______/11/2012

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: APPROVAL FOR PURCHASE OF NEW HT PANEL IN THE NAME


OF AYESHA TEXTILE UNIT NO. 2 REF. NO. 27/11631-2108400
SANCTIONED LOAD 2963 KW TARIFF B-3 FAISALABAD ROAD
SHEIKHUPURA

Reference: Your letter No. 18406-07 dated 5-8-2012

As directed by worthy CEO LESCO, particulars of existing panel may


please be provided to this office to proceed further.

Chief Engineer (P&D)


(Engr. Navid Mumtaz)

To: Manager (Op.) Sheikhupura Circle LESCO.

Info: 1. DM (O) Rural Divn. LESCO Sheikhupura for necessary action as above.
2. Master file.

No.___________/DRW/25/Skp. Dated____/11/2012

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: VERIFICATION OF APPROVAL / SUB-DIVISION OF S.A GARDEN


HOUSING SCHEME G.T ROAD KALA SHAH KAKU TEHSIL
FEROZWALA D ISTT SHEIKHUPURA.

Photocopy of approval letter issued by your office vide No. TO/(P&C) 378
dated 19-05-04 alongwith approved layout plan of the subject Housing Scheme is sent
herewith. Please check your record and confirm authenticity / genuiness of the requisite
documents to proceed further.

DA – As above Chief Engineer (P&D)


(Engr. Ehsan Elahi)

To: Town Officer (Planning & Coordination)


TMA Ferowala, Distt Sheikhupura.

Info: 1. District Coordination Officer Sheikhupura with the request to direct officer
concerned to confirm the genuiness of documents as mentioned above
(copies enclosed).

2. Master file.
DA – As above (Sr. No.1)

No._____________/DRW/1278/LESCO Dated_______/04/2010.

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: 22.5-K LAND FOR GRID STATION IN OPF HOUSING SCHEME


RAIWIND ROAD, LAHORE.

Enclosed please find herewith a copy of layout plan of the Society duly
marked the land as offered by M/s OPF, for proposed Grid Station in OPF Housing
Scheme Raiwind Road, Lahore. It is requested that LESCO Siting Board may visit the site
and finalize the land of grid station to proceed further.

DA – As above Chief Engineer (P&D)


( Engr. Ehsan Elahi )

To: General Manager (Operation) LESCO,


LESCO HQ, Lahore.

Info: 1. M/s Regional Head (Punjab) OPF, 33-P Model Town Extension, Lahore
with reference to their letter No.OPF/5412/HD/ELECT/RR/1258 dated
25-03-2010 to coordinate with LESCO Siting Board to proceed further.

2. Master file.

No.___________/P&D/DRW/30/LESCO Dated____/4/2010

Hamid / Dak-h6
Subject: EXTERNAL ELECTRIFICATION OF SADIQ COLONY HOUSING
SCHEME, G.T ROAD, OKARA.

Reference: 1. This office letter No. 28750 dated 23-01-2010.


2. Your letter No. Sadiq Colony HS/Okara/02 dated 19-02-2010.

With reference to your letter referred above, it is observed that since there is
change in layout plan of already approved in 1976 so sponsor may be advised to got fresh
approval on revised layout plane from TMA Okara to proceed further into the matter.

Chief Engineer (P&D)


( Saleem Akhtar )

To: M/s Power Com Consultants,


Suit No. 1 Ist Floor Khurram Shopping Centre,
Wahdat Road, Lahore.

Info: 1. Sh. Muhammad Shafiq, Sponsor of Sadiq Colony Housing Scheme, G.T.
Road, Okara.
2. TMA Okara..

No.____________/P&D/DRW/162/LESCO Dated____/2/2010
Hamid / Dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: TRANSFER OF LAND FOR PROPOSED 132 KV SADHOKI GRID


STATION IN AUDIT & ACCOUNTS EMPLOYEES COOP.
HOUSING SOCIETY LTD.

Reference: 1. Legal Director letter No.6934-35 dated 29-05-2007.


2. This office letter No. 2433-35 dated 5-7-2007.
3. This office letter No. 5055-56 dated 8-09-2008.
4. Your letter No.JES/AACHS/LESCO/35 dated 30-01-2010.

With reference to above mentioned letters at Ref-1,2&3, in order to proceed


further into the matter, the land allocated for grid station measuring 10-Kanals &
16-Marlas may be got transferred in favour of LESCO through registered sale deed.
Simultaneously remaining 21-Kanals & 4-Marlas may also be got allocated and
transferred on priority.

Chief Engineer (P&D)


( Saleem Akhtar )

To: M/s Jansons Engineering Survives,


IEP Building Liberty
Roundabout Gulberg-III, Lahore

Info: 1. Chief Engineer (Development) LESCO Lahore to get transferred the land
for grid station free of cost in favour of LESCO, take possession at site and
carry out load flow study of the above mentioned grid station.
2. Legal Director LESCO.
3. PD GSC LESCO, to provide copy of transferred deed if already executed,
otherwise proceed for transferring the land in favour of LESCO.
4. Dy. Manager Property Management Cell, LESCO.
5. President Audit & Accounts Cooperative Housing Society,
A.G. Punjab Office Complex, Lahore for necessary action as above.
6. Master File.

No.____________/P&D/DRW/162/LESCO Dated____/2/2010
Hamid / Dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF S.A. GARDEN HOUSING


SCHEME, KALA SHAH KAKU, TEHSIL FEROZEWALA, DISTRICT
SHEIKHUPURA (ULTIMATE DEMAND : 2338 KW – INDIVIDUAL
METERING).
Reference: 1. This office letter No.8345-52 dated 14-01-2011.
2. Your request dated 24-01-2011.

Before processing the case of private permission as requested in the above


referred letter, please proceed further as under:-

1. Cost of source feed line including dismantlement and Barqaab charges and cost
of grid end material to be executed by LESCO: Rs.51,92,612/- alongwith
inspection / supervision charges @ 1.5% which comes to be Rs.178,324/-may
be deposited with Finance Director LESCO.
2. Bank Guarantee equivalent to 25% amount of estimated cost which comes to be
Rs.29,72,070/- from a scheduled bank may be furnished.
3. An undertaking on stamp paper of Rs.100/- duly attested by Oath
Commissioner / Notary Public, may be submitted as requested vide above
referred letter given at Ref-1.

Chief Engineer (P&D)


(Engr. Aziz-ur-Rehman)
To: M/s F Housing Scheme,
Kala Shah Kaku, Tehsil Ferozewala
Disst Sheikhupura
Info: 1. Finance Director LESCO. On payment of Rs.51,92,612/-, the amount may
be transferred as mentioned below through credit advices whereas
inspection/supervision charges Rs.178,324/- may be kept in LESCO income
account under intimation to this office.
(i) Sr. Manager (Construction) LESCO =Rs. 47,75,046/-
(ii) SE/ Manager (GSO) LESCO =Rs.417,566/-
2. Sr. Manager (Construction) LESCO
. 3. Manager/SE GSO LESCO.
4. M/s Hamza Engineers, 139-A/F Raja Centre Main Market Gulberg-II,
Lahore.
5. Master file.
No.___________/ P&D/DRW/1268 Dated____/02/2011

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF S.A. GARDEN HOUSING


SCHEME, KALA SHAH KAKU, TEHSIL FEROZEWALA, DISTRICT
SHEIKHUPURA (ULTIMATE DEMAND : 2338 KW – INDIVIDUAL
METERING).
Reference: 1. This office letter No.1415-25 dated 25-02-2010
2. Your request dated 01-03-2010.

Before processing the case of private permission as requested in the above


referred letter, please proceed further as under:-

3. Cost of source feed line, cost of shifting of existing line including


dismantlement and Barqaab charges and cost of grid end material to be
executed by LESCO: Rs.87,09,141/- alongwith inspection / supervision charges
@ 1.5% which comes to be Rs.365,744/-may be deposited with Finance
Director LESCO.
4. Bank Guarantee equivalent to 25% amount of estimated cost which comes to be
Rs.60,95,731/- from a scheduled bank may be furnished.
3. An undertaking on stamp paper of Rs.100/- duly attested by Oath
Commissioner / Notary Public, may be submitted as requested vide above
referred letter given at Ref-1.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)
To: M/s Al-Rehman Garden Housing Scheme,
Near Faizpur Interchange Sharqpur Road,
Tehsil Faizpur Disst Sheikhupura

Info: 1. Finance Director LESCO. On payment of Rs.87,09,191/-, the amount may


be transferred as mentioned below through credit advices whereas
inspection/supervision charges Rs.365,744/- may be kept in LESCO income
account under intimation to this office.
(i) Sr. Manager (Construction) LESCO =Rs.82,29,475/-
(ii) SE/ Manager (GSO) LESCO =Rs.479,666/-
2. Sr. Manager (Constructio
n) LESCO.
3. Manager/SE GSO LESCO.
4. M/s Hamza Engineers, 139-A/F Raja Centre Main Market Gulberg-II,
Lahore.
5. Master file.
No.___________/ P&D/DRW/1187 Dated____/03/2010

Hamid / dak-h4

LAHORE ELECTRIC SUPPLY COMPANY LIMITED


TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: DEPOSIT WORK OF STREET LIGHT CONNECTIONS AT


PUNJAB INDUSTRIAL ESTATE AND DIFFERENCE IN COST
ESTIMATE.

Enclosed please find herewith a copy of CEO, Punjab Industrial Estate letter
No. CEO/PIE/1801 dated 17-02-2010, which is self-explanatory and report the status of
execution of work under intimation to this office.

DA – As above Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Sr. Manager Construction LESCO

Info: 1. M/s Punjab Industrial Estate, Ist Floor, Saudi Pak House, 14 Egerton Road
Lahore to pursue the matter with Sr. Manager Construction LESCO.

2. Master file.

No.___________/P&D/DRW/309-2nd Dated____/03/2010.

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: TRANSFER OF LAND ALLOCATED FOR GRID STATION IN


FAZAIA HOUSING SCHEME RAIWIND ROAD, LAHORE
(PROJECT OF PAKISTAN AIR FORCE)

Reference: 1.This office letter No. 26050-55 dated 13-11-2009.


2. M/s Fazaia Housing Scheme letter No.FHSL/5723/1 dated 10-02-10.

A copy of ‘Fard Malkiat’ after mutation (Intiqaal) in favour of LESCO


received from the Sponsor of subject Housing Scheme vide above referred letter, is sent
herewith for onward submission to Property Management Cell LESCO.
The possession of land and construction of boundary wall may please be
ensured immediately. Moreover sign board for the proposed 132 kV grid station may also
be displayed at significant place at the proposed site under intimation to this office.
Please carryout necessary load flow study as the sponsor has repeatedly
requested for construction of said grid station on priority.

DA – As above Chief Engineer (P&D)


(Engr. Ehsan Elahi)

To: Chief Engineer (Development) LESCO.


Info: 1. PD (GSC) LESCO.
2. Legal Director LESCO.
3. Manager Civil Work Divn. LESCO.
4. DM, Property Management Cell LESCO.
5. DM Civil Works Divn. LESCO.
6. LAC LESCO O/O PD, GSC LESCO, 34-Industrial Area Gulberg-III,
Lahore for necessary action as above.
7. M/s IN Consultant (Pvt) Ltd 80-Aurangzaib Block, New Garden Town,
Lahore.
8. M/s Fazaia Housing Scheme, Raiwind Road, Lahore.
9. Master file.
No.______________/DRW/1141/LESCO Dated______/03/2010
Hamid / Dak-h6.
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF IQRA CITY HOUSING


SCHEME PATTOKI DISTT KASUR (ULTIMATE DEMAND: 134.2
KW – INDIVIDUAL METERING)

Reference: 1. This office letter No. 2642-49 dated 15-08-2008.


2. Your request dated 23-02-2010.

While acceding your request, the Competent Authority has allowed to


deposit the revised capital cost at fresh rates which comes out to Rs.15,44,810/- (Rupees
fifteen lac forty four thousand eight hundred and ten only) and difference of design
vetting charges Rs.1774/- (Rupees one thousand seven hundred and seventy four only).
The amounts as mentioned above may please be deposited with Finance Director LESCO
immediately under intimation to this office.

All other terms and conditions of technical clearance given at Refernce-1 will
remain intact.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Sponsor, Iqra City Housing Scheme,


Pattoki, Distt Kasur.

Info: 1. Finance Director LESCO. On payment, the capital cost: Rs.15,44,810/- may
be transferred to Sr. Manager Construction while difference of design
vetting charges Rs.1774/- may be kept in LESCO Income account under
intimation to this office.
2. Sr. Manager Construction LESCO.
3. M/s Hamza Engineers, 139-A/F Raja Centre Main Market Gulberg-II
Lahore.
4. Master file.
No._____________/DRW/1191/LESCO Dated______/02/2010.
Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF GREEN VIEW HOMES


1-KACHA JAIL ROAD, KOT LAKHPAT, LAHORE (ULTIMATE
DEMAND: 264 KW – INDIVIDUAL METERING)

Reference: 1. This office letter No. 14596-601 dated 05-03-2009.


2. GM (O) PEPCO letter No. 4088-89/GMO/CE(O)/DHQ dated:26-11-09.

Payment of capital cost: Rs.14,28,519/- (Rupees fourteen lac twenty eight


thousand & five hundred nineteen only) alongwith difference of design vetting charges
Rs.3801/- (Rupees three thousand eight hundred one only) is still awaited, which may
please be deposited with Finance Director LESCO immediately under intimation to this
office otherwise approval given at reference-1 will be withdrawn.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Sponsor, Green View Homes,


1- Kacha Jail Road, Kot Lakhpat, Lahore.

Info: 1. Finance Director LESCO. On payment of capital cost:


Rs.14,28,519/- may be transferred to Sr. Manager Construction while
difference of design vetting charges Rs.3801/- may be kept in LESCO
Income account under intimation to this office.
4. Sr. Manager Construction LESCO.
5. M/s Orion Consultants, 25-Peshawar Block, Fortress Stadium, Lahore Cantt
6. Master file.
No._____________/DRW/1132/LESCO Dated______/2/2010

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

REMINDER-I

Subject: UNDERGROUND EXTERNAL ELECTRIFICATION


DISTRIBUTION SYESTEM OF TRICON VILLAGE HOUSING
SCHEME NEAR JUBILEE TOWN UBD CANAL LAHORE
(ULTIMATE LOAD: 2012.2 KW)

Reference: 1. This office letter No.28165-66 dated 12-1-2010.


2. This office letter No.1051-52 dated 15-02-2010.

As already requested vide above referred letters, renewed Bank Guarantee


of Rs.81,44,166/- against your post dated cheque, has not yet furnished by you. Therefore
the same may be furnished to this office with in three days positively. Please fulfill your
commitment, After that LESCO may take its course as deemed fit without any further
notice.

Chief Engineer (P&D)


( Saleem Akhtar )

To: M/s Tricon Developers,


8-K Main Boulevard, Gulberg II, Lahore.

Info: 1. M/s Power Com Consultants, Suit No. 1 Ist Floor Khurram Shopping
Centre, Wahdat Road, Lahore for necessary action as above.
2. Master file.

No.___________/DRW/984/LESCO Dated____/02/2010
Hamid / Dak-h6
Subject: EXTERNAL ELECTRIFICATION OF RIVER EDGE HOUSING SCHEME
MOUZA SHAHPUR KANJRA 17-KM MULTAN ROAD LAHORE
(ULTIMATE DEMAND : 3658 KW – INDIVIDUAL METERING)

Reference: 1. This office letter No.1408-17 dated 22-07-2008.


2. This office letter No.28630-37 dated 22-01-2010.
3. F.D LESCO letter No. 1943-44 /FD/IOT/LESCO dated 08-02-2010.

Since Finance Director LESCO vide his letter given at Reference-3 has issued
Credit Advice of Rs.1,02,91,033/- in your favour; as such go-ahead signal is hereby issued for
execution of work as per approval letter given at Reference-1.

However out of Rs.1,02,91,033/- following amounts which were wrongly sent to


you may be transferred through IOT as mentioned below:

(i) Manager GSO LESCO. Rs.1,34,627/-(difference of cost of grid end material)


(ii) FD LESCO. Rs.40,216/- (difference of design vetting charges)
Rs.85,069/- (supervision inspection charges for material to
be privately purchased.)

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Sr. Manager Construction LESCO


Info:
1. Finance Director LESCO. On receipt of Rs.1,25,285/- from Sr. Manager Construction
LESCO, the same may be kept in LESCO Income Account.
2. Manager (O) Central Circle LESCO.
3. SE / Manager (GSO) LESCO.
4. DM (O) A.I. Town Divn. LESCO.
5. AM (O) Chung Sub-Divn. LESC|O.
6. M/s Power Com Consultants, Suit No. 1 Ist Floor Khurram Shopping Centre,
Wahdat Road, Lahore.
7. M/s River Edge Housing Scheme,135-E-1 Stadium Road, Gulberg-III, Lahore. He is
advised to submit POs for vetting by this office for the items to be privately
purchased.
8. Master file.
No._____________/DRW/1103/LESCO Dated______/02/2010

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

REMINDER

Subject: TRANSFER OF 32 KANAL LAND FOR GRID STATION IN LAKE


CITY HOUSING SCHEME RAIWIND ROAD LAHORE

Reference: 1. This office letter No. 27671-73 dated 29-12-2009.


2. This office letter No. 28728-30 dated 23-11-2010.

Sample draft of ‘Registration Deed’ of 32-kansls land for grid station at


Lake City Housing Scheme, Raiwind Road, Lahore was sent to your office for vetting and
early return to this office has not so far been received back in this office. The matter is
already delayed as the sponsor is pressing hard, P lease expedite the matter so that
Sponsors may be requested to provide ‘Registered Deed’ as per sample vetted by you
on non-judicial papers after getting the needful done by Revenue Department,
Government of Punjab.
Chief Engineer (P&D)
( Saleem Akhtar )

To: Legal Director LESCO

Info: 1. M/s Lake City Holdings (Pvt.) Ltd. ) with reference to your
Raiwind Road, Lahore. ) letter dated 04-02-10,
you ) are requested to
pursue the
7. M/s Power Com Consultants, Suit No. 1 ) matter with Legal Director
Ist Floor Khurram Shopping ) LESCO.
Centre, Wahdat Road, Lahore )
3. Master file.

No.____________/P&D/DRW/1024/LESCO Dated______/2/2010

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: NEW GENERAL SERVICE CONNECTION FOR FARM HOUSE IN


THE NAME OF MR. SULMAN KHALID BUTT AT VILLAGE
BARKA.

Reference: 1. Your letter No. 816-17 dated 03-02-2010.

The decision in this regard has already made by Competent Authority in a


similar nature case vide this office letter No 13866 dated 04-02-2009 also mention in your
letter under reference.
You are, therefore, advised to proceed in the light of above referred letter
under intimation to this office.

Chief Engineer (P&D)


( Saleem Akhtar )

To: Manager (O) Southern Circle LESCO.

Info: 1. Master file

No.____________/P&D/DRW/15145/5th Dated______/2/2010

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: NEW CONNECTION FOR 4000 KW LOAD OF M/S ZAIN STEEL MILLS
MOMANPURA SHEIKHUPURA ROAD FEROZEWALA DISTT.
SHEIKHUPURA

Reference: 1. This office letter No. 9267-75 dated 3-1-2011.


2. This office letter No. 1695-99 dated 8-3-2011.

Despite elapse of a period of about one year completion report and financial
closure of the subject work is still awaited from your end, which may please be supplied
to this office immediately so as to proceed further.

Chief Engineer (P&D)


LESCO Lahore

To: Sr. Manager Construction LESCO

Info: Master file.

No.___________/DRW/303/Ist Dated_____/02/2013

Hamid / Dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: RECOVERY OF 25% GRID SHARING COST FROM INDIVIDUAL


CONSUMERS / PLOT OWNERS IN NEW HOUSING SCHEMES

Audit Parties during the audit of various Sub-Divisions observed that 25 %


grid sharing cost is not being recovered from the individual applicants in New Housing
Schemes as per assessed load in the light of instructions of the department, which has
been seriously by the Chief Executive Officer LESCO.

You are, therefore, advised to instruct all DMs/AM (O) and concerned staff
under your administrative control to ensure recovery of 25% grid sharing cost from the
individuals applicants at the time of installation of connections according to assessed load
for which necessary instructions have already issued by this office vide No. 57868-86
dated 22-5-2001, 1808-15 dated 10-2-2005 & No. 9077-82 dated 9-6-2005 (copies
enclosed). Separate Registers in this regard may also be got maintained in all the Sub-
Divisions, which should be checked / inspected by the Senior Officers during the
inspection of concerned office. It may also be made clear to all concerned that strict
disciplinary action will be initiated against the concerned officials / officers found
responsible for less recovery of the grid sharing cost.

DA – As above General Manger (Technical)


( Sadr-ul-Huda)

To: All Mangers (Op.) LESCO.


Info: Master file.

No.____________/P&D/DRW/246/LESCO Dated______/1/2010
Hamid/ dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF SUKH CHAIN TOWN


OKARA BY PASS OKARA (ULTIMATE DEMAND: 640 KW –
INDIVIDUAL METERING)

Reference: 1. This office letter No. 14331-38 dated 02-03-2009.


2. GM (O) PEPCO letter No. 4088-89/GMO/CE(O)/DHQ dated:26-11-09.

Payment of capital cost: Rs.54,16,784/- (Rupees fifty four lac sixteen


thousand seven hundred eighty four only) alongwith difference of design vetting charges
Rs.11685/- (Rupees eleven thousand six hundred eighty five only) is still awaited, which
may please be deposited with Finance Director LESCO immediately otherwise approval
given at reference-1 will be withdrawn without further notice.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Ch. Muhammad Rustam Bhatti


& Muhammad Akram Bhatti,
Sponsors, Sukh Chain Town,
Okara By-pass road, Okara.

Info: 1. Finance Director LESCO. On payment of capital cost:


Rs.54,16,784/- may be transferred to Sr. Manager Construction while
difference of design vetting charges Rs.11,685/- may be kept in LESCO
Income account under intimation to this office.
8. Sr. Manager Construction LESCO.
9. M/s Power Com Consultants, Suit No. 1, Ist Floor Khurram Shopping
Centre, Wahdat Road, Lahore
10. Master file.
No._____________/DRW/1191/LESCO Dated______/1/2010

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 6308360 PBX: 6314616-20 (Ext.200)
E-mail: srmanpd@lesco.gov.pk

Subject: INTERLINKING FEEDING AT AWT HOUSING SCHEME (PHASE-I)


LAHORE

As intimated by Sr. Manager Construction LESCO, due to enhanced rates of


material, estimated capital cost of subject work has been increased from Rs.14,82,582/- to
Rs.23,38,017/-. Therefore difference of capital cost: Rs.855,435/- may please be deposited
in the account of Finance Director LESCO under intimation to this office.

Chief Engineer (P&D)


( Saleem Akhtar )

To: OIC Project,


AWT Housing Scheme (Phase-II)
Adda Plot Raiwind Road, Lahore.
P.O Thokar Niaz Baig Lahore 53700

Info: 1. Finance Director LESCO. On payment, difference of capital cost:


Rs.855,435/- may be transferred to Sr. Manager Construction through Credit
Advice under intimation to this office.

3. Sr. Manager Construction LESCO with ref. to his No. 4496-4501/PDC/LHR


dated 16-10-2009.

4. DM Construction South Construction Divn. LESCO

5. Master file.

No.__________/DRW/207/LESCO Dated______/1/2010
Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: TRANSFER OF 32 KANAL LAND FOR GRID STATION IN LAKE


CITY HOUSING SCHEME RAIWIND ROAD LAHORE

Reference: This office letter No. 27671-73 dated 29-12-2009.

Sample draft of ‘Registration Deed’ of 32-kansls land for grid station at


Lake City Housing Scheme, Raiwind Road, Lahore was sent to your office for vetting and
early return to this office has not so far been received back in this office. Please expedite
the matter so that Sponsors may be requested to provide ‘Registered Deed’ as per sample
vetted by you on non-judicial papers after getting the needful done by Revenue
Department, Government of Punjab.

Chief Engineer (P&D)


( Saleem Akhtar )

To: Legal Director LESCO

Info: 1. M/s Lake City Holdings (Pvt.) Ltd. )


Raiwind Road, Lahore. ) to pursue the matter
11. M/s Power Com Consultants, Suit No. 1 ) with Legal Director
Ist Floor Khurram Shopping ) LESCO.
Centre, Wahdat Road, Lahore )

3. Master file.

No.____________/P&D/DRW/1024/LESCO Dated______/1/2010

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: BANK GUARANTEE FOR MAINTENANCE OF UNDERGROUND


DISTRIBUTION NETWORK OF IQBAL AVENUE
COOPERATIVE HOUSING SOCIETY (PHASE-III) CANAL ROAD
NEAR MOUZA CHUNG LAHORE

Reference: 1. Your letter No. IACHS/58/4395 dated 29-12-2009.


2. This office letter No. 22326-31 dated 11-8-2009.
3. This office letter No. 23907-12 dated 16-9-2009.
4. This office letter No. 25560 dated 28-10-2009.
5. This office letter No. 27467-70 dated 23-12-2009.

As already requested from Reference 2 – 5, Bank Guarantee equivalent to


Rs.18.5 Millions regarding maintenance of underground distribution system of your
Housing Scheme for a period of 07 years duly vetted by Legal Director LESCO alongwith
a copy of Agreement executed by you for the said job may please be furnished to this
office in order to proceed further into the matter.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)
To: M/s Iqbal Avenue Coop. Housing Society Phase-III,
Near Shaukat Khanum Hospital Johar Town, Lahore
Info: Master file.
No.____________/P&D/DRW/920/LESCO Dated______/1/2010
Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: COMPLAINT NO. 4 DATED 7-10-2009 LODGED BY MR. SAID


MUHAMMAD BHATTI R/O 32/R-II M.A. JOHAR TOWN LAHORE
BEFORE THE CHIEF MINISTER SECRETARIAT PUNJAB LAHORE

Reference: DM (O) Township Divn. LESCO letter No. 21627-29 dated 29-10-2009

As requested in the above referred letter, the work of external


electrification of R, R-1, R-II, R-III and Q Blocks of Johar Town may be expedited.

Deputy Manager (Planning)


For Chief Engineer (P&D)

To: Director (EME ) LDA, Lahore

Info: Master file.

No.______________/DRW/64/LESCO Dated____/1/2010

Hamid/dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: BANK GUARANTEES FOR EXTERNAL ELECTRIFICATION OF


PHASE-1 OF AUDIT AND ACCOUNTS EMPLOYEES COOP. HOUSING
SOCIETY LTD. LAHORE (ULTIMATE DEMAND 8030 KW)

Enclosed please find herewith photocopies of 03 No. Bank Guarantees


received from the Sponsors of subject Housing Scheme for your valuable comments /
opinion on last paragraph of the Bank Guarantees.

DA – As above Chief Engineer (P&D)


( Engr. Saleem Akhtar )

To: Legal Director LESCO

Info: Master file.

No.___________/ P&D/DRW/162/LESCO Dated______/1/2010

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: LAND ALLOCATED FOR 132 KV GRID STATION KHAYABAN-E-AMIN


HALLOKI DEFENCE ROAD LAHORE

Reference: 1. Operation Director LESCO letter No. 2079-80 dated 11-1-2010.


2. Your office letter No.7405-07 dated 16-09-2009

The site sketch of the land included and excluded in the allocated land
because of 50-ft road planned of proposed 132 kV Grid Station in Khayaban-e-Amin
Housing Scheme may please be supplied to Operation Director LESCO as advised by him
in the above referred letter.

Chief Engineer (P&D)


( Saleem Akhtar )

To: PD, GSC LESCO

Info: 1. Chief Engineer (Development) LESCO Lahore with reference to above.


2. M/s Power Com Consultants, Suit # 1, First Floor, Khurram Shopping Centre,
Wahdat Road, Lahore
3. Master file.

No.______________/P&D/DRW/1037/LESCO Dated____/1/2010

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXECUTION OF WORK OF EXTERNAL ELECTRIFICATION OF


‘EDEN ABAD’ HOUSING SCHEME NEAR HALLOKI THROUGH
WAPDA APPROVED CONTRACTORS

Reference: Your letter No. JES/Edenabad/LESCO/01 dated 9-10-2009.


As already requested vide this office No. 25849-55 dated 5-11-2009, before
processing the case of private permission for execution of work of external electrification of
subject Housing Scheme through WAPDA approved Contractors, please proceed further as
under:-
5. Bank Guarantee (as per sample enclosed) equivalent to 25% amount of estimated cost
which comes to be Rs.58,47,560/-, valid for the entire period of completion of work,
may be furnished to this office.
6. Inspection / supervision charges @1.5% of the estimated cost which comes to be
Rs.350,854/- may be deposited with Finance Director LESCO
7. Cost and installation charges of 11 kV grid end panel and source feed line:
Rs.15,43,519/- may also be deposited with Finance Director LESCO.

Chief Engineer (P&D)


LESCO Ltd. Lahore

To: M/s Jansons Engineering Services,


IEP Building, Liberty Roundabout Gulberg-III, Lahore.
Info: 1. Finance Director LESCO. On payment, the amount may be transferred as
mentioned below through credit advices under intimation to this office.
(i) Inspection/supervision charges
Rs.350,854/- LESCO Income Account
(ii) Cost & installation charges of grid
End panel Rs.14,48,838/- Manager GSO LESCO
(iii) Cost of source feed line: Rs.94,681/- Sr. Manager Construction
2. Sr. Manager Construction LESCO
3. Manager / SE GSO LESCO.
4. Manager(O) Central Circle LESCO.
5. DM (O) Raiwind Divn. Lahore.
6. Chairman, Eden Housing Scheme (Pvt.) Ltd. Eden Towers M-3 82-E/1 Gulberg-
III, Lahore for necessary action as above.
7. Master file.

No.___________/DRW/1198/LESCO Dated______/1/2010
Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: 32-K LAND FOR GRID STATION IN DHA LAHORE EME SECTOR
MULTAN ROAD LAHORE

Enclosed please find herewith a copy of layout plan of the Society duly
marked the land for proposed Grid Station in DHA Lahore EME Sector Multan Road,
Lahore. It is requested that LESCO Siting Board may visit the site and finalize the land of
grid station to proceed further.

DA – As above Chief Engineer (P&D)


( Saleem Akhtar )

To: Operation Director LESCO,


LESCO HQ, Lahore.

Info: 1. M/s DHA Lahore EME Sector, Multan Road, Lahore with reference to their
letter No. 179/DHA-EME/CE (Civil) dated 6-1-2010 to coordinate with
LESCO Siting Board to proceed further.

2. Master file.

No.___________/P&D/DRW/228/LESCO Dated____/1/2010

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: UNDERGROUND EXTERNAL ELECTRIFICATION


DISTRIBUTION SYESTEM OF TRICON VILLAGE HOUSING
SCHEME NEAR JUBILEE TOWN UBD CANAL LAHORE
(ULTIMATE LOAD: 2012.2 KW)

Reference: 1. This office letter No. 28091-92 dated 9-1-2010


2. Your letter No. TD/LESCO/2010 dated 9-1-2010.

Since postdated cheque No. 0581452 dated 10-2-2010 for Rs.81,44,166/- of


Meezan Bank Ltd. Main Boulevard Gulberg, Lahore has been received in this office,
therefore old Bank Guarantee No. BOP/2008/508 dated 30-7-2008 is returned herewith in
original.

It is further added that renewed bank guarantee for the requisite amount
for the entire period of completion of work, as per sample already sent to you, may be
furnished to this office one week before the expiry of postdated cheque.

DA – As above Chief Engineer (P&D)


( Saleem Akhtar)

To: Mr. Asif Kamal,


CEO Tricon Developers,
8-K Main Boulevard Gulberg-II,
Lahore.
Info: 1. Finance Director LESCO
2. Master file.

No._______________/DRW/984/LESCO Dated____/1/2010
Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: UNDERGROUND EXTERNAL ELECTRIFICATION


DISTRIBUTION SYESTEM OF TRICON VILLAGE HOUSING
SCHEME NEAR JUBILEE TOWN UBD CANAL LAHORE
(ULTIMATE LOAD: 2012.2 KW)

Reference: Your office letter No. TD/LESCO/Admn./03/09 dated 23-12-2009.

The competent authority has agreed with your Option-II given in the above
referred letter. Therefore postdated cheque for the requisite amount till submission of
renewed Bank Guarantee may be furnished to this office, so that Old Bank Guarantee
could be returned.

This issues with the approval of Chief Executive Officer LESCO

Chief Engineer (P&D)


( Saleem Akhtar)

To: Mr. Asif Kamal,


CEO Tricon Developers,
8-K Main Boulevard Gulberg-II,
Lahore.
Info: 1. Finance Director LESCO
2. Master file.

No._______________/DRW/984/LESCO Dated____/1/2010
Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: PUNJAB PRIVATE HOUSING SCHEMES AND LAND SUB-


DIVISION RULES

Reference: Your office letter No. 4264-71/CE(O)/DHQ/6-B-Disco dated 14-12-2009.

Draft of Punjab Government regarding Private Housing Schemes and Land


Sub-Division Rules pertaining to electricity matter and land required for construction of
Grid Station has been examined and comments are as under:

(i) This policy covers all Housing Schemes irrespective of the area as such any
Housing Scheme not cover under this policy will be considered as illegal.

(ii) Legal protection has been provided for the land required for grid station as per
requirement of WAPDA.

(iii) Legal protection has been given as per Article 29 of the Draft for the work to be
executed in accordance with the law, rules and procedure.

(iv) Sponsors shall also provide soft copy of documents.

(v) There is fee to be deposited for conversion of pro-urban into Housing Scheme.

(vi) It is legislation of Punjab Government and WAPDA rights have been protected
in the Draft and un-approved Housing Schemes have been declared as illegal.

Since action has also been proposed against illegal Schemes as such it is
mandatory for WAPDA to obtain approval of civic authority.

This issues with the approval of General Manager (Technical) LESCO.

Chief Engineer (P&D)


( Saleem Akhtar)

To: Chief Engineer (Op.) PEPCO,


G-44 Wapda House, Lahore.
Info: Master file.

No._______________/DRW/247-A/LESCO Dated____/1/2010
Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: PUNJAB PRIVATE HOUSING SCHEMES AND LAND SUB-


DIVISION RULES

Reference: Your office letter No. 4264-71/CE(O)/DHQ/6-B-Disco dated 14-12-2009.

Draft pertaining to electricity matter and land required for construction of


Grid Station has been examined and comments are as under:

Para Para Description Comments/suggestions


No.
1. The recovery of Grid Cost Share for the provision of electricity to Housing
Scheme(s) shall be regulated as under:
1.1 The ultimate demand of the Housing Scheme(s) Agreed
shall be assessed according to the instructions
already issued to all, AEBs (now DISCOs) by
GM(PE&S) /CEDE/DDE/E-42/2163-81 dated: 26-
10-1993, unless otherwise stated in the following
paragraphs.
1.2 The load of commercial buildings in new Housing .
Scheme(s) will be assessed as per GM(PE&S) vide Agreed
letter reffered in Para 1.1 above and on the basis of
actual covered area by incorporating all the floors
to be constructed.
1.3 In case of Housing Scheme(s) with the total area May be deleted as the same clause
less than 160 Kanals, or s may be specified by the already included another draft
respective province as minimum area required for received from CE (O) PEPCO for
approval of a housing scheme, all rules and revised policy instructions for
regulations for the external electrification of execution of Housing Scheme and
housing schemes will be applicable. Commercial Buildings.(However
However, in lieu of approval of the relevant civic as per revised draft of policy of
authority, a layout plan prepared by consultant and Punjab Govt, NOC and approval
verified by DISCO will be accepted. of Civic authority is Mandatory)
1.4 Grid Cost Share will also be recoverable from Agreed
sponsors of commercial buildings /plazas including
apartment buildings at the same rates as housing
schemes.
2. The grid cost share shall be recovered as under:
2.1 The share of cost of construction of Grid Station, Agreed
Transmission Line and Equipment etc. shall be
recovered from all the Sponsor(s) of Housing
Scheme(s) whether electric supply is proposed
from a new or existing Grid Station.
2.2 The recovery of Grid Cost Share from the Agreed
Sponsor(s) of the Housing Scheme(s) will be
recoverable as per following rates, which will be
updated by CE Design NTDC on yearly basis.
Per MW cost Per MW Cost Per MW Per MW total
of of Grid station cost of cost (Millions
Transmission & Allied Land Rs.)
Line Equipment (Millions
(Million etc. (Million Rs.)
Rs./KM) Rs.)
0.371 5.68 2.61 8.661
2.3 The recovery of Grid Cost Share including Cost of Agreed
Land will be apportioned as under:
(i) 50% of grid cost share will be borne by
DISCO/PEPCO.
(ii) 50% of grid cost share will be borne by the
Sponsors of Housing Scheme(s).
3. In case, the ultimate load demand of Housing Agreed
Scheme(s) exceeds 5 MW, land for construction
of Grid Station measuring 4 acres will be provided
by the Sponsor(s) of Housing Scheme(s), free of
cost. As such, the cost of land mentioned in Para
(2.2) above will not be recovered from these
sponsor(s).
4 In case of plazas/commercial buildings and (i) In case of plazas/commercial
apartments, if the ultimate load demand exceeds 5 buildings and apartments, if the
MW, a GIS will be provided by the sponsors, ultimate load demand exceeds 5
Alternatively, if the space is available on the nearby MW, a GIS will be provided by
DISCO Grid Station, a Power Transformer the sponsors.
alongwith allied equipment, of appropriate capacity (ii) (The remaining option of
may be installed at the cost of the sponsor. installation of Power T/F at
LESCO grid station is not
recommended).
5. If provision of land by sponsor for the construction If provision of land by sponsor for
of AIS (Air Insulated Sub-station) as required in the construction of AIS (Air
paragraph 3 is not possible, and a GIS (Gas Insulated Sub-station) as required
Insulated Sub-station) has to be constructed, its full in paragraph 3 is not possible, and
cost will be borne by the sponsor. a GIS (Gas Insulated Sub-station)
The sponsor will also be liable to provide suitable has to be constructed at its own as
accommodation for the staff of the grid station. per WAPDA/PEPCO standard and
The construction of grid station by the sponsor design, its full cost will be borne
under these circumstances will be permitted against by the sponsor.
a bank guarantee/mortgage of property to be The sponsor will also be liable to
provided by the sponsor. This bank guarantee / provide suitable accommodation
mortgage of property will be of sufficient amount for the staff of the grid station and
to cover the full cost of the grid and valid for the transfer the land of grid station in
construction period of the grid station. the name of LESCO.
The DISCO will, however, have the right to use The construction of grid station by
such a grid station to supply power to its consumers the sponsor under these
outside the area of that housing scheme. circumstances will be permitted
against a bank guarantee to be
provided by the sponsor by the
sponsor.
This bank guarantee / mortgage of
property should be sufficient
amount to cover the full cost of the
grid and should remain valid for
the construction period of the grid
station. The DISCO will, however,
have the right to use such a grid
station to supply power to its
consumers outside the area of that
housing scheme by way of
installing another Power
Transformer in the same yard.
(As regard land and cost of GIS
grid station, It is suggested that
matter may be got clarified from
CE (Design) NTDC before
issuance of this policy as land
required for GIS grid station not
given in Draft Policy)
New Para If a sponsor wants to construct
AIS (Air Insulated Sub-station)
Grid Station at its own, the same
procedure will be adopted as in
para-5.
6. Sponsor(s) will be responsible for Right of Way of Agreed
Allied Transmission and Distribution Lines to be
constructed for Grid Station and dispersal of Power,
DISCO will have the right of way within the
housing scheme for taking out feeders and also
reserve all rights to utilize the Land of Grid Station
and other facilities for providing services to other
customers.
7. For Housing Schemes opting under ground Agreed
Distribution System, Ultimate Load Demand will
be calculated by considering Development Factor
as unity. Circular letter No. GM (PE&S) / CEDE /
DDE-E-42 / 4163-81 dated: 26-10-1993 will stand
amended to that extent
This issues with the approval of competent authority.
( Sadr-ul-Huda )
General Manager (Tech.)
To: Chief Engineer (Op.) PEPCO,
Wapda House, Lahore.

Info: Master file.


No._____________/DRW/346/LESCO Dated____/1/2010
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: RECOVERY OF GRID STATION COST SHARE FROM THE


SPONSORS OF THE HOUSING SCHEME

Reference: Your office letter No. 4185-87/CE (O)DHQ/Housing Scheme dated 8-12-
2009.

Para-wise comments are as under which will supersede GM(C&M) letter


No. 19-31/GM(C&M)/P/E-5 dated 2-01-2003 and all other instructions issued from time
to time on the above noted subject:
Para Para Description Comments/suggestions
No.
1. The recovery of Grid Cost Share for the provision of electricity to Housing
Scheme(s) shall be regulated as under:
1.1 The ultimate demand of the Housing Scheme(s) Agreed
shall be assessed according to the instructions
already issued to all, AEBs (now DISCOs) by
GM(PE&S) /CEDE/DDE/E-42/2163-81 dated: 26-
10-1993, unless otherwise stated in the following
paragraphs.
1.2 The load of commercial buildings in new Housing .
Scheme(s) will be assessed as per GM(PE&S) vide Agreed
letter reffered in Para 1.1 above and on the basis of
actual covered area by incorporating all the floors
to be constructed.
1.3 In case of Housing Scheme(s) with the total area May be deleted as the same clause
less than 160 Kanals, or s may be specified by the already included another draft
respective province as minimum area required for received from CE (O) PEPCO for
approval of a housing scheme, all rules and revised policy instructions for
regulations for the external electrification of execution of Housing Scheme and
housing schemes will be applicable. Commercial Buildings.(However
However, in lieu of approval of the relevant civic as per revised draft of policy of
authority, a layout plan prepared by consultant and Punjab Govt, NOC and approval
verified by DISCO will be accepted. of Civic authority is Mandatory)
1.4 Grid Cost Share will also be recoverable from Agreed
sponsors of commercial buildings /plazas including
apartment buildings at the same rates as housing
schemes.

2. The grid cost share shall be recovered as under:


2.1 The share of cost of construction of Grid Station, Agreed
Transmission Line and Equipment etc. shall be
recovered from all the Sponsor(s) of Housing
Scheme(s) whether electric supply is proposed
from a new or existing Grid Station.
2.2 The recovery of Grid Cost Share from the Agreed
Sponsor(s) of the Housing Scheme(s) will be
recoverable as per following rates, which will be
updated by CE Design NTDC on yearly basis.
Per MW cost Per MW Cost Per MW Per MW total
of of Grid station cost of cost (Millions
Transmission & Allied Land Rs.)
Line Equipment (Millions
(Million etc. (Million Rs.)
Rs./KM) Rs.)
0.371 5.68 2.61 8.661
2.3 The recovery of Grid Cost Share including Cost of Agreed
Land will be apportioned as under:
(i) 50% of grid cost share will be borne by
DISCO/PEPCO.
(ii) 50% of grid cost share will be borne by the
Sponsors of Housing Scheme(s).
3. In case, the ultimate load demand of Housing Agreed
Scheme(s) exceeds 5 MW, land for construction
of Grid Station measuring 4 acres will be provided
by the Sponsor(s) of Housing Scheme(s), free of
cost. As such, the cost of land mentioned in Para
(2.2) above will not be recovered from these
sponsor(s).
4 In case of plazas/commercial buildings and (i) In case of plazas/commercial
apartments, if the ultimate load demand exceeds 5 buildings and apartments, if the
MW, a GIS will be provided by the sponsors, ultimate load demand exceeds 5
Alternatively, if the space is available on the nearby MW, a GIS will be provided by
DISCO Grid Station, a Power Transformer the sponsors.
alongwith allied equipment, of appropriate capacity (ii) (The remaining option of
may be installed at the cost of the sponsor. installation of Power T/F at
LESCO grid station is not
recommended).
5. If provision of land by sponsor for the construction If provision of land by sponsor for
of AIS (Air Insulated Sub-station) as required in the construction of AIS (Air
paragraph 3 is not possible, and a GIS (Gas Insulated Sub-station) as required
Insulated Sub-station) has to be constructed, its full in paragraph 3 is not possible, and
cost will be borne by the sponsor. a GIS (Gas Insulated Sub-station)
The sponsor will also be liable to provide suitable has to be constructed at its own as
accommodation for the staff of the grid station. per WAPDA/PEPCO standard and
The construction of grid station by the sponsor design, its full cost will be borne
under these circumstances will be permitted against by the sponsor.
a bank guarantee/mortgage of property to be The sponsor will also be liable to
provided by the sponsor. This bank guarantee / provide suitable accommodation
mortgage of property will be of sufficient amount for the staff of the grid station and
to cover the full cost of the grid and valid for the transfer the land of grid station in
construction period of the grid station. the name of LESCO.
The DISCO will, however, have the right to use The construction of grid station by
such a grid station to supply power to its consumers the sponsor under these
outside the area of that housing scheme. circumstances will be permitted
against a bank guarantee to be
provided by the sponsor by the
sponsor.
This bank guarantee / mortgage of
property should be sufficient
amount to cover the full cost of the
grid and should remain valid for
the construction period of the grid
station. The DISCO will, however,
have the right to use such a grid
station to supply power to its
consumers outside the area of that
housing scheme by way of
installing another Power
Transformer in the same yard.
(As regard land and cost of GIS
grid station, It is suggested that
matter may be got clarified from
CE (Design) NTDC before
issuance of this policy as land
required for GIS grid station not
given in Draft Policy)
New Para If a sponsor wants to construct
AIS (Air Insulated Sub-station)
Grid Station at its own, the same
procedure will be adopted as in
para-5.
6. Sponsor(s) will be responsible for Right of Way of Agreed
Allied Transmission and Distribution Lines to be
constructed for Grid Station and dispersal of Power,
DISCO will have the right of way within the
housing scheme for taking out feeders and also
reserve all rights to utilize the Land of Grid Station
and other facilities for providing services to other
customers.
7. For Housing Schemes opting under ground Agreed
Distribution System, Ultimate Load Demand will
be calculated by considering Development Factor
as unity. Circular letter No. GM (PE&S) / CEDE /
DDE-E-42 / 4163-81 dated: 26-10-1993 will stand
amended to that extent
This issues with the approval of competent authority.
( Sadr-ul-Huda )
General Manager (Tech.)
To: Chief Engineer (Op.) PEPCO,
Wapda House, Lahore.

Info: Master file.


No._____________/DRW/346/LESCO Dated____/1/2010
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: RCO OF PARADISE SPINNING MILL AGAINST REF. NO. 24-1919-


91620009

Reference: Your letter No. 14005-07 dated 23-12-2009.

In this connection, please refer to this office letter No. 27383-84 dated
19-12-2009 vide which it has already been advised to take up the matter with Operation
Director LESCO for decision as operational matters are within his purview.

Chief Engineer (P&D)


( Saleem Akhtar )

To: Manager (Op.) Central circle LESCO.

Info: 1. DM (O) Raiwind Divn. LESCO.

2. Master file.

No.__________/DRW/950/LESCO Dated____/12/2009
Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: TRANSFER OF 32 KANAL LAND FOR GRID STATION IN LAKE


CITY HOUSING SCHEME RAIWIND ROAD LAHORE

Enclosed please find herewith a sample draft of ‘Registration Deed’ of


32-kansls land for grid station being allocated by the Sponsors of Lake City Housing
Scheme, Raiwind Road, Lahore for vetting and early return to this office, so that the
Sponsors may be advised to provide ‘Registered Deed’ as per sample vetted by you on
non-judicial papers after getting the needful done by Revenue Department, Government of
Punjab.

DA – As above Chief Engineer (P&D)


( Saleem Akhtar )

To: Legal Director LESCO

Info: 1. M/s Lake City Holdings (Pvt.) Ltd. )


Raiwind Road, Lahore. ) to pursue the matter
12. M/s Power Com Consultants, Suit No. 1 ) with Legal Director
Ist Floor Khurram Shopping ) LESCO.
Centre, Wahdat Road, Lahore )

3. Master file.

No.____________/P&D/DRW/1024/LESCO Dated______/12/2009

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 6308360 PBX: 6314616-20 (Ext.200)
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF WAPDA TOWN SHEIKHUPURA

Reference: This office letter No. 27582-85 dated 24-12-2009.

Payment of difference of capital cost as mentioned in the above referred


letter, is not forthcoming from this office record. Therefore, if you have deposited the
same then a copy of Receipt issued by Finance Director LESCO may please be provided
to this office.

Chief Engineer (P&D)


( Engr. Navid Mumtaz)

To: General Security,


Wapda Town, Sheikhupura.
P.O. Noorpur Virkaan, Sheikhupura.

Info: 1. Sr. Manager Constructon LESCO.


2. Master file.

No.__________/DRW/820/LESCO Dated______/2/2013

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 6308360 PBX: 6314616-20 (Ext.200)
E-mail: srmanpd@lesco.gov.pk

Subject: TRANSFER OF LAND FOR GRID STATION AT WAPDA TOWN


SHEIKHUPURA

Enclosed please find herewith Office Order No. WECHS/Skp/36-W/98


dated 6-11-2006 (in original) issued by General Secretary Wapda Employees Cooperative
Housing Society Sheikhupura regarding transfer of land for grid station measuring four
(4) Acres & one (1) Marla in Block-F of WAPDA Town Sheikhupura, for record and
further action at your end please.

DA – As above (In original) Chief Engineer (P&D)


( Saleem Akhtar )

To: Deputy Manager,


Property Management Cell,
LESCO Headquarter Lahore.

Info: 1. Operation Director LESCO.


2. Chief Engineer Development LESCO.
3. Legal Director LESCO.
4. HRD, LESCO.
5. Manager, GSO Circle LESCO.

6. PD, GSC, LESCO, Lahore ) to submit progress regarding possession of


7. DM (Civil) GSC LESCO ) land (4 Acres & 1 Marla ) and construction
) of boundary wall.

8. General Security Wapda Town, P.O. Noorpur Virkaan, Sheikhupura.


9. Master file.

No.__________/DRW/820/LESCO Dated______/12/2009
Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF KING EDWARD MEDICAL


COLLEGE DOCTORS COOP. HOUSING SOCIETY LTD. LAHORE

Reference: 1. This office letter No. 12261-64 dated 25-1-2008.


2. This office letter No. 13248-49 dated 12-2-2008.
3. This office letter No. 19574-75 dated 23-5-2008.
4. This office letter No. 27492-94 dated 23-12-2009.

As already requested in the above referred letters, land of proposed 132 kV


grid station measuring 47-Kanals & 8 Marlas may be consolidated in one piece and
transfer the same in favour of LESCO after getting the draft of Registration Deed vetted
from Legal Director LESCO immediately under intimation to this office. Moreover it is
intimated that LESCO requires transfer deed and not the Waquaf-Nama.

Chief Engineer (P&D)


LESCO, Lahore
To: President, King Edward Medical College,
Housing Society Ltd. Room No. 5
2nd Floor Al-Hijaz Building Ewing Road,
Nila Gumbad Lahore

Info: 1. Legal Director LESCO.

2. PD, GSC LESCO to with reference to his No. PD/GSC/LESCO/Lhr/1212-


14 dated 06-02-2010.

3. Master file.

No.______________/P&D/DRW/353/LESCO Dated____/03/2010
Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: ENCASHMENT OF BANK GUARANTEE – EXTERNAL ELECTRIFICATION


OF OPF HOUSING SCHEME (PHASE-I) RAIWIND ROAD LAHORE

Reference: This office letter No. 18218-23 dated 9-5-2008.

Enclosed please find herewith renewed Bank Guarantee for Rs.53,57,226/-


valid upto 31-12-2009, which may be got encahsed in LESCO Income Account forthwith
under intimation to this office. Original Bank Guarantee bearing No. L/G No. 421131-22
dated 22-1-2007 furnished by the Sponsors in the first instance was already sent to your
office vide memo under reference.

This issues with the approval of Chief Executive Officer LESCO.

MATTER MOST URGENT

DA - Renewed Bank Guarantee Chief Engineer (P&D)


LESCO Ltd Lahore.

To: Finance Director LESCO

Info: Master file.

No.____________/P&D/DRW/30/LESCO Dated______/12/2009
Hamid / Dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: BANK GUARANTEES – EXTERNAL ELECTRIFICATION OF PHASE-1


OF AUDIT AND ACCOUNTS EMPLOYEES COOP. HOUSING SOCIETY
LTD. LAHORE (ULTIMATE DEMAND 8030 KW)

Reference: 1. This office letter No. 23229-31 dated 3-9-2009.


2. This office letter No. 25438-40 dated 26-10-2009.
3. This office letter No. 17453-55 dated 2-5-2009.
4. This office letter No. 2553-55 dated 28-10-2009.
Bank Guarantee No. 6514 for Rs. 12,56,610/- issued on 19-3-2008 which
was further extended for one year is going to be expired on 31-12-2009. The same was
returned to you with the request to furnish the same as per sample provided to you vide
this office No. 23229-31 dated 3-9-2009 and reminded vide No. 25438-40 dated
26-10-2009.

So far you have not furnished the same on LESCO approved draft. You are
once again requested to furnish the same by extending it for further two years of entire
period of completion of work, within 10-days, failing which further proceedings of your
Housing Scheme will be stopped and temporary connection in your housing scheme will
be disconnected.

Chief Engineer (P&D)


( Engr. Saleem Akhtar )
To: President Audit & Accounts Coop.
Housing Society A.G. Punjab Office Complex, Lahore

Info: 1. Manager (Op.) South Circle LESCO


2. DM (O) Kot Lakhpat Divn. LESCO.
3. AM (O) Hamza Town Sub-Divn. LESCO.
4. M/s Jansons Engineering Services, IEP Building, Liberty Roundabout
Gulberg-III, Lahore with reference to their letter dated 5-11-2009 for
necessary action as above.
5. Master file.
No.___________/ P&D/DRW/162/LESCO Dated______/12/2009
Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: TRANSFER OF LAND OF GRID STATIONS ALLOCATED BY THE THE


SPONSORS OF HOUSING SCHEMES

I would like to draw your personal attention towards this office letter No.
23658-60 dated 9-9-2009 vide which list prepared by CE (Development) LESCO showing
status of land of grid stations to be provided by the Sponsors of Housing Societies was
sent to you with the direction that the same may be reconciled with your record and
missing Housing Society, if any, be pointed out immediately. It was further directed to
ensure that Sponsors of all Housing Societies having ultimate load demand 05 MW and
above have allocated and transferred the land of grid stations in favour of LESCO. But it
is regretted to point out that despite reminder issued vide No. 25159-60 dated 21-10-2009
and elapse of more than two months period, no response has been received from your end.
You are directed to take cognizance of the issue and arrange transfer of land
of grid stations in all cases of Housing Societies with ultimate load demand 5 MW and
above in consultation with Legal Director and Tehsildar of P.D (GSC). Furthermore after
transfer of land and mutation etc. the Registered Sale Deed / Transfer letter etc. may be
handed over to HRD / Deputy Manager (Property Management) LESCO to avoid any
complication at belated stage.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: 1. Mr. Bashir Ahmad, DM (P)


2. Mr. Safdar Ali, DM (P)
3. Ch. Muhammad Anwar, DM (P)
4. Mr. Zafar Mahmood Chishti, DM(P)
5. Mr. Masood Raza Tariq, AM (P)
6. Mr. Najam, HDM
Info: 1. P.A.
2. Master file.

No.______________/DRW/ Dated____/12/2009
Hamid/dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: RENEWAL OF EXPIRED BANK GUARANTEES

I would like to invite your personal attention towards this office No. 16092-
97 dated 4-4-2009 vide which list of expired Bank Guarantees along with sample draft of
Bank Guarantee duly vetted by Legal Director LESCO was supplied to you for obtaining
fresh bank grantees as per approved draft. But it is regretted to point out that despite
reminders issued vide No. 17826-33 dated 12-5-2009 and 25040-41 dated 17-10-2009 and
elapse of a period of 08 months progress achieved in this regard has not so been intimated.

You are once again advised to look into the matter at personal level and
confirm that in all cases of expired bank guarantees, fresh bank grantees as per approved
draft are obtained from the Sponsors to avoid any un-pleasant situation.

Chief Engineer (P&D)


(Engr. Saleem Akthar)

To: 1. Mr. Bashir Ahmad, DM (P)


7. Mr. Safdar Ali, DM (P)
8. Ch. Muhammad Anwar, DM (P)
9. Mr. Zafar Mahmood Chishti, DM(P)
10. Mr. Masood Raza Tariq, AM (P)
Info: 1. HDM Planning Section to follow and get the needful done in all cases of
expired Bank Guarantees otherwise you will be held responsible for the
consequences.
2. P.A.
3. Master file.
No.___________/ P&D/DRW/920-A/LESCO Dated______/12/2009
Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICAIOTN OF BLOCK H-1 OF SABZAZAR


HOUSING SCHEME

Reference: 1. This office letter No. 22061-68 dated 6-8-2009.


2. This office letter No. 25144-49 dated 20-10-2009

As per clause – 14 of this office letter given at Refeerence-1,


stage inspection of the subject work may be carried out and result thereof be submitted
to this office.

Chief Engineer (P&D)


( Saleem Akhtar )

To: Sr. Manager Construction LESCO

Info: 1. Director (EME) LDA, Lahore.


2. Master file.

No.____________/P&D/DRW/1200 Dated____/12/2009
Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF GREEN VALLEY HOUSING


SCHEME SARGODHA ROAD SHEIKHUPURA

Reference: 1. This office letter No. 16623-27 dated 16-4-2009


2. This office letter No. 27056-60 dated 14-12-2009.

As already requested in the above referred letters, capital cost:


Rs.29,16,524/- and difference of design vetting charges: Rs.9585/- may please be
deposited with Finance Director LESCO immediately so that work of external
electrification of your scheme may be taken in hand by Construction staff.

Deputy Manager (Planning)


LESCO HQ. Lahore

To: M/s Green Valley Housing Scheme,


Sargodha Road, Sheikhupura.
Info: 1. Finance Director LESCO.
2. Sr. Manager Construction LESCO.
3. Manager (Op.) Sheikhupura Circle LESCO.
4. M/s Jansons Engineering Services, IEP Building, Liberty Roundabout
Gulberg-III, Lahore
5. Master file.

No._____________/P&D/DRW/1116/LESCO Dated____/1/2010
Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTENSION OF LOAD FROM HANGE OF TARIFF OF DHA


LAHORE EME SECTOR

Reference: Your letters dated 15-11-2008 & dated 1-1-2009.

Referring Minutes of meeting issued vide No. 15196-98 dated 1-2-2007


(copy enclosed), you are requested to please fulfill the requirements as laid down in the
letter as mentioned above.

DA – As above Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Lt. Col. Mr. Zafar Ali Shaheen


Headquarter 4 Corps Lahore Cantonment,
Lahore.
Info: Master file.

No.___________/P&D/DRW/228/LESCO Dated____/1/2009

Hamid / Dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: LIST OF HOUSING SOCIETIES / COLONIES AND OTHER BULK


POWER PURCHASERS

Reference: Your letter No. 4128-30/CE (O)/DHQ/6-B-DISCO dated 4-12-2009

Enclosed please find herewith a list of Housing Societies, High Rise


Buildings, Shopping Plazas, Complexes and other Bulk Power Purchasers (receiving one
megawatt or more at one premises) in LESCO as desired please.

DA – As above Chief Engineer (P&D)


( Saleem Akhtar )

To: Director (HQ) Operation,


O/O Chief Engineer (Operation),
G-44 Wapda House, Lahore.

Info: Master file.

No.___________/P&D/DRW/ Dated____/12/2009

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTENSION OF LOAD FROM 4000 KW TO 4900 KW OF EME


SECTOR DHA LAHORE

Reference: 1. Your letter No. 807/Elec/E&M dated 10-10-2009.


2. This office letter No. 25065-71 dated 17-10-2009
License issued by Government of Punjab to sell power as non-licensee stood
expired in September 1998. You are requested to provide approval for sale of power from
NEPRA for extended territory of 7500 Kanal which was barely 3500 Kanal in 1995 when
4 MW load was allowed by this office in Tariff C-II.

For the many years you have been making different plans for the
electrification of scheme and during 2006 you planned to surrender the total infrastructure
in favour of LESO by opting for individual metering. Thereafter during 2007 you again
switched over towards power generation and now after 02 years you have approached this
office for extension of load from 4 MW to 4.9 MW which is not understood and it appears
that you are taking time with stopgap arrangement with no concrete plan to execute which
may lead LESCO as well as your management into tremble, looking to the rapid build-up
of load in the Society.

You are, therefore, requested to come-up with workable plan so as to


proceed further.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)
To: M/s EME – DHA Lahore EME Sector,
66-EME Coop. Housing Society Ltd.
Sub Post office EMECHS Multan Road, Lahore.

Info: 1. Manager (Op.) Central Circle LESCO.


2. Deputy Manager (Op.) A.I. Town Divn. LESCO Lhr.
3. Master file.
No.___________/P&D/DRW/228/LESCO Dated____/12/2009
Hamid / Dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF ELITE CITY HOUSING SCHEME


KOT RUKAN DIN KHARA ROAD KASUR CITY

Reference: 1. This office letter No. 9522-29 dated 21-11-2008.


2. Your letter dated 17-10-2009.

The Chief Executive Officer LESCO has not acceded to your request.
Therefore remaining amount of revised capital cost: Rs.41,76,952/- & difference of design
vetting charges: Rs.21423/- may be deposited with Finance Director LESCO to proceed
further.
This issues with the approval of Chief Executive Officer LESCO.

Chief Engineer (P&D)


( Saleem Akhtar )

To: Chairman Elite City Housing Scheme,


Kot Rukan Din Khara Road,
Kasur
Info: 1. Finance Director LESCO. As soon as remaining amount of revised capital
cost: Rs.41,76,952/- and difference of design vetting charges: RS. 21,423/-
is realized in his Account, the same may be transferred to the following
Head of Accounts under intimation to this office:
(i) Senior Manager Const. LESCO. Rs.41,76,952/-
(ii) LESCO Income Account Rs.21,423/-
2. Sr. Manager Construction LESCO.
3. M/s Orion Consultants, 25-Peshawar Block, Fortress Stadium, Lahore Cantt.
4. Master file.

No.______________/ P&D/DRW/1184/LESCO Dated______/12/2009


Hamid / Dak-h4.
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: TRANSFER / POSSESSION OF 05 KANALS LAND FOR


CONSTRUCTION OF GRID STATION AT THE PUNJAB UNIVERSITY
IN THE VICINITY OF KATCHI ABADI NEAR SOHAIL IFTIKHAR
RESEARCH INSTITUTE

Reference: This office letter No. 26475-85 dated 24-11-2009.

Enclosed please find herewith a copy of Draft of lease agreement duly


vetted by Legal Director LESCO.

Agreement to Lease as per draft vetted by Legal Director LESCO on stamp


papers duly signed by the lesser may be furnished to this office for the signature of CEO
LESCO.

DA – As above Chief Engineer (P&D)


LESCO Ltd. Lahore

To: M/s Jansons Engineering Services,


IEP Building, Liberty Roundabout
Gulberg-III, Lahore

Info: 1. Registrar, University of the Punjab Quaid-Azam Campus, Lahore.


2. Legal Director LESCO.
3. P.D. GSC LESCO, Lahore.
4. Manager (Admn.) LESCO.
5. DM, Property Management Cell LESCO.
6. Manager Civil Work Divn. LESCO.
7. DM Civil Works Divn. LESCO.
8. LAC LESCO O/O PD, GSC LESCO, 34-Industrial Area Gulberg-III,
Lahore.
9. Master file.
No.______________/ P&D/DRW/ Dated______/12/2009
Hamid / Dak-h4.
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: TRANSFER / POSSESSION OF 05 KANALS LAND FOR


CONSTRUCTION OF GRID STATION AT THE PUNJAB UNIVERSITY
IN THE VICINITY OF KATCHI ABADI NEAR SOHAIL IFTIKHAR
RESEARCH INSTITUTE

Enclosed please find herewith a copy of Notification No. D/661/R dated


13-11-2009 issued by the Registrar University of the Punjab regarding allocation of 05
Kanals land for construction of grid station at the Punjab University in the vicinity of
Katchi Abadi near Sohail Iftikhar Research Institute.

The possession of proposed land may please be taken over besides arranging
construction of boundary wall. Moreover sign board for the proposed 132 kV grid station
may also be displayed at significant place at the proposed site under intimation to this
office.

DA – As above Chief Engineer (P&D)


LESCO Ltd. Lahore

To: Chief Engineer (Development) LESCO.


Info: 1. General Manager (T) LESCO.
2. Registrar, University of the Punjab Quaid-Azam Campus, Lahore.
3. Legal Director LESCO.
4. P.D. GSC LESCO, Lahore.
5. Manager (Admn.) LESCO.
6. DM, Property Management Cell LESCO.
7. Manager Civil Work Divn. LESCO.
8. DM Civil Works Divn. LESCO.
9. LAC LESCO O/O PD, GSC LESCO, 34-Industrial Area Gulberg-III,
Lahore.
10. M/s Jansons Engineering Services, IEP Building, Liberty Roundabout
Gulberg-III, Lahore. Necessary lease agreement may be got prepared in
consultation with Legal Director LESCO and furnish to this office to
proceed further.
11. Master file.
No.______________/ P&D/DRW/ Dated______/11/2009
Hamid / Dak-h4.
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: SALE DEED OF 32 KANALS LAND FOR THE PROPOSED 132 KV GRID
STATION AT SPRING MEADOWS FARM HOUSING SCHEME BADIAN
ROAD LAHORE

Reference: This office letter No. 11987-97 dated 19-1-2009.

The original ‘Sale Deed’, duly registered, received from the Sponsors
of subject Housing Scheme is sent herewith for getting mutation (Intiqaal) in favour of
LESCO and onward submission to Property Management Cell LESCO.

In addition to above, possession of land and construction of boundary wall


may please be ensured immediately. Moreover sign board for the proposed 132 kV grid
station may also be displayed at significant place at the proposed site under intimation to
this office.

DA – As above Chief Engineer (P&D)


(Original Sale Deed) (Engr. Saleem Akhtar)

To: PD, GSC, LESCO.


Info: 1. Legal Director LESCO.
2. Chief Engineer (Development) LESCO.
3. Manager (Admn.) LESCO.
4. DM, Property Management Cell LESCO.
5. Manager Civil Work Divn. LESCO.
6. DM Civil Works Divn. LESCO.
7. LAC LESCO O/O PD, GSC LESCO, 34-Industrial Area Gulberg-III,
Lahore for necessary action as above.
8. M/s Power Com Consultants, Suit No. 1 Ist Floor Khurram Shopping
Centre, Wahdat Road, Lahore
9. M/s Spring Meadows Farm Housing Scheme, Badian Road, Lahore.
10. Master file.
No.______________/ P&D/DRW/ Dated______/11/2009
Hamid / Dak-h4.
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF AL-KARAM CITY HOUSING


SCHEME MULTAN ROAD, MANGA MANDI

Reference: Your request on the above noted subject.

NOC of owners in favour of Sponsor has not been received alongwith the
Design / documents of the subject Housing Scheme, which may please be supplied to this
office to proceed further.

DA – As above Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: M/s Power Com Consultants,


Suit No. 1 Ist Floor Khurram Shopping Centre,
Wahdat Road, Lahore.

Info: Master file.

No._____________/DRW/1256/LESCO Dated_______/11/2009

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF KHAYBAN-E-MUSTAFA


HOUSING SCHEME JOHAR TOWN LAHORE ( ULTIMATE DEMAND :
119.31 KW – INDVIDUAL METERING)

Reference: This office letter No. 10870-77 dated 19-12-2008.

Approval letter alongwith approved layout plan of the subject Housing


Scheme from TMA concerned is still awaited from your end, which may please be
supplied to this office to proceed further.

Deputy Manager (Planning)


For Chief Engineer (P&D)

To: M/s Khayaban-e-Mustafa Housing Scheme,


Johar Town Lahore.

Info: Master file.

No._____________/DRW/1147/LESCO Dated______/10/2009

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF AL-REHMAN GARDEN


HOUSING SCHEME (PHASE-II) NEAR FAIZPUR INTERCHANGE
SHARAQPUR ROAD SHEIKHUPURA

Reference: Your letter No. HE/24-01 dated 25-9-2009.

The revised sketch / estimate of source feed line after attending the
observations/shortcomings pointed out at site in your presence, may be sent to this office
immediately to proceed further.

( Bashir Ahmad )
Deputy Manager (Planning)
For Chief Engineer (P&D)

To: M/s Hamza Engineers,


139-A/F Raja Centre,
Main Market, Gulberg-II, Lahore.

Info: Master file.

No.______________/DRW/1187/LESCO Dated____/11/2009
Hamid/dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXECUTION OF WORK OF EXTERNAL ELECTRIFICATION OF


‘EDEN ABAD’ HOUSING SCHEME NEAR HALLOKI THROUGH
WAPDA APPROVED CONTRACTORS

Reference: Your office letter No. JES/EDENABAD/LESCO/01 dated 9-10-2009


Before processing the case of private permission for execution of work of external
electrification of subject Housing Scheme through WAPDA approved Contractors, please
proceed further as under:-
8. Bank Guarantee (as per sample enclosed) equivalent to 25% amount of estimated cost
which comes to be Rs.58,47,560/-, valid for the entire period of completion of work,
may be furnished to this office.
9. Inspection / supervision charges @1.5% of the estimated cost which comes to be
Rs.350,854/- may be deposited with Finance Director LESCO
10. Cost and installation charges of 11 kV grid end panel and source feed line:
Rs.15,43,519/- may also be deposited with Finance Director LESCO.

DA – As above Chief Engineer (P&D)


LESCO Ltd. Lahore
To: M/s Jansons Engineering Services,
IEP Building, Liberty Roundabout Gulberg-III, Lahore.
Info: 1. Finance Director LESCO. On payment, the amount may be transferred as
mentioned below through credit advices under intimation to this office.
(i) Inspection/supervision charges
Rs.350,854/- LESCO Income Account
(ii) Cost & installation charges of grid
End panel Rs.14,48,838/- Manager GSO LESCO
(iii) Cost of source feed line: Rs.94,681/- Sr. Manager Construction
8. Sr. Manager Construction LESCO
9. Manager / SE GSO LESCO.
10. Manager(O) Central Circle LESCO.
11. DM (O) Raiwind Divn. Lahore.
12. Chairman, Eden Housing Scheme (Pvt.) Ltd. Eden Towers M-3 82-E/1 Gulberg-
III, Lahore for necessary action as above.
13. Master file.

No.___________/DRW/1198/LESCO Dated______/11/2009
Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: UNDERGROUND EXTERNAL ELECTRIFICATION OF PEACE HOMES


RAIWIND ROAD LAHORE

Single line diagram of 11 kV Ali Raza Abad-1 feeder received alongwith


the Design has not been signed by AM (O) concerned. Therefore updated single line
diagram 11 kV feeder duly singed by the AM (O) concerned may please be provided to
this office to proceed further.

Deputy Manager (Planning)


For Chief Engineer (P&D)

To: M/s Jansons Engineering Services,


IEP Building, Liberty Roundabout
Gulberg-III, Lahore.

Info: Master file.

No.___________/ P&D/DRW/1226/LESCO Dated______/10/2009

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF KHAYBAN-E-MUSTAFA HOUSING


SCHEME JOHAR TOWN LAHORE ( ULTIMATE DEMAND : 119.31 KW –
INDVIDUAL METERING)

Reference: This office letter No. 10870-77 dated 19-12-2008.

Approval letter alongwith approved layout plan of the subject Housing


Scheme from TMA concerned is still awaited from your end, which may please be
supplied to this office to proceed further.

Deputy Manager (Planning)


For Chief Engineer (P&D)

To: M/s Khayaban-e-Mustafa Housing Scheme,


Johar Town Lahore.

Info: Master file.

No._____________/DRW/1147/LESCO Dated______/10/2009

Hamid / dak-h4
To,

Manager (HR&A)
LESCO, Lahore.

Sub: Request to change the date of Ex-Pakistan Leave

Respected Sir,

It is submitted that due to changes in the Schedule of Huj Flights by


PIA, the date of my Ex-Pakistan leave may kindly be approved from 1-11-2009
to 15-12-2009 instead of already requested from 22-10-2009 to 5-12-2009.

Thanks.

Yours obediently,

( Manzoor Ahmad )
S/O Muhammad Bashir,
LS/I
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: TRANSFER OF LAND FOR PROPOSED 132 KV GRID STATION IN


LAKE CITY HOUSING SCHEME 14-KM RAIWIND ROAD
LAHORE

Reference: Your letter No. LCH/CE/468/2009 dated 16-6-2009 addressed to Legal


Director LESCO wits its copies to this office and others.

Please intimate the Agenda of the meeting and the points you want to
discuss as requested in your above referred letter to fix the date for meeting.
Please coordinate this office in this regard.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Chief Engineer,


Lake City Holdings (Pvt.) Ltd.
Ist Floor City City Tower,
6-K Main Boulevard Gulblerg-II,
Lahore.

Info: 1. Legal Director LESCO with reference to above.

2. M/s Power Com Consultants, Suit No. 1 Ist Floor Khurram Shopping
Centre, Wahdat Road, Lahore.

3. Master file.

No.____________/P&D/DRW/1024/LESCO Dated______/10/2009

Hamid / Dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: TRANSFER OF LAND FOR PROPOSED 132/11 KV GRID STATION


IN DHA RAHBAR SECTOR LAHORE

Reference: Your office letter No. 701/CE/Elect/Phase-I dated 18-9-2009.

As already requested by this office vide No. 21525-33 dated 23-7-2009 and
PD (GSC) LESCO Lahore letter No. PD/GSC/LESCO/7420-25 dated 16-9-2009,
32 Kanal land grid station already selected by LESCO Siting Board may be transferred in
favour of LESCO. Moreover physical possession of the said piece of land may also be
handed over to LESCO so that construction activities may be started at site.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Chief Engineer,


DHA Lahore Rahbar Sector,
C/O Headquartrs Pakistan Rangers (Punjab),
Ghazi Road Lahore-33
Info: 1. Legal Director LESCO, Lahore.
2. Chief Engineer O&M (T&G) LESCO, Lahore.
3. Chief Engineer (Development) LESCO, Lahore.
4. Project Director (GSC) NTDC Gulberg-III, Lahore to follow up and get the
needful done.
5. DM Civil Works Divn. LESCO. He is advised to take possession of land
and construction of boundary wall may please be started and sign board for
the proposed 132 kV grid station may also be displayed at significant place
at the proposed site under intimation to all concerned.
6. Dy. Manager Property Management LESCO, Lahore.
7. M/s Power Com Consultants, Suit No. 1 Ist Floor Khurram Shopping
Centre, Wahdat Road, Lahore for necessary action as above.
8. Master file.
No._____________/DRW/1212/LESCO Dated____/10/2009
Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

FAX MESSAGE

Subject: CONNECTIONS RUNNING AS STOPGAP ARRANGEMENTS

Enclosed please find herewith a copy of Manager (O) Central Circle LESCO
letter No. 8673-74 dated 13-10-2009 containing following remarks of General Manager
(Technical) LESCO:

“As repeatedly asked; all stop-gap arrangements must be dispensed-with


within minimum possible time by diverting maximum attention on proposed
feeders. This bad precedence must be stopped”.

List of connections running as stopgap arrangement was sent to your office


vide No. 13445-53 dated 11-2-2009 with the direction to expedite the works so that
respective consumers may be shifted on their original feeders. But despite reminders
issued vide No. 14114-21 dated 23-2-2009 and No. 17842-47 dated 12-5-2009 progress
achieved in this regard has not so far been intimated to this office.

In the light of aforementioned instructions of G.M. (Technical) and save the


department from further loss, all pending works of stopgap arrangements must be
completed within minimum possible time and completion reports alongwith financial
closures be sent to this office on Top Priority so that necessary SJOs/SCOs may be issued
for shifting the consumers on their original independent feeders.

DA – As above Chief Engineer (P&D)


(Engr. Saleem Akhtar)
To: Sr. Manager Construction LESCO

Info: 1. General Manager (Technical) LESCO for kind information please.


2. All Deputy Managers (P&D) ) to follow up and all cases must
3. Mr. Najam-ul-Hassan, HDM (P&D) ) be finalized within minimum
) possible time.
4. P.A.
5. Master file.
No.____________/P&D/DRW/ Dated______/10/2009
Hamid / Dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: PEC STANDARD BIDDING DOCUMENTS

Reference: Your office letter No. 4045-51 dated 15-10-2009

A copy of PES Standard Bidding Documents, mentioned in the above


referred letter may please be supplied to this office to proceed further.

Chief Engineer (P&D)


( Saleem Akhtar )

To: Chief Engineer (Development)


LESCO, Lahore.

Info: Master file.

No._____________/DRW/ Dated______/10/2009

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: VERIFICATION OF APPROVAL OF SUB-DIVISION PLAN OF


APEX RESIDENCES, MEASURING 09 KANAL 07 MARLAS, 95 Sft.
SITUATED AT KHASRA NO. 12431/12432/12434 MOUZA NIAZ
BAIG LAHORE

Please refer to this office letter No. 23701-2 dated 19-9-2009 vide which
copy of approval letter alongwith approved layout plan of Apex Residences was sent to
your office for verification of the requisite documents, but despite elapse of a period of
more than one month no response is received from your end.

It is once again requested to look into the matter and report regarding
genuiness of aforementioned documents may please be furnished to this office on priority.

Deputy Manager (Planning)


For Chief Engineer (P&D)

To: Town Officer (P&C)


Allama Iqbal Town,
7-College Block A.I. Town,
Lahore.

Info: 1. District Coordination Officer Lahore with the request to direct Town Officer
(P&C) Allama Iqbal Town Lahore to confirm the genuiness of documents as
mentioned above.

2. Master file.

No._____________/DRW/1229/ LESCO Dated______/10/2009

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: RELOCATION OF EXISTING OVER HEAD HT LINES PASSING


THROUGH FAZAIA HOUSING SCHEME LAHORE

Enclosed please find herewith a copy of letter No. FHS|L/5723/Org dated


10-10-2009 received from Air Commodore (Retd) Project Manger Fazaia Housing
Scheme Lahore, which is self-explanatory.

Please get the work expedited as requested in the above referred letter under
intimation to this office.

DA – As above Deputy Manager (Planning)


For Chief Engineer (P&D)

To: Sr. Manager Construction LESCO

Info: Master file.


No._____________/DRW/1141/LESCO Dated______/10/2009

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: VERIFICATION OF APPROVAL / SUB-DIVISION OF PROPERTY


MEASURNG 48 KANAL 19-MARLA (AL-KARAM LAND SUB-
DIVISION PLAN) SITUATED AT KHASARA NOS.
10689,10690,10691,10692, 10693 & 10694, MAUZIA MANGA
OOTAR, MULTAN ROAD LAHORE

Photocopy of approval letter issued by your office vide No. 147(P&C) dated
25-7-2008 alongwith approved layout plan of the subject Housing Scheme is sent
herewith. Please check your record and confirm authenticity / genuiness of the requisite
documents to proceed further.

DA – As above Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Town Officer (P&C)


TMA Iqbal Town,
7-College Block A.I. Town, Lahore.

Info: 1. District Coordination Officer Lahore with the request to direct officer
concerned to confirm the genuiness of documents as mentioned above
(copies enclosed).

2. Master file.
DA – As above (Sr. No.1)

No._____________/DRW/1256/LESCO Dated_______/11/2009

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: PROVISION OF ELECTRICITY IN ALIYA TOWN SUKH NEHAR,


BAGHBANPURA LAHORE

Reference: TMO Shalamar Town, Lahore letter No. 801-TMO/Ist dated 8-10-2009 and
telephonic discussion on the subject dated 10-10-2009.

Copy of this office letter No. 24220-23 dated 30-9-2009 depicting the total
picture of the issue, sent to Deputy Secretary (CP) Prime Minister’s Sectt. (P), Islamabad
for necessary instructions, is being enclosed for information.

DA – As above ( Sadr-ul-Huda )
General Manager (Tech.)
LESCO

To: General Manager (Op.)


Wapda House, Lahore.
Info: Master file.

No.______________/P&D/DDC/305/PP-141 Dated____/10/2009
Hamid/dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: ENQUIRY COMMITTEE REPORT REGARDING ILLEGAL / UN-


AUTHOIZED ELECTRIFICATION AND PROVIDING CONNECTION IN
MIAN COLONY NO. 2 FALLING UNDER JIA MUSA SUB-DIVN. LESCO.

Enclosed please find herewith a copy of Enquiry Committee report as


mentioned in the subject. You are advised to take immediate action against Sr. No. ‘E’
(Page-6) of recommendations of the Enquiry Committee under intimation to this office.

This issues with the approval of Chief Executive Officer LESCO.

DA – As above Chief Engineer (P&D)


( Saleem Akhtar )

To: DM (O) Ravi Road Divn. LESCO.


Info: 1. Manager (O) Northern Circle LESCO for information and necessary action.
2. Master file.

No.______________/P&D/ Dated____/10/2009

Hamid/dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: RECOVERY OF SHARING COST OF GRID STATION FROM


SPONSORS OF HOUSING SOCIETY(IES)

Reference: Your office letter No. 3136-45/CE(O)DHQ/Housing Society dated


19-9-2009.
Point-wise comments are as under:

1. Agreed. It is further clarified that if land for grid station is provided by the
Sponsors then cost of land will not be charged to the Society as per Circular
instructions issued by G.M (C&M) Power vide No. 19-31/GM(C&M)P/E-5
dated 2-1-2003 (copy enclosed).
2. Agreed.

It is further suggested that the Sponsors may also be allowed to construct


their grid stations at their own subject to the following conditions:
(i) Sponsors shall transfer 4 to 6 Acres land of grid station in favour of
LESCO/WAPDA.
(ii) Grid Station will be constructed having provision of minimum 3 No. T/F
Bays and 2 No. T/L Bays.
(iii) Grid stations shall be maintained and operated by LESCO/WAPDA.
(iv) Sponsors will not object for installation of additional Power Transformer for
LESCO/WAPDA to feed the area other than the said Housing Scheme.

(v) Sponsor will provide Right-of-Way for the feeders to be constructed from
proposed grid station to feed the areas other than the said Housing Scheme.

DA – As above General Manager (Technical)


( Sadr-ul-Huda )

To: Chief Engineer (Operation) PEPCO


Wapda House, Lahore.
Info: Master file.
No.______________/DRW/246/LESCO Dated____/9/2009
Hamid/dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: TRANSFER OF LAND OF GRID STATIONS ALLOCATED BY THE THE


SPONSORS OF HOUSING SCHEMES

A copy of list prepared by CE (Development) LESCO showing status of


land of grid stations by the Sponsors of Housing Societies is being enclosed which may be
reconciled with your record and missing Housing Society, if any, be pointed out
immediately.

It may also be ensured that Sponsors of all Housing Societies having


ultimate load demand 05 MW and above have allocated and transferred the land of grid
stations in favour of LESCO. Moreover after transfer of land and mutation etc. the
Registered Sale Deed / Transfer letter etc. may be handed over to HRD / Deputy Manager
(Property Management) LESCO to avoid any complication at belated stage.

DA – As above Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: 1. All Deputy Managers (P&D)


2. H.D.M. (P&D)

Info: 1. Chief Engineer (Development) LESCO.


2. Master file.

No.______________/DRW/ Dated____/9/2009

Hamid/dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: RECOVERY OF SHARING COST OF GRID STATION FROM


SPONSORS OF HOUSING SOCIETY(IES)

Reference: Your office letter No. 2525-34/CE(O)DHQ/6-B-Disco dated 13-8-2009.

Enclosed please find herewith proposal on the basis of revised rates per MW
as desired in the above referred letter.

DA – As above Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Chief Engineer (PEPCO)


Wapda House, Lahore.

Info: Master file.

No.______________/DRW/ Dated____/9/2009

Hamid/dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF EXPO-AVENUE HOUSING


SCHEME, MOUZA RAKH TEHSIL AND DISTT. LAHORE

Reference: Your letter No. Ref:HE/247-02 dated 2-7-2009.

While checking the design following short comings have been observed,
which may be attended to proceed further:
(1) T-4 (25 kVA Transformer) has been proposed for electrification whereas
as per clause-2 of Circular letter No. 2163-81 dated 26-10-1993, less than
100 kVA T/F cannot be proposed.
(2) Ant conductor is proposed instead of Wasp on T-3 200 kVA T/F from Node
No. 10 to 20.
(3) In Inventory list, L.T assemblies does not tally with the design map.
(4) In addition to above, Approval of Civic Authority / LDA may also be
supplied as already requested vide this office No. 19763-64 dated
29-6-2009.

Deputy Manager (Planning)


For Chief Engineer (P&D)

To: M/s Hamza Engineers,


139-A/F Raja Centre,
Main Market, Gulberg, Lahore.

Info: 1. M/s Expo-Avenue Housing Scheme Near Mouza Rakh Lahore for necessary
action as above.

2. Master file.

No.______________/DRW/1246/LESCO Dated____/8/2009

Hamid/dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: BANK GUARANTEES – EXTERNAL ELECTRIFICATION OF PHASE-1


OF AUDIT AND ACCOUNTS EMPLOYEES COOP. HOUSING SOCIETY
LTD. LAHORE (ULTIMATE DEMAND 8030 KW)

Reference: Your letter No. AN/LG/6514, AN/LG/6515 & AN/LG/6516 all dated
6-8-2009.

03 No. Bank guarantees received through Manager HBL, The Mall Branch
Bank Square, Lahore vide above referred letters are returned herewith in original with the
request that the same may be furnished as per sample already sent to you vide this office
letter No. 17453-55 dated 2-5-2009. A copy of the same is again enclosed.

DA – As above Chief Engineer (P&D)


( Engr. Saleem Akhtar )

To: President Audit & Accounts Coop.


Housing Society A.G. Punjab Office Complex,
Lahore

Info: 1. Manager HBL, The Mall Branch, Bank Square,. Lahore.

2. M/s Jansons Engineering Services, IEP Building, Liberty Roundabout


Gulberg-III, Lahore for necessary action as above.

3. Master file.
No.___________/ P&D/DRW/162/LESCO Dated____/8/2009

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF JUDICIAL COMPLEX,


CHUNIAN DISTT. KASUR

Reference: Your letter No. Judicial Complex / Chunian / Distt. Kasur/DE/01 dated
11-8-2009.

The documents provided by you vide your letter referred above have been
scrutinized in this office and following short comings have been observed, which may be
attended to proceed further:
(5) Photocopy of I.D card of the sponsor not provided.
(6) Approval of judicial complex from concerned Authority not attached.
(7) Photocopy of the agreement between sponsor (6th provincial building) and
the consultant as intimated in the design book not provided.

( Muhammad Anis )
Deputy Manager (Planning)
For Chief Engineer (P&D)

To: M/s Power Com Consultants,


Suit No. 1 Ist Floor Khurram Shopping Centre,
Wahdat Road, Lahore

Info: 1. Mr. Khalid Farooq, Executive Engineer 6th Provincial Building Lahore.
for necessary action as above.

2. Master file.

No.______________/DRW/1250/LESCO Dated____/8/2009

Hamid/dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

FAX MESSAGE

Subject: RECOVERY OF SHARING COST OF GRID STATION FROM


SPONSORS OF HOUSING SOCIETY (IES)

Chief Engineer (Op.) PEPCO vide his letter No. 2525-34 dated 13-8-2009
(copy enclosed) has intimated that grid sharing cost as mentioned below was assessed
about six years back whereas now the prices of grid station equipment, transmission line
material and land have escalated appreciably which warrants revision:

a) Rs. 4.93 Million per MW of ultimate demand of load of Housing


Society(ies) as cost of grid station, transmission line and equipment
etc.

b) Rs. 0.534 Million per MW as cost of land.

As advised in the above referred letter, necessary proposal on the basis of


revised rate per MW keeping in view the increased prices of grid station equipment,
transmission line material and land etc. may be please be submitted to this office for
onward submission to Chief Engineer (Op.) PEPCO.

DA – As above Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Chief Engineer (Development) LESCO

Info: Master file.

No.______________/DRW/246/LESCO Dated____/8/2009

Hamid / dak-h6
To,

The Chief Executive Officer,


LESCO Ltd. Lahore.

Subject: REQUEST TO ENERGIZE NEW CONNECTION OF CAPITAL STEEL RE-


ROLLING MILLS FOR 550 KW LOAD AGAINST APP. NO. 327/B-3
DATED 16-1-2007

Sir,

We would like to inform you that all formalities regarding our new
connection as mentioned in the subject have been completed but our connection
is not be energized due to dispute of R&R charges. We request your honour to
allow 05 installments of disputed amount of R&R charges besides energization of
connection after payment of Ist installment. It is further added that in case
disputed amount of R&R charges found not recoverable from us by the competent
authority, the deposited amount may be refunded.

Thanks.

Yours sincerely,

(Muhammad Saleem)
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTENSION OF LOAD FROM 1716 KW TO 4202 KW (NET EXTENSION


2486) OF M/S BHANERO TEXTILE MILLS LTD. UNIT NO. 2 18-KM
FEROZE WATOAN FAISALABAD ROAD SHEIKHUPURA

As intimated by Sr. Manager Construction LESCO, due to enhanced rates of


material, estimated capital cost of subject work has been increased from Rs.96,56,273/- to
Rs.1,09,67,168/-. Therefore difference of capital cost: Rs.13,10,895/- (Rupee thirteen lac
ten thousand eight hundred ninety-five only) may please be deposited in the office of
Finance Director LESCO under intimation to this office.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Mr. Bhanero Textile Mills Ltd. Unit No. 2


18-KM Feroze Watoan Faisalabad Road, Sheikhupura

Info: 1. Finance Director LESCO. On payment, difference of capital cost:


Rs.13,10,895/- may be transferred to Sr. Manager Construction through
Credit Advice under intimation to this office.

6. Sr. Manager Construction LESCO with ref. to his No. 9820-23 dated
7-3-2009
7. DM Construction Divn. LESCO Sheikhupura with ref. to his No. 10898-99
dated 13-2-2009.

4. Master file.
No._____________/DRW/401/Skp. Dated______/8/2009

Hamid / dak-h6
LESCO
Subject: POLICY / CRITERIA REGARDING EXTERNAL ELECTRIFICATION
OF HOUSING SCHEMES

Requirements:
1. Approval of layout plan of the Scheme from concerned Department /
Authority or Local Body etc.
2. Design of external electrification of the Housing Scheme submitted through
any of the Consultants registered with Pakistan Engineering Council
alongwith relevant documents i.e. ownership proof, necessary undertakings,
photocopies of NIC etc.
3. 04 to 06 Acres land for grid station is to be provided by the Sponsors of all
Housing Schemes with ultimate load demand 5 MW and above.

Processing of Design:
After approval of design of the Schemes by LESCO Sponsors are required
to deposit the following amounts:
(i) Design vetting @ 1.5% of the total estimated cost of the project.
(ii) 25% grid sharing for ultimate load demand of the Scheme from the
Sponsors @ Rs.1366/- per kW & Rs.1233/- per kW in case land of
grid station is provided by the Sponsors.
(iii) In addition to above, 25% grid sharing cost @ Rs. 1366/- per kW is
to be deposited by the individuals plot owners at the time of getting
connections.

Issuance of Technical Clearance


 On payment of design vetting charges and grid sharing cost as mentioned
above, technical clearance is issued asking the Sponsors to deposit
capital cost of the project.
 After payment of capital cost, go-ahead signal is issued for execution of
work by Manager Construction.
 In case Sponsors intends to get the Scheme executed privately through
WAPDA approved Contractors, Inspection / Supervision charges @
1.5% of the estimated cost is to be deposited besides submitting Bank
Guarantee equivalent to 25% amount of the estimated cost.

No. of Housing Schemes in process : 63


LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: VERIFICATION OF APPROVAL OF SUB-DIVISION PLAN OF


JOHAR VILLAS NEAR WAFAQI COLONY MOUZA DHANA
SINGH WALA LAHORE

A copy of provisional approval letter issued by your office vide No. 211-
AIT/P&C dated 24-5-2008 alongwith approved layout plan of the subject Housing
Scheme is sent herewith. Please check your record and confirm the authenticity /
genuiness of the requisite documents to proceed further.

DA – As above Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Town Officer (P&C)


Allama Iqbal Town, Lahore

Info: 1. District Coordination Officer Lahore with the request to direct officer
concerned to confirm the genuiness of documents as mentioned above
(copies enclosed).

2. P.A.

3. Master file.
DA – As above (Sr. No.1)

No._____________/DRW/1221/LESCO Dated_______/7/2009

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: BANK GUARANTEE FOR MAINTENANCE OF UNDERGROUND


DISTRIBUTION NETWORK OF IQBAL AVENUE
COOPERATIVE HOUSING SOCIETY (PHASE-III) CANAL ROAD
NEAR MOUZA CHUNG LAHORE

Reference: This office letter No. 3451-59 dated 8-7-2006

As per clause – 2 & 3 of Terms and Conditions of letter under reference,


Bank Guarantee equivalent to Rs.18.5 Millions (Rupees eighteen & half Millions)
regarding maintenance of underground distribution system of your Housing Scheme for a
period of 07 years duly vetted by Legal Director LESCO please be furnished to this office
alongwith a copy of Agreement executed by you for the said job with well reputed
Company.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: M/s Iqbal Avenue Coop. Housing Society Phase-III,


Near Shaukat Khanum Hospital Johar Town, Lahore

Info: 1. Legal Director LESCO.


2. Manager (O) Central Circle LESCO. ) to ensure payment of grid sharing
3. DM (O) A.I. Town Divn. LESCO. ) cost and security from the
4. AM (O) Chung Sub-Divn. LESCO. ) individual applicants in
5. AM (CS) A.I. Town Divn. LESCO ) accordance with load criteria
) given in the planning guide
6. Master file.

No.____________/P&D/DRW/920/LESCO Dated______/8/2009
Hamid / Dak-h6
LESCO
Subject: POLICY / CRITERIA REGARDING EXTERNAL ELECTRIFICATION
OF HOUSING SCHEMES
Requirements:
4. Approval and approved layout plan of the Scheme from concerned
Department / Authority or Local Body etc.
5. Design of external electrification of the Housing Scheme is to be prepared
and submitted through any of the Consultants registered with Pakistan
Engineering Council alongwith relevant documents i.e. ownership proof,
necessary undertakings, photocopies of NIC etc.
6. 04 to 06 Acres land for grid station is to be provided by the Sponsors of all
Housing Schemes with ultimate load demand 5 MW and above as per
approval of BOD of LESCO.
Processing of Design:
After approval of design of the Schemes by the competent authority (CEO),
Sponsors are required to deposit the following amounts:
(iv) Design vetting @ 1.5% of the total estimated cost of the project.
(v) 25% grid sharing for ultimate load demand of the Scheme from the
Sponsors @ Rs.1366/- per kW.
(vi) In addition to above, 25% grid sharing cost @ Rs. 1366/- per kW is
to be deposited by the individuals plot owners at the time of getting
connections.
(vii) In cases where Sponsors provide land for grid station, grid sharing
cost is recovered after deduction of cost of land in the light of
instructions issued by GM (C&M) Power vide No. 19-31 dated
2-1-2003 as follows:
“Rs.4.93 Million per MW of load of Housing Society (ies) as cost of
grid station, transmission line and equipment etc. and Rs. 0.534
Million per MW as cost of land”
Issuance of Technical Clearance
 On payment of design vetting and grid sharing cost as mentioned above,
technical clearance containing design aspects of the scheme is to be
issued asking the Sponsors to deposit capital cost of the project.
 After payment of capital cost, go-ahead signal is issued for execution of
work by Manager Construction.
 In case Sponsors intends to have get the work executed privately through
WAPDA approved Contractors, Inspection / Supervision charges @
1.5% of the estimated cost is to be deposited besides submitting Bank
Guarantee equivalent to 25% amount of the estimated cost.
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: POLICY / CRITERIA REGARDING EXTERNAL ELECTRIFICATION


OF HOUSING SCHEMES

Reference: 1. Your office letter No. 3385-93/CE(O)/DHQ dated 5-8-2009.


2. This office No. 22041 dated 6-8-2009.

As already intimated the cases of external electrification of Housing


Schemes are being processed in the light of ‘Standard Criteria for the Electrification of
New Housing Schemes’ circulated by General Manager (PE&S) WAPDA Lahore vide
No. GM (PE&S)/CEDE/DDE/E-42/2163-81 dated 26-10-1993 and other relevant
instructions issued by the Authority from time to time.

Briefly the processing procedure is described hereunder:

Requirements:
7. Approval and approved layout plan of the Scheme from concerned
Department / Authority or Local Body as mentioned below:-

 160 Kanals and above by LDA.


 Below 160 Kanals by TMA / Local Body etc.

8. Design of external electrification of the Housing Scheme is to be prepared


and submitted through any of the Consultants registered with Pakistan
Engineering Council alongwith relevant documents i.e. ownership proof,
necessary undertakings, photocopies of NIC etc.

9. 04 to 06 Acres land for grid station is to be provided by the Sponsors of all


Housing Schemes with ultimate load demand 5 MW and above as per
approval of BOD of LESCO.

Cont….P/2
-2-
Processing of Design
After approval of design of the Schemes by the competent authority (CEO),
Sponsors are required to deposit the following amounts:

(viii) Design vetting charges @ 1.5% of the total estimated cost of the
project.

(ix) Inspection / Supervision charges @ 1.5% of the estimated cost in


case Sponsors intends to get the work executed privately through
WAPDA approved Contractors.

(x) 25% grid sharing for ultimate load demand of the Scheme from the
Sponsors @ Rs.1366/- per kW.

(xi) In addition to above, 25% grid sharing cost @ Rs. 1366/- per kW is
to be deposited by the individuals plot owners at the time of getting
connections.

(xii) In cases where Sponsors provides land for grid station, grid sharing
cost is recovered after deduction of cost of land in the light of
instructions issued by GM (C&M) Power vide No. 4931 dated
7-10-2004.

Issuance of Technical Clearance


 On payment of design vetting and grid sharing cost as mentioned above,
technical clearance containing design aspects of the scheme is to be
issued asking the Sponsors to deposit capital cost of the project.

 After payment of capital cost, go-ahead signal is issued for execution of


work by Manager Construction.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Chief Engineer (Operation) PEPCO


Wapda House, Lahore.

Info: Master file.


No._____________/DRW/ Dated______/8/2009

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF MADNI PARK HOUSING


SCHEME (PHASE-II) KHARIANWALA ROAD SHEIKHUPURA

As intimated by Sr. Manager Construction LESCO, due to enhanced rates of


material, estimated capital cost of subject work has been increased from Rs.26,78,692/- to
Rs. 33,80,591/-. Therefore difference of capital cost: Rs.701,899/- (Rupee seven lac one
thousand eight hundred ninety nine only) may please be deposited in the office of Finance
Director LESCO under intimation to this office.

In addition to above, layout plan of the scheme duly approved and signed by
the concerned Department / Authority or Local Body (TMA) alongwith approval letter
may be supplied to this office so that go-ahead signal for execution of work is issued to
Sr. Manager Construction.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Mr. Muhammad Iqbal, Attorney,


Madni Park Housing Scheme (Phase-II)
Kharianwala Road Sheikhupura

Info: 1. Finance Director LESCO. On payment, difference of capital cost:


Rs.701,899/- may be transferred to Sr. Manager Construction through Credit
Advice under intimation to this office.

8. Sr. Manager Construction LESCO with ref. to his No. 1042-44 dated
27-7-2009
9. DM Construction Divn. LESCO Sheikhupura.

4. Master file.
No._____________/DRW/1084/LESCO Dated______/8/2009

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF TARGET TRADE CENTRE


45-JAIL ROAD LAHORE

Reference: Your letter dated 4-7-2009.

The information / documents demanded vide this office letter No. 9375
dated 6-12-2005 are mandatory before processing the case of external electrification,
which may please be provided to proceeded further.

Deputy Manager (Planning)


For Chief Engineer (P&D)

To: M/s Target Trade Centre,45-Jail Road, Lahore.

Info: 1. M/s Orion Consultants, 25-Peshawar Block, Fortress Stadium, Lahore Cantt.
for necessary action as above.

2. Master file.

No.____________/P&D/DRW/953/LESCO Dated____/8/2009

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: DESIGN OF 132 KV GRID STATION SADHOKE AT PLOT NO. 209-C-I


IN AUDIT AND ACCOUNTS EMPLOYEES CO-OP HOUSING SOCIETY
LTD LAHORE

Reference: M/s Jansons Engineering Services letter No. JES/AACHS/Grid/34 dated


28-7-2009 addressed to this office and your office.

As the subject matter relates to your office, therefore Drawings of proposed


grid station submitted by M/s Jansons Engineering Services vide above referred letter may
be examined and proceed further accordingly as per instructions of the department at your
level please.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Chief Engineer (Development) LESCO

Info: 1. M/s Jansons Engineering Services, IEP Building, Liberty Roundabout


Gulberg-III, Lahore to pursue the matter with Chief Engineer
(Development) LESCO.

2. Master file.

No.____________/DRW/162/LESCO Dated____/8/2009

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF PHASE-1 OF AUDIT AND


ACCOUNTS EMPLOYEES CO-OP HOUSING SOCIETY LTD LAHORE
(ULTIMATE DEMAD 8030 KW).

Your Bank Guarantees No. LG.NO.6514, 6515 & 6516 all dated 19-03-
2008 for Rs.12,56,610/-, Rs.27,67,049/- & Rs. 43,91,170/- total Rs. 84,14,829/- furnished
in lieu of private execution of work of external electrification of subject Housing Scheme
were valid upto 18-03-2009. But despite reminder issued vide No. 13832-33 dated 17-2-
2009, you did not furnish the renewed bank guarantee till date, which is against the Terms
& Conditions laid down in this office letter No. 17266-75 dated 23-4-2008.

Keeping in view the position explained above, reasons for not executing the
work upto 18-3-2009 may be intimated besides submitting the renewed bank guarantee as
per enclosed sample within 10-days positively. In case you failed to do, your agreement
with LESCO shall stand rescinded without further notice.

DA – As above Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: President Audit & Accounts Coop. Housing Society,


A.G. Punjab Office Complex Lahore

Info: 1. Manager, Habib Bank Ltd., The Mall Branch, Bank Square Lahore with the
request not to release the amount of Bank Guarantees till go-ahead signal is
issued by this office

2. M/s Jansons Engineering Services, IEP Building, Liberty Roundabout


Gulberg-III, Lahore.

3. Master file.

No.__________/DRW/162/LESCO Dated____/4/2009
Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: WRIT PETITION NO. 1245/2001 FILED BY M/S EDEN


DEVELOPERS (PVT.) LTD. – EDEN PARK HOUSING SCHEME

Reference: This office letter No. 6931 dated 5-9-2006.

In the light of decision of Lahore High Court, Lahore in Writ Petition No.
1245/2001 and your representation dated 7-7-2006 addressed to Chairman WAPDA, you
were requested to visit this office on any working day during working hours for discussion
and to proceed further, but you did not do so.

Since in the light of instructions of department, grid sharing cost and cost of
11 kV independent feeder is yet to deposited by you, therefore, grid sharing
cost: Rs. 13,39,329/- and cost of 11 kV independent feeder Rs. ____________ may please
be deposited with Finance Director LESCO under intimation to this office.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: M/s Eden Developers (Pvt.) Ltd. Eden Towers,


M-3 82-E-1 Main Boulevard Gulberg-III, Lahore.

Info: 1. Finance Director LESCO.


2. Sr. Manager Construction LESCO.
3. Manager (O) Central Circle LESCO.
4. DM (O) Raiwind Divn. LESCO.
5. M/s Power Com Consultants, Suit No. 1 Ist Floor Khurram Shopping
Centre, Wahdat Road, Lahore to get the matter resolved by taking personal
interest.
6. Master file.

No.___________/P&D/DRW/296/LESCO Dated____/7/2009
Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: TRANSFER OF LAND ALLOCATED FOR GRID STATION IN


132 KV GRID STATION IN LAKE CITY HOUSING SCHEME
RAIWIND ROAD LAHORE

Reference: Legal Director LESCO letter No. 6501-04 dated 22-7-2009.

Registration Sale Deed on stamp paper as per sample sent to you vide above
referred letter may be prepared and furnished to this office for the signature of CEO
LESCO after getting it vetted from Legal Director LESCO.

DA – As above Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Director (EGC) Lake City Holdings (Pvt.) Ltd.


First Floor city Towers 6-K Main Boulevard Gulberg-II,
Lahore.

Info: 1. Legal Director LESCO


2. Chief Engineer Development LESCO.
3. PD, GSC LESCO.
4. DM Civil Work Divn. LESCO.
5. DM (Property Management) LESCO.
6. M/s Power Com Consultants, Suit No. 1 Ist Floor Khurram Shopping
Centre, Wahdat Road, Lahore for necessary action as above.
7. Master file.

No.____________/P&D/DRW/1103/LESCO Dated______/7/2008
Hamid / Dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 6308360 PBX: 6314616-20 (Ext.200)
E-mail: srmanpd@lesco.gov.pk

Subject: POSSESSION OF LAND AND CONSTRUCTION OF BOUNDARY


WALL FOR PROPOSED 132 KV GRID STATION IN LAKE CITY
HOUSING SCHEME RAIWIND ROAD LAHORE

Reference: M/s Lake City Holdings letter dated 27-7-2009 on the above noted subject
addressed to GM (T) with its copies to this office, your office and others.

As advised by the General Manager (Technical) LESCO, the possession of


land selected by Site Selection Board for proposed 132 kV Grid Station in Lake City
Housing Scheme may be taken and boundary wall be got constructed under intimation to
all concerned.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Director (EGC) Lake City Holdings (Pvt.) Ltd. First Floor city Towers 6-K
Main Boulevard Gulberg-II, Lahore.
PD, GSC LESCO.

Info: 1. Chief Engineer (Development) LESCO.


2. Chief Engineer O&M (T&G) LESCO.
3. DM Civil Works Divn. LESCO
4. Director (EGC) Lake City Holdings (Pvt.) Ltd. First Floor city Towers 6-K
Main Boulevard Gulberg-II, Lahore. The title of land of proposed 132 kV
grid station selected by LESCO Siting Board may be transferred in the name
of LESO in consultation with Legal Director LESCO and Registered Sale
Deed may be prepared and furnished to this office after getting mutation
(Intiqaal) in favour of LESCO for onward submission to Property
Management Cell.
5. M/s Power Com Consultants, Suit No. 1 Ist Floor Khurram Shopping
Centre, Wahdat Road, Lahore for necessary action as above.
6. Master file.

No._______________/DRW/ Dated____/7/2009
Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: FINANCIAL CLOSURE OF M/S SAPHIRE FIBERS LTD. UNIT-3 26-KM


FAISALABAD ROAD SHEIKHUPURA

Reference: 1. DM Construction Sheikhupura No. 9385-87 dated 7-11-2008.


2. This office letter No. 18725 dated 5-6-2009.

Despite repeated reminders, financial closure of the subject work is still


awaited from your end, which may please be supplied to this office immediately to
proceed further.

Deputy Manager (Planning)


For Chief Engineer (P&D)

To: Sr. Manager Construction LESCO

Info: 1. DM Construction Divn. LESCO Sheikhupura for necessary action as above.


2. Master file.

No.____________/P&D/468/Skp. Dated____/07/2009

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICAIOTN OF BLOCK H-1 OF SABZAZAR


HOUSING SCHEME

Reference: 1. M/s Power Com letter dated 26-6-2009.


2. Your telephonic discussion dated 25-7-2009.

Since you intend to get the work executed privately through


WAPDA/LESCO approved Contractors, therefore formal request in this regard may be
sent to this office.

Deputy Manager (Planning)


For Chief Engineer (P&D)

To: Director (EME) LDA, Lahore.

Info: 1. M/s Power Com Consultants, Suit No. 1 Ist Floor Khurram Shopping
Centre, Wahdat Road, Lahore

2. Master file.

No.____________/P&D/ Dated____/07/2009
Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: STATUS OF LAND FOR 132 KV GRID STATIONS JUBILEE TOWN AND
LDA-I HOUSING SCHEMES

Reference: 1. This office letter No. 21083-87/LESCO/DRW-410 dated 18-6-2008.


2. Your office letter No. Dir(EME)/LDA/2385 dated 17-7-2008
3. This office letter No. 21551-53 dated 23-7-2009.
4. PD, GSC letter No. 6589-91 dated 21-8-2009.

Despite repeated requests, title of land allocated for Grid Stations in Jubilee
Town & LDA-1 Housing Schemes has not yet been transferred in favour of LESCO by
LDA. Therefore the matter may be expedited so that after transfer of land, LESCO may
start construction of grid stations in both the Housing Schemes.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Director (EME) LDA,


7-Court Street LDA Complex,
Lahore.

Info: 1. Chief Engineer (Development) LESCO.


2. PD (GSC) LESCO for necessary action as above.
3. Master file.

No.___________/DRW/410/LESCO Dated_____/12/2009
Hamid / dak-h6
Subject: LIST OF IMPORTANT COURT CASES

Sr. No. Petitioner Name of Court Name of Counsel

1. Precession Forging Lahore High Court Mr. M. Ilyas Khan

2. Siddique Leather -do- -do-

3. City Steel Civil Court Mr. Ramay

4. Qadri Steel Civil Court Case is being


pursued by DM (O)
Badami Bagh

( Naveed Mumtaz )
Deputy Manager (Planning)
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: UNDERTAKING

Reference: Your office letter No. 19875/MDP/DD(CM)-I/SSB-09/34 dated 8-7-2009.

As advised in the above referred letter, following documents are being


enclosed herewith:-

a. Undertaking / Certificate on prescribed proforma (Annex-A) on non-judicial


paper duly attested by Notary Public (alongwith two photocopies).

b. Bio Data on the prescribed proforma (Annex-B).

DA – As above Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Director (CM)-I PEPCO


WAPDA House, Lahore.

Info: P.A.

No.____________/P&D/ Dated_____/7/2009

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF GREEN VIEW COLONY MOUZA


CHUNG, MULTAN ROAD LAHORE (ULTIMATE DEMAND : 105.2 KW –
INDIVIDUAL METERING)

Reference: This office letter No. 17456-59 dated 2-5-2009.

Payment of difference of capital cost: Rs.1902/- and layout plan of the


Scheme duly approved and signed by the concerned Department / Authority or Local
Body (TMA) alongwith approval letter is still awaited. Therefore needful may be done
immediately to proceed further.

Deputy Manager (Planning)


For Chief Engineer (P&D)

To: M/s Green View Colony,


Mouza Chung, Multan Road, Lahore.

Info: 1. Finance Director LESCO.


2. Sr. Manager Construction LESCO.
3. M/s Hamza Engineers, 139-A/F, Raja Centre Main Market Gulberg-II,
Lahore for necessary action as above.
4. Master file.
No._____________/DRW/1191/LESCO Dated_____/7/2009

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF BLOCKS K,Q,R,R-1,R-II &


R-III OF M.A. JOHARTOWN LAHORE

Reference: This office Order No. 17244-47 dated 27-4-2009

The report of Committee constituted vide above referred Office Order is still
awaited, which may be expedited.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Manager (O) Central Circle LESCO.

Info: Master file.

No.___________/P&D/DRW/64/LESCO Dated____/7/2009

Hamid / Dak-h3
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: CONSTRUCTION OF 02 NO. 11 KV INDEPENDENT FEEDERS


FOR SOP TO SABZAZAR HOUSING SCHEME (PHASE-II)
LAHORE

Reference: Your letter No. 9647-49 dated 5-3-2009.

Leftover work of 02 No. 11 kV independent feeders for SOP to Sabzazar


Housing Scheme (Phase-II), Lahore may please be intimated to this office for the
information of General Manager (Technical) LESCO.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Sr. Manager Construction LESCO

Info: 1. Deputy Manager (South) Construction Divn. LESCO for necessary action as
above.

2. Master file.

No.___________/P&D/DRW/88/LESCO Dated______/7/2009
Hamid / Dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF JOHAR VILLAS

Reference: Your letter No. 11388-90 dated 28-5-2009.

Residents of the area have submitted application that they are ready to pay
the cost of external electrification of the locality of Johar Villas. Please get prepared the
estimate and submit to this office within four days.

Chief Engineer (P&D)


LESCO Ltd. Lahore

To: Manager (O) Central Circle LESCO

Info: 1. DM (O) Township Divn. LESCO.


2 Master file.

No.____________/P&D/DRW/1221/LESCO Dated____/7/2009

Hamid / Dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: REQUEST OF M/S CITY TOWERS 6-K MAIN BOULEVARD


GULBER-III LAHORE FOR EXTENSION OF LOAD FROM 1400
KW TO 2400 KW

It is submitted that extension of load of M/s City Towers (Commercial


Building) 6-K Main Boulevard Gulberg-III, Lahore under Tariff C-2 b (Bulk Supply) was
approved by this office vide letter No. 12290-98/DRW/532/4 dated 18-6-2003 through
11 kV independent feeder emanating from 132 kV Rehman Park Grid Station.

Now M/s City Towers has submitted application for extension of load from
1400 kW to 2400 kW. This office may please be advised regarding processing the said
case of extension of load keeping in view the requirement of distribution license for resale
of power.

Chief Engineer (P&D)


( Rao Zamir-ud-Din )

To: The Registrar, NEPRA,


NEPRA Tower, Attaturk Avenue,
G-5/1 Islamabad.

Info: 1. M/s City Towers (Commercial Building) 6-K Main Boulevard Gulberg-III,
Lahore to pursue the matter with NEPRA for early finalization of their case
of extension of load.

2. Master file.

No.____________/P&D/DRW/532/LESCO Dated____/10/2014
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF REHMAT PARK SHADIWAL


(MEHAR PURA) LAHORE

Reference: Your letter dated 28-11-2008.

As per policy of the Department electrification of all such Abadies /


Housing Schemes is to be carried out on cost deposit basis either borne by the
residents/sponsors or any other Government Agency. However estimate for external
electrification of the area in question has been prepared which comes to be Rs.892,207/-,
which may please be arranged so that electrification of Rehmat Park is carried out.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Malik Muhammad Afzal Khokhar,


Member National Assembly,
NA-128 Lahore
Info: Master file.

No.____________/ DRW/12327/2nd Dated____/7/2009


Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: INSTALLATION OF 2 NO. 200 KVA T/FS BLCOKS A&D NAZ


TOWN LAHORE

In continuation to this office lettr No. 14252-56 dated 27-2-2009.

Mr. Liaqat Ali Bhatti of Naz Town met with worthy Chief Executive Officer
LESCO on 13-7-2009 who has decided that there is no need of NOC for provision of
electric connections from any person in Block A & D of Naz Town, Lahore.

Chief Engineer (P&D)


( Engr. Saleem Akhtar)

To: DM (O) Township Divn. LESCO

Info: 1. AM (O) Wapda Town Sub-Divn. LESCO

2. Master file.

No.______________/ DRW/97/LESCO Dated_____/7/2009

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF CH. GHULAM ABBAS KASHMIR


HOUSNG COLONY PURAB MURIDKE DISTT. SHEIKHUPURA

Reference: Your letters dated 30-5-2009 & 11-6-2009

In the light of instructions of the department and policy in vogue, following


requirements are to be fulfilled by the sponsors of housing scheme before processing the
case of external electrification of Housing Colony, so you are requested to fulfill the
following requirements to proceed further:

1. Approval and approved layout plan of the Scheme from LDA/TMA


2. Revised design through Consultants.
3. 4 to 6 Acres land for grid station being ultimate load demand beyond
05 MW.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Syed Baqir Raza,


Section Officer (D-II)
Azad Jammu & Kashmir Council Sectt.
Sector F-5/2, Islamabad

Info: Master file.

No.___________/P&D/DRW/609/LESCO Dated____/7/2009
Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF CH. GHULAM ABBAS KASHMIR


HOUSNG COLONY PURAB MURIDKE DISTT. SHEIKHUPURA

Reference: Your letters dated 30-5-2009 & 11-6-2009

In the light of instructions of the department and policy in vogue, following


requirements are to be fulfilled by the sponsors of housing scheme before processing the
case of external electrification of Housing Colony, so you are requested to fulfill the
following requirements to proceed further:

4. Approval and approved layout plan of the Scheme from LDA/TMA


5. Revised design through Consultants.
6. 4 to 6 Acres land for grid station being ultimate load demand beyond
05 MW.

Chief Engineer (P&D)


(Engr. Saleem Akhtar)

To: Syed Baqir Raza,


Section Officer (D-II)
Azad Jammu & Kashmir Council Sectt.
Sector F-5/2, Islamabad

Info: Master file.

No.___________/P&D/DRW/609/LESCO Dated____/7/2009
Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED

Subject: MATERNITY CLAIM

Enclosed please find herewith maternity claim for Rs. _________________


of Mr. __________________________________________________________________
for verification and early return.

DA – Complete case| Deputy Manager (Op.)


Street Light Divn. LESCO
Lahore

To: M.S. Wapda Hospital,


Lahore.

No.___________/ Dated______/10/2009
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: UNDERGROUND EXTERNAL ELECTRIFICATION OF SHEIKHU


GARDENS HOUSING SCHEME LAHORE ROAD SHEIKHUURA

Reference: 1. This office letter No. 1695-97 dated 3-8-2012.


2. Your letter dated 11-10-2012.

The case was put up to Chief Executive Officer LESCO, who has advised
that since a period of more than 03 months has been elapsed, therefore revised design as
per fresh rates of inventory and latest parameters of source feed line and grid station may
be prepared and submitted to this office to proceed further.

Chief Engineer (P&D)


(Engr. Navid Mumtaz)

To: M/s Orion Consultants,


25-Peshawar Block, Fortress Stadium,
Lahore Cantt

Info: 1. M/s Pebbles (Pvt.) Ltd. 35-A Empress Road, Lahore.


2. Master file.

No._____________/DRW/1322/LESCO Dated______/11/2012

Hamid / dak-h6
The Chief Engineer (P&D) Dated: 05 December 2012
LESCO, Lahore.

UNDERGROUND EXTERNAL ELECTRIFICATION OF SHEIKHU GARDENS


HOUSING SCHEME LAHORE ROAD SHEIKHUURA

Reference: Your office letter No. 6143-44 dated 30-11-2012 and in continuation to this
office letters on the subject.

In this regard, it is intimated that there is no change in rates of material as well as loading
position of grid station and source feed line as asked in your above referred letter.
Furthermore the entire proposed electrification system is underground for which LESCO’s
material rates are not applicable. Therefore letter issued by your regarding payment of
design vetting and grid sharing charges may be revalidated for one week.

Thanking you in anticipation.

With best regards,

Yours sincerely,

Engr. Shahid A. Bhatty


Chief Executive
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: UNDERGROUND EXTERNAL ELECTRIFICATION OF SHEIKHU


GARDENS HOUSING SCHEME LAHORE ROAD SHEIKHUURA

Reference: 1. This office letter No. 1695-97 dated 3-8-2012.


2. Your letter dated 30-11-2012.

Worthy CEO LESCO while acceding to your request has extended the
validity of provisional approval letter given at Reference-1 upto 15-12-2012. Therefore
design vetting charges: Rs. 10,83,178/- and grid sharing cost Rs. 59,87,547/- may please
be deposited with Finance Director LESCO upto 15-12-2012 under intimation to this
office.

Chief Engineer (P&D)


(Engr. Navid Mumtaz)

To: M/s Orion Consultants,


25-Peshawar Block, Fortress Stadium,
Lahore Cantt

Info: 1. Finance Director LESCO.


2. M/s Pebbles (Pvt.) Ltd. 35-A Empress Road, Lahore.
3. Master file.

No._____________/DRW/1322/LESCO Dated______/12/2012

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

OFFICE ORDER

Mr. Kamran Rauf Baig, Data Coder is hereby attached with DM (P-4)
Mr. Ghazanfar Abbas Rizvi with immediate effect and till further order. He will also work
on US AID assignment in addition to his own job.

Chief Engineer (P&D)


(Engr. Navid Mumtaz)

Info: 1. DM concerned.
2. Official concerned.
2. P.A
4. Master file.

No._____________/ Dated______/1/2013
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF TAHIR GARDEN HOUSING


SCHEME CHUCHAK ROAD RENALA

Sponsor of subject Housing Scheme has requested to issue revised estimate


of 2nd installment of capital cost. Therefore detail of material drawn and installed at site
alongwith detail of expenditure incurred and financial detail may please be provided to
this office immediately to proceed further.

Chief Engineer (P&D)


(Engr. Navid Mumtaz)

To: Sr. Manager Const. LESCO

Info: Master file.

No._____________/DRW/ Dated______/12/2012

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: LEFTOVER WORK OF EXTERNAL ELECTRIFICATION OF


YASIN GARDEN HOUSING SCHEME SHAHDARA BY PASS
LAHORE

Reference: 1. Addl. Manager North Const. Divn. letter No. 2403-4 dated 16-3-2015.
2. Your letter No. 6656-57 dated 27-3-2015.
3. This office letter No. 2386-88 dated 2-4-2015.
4. F.D LESCO letter No. 1207-08 dated 18-5-2015.

Since Finance Director LESCO vide his letter given at Reference-4 has
issued Credit Advice of capital cost: Rs.10,54,582/- in your favour; as such go-ahead
signal is hereby issued to complete the work of external electrification of subject Housing
Scheme. After completion of work, financial closure may be sent to this office to proceed
further accordingly.

Chief Engineer (P&D)


( Rao Zamir-ud-Din )

To: PD (Construction) LESCO

Info: 1. Chief Financial Officer LESCO.


2. Manger (Op.) Northern Circle LESCO.
3. DM (O) Ferozewala Divn. LESCO.
4. SDO (Op.) G.T. Road Sub-Divn. LESCO.
5. Mian Mursal Ali S/O Haji Ghulam Yasin, resident of 22-A Akram Park Abu
Bakar Road, Shad Bagh, Lahore.
6. Master file.

No._____________/DRW/1023/LESCO Dated______/5/2015

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF YASIN GARDEN HOUSING


SCHEME SHAHDARA BY PASS LAHORE RENALA

Reference: Your office letter No. 12288-89/PDC/Lahore dated 25-3-2011.

Detail of work executed and yet to be executed in the subject Housing


Scheme may please be provided to this office immediately.

Chief Engineer (P&D)


(Engr. Navid Mumtaz)

To: Sr. Manager Const. LESCO

Info: 1. Mian Mursal Ali S/O Haji Ghulam Yasin & others,
22-A Akram Park, Abu Bakar Road, Shad Bagh, Lahore with reference to
his application dated 1-1-2013 to pursue the matter with Sr. Manager
Construction LESCO.

2. Master file.

No._____________/DRW/1023/LESCO Dated______/1/2013

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF GREEN VALLEY HOUSING


SCHEME SARGODHA ROAD SHEIKHUPURA

Reference: Your office letter No. 14091-93 dated 12-10-2012.

While going through the record, it has been observed that Sponsor has not
yet deposited the capital cost of external electrification of subject Housing Scheme, which
now at fresh rates of material comes to be Rs.32,67,515/-. Therefore either Sponsor or
residents should deposit the requisite amount in lump sum with Finance Director LESCO
so that after completion of work of external electrification connections may be provided to
the residents.

Chief Engineer (P&D)


(Engr. Navid Mumtaz)

To: Deputy Manager (Op.),


City Division, LESCO,
Sheikhupura

Info: 1. Finance Director LESCO.


2. Manager (Op.) LESCO Sheikhupura Circle.
3. Sr. Manager Const. LESCO
4. Master file.

No._____________/DRW/1116/LESCO Dated______/1/2013

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Final Notice

Subject: EXTERNAL ELECTRIFICATION OF SHER MUHAMMAD TOWN


HOUSING SCHEME CHAK NO. 2/4-L OKARA

Reference: 1. Your letter No. Sher Muhammad Town Okara/DE/01 dated 15-2-2012.
2. This office letter No. 18155-56 dated 10-4-2012.

This office has requested to provide approved layout plan of subject


Housing Scheme alongwith approval letter from concerned Civic Authority vide above
mentioned letter. But nothing has been done so far at your. You are finally informed to
provide the above mentioned documents otherwise your application will be cancelled.

Addl. Manger (Planning)


For Chief Engineer (P&D)
LESCO, Lahore.

To: M/s Power Com,


Suit No. 1 First Floor, Khurram Shopping Centre,
12-Main Wahdat Road, Lahore.

Info: Master file.

No._____________/DRW/1116/LESCO Dated______/1/2013
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Final Notice

Subject: EXTERNAL ELECTRIFICATION OF SHAH NAWAZ TOWN


HOUSING SCHEME CHAK NO. 51/2-L HOSPITAL ROAD OKARA

Reference: 1. Your letter No. Shah Nawaz Town/Okara/DE/01 dated 14-3-2012


2. This office letter No. 18568-69 dated 16-4-2012.

This office has requested to provide approved layout plan of subject


Housing Scheme alongwith approval letter from concerned Civic Authority vide above
mentioned letter. But nothing has been done so far at your. You are finally informed to
provide the above mentioned documents otherwise your application will be cancelled.

Addl. Manger (Planning)


For Chief Engineer (P&D)
LESCO, Lahore.

To: M/s Power Com,


Suit No. 1 First Floor, Khurram Shopping Centre,
12-Main Wahdat Road, Lahore.

Info: Master file.

No._____________/DRW/1361/LESCO Dated______/1/2013
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Final Notice

Subject: EXTERNAL ELECTRIFICATION OF NIAZI TOWN CHAK


NO. 5/4-L G.T. ROAD OKARA

Reference: This office letter No. 13491 dated 14-2-2009.

This office has requested to provide approved layout plan of subject


Housing Scheme alongwith approval letter from concerned Civic Authority vide above
mentioned letter. But nothing has been done so far at your. You are finally informed to
provide the above mentioned documents otherwise your application will be cancelled.

Addl. Manger (Planning)


For Chief Engineer (P&D)
LESCO, Lahore.

To: M/s Power Com,


Suit No. 1 First Floor, Khurram Shopping Centre,
12-Main Wahdat Road, Lahore.

Info: Master file.

No._____________/DRW/1209/LESCO Dated______/1/2013
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Final Notice

Subject: EXTERNAL ELECTRIFICATION OF AL-HASEEB BLOCK


HOUSING SCHEME NEAR NOOR SHAH ROAD GAMBER OKARA

Reference: This office letter No. 109-10 dated 25-1-2010.

This office has requested to provide approved layout plan of subject


Housing Scheme alongwith approval letter from concerned Civic Authority vide above
mentioned letter. But nothing has been done so far at your. You are finally informed to
provide the above mentioned documents otherwise your application will be cancelled.

Addl. Manger (Planning)


For Chief Engineer (P&D)
LESCO, Lahore.

To: M/s Jansons Engineering Services,


IEP Building Liberty Roundabout Gulberg-III,
Lahore.

Info: 1. M/s Al-Haseeb Block Housing Scheme near Noor Shah Road Adda Gamber
Distt. Okara for necessary action as above.

2. Master file.

No._____________/DRW/1258/LESCO Dated______/1/2013
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Final Notice

Subject: EXTERNAL ELECTRIFICATION OF NOOR GARDEN HOUSING


SCHEME CHAK NO. 55/2-L OKARA

Reference: This office letter No. 1377 dated 1-8-2012.

This office has requested to provide approved layout plan of subject


Housing Scheme alongwith approval letter from concerned Civic Authority etc. vide
above mentioned letter. But nothing has been done so far at your. You are finally
informed to provide the above mentioned documents otherwise your application will be
cancelled.

Addl. Manger (Planning)


For Chief Engineer (P&D)
LESCO, Lahore.

To: M/s Electrical Planners Engineers,


Civil Lines Road Chowk Kutchery Multan

Info: Master file.

No._____________/DRW/1258/LESCO Dated______/1/2013
To,
The Chief Engineer (P&D)
LESCO Lahore.

Subject: DEPARTURE REPORT

Sir,

In compliance with HRD LESCO Office Order No. HRD/ESTB/6207-11


dated 8-1-2013, I hereby submit my departure report today i.e. on 8-1-2013 (AN) to attend
Upper Technical Subordinates Staff Course (Pre-Promotion) Session 29 th scheduled to be
held at WAPDA Engineering Academy, Faisalabad w.e.f 7-1-2013 to 1-2-2013.

Thanks.

Yours obediently,

(Muhammad Zaheer Babar)


LS/I
To,
The Chief Engineer/Principal,
WAPDA Engineering Academy,
Faisalabad

Subject: ARRIVAL REPORT

Sir,

In compliance with HRD LESCO Office Order No. HRD/ESTB/6207-11


dated 8-1-2013, I hereby submit my arrival report today i.e. on 9-1-2013 (FN) to attend
Upper Technical Subordinates Staff Course (Pre-Promotion) Session 29th.

Thanks.

Yours obediently,

(Muhammad Zaheer Babar)


LS/I
The Incharge Marketing Cell,
LESCO HQ. Lahore.

Subject: Extension of load of Tayyab Paper Mills from 980 kW to 1500 kW


instead of 980 kW to 1250 kW
Sir,
It is stated that presently we are running our connection for 980 kW.
We intend to extend our load. In the first instance due to miscalculation of load to be
extended we applied EOL from 980 kW to 1250 kW whereas actually our extended load
is upto 1500 kW. Therefore new A&A form for extension of load from 980 kW to
1500 kW are enclosed, which may please be forwarded to Chief Engineer (P&D) LESCO.
Other documents are already available in his office.

Thanking you in anticipation.

For M/s Tayyab Paper Mills


LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: ILLEGAL ELECTRIFICATION OF TAYYBA GARDEN FAIZ PUR


INTERCHANGE OPP. NAZIR CNG SHARAQPUR ROAD LAHORE

Reference: This office letter No. 9070 dated 31-1-2013.

The requisite report is still awaited from your end, which may please be
supplied to this office immediately in order to proceed further in the matter.

Addl. Manager (Planning)


For Chief Engineer (P&D)

To: Manager (S&I),


LESCO HQ. Lahore

Info: Master file.

No._____________/DRW/805/Ist Dated______/3/2013

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION IN RESPECT OF AREA


DEVELOPMENT SCHEME AT SANGLA HILL

Ref: Your office letter No. 1195 dated 14-6-2014

As already requested vide this office letter No. 11749-51 dated 4-3-2014
and No. 12871-73 dated 27-3-2014, remaining amount of capital cost: Rs.18,56,884/-
may please be deposited with Chief Financial Officer LESCO so that go-ahead signal
for execution of work may be issued to PD (Construction) LESCO.

Addl. Manager (Planning)


For Chief Engineer (P&D)

To: Deputy Director,


Punjab Housing &Town Planning Agency,
Sub-Region, Sheikhupura

Info: 1. Chief Financial Officer LESCO


2. PD (Construction) LESCO.
3. Master file.

No.___________/DRW/1235/LESCO Dated_____/7/2014

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: INSTALLMENTS OF GRID SHARING COST – UNDERGRUND


EXTERNAL ELECTRIFICATION OF SHEIKHU GARDENS LAHORE
ROAD SHEIKHUPURA

Ref: Your letter 26-12-2012.

The Chief Executive Officer LESCO has not acceded to your request
regarding allowing installments of grid sharing cost. Therefore grid sharing cost:
Rs.59,87,547/- may please be deposited with Finance Director LESCO in lump sum so as
to proceed further.

Chief Engineer (P&D)


( Engr. Navid Mumtaz)

To: M/s Orion Consultants,


25-Peshawar Block, Fortress Stadium,
Lahore Cantt.

Info: 1. Finance Director LESCO.


2. M/s Pebbles (Pvt.) Ltd. 35-A Empress Road, Lahore.
3. Master file.

No.___________/DRW/1322/LESCO Dated_____/1/2013

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTENSION OF BANK GUARANTEE NO. HMB/LHR/LG/660-09 DATED


10-11-2009 FOR RS.40,31,250/- ON ACCOUNT OF M/S RELIANCE
COTTON SPINNING MILLS LTD.

Ref: Your letter No. HMB/CR/880/2012 dated 2-11-2012.

Enclosed please find herewith a copy of SOP and sample of Bank Guarantee
devised by LESCO with the request that Bank Guarantee may be furnished on the
enclosed sample.

DA / SOP & sample


Bank Guarantee Chief Engineer (P&D)
( Engr. Navid Mumtaz)

To: M/s Reliance Cotton Spinning Mills Ltd.


Feroze Wattowan, Warburton Road,
Sheikhupura.

Info: Master file.

No.___________/DRW/467/Skp. Dated_____/2/2013
Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 6308360 PBX: 6314616-20 (Ext.200)
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF WAPDA TOWN SHEIKHUPURA

Reference: This office letter No. 27582-85 dated 24-12-2009.

As intimated by Sr. Manager Construction LESCO, due to enhanced rates of


material, estimated capital cost of Blocks L & M has been increased from Rs.95,69,388/-
to Rs.1,25,79,269/-. Therefore difference of capital cost: Rs.30,09,881/- (Rupee thirty lac
nine thousand eight hundred eighty one only) may please be deposited in the account of
Finance Director LESCO under intimation to this office.

Chief Engineer (P&D)


( Saleem Akhtar )

To: General Security, Wapda Town, Sheikhupura.


P.O. Noorpur Virkaan, Sheikhupura.

Info: 1. Finance Director LESCO. On payment, difference of capital cost:


Rs.30,09,881/- may be transferred to Sr. Manager Construction through
Credit Advice under intimation to this office.

2. Sr. Manager Construction LESCO with ref. to his No. 6562-63 dated
12-12-2009

3. DM Construction Divn. LESCO Sheikhupura with ref. to above.

4. Master file.

No.__________/DRW/820/LESCO Dated______/12/2009
Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 6308360 PBX: 6314616-20 (Ext.200)
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF WAPDA TOWN SHEIKHUPURA

Reference: This office letter No. 27582-85 dated 24-12-2009.

Payment of difference of capital cost as mentioned in the above referred


letter, is not forthcoming from this office record. Therefore, if you have deposited the
same then a copy of Receipt issued by Finance Director LESCO may please be provided
to this office.

Chief Engineer (P&D)


( Engr. Navid Mumtaz)

To: General Security,


Wapda Town, Sheikhupura.
P.O. Noorpur Virkaan, Sheikhupura.

Info: 1. Sr. Manager Constructon LESCO.


2. Master file.

No.__________/DRW/820/LESCO Dated______/2/2013

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
OFFICE OF CHIEF ENGINEER O&M (DIST.)
22-A QUEENS ROAD LAHORE
Ph: # 99204795 PBX: 99204820-30 (Ext.311)
E-mail: srmanpd@lesco.gov.pk

Subject: REPRESENTATION OF M/S POLY PACK (PVT.) LTD. TO


CATEGORIZE AS TEXTILE INSTEAD OF CHEMICAL INDUSTRY

Reference: Representation dated 12-2-2013 of M/s Poly Pack (Pvt.) Ltd. to categorize
as Textile instead of Chemical Industry (copy enclosed).

The instructions to change the category as Textile Industry instead of


Chemical Industry have already been endorsed to your office vide Endst. No. 1271/CE
O&M (T&G) dated 8-10-2012 (copy enclosed). The needful may be done accordingly.

DA/ As above
Chief Engineer O&M (Dist.)
( Mahboob Ali )

To: Deputy Manager (PDC),


LESCO, Mcleod Road, Lahore.

Info: Master file.

No._____________/ Dated______/2/2013

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

Subject: EXTENSION OF LOAD FROM 25 KW 2000 KW OF M/S EMPIRE PAPER


MILLS MOMANPURA SHEIKHUPURA ROAD LAHORE

Reference: 1. This office letter No. 7101-09 dated 22-12-2010.


2. This office letter No. 3631-35 dated 19-4-2011.

Financial closure of the subject work is still awaited from you end, which
may please be supplied to this office immediately.

Chief Engineer (P&D)


LESCO Lahore

To: Sr. Manager Const. LESCO

Info: Master file.

No._____________/DRW/347/Ist Dated______/2/2013

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

Subject: INSTALLATION OF CONNECTION IN UN-ELECTRIFIED HOUSING


SCHEME NAMELY AL-KHAIR CITY FEROZEWALA NEAR
GOVERNMENT DEGREE COLLECGE FOR GIRLS SHAH KHALID
TOWN LAHORE

On receipt of application for new temporary connection in the subject


Housing Scheme, the representative of this office visited the site and observed that
a connection under Tariff A1 sanctioned load 1 kW being fed through 1 No. 15 kVA
Transformer already existing in un-electrified Housing Scheme and supply has been given
to some houses from the said connection.

Please investigate the matter and submit a detailed report to this office
besides initiating disciplinary action against the officer / official who installed illegal
connection in un-electrified Housing Scheme.

Chief Engineer (P&D)


(Muhammad Arshad Rafiq)

To: Manger (O) Northern Circle LESCO

Info: 1. DM (O) Ferozewala Divn. LESCO for necessary action as above.


2. Master file.

No._____________/DRW/T-860/Ist Dated______/3/2013

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

TOP PRIORITY

Subject: ORDERS OF HON’ABLE SUPREME COURT OF PAKISTAN


REGARDING COMPLETION OF WORK OF TRANSMISSION
LINE AND GRID STATION AS WELL AS EXTERNAL
ELECTRIFICATION OF LDA AVENUE – 1 HOUSING SCHEME BY
THE END OF DECEMBER 2013

Enclosed please find herewith a copy of Orders dated 4-3-2013 of Hon’able


Supreme Court of Pakistan regarding completion of work of Transmission line & Grid
Station as well as external electrification of LDA Avenue – 1 Housing Scheme by the end
of December 2013, which may be complied with in letter and spirit under intimation to all
concerned.

DA / As above
Chief Executive Officer
( Muhammad Saleem )

To: 1. P.D (GSC) LESCO


2. PD (Construction) LESCO

Info: 1. Chief Engineer (P&D) LESCO ) to ensure compliance of the


2. Chief Engineer (Development) LESCO ) Orders of Hon’able Supreme
3. Master file ) Court of Pakistan (copy attached)

DA / As above

No.___________/DRW/774/LESCO Dated______/03/2013

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

Subject: LAHORE RING ROAD PROJECT

Please refer to Additional Manager (CS) LESCO letter No. 8973-78 dated
6-3-2013 vide which a copy of Minutes of Meeting dated 9-1-2013 held with Ring Road
Authority has been sent to your office.

Please ensure compliance of the instructions contained in the above referred


letter under intimation to all concerned.

Chief Engineer (P&D)


(Muhammad Arshad Rafiq)

To: 1. Manger (O) Northern Circle LESCO


2. Manager (O) Eastern Circle LESCO
3. Manager (O) Southern Circle LESCO
4. PD (Construction) LESCO

Info: Master file.

No._____________/DRW/1280/LESCO Dated______/3/2013

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF SUB-DIVISION OF LAND “GREEN


CITY & EXECUTIVE BLOCK” SITUATED ON SHER GARH ROAD
CHAK NO. 20/2L FEROZE TOWN RENALA KHHURD

Reference: Your request on the subject.


The design and specification for external electrification of Sub-Division of Land
“Green City & Executive Block” situated on Sher Garh Road Chak No. 20/2L Feroze Town,
Renala Khurd, prepared by you has been processed in this office and approved provisionally
through existing 11 kV City feeder emanating from 132 kV Renala Khurd Grid Station. As per
MD (D) office Order issued vide No. PS / MDD / GMO / DHQ / 327/L/5371-83 dated 13-10-91.

Accordingly to the procedure described in the MD (D) above quoted Office Order,
an amount of Rs.1,13,965/- may be got deposited from the Sponsor on account of design vetting
charges @ 1.5 % of the total estimated amount, in the office of Finance Director LESCO 22-A
Queen’s Road, Lahore as per instructions issued by the Authority.
In order to accommodate the instant load, 25% cost sharing of grid station @
Rs.1366/- per kW for ultimate load is also recoverable from the Sponsor. Since ultimate load of
the colony is 908.43 kW, so net recoverable cost of grid sharing comes to be Rs.12,40,915/-,
which may also be got deposited with Finance Director LESCO simultaneously.

The formal approval letter containing the details of design aspects shall be issued
on receipt of design vetting charges and 4 No. copies of design books duly incorporating the
discrepancies pointed out by this office.

The validity of this demand stands for one month only.


This is being issued with the approval of Chief Executive Officer LESCO.

Chief Engineer (P&D)


(Muhammad Arshad Rafiq)
To: M/s Power Com,
Suit No. 1 First Floor, Khurram Centre,
Wahdat Road, Lahore.

Info: 1. Finance Director LESCO.


2. Manager (Op) Okara.
3. DM (O) Renala Khurd.
4. M/s Zahid Azeem & Tahir Azeem, Attorneys, Sub-Division of Land “ Green City
& Executive Block”, Chak No. 20/2L Sher Garh Road, Feroze Town, Renala
Khurd Distt. Okara.
5. Master file.
No. ________________/DRW/1409/LESCO Dated_____/03/2013

Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

Subject: REVISED ROUTE FOR M/S BLESSED TEXTILE MILLS LTD.

Reference: Your office letter No. 628-29/PDC/LHR dated 25-7-2011.

The work of 11 kV feeder of the subject consumer may be taken in hand as


per actual requirement at site. However after completion of work, financial closure and as
built drawing by incorporating the necessary changes made at site, may be furnished to
this office to proceed further in the matter.

Chief Engineer (P&D)


(Muhammad Arshad Rafiq)

To: PD (Construction) LESCO

Info: 1. DM, Construction Divn. LESCO Sheikhupura for necessary action as above.
2. Master file.

No._____________/DRW/458/Skp. Dated______/3/2013

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

Subject: LOAD MANAGEMENT FOR CONTINUOUS [RPCESS OMDISTRU ETC.

Enclosed please find herewith a copy of letter No. PS (VP)/2013 dated


6-3-2013 alongwith its enclosure received from the Vice President of Lahore Chamber
Commerce & Industry.

Please go through the contents of enclosed letters and proposal / feasibility


report in this regard may be submitted to this to proceed further in the matter.

DA / As above

Chief Engineer (P&D)


(Muhammad Arshad Rafiq)

To: Manager (Op.) Sheikhupura Circle LESCO.

Info: Master file.

No._____________/DRW/16134/Skp. Dated______/3/2013

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF JAMSHEED STREET MAJEED


TOWN RAVI RAYON G.T. ROAD MURIDKE

Reference: Your office letter No. JES/Majeed Town/LESCO/01 dated 10-4-2012.

The case has been examined and observed that you have submitted the
design for external electrification of Jamsheed Street, Majeed Town, Ravi Rayon G.T.
Road, Muridke being a Housing Scheme. But on the other hand TMA Muridke vide his
letter No. TMA/MDK/715 dated 7-8-2012 has intimated that:-

“Land measuring 8-Kanal 4-Marlas does not fall the definition of the
Housing Colony and it cannot be approved as a Housing Colony under the
relevant rule and laws.

Since this is not a case of external electrification of a Housing Scheme as


clarified by TMA Muridke, therefore the case is hereby closed.

Chief Engineer (P&D)


(Muhammad Arshad Rafiq)

To: M/s Jansons Engineering Services


3rd Floor, IEP Building, 97-B/D-1,
Main Boulevard Liberty Roundabout,
Gulberg-III, Lahore-54660

Info: 1. TMA Muridke.


2. Mr. Jamshed S/O Khushi Muhammad, House No. 60-A Gulfshan Colony,
Morre Samanabad Lahore.
3. Master file.

No._____________/DRW/1368/LESCO Dated______/5/2013

Hamid / dak-h6
Subject: CHANGE OF NAME OF M/s SPINCOT TEXTILE MILLS (PVT.)
LTD.

It is intimated that case of change of Name is to be processed by Customer


Services Directorate, therefore instant case of CON, may please be returned back to CSD
LESCO to proceed further at their level. However case of extension of load from
2700 kW to 3000 kW will be dealt with separately by this office.

Addl. Manager (Planning)

Chief Engineer (P&D)


LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: VERIFICATION OF APPROVAL / SUB-DIVISION OF LAHORE


GARDEN HOUSING SCHEME SHARAQPUR ROAD, TEHSIL
FEROZWALA D ISTT SHEIKHUPURA.

Photocopy of approval letter issued by your office vide No. TMA/F/12/84


dated 16-03-2012 alongwith approved layout plan of the subject Housing Scheme, is sent
herewith. Please check your record and confirm authenticity / genuiness of the requisite
documents to proceed further.

DA – As above Chief Engineer (P&D)


(Muhammad Arshad Rafiq)

To: Town Officer (Planning & Coordination)


TMA Ferowala, Distt Sheikhupura.

Info: 1. District Coordination Officer Sheikhupura with the request to direct officer
concerned to confirm the genuiness of documents as mentioned above
(copies enclosed).

2. Master file.
DA – As above (Sr. No.1)

No._____________/DRW/ Dated_______/056/2013

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: 11 KV INDEPENENT FEEDER OF S.A. GARDEN HOUSING


SCHEME G.T ROAD KALA SHAH KAKU TEHSIL FEROZWALA
D ISTT SHEIKHUPURA.

Reference: This office letter No. 50-16-22 dated 18-5-2011.

As intimated by the Sponsor, work of external electrification of subject


Housing Scheme has been completed. Therefore if work of 11 kV source feed line has
been completed by Construction crew, then financial closure of the work may be sent to
this office in order to proceed further in the matter.

Chief Engineer (P&D)


(Muhammad Arshad Rafiq)

To: PD (Construction) LESCO.

Info: 1. M/s S.A. Garden Housing Scheme, G.T. Road Kala Shah Kaku Tehsil
Ferozewala Distt. Sheikhupura to pursue the matter with P.D. (GSC)
LESCO regarding completion / financial closure of work of source feed line.

2. Master file.

No._____________/DRW/1268/LESCO Dated_______/06/2013

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
OFFICE OF CHIEF ENGINEER (P&D)
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF SAAD CITY HOUSING


SCHEME AMEER COLONY SUFFA SCHOOL ROAD OKARA
(INDIVIDUAL METERING)

Reference: Your letter No. 15189-90/PDC/Lhr. dated 27-6-2013.

The Chief Executive Officer LESCO while acceding to your request has
approved the revised estimate for Rs.32,84,220/-.

Since revised estimated amount is well within the deposit in hand, therefore
the work may be executed. However after completion of work financial closure be sent to
this office to proceed further accordingly.

This issues with the approval of Chief Executive Officer LESCO.

Additional Manager (Planning)


For Chief Engineer (P&D) LESCO

To: Sr. Manager Construction LESCO.

Info: 1. XEN Okara Const. Divn. LESCO for necessary action as above.
2. Master file.

No.___________/P&D/DRW/1353/LESCO Dated______/7/2013

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
OFFICE OF CHIEF ENGINEER (P&D)
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

FAX MESSAGE

Subject: INSTALLATION OF CONNECTION AT FAMILY ROOMS AT


CENTRAL JAIL KOT LAKHPAT LAHORE

During meeting with Secretary, Communication & Works Department


(CWD) Lahore on 2-7-2013, the issue regarding provision of connections to Family
Rooms at Central Jail, Kot Lakhpat, Lahore was discussed in detail. It was also intimated
that in Writ Petition No. 16322/2010 filed in Hon’able Lahore High Court, Lahore the
case has been fixed for hearing on 9-7-2013.

You are, therefore, directed to arrange installation of connections at Family


Rooms at Central Jail, Kot Lakhpat, Lahore by 6-7-2013 and this office as well as CWD
Department may be informed accordingly well before the next date of hearing.

CHIEF ENGINEER (P&D)


( MUHAMMAD ARSHAD RAFIQ)

To: Ch. Muhammad Amin,


DM (O) Kot Lakhpat Divn. LESCO.

Info: 1. Chief Executive Officer LESCO for kind information please.

2. Manager (Op.) South Circle LESCO to ensure compliance by the target


date.

2. Master file.

No.___________/P&D/DRW/ Dated______/7/2013

Hamid / Dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
OFFICE OF CHIEF ENGINEER (P&D)
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

Subject: ONE POINT BULK SUPPLY FOR SHEIKHU GARDENS HOUSING


SCHEME LAHORE ROAD SHEIKHUPURA

Reference: PPL/LESCO/005 dated 24-6-2013.

As you intend to have One Point Bulk Supply for the subject Housing
Scheme, therefore NOC / Distribution license from NEPRA for sale of power
may please be provided to this office in order to proceed further in the matter.

CHIEF ENGINEER (P&D)


( MUHAMMAD ARSHAD RAFIQ)

To: M/s Pebbles (Pvt.) Ltd.


Sheikhu Gardens Housing Scheme,
Lahore Road, Sheikhupura.

Info: Master file.

No.____________/DRW/1322/LESCO Dated______/7/2013

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF SAAD CITY HOUSING SCHEME


(PHASE-II) 1/4-L ROAD OKARA (ULTIMATE LOAD DEMAND: 333 KW)

Reference: Your request on the subject.


The design and specification for external electrification of Saad City Housing
Scheme (Phase-II) 1/4-L Road Okara, prepared by you has been processed in this office and
approved provisionally through existing 11 kV Colony feeder emanating from 132 kV Okara-II
Grid Station. As per MD (D) office Order issued vide No. PS / MDD / GMO / DHQ /
327/L/5371-83 dated 13-10-91.

Accordingly to the procedure described in the MD (D) above quoted Office Order,
an amount of Rs.49,270/- may be got deposited from the Sponsor on account of design vetting
charges @ 1.5 % of the total estimated amount, in the office of Finance Director LESCO 22-A
Queen’s Road, Lahore as per instructions issued by the Authority.
In order to accommodate the instant load, 25% cost sharing of grid station @
Rs.1366/- per kW for ultimate load is also recoverable from the Sponsor. Since ultimate load of
the colony is 333 kW, so net recoverable cost of grid sharing comes to be Rs.455,766/-, which
may also be got deposited with Finance Director LESCO simultaneously.

The formal approval letter containing the details of design aspects shall be issued
on receipt of design vetting charges and 4 No. copies of design books duly incorporating the
discrepancies pointed out by this office.

The validity of this demand stands for one month only.


This is being issued with the approval of Chief Executive Officer LESCO.

Technical Director
LESCO
To: M/s Power Com,
Suit No. 1 First Floor, Khurram Centre,
Wahdat Road, Lahore.

Info: 1. Finance Director LESCO.


2. Manager (Op) Okara.
3. DM (O) Okara Divn. LESCO.
4. M/s Saad City Housing (Phase-II) 1/4–L Road Okara.
5. Master file.
No. ________________/DRW/1407/LESCO Dated_____/08/2013

Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

Subject: MOU REGARDING HANDING OVER OF EXTERNAL


ELECTRIFICATION SYSTEM OF VALANCIA HOUSING SCHEME
FROM BULK SUPPLY TARIFF TO INDIVIDUAL METERING

Reference: This office letter No. 9219-23/DRW/12 dated 27-2-2013.

As per clause – 4 of MOU executed between the Management of Pakistan


Expatriates Cooperative Housing Society (PECHS) Valancia and LESCO, before handing
over / taking over of electrification system of Valancia Housing Scheme, you have to
provide 32 kanals land for grid station (free of cost) and also transfer the same in favour
of LESCO at your own expenses.

Accordingly in the above referred letter, you were requested to submit


‘Akas Shajra’, latest ‘Fard, ownership proof and demarcation plan of land for
132 Valancia grid station, which has already been approved by LESCO Site Selection
Board. But despite elapse of a period of about 06 months, the requisite documents are still
awaited from your end. It is, therefore, once again requested to provide the same
immediately in order to proceed further in the matter.

Chief Engineer (P&D)


(Khalid Mahmood Sandhu)

To: General Manager,


Block H/A6 Commercial Zone,
Pakistan Expatriates Cooperative Housing Society
Valancia Lahore.

Info: Master file.


No.__________/DRW/12/LESCO Dated_____/08/2013

Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
OFFICE OF CHIEF ENGINEER (P&D)
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

Subject: ONE POINT BULK SUPPLY CONNECTION TO BISMILLAH


ENERGY (PVT.) LTD. FOR AL-REHMAN GARDEN (PHASE-II)
HOUSING SCHEME SHARAQPUR ROAD DISTT. SHEIKHUPURA

Reference: Your request on the above noted subject.

As you intend to have One Point Bulk Supply for the subject Housing
Scheme, therefore NOC / Distribution license from NEPRA for sale of power
may please be provided to this office in order to proceed further in the matter.

This issues with the approval of Chief Executive Officer LESCO.

CHIEF ENGINEER (P&D)


( KHALID MAHMOOD SANDHU)

To: Haji Akhlaq Ahmed,


Chief Executive,
Bismilla Energy (Pvt.) Ltd.
Sharaqpur Road, Near Faizpur,
Motorway Interchange, Lahore.

Info: Master file.

No.____________/DRW/ Dated______/9/2013

Hamid / Dak-h6
To,

The Manager (HR)


LESCO, Lahore

Subject: Arrival Report

Sir,

In compliance with your Office Order No.HRD/EST/19219-24 dated


26-8-2013, I submit my arrival report today i.e. on 2-9-2013 (FN).

Thanks.

Yours obediently,

(Shabbir Ahmed Khan)


Assistant Manager (Op.)
The Chief Executive Officer,
LESCO, Lahore.

Subject: External Electrification of Fazal-E-Haq Garden Housing Scheme Opp.


Millat Tractors Lahore-Sheikhupura Road, Sheikhupura

Reference: Your office letter No. 3557-64 dated 19-9-2013.

In the light of above referred letter we have to deposit total amount of


Rs.1,60,92,708/- (Including Design Vetting & grid sharing charges) as detailed below:

(i) Design vetting charges Rs. 3,15,900/-


(ii) Grid sharing charges: Rs. 14,83,476/-
(iii) Cost of electrification etc. Rs. 1,43,93,332/-
___________________________
Total: Rs.1,60,92,708/-

Accordingly we have deposited design vetting charges: Rs.215,900/- & grid


sharing cost Rs.14,83,476/- in the office of Finance Director LESCO on 25-9-2013 vide
Receipt No. 189545 & 57527 respectively.

After deducting the above amount, we have to deposit only cost of external
electrification etc. Rs.1,43,93,332/- but again we have deposited total amount of
Rs.1,60,92,708/- mistakenly in the office of Finance Director LESCO vide Receipt No.
189552 dated 3-10-2013.

Keeping in view the position explained above, Finance Director LESCO


may please be advised that out of total amount deposited vide Receipt No. 189552 dated
3-10-2013, Rs.1,43,93,332/- may be transferred to concerned offices while excess amount
deposited by us i.e. Rs. 16,99,376/- may be refunded to us.

Thanking you in anticipation.

Yours sincerely,

( Mian Atta-ur-Rehman )
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF AZHAR TOWN CHAK NO. 5/4-L


G.T. ROAD OKARA

Reference: Your office letter No. Azhar Town/Okara/DE/01 dated 30-9-2013

As per ownership proof (Fard) received alongwith above referred letter


224-Kanals land is in the name of Sponsor and remaining 142-Kanal & 8-Marlas is in the
name of TMA, which may be clarified.

In addition to above, original approval letter alongwith original approved


layout plan of the scheme duly approved by the TMA may also be supplied to this office
to proceed further in the matter.

Addl. Manager (Planning)


For Chief Engineer (P&D)

To: M/s Power Com Consultants,


Suit No. 1 Ist Floor Khurram Shopping
Centre, Wahdat Road, Lahore
Info: 1. M/s Azhar Town Housing Scheme, Chak No. 5/4-L G.T. Road, Okara.
2. Master file.

No.______________/ P&D/LESCO Dated______/10/2013

Hamid / Dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF FAZAL-E-HAQ GARDEN HOUSING


SCHEME OPP. MILLAT TRACTORS LAHORE-SHEIKHUPURA ROAD
SHEIKHUPURA (ULTIMATE DEMAND: 1086 KW)

In continuation to this office letter No. 3557-64 dated 19-9-2013

In the light of above referred letter Sponsor was liable to deposit total amount of
Rs.1,60,92,708/- (Including Design Vetting & grid sharing charges) as detailed below:
(i) Design vetting charges Rs. 2,15,900/-
(ii) Grid sharing charges: Rs. 14,83,476/-
(iii) Cost of electrification etc. Rs. 1,43,93,332/-
________________________
Total: Rs.1,60,92,708/-
The Sponsor accordingly deposited design vetting charges: Rs.215,900/- & grid
sharing cost Rs.14,83,476/- in your office on 25-9-2013 vide Receipt No. 189545 & 57527
respectively. Credit Advices for the requisite amounts have also been issued by our office vide
No. 8652/FD/LESCO/Bkg dated 8-10-2013 & No. 11148/FD/LESCO/Cashier dated 9-10-2013.

After deducting the above amount, only cost of external electrification etc.
Rs.1,43,93,332/- was to be deposited but Sponsor again deposited total amount of
Rs.1,60,92,708/- mistakenly in your office vide Receipt No. 189552 dated 3-10-2013.

Keeping in view the position explained above, amount: Rs.1,60,92,708/-


subsequently deposited vide Receipt No. 189552 dated 3-10-2013 may be transferred as
mentioned below:
(i) PD (Construction) LESCO Rs.1,31,64,962/-
(ii) Manager (GSO) LESCO Rs.10,07,843/-
(iii) LESCO Income Account Rs.1,20,527/-
(iv) Excess amount may be refunded to Sponsor, Rs.16,99,376/-
As requested by the Sponsor (copy enclosed)
DA/As above

Chief Engineer (P&D)


( Rao Zameer-ud-Din )

To: Finance Director LESCO

Info: 1. PD (Construction) LESCO


2. Manager (GSO) LESCO.
3. Mian Atta-ur-Rehman, Sponsor Fazal-e-Haq Gardens Housing Scheme Opp.
Millat Tractor Lahore Sheikhupura Road, Begum Kot Shahdara Lahore with ref. to
his application dated 8-10-2013
4. Master file.
No.______________/ P&D/1402/LESCO Dated______/10/2013
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF SHAHEEN HOUSING


SCHEME MAIN G.T. ROAD FEROZEWALA DISTT.
SHEIKHUPURA

Reference: Your letter No. HE-345-01 dated 8-10-2013.

While checking the Design of subject Housing Scheme following


documents found missing, which may be supplied to this office to proceed further:

(i) Ownership proof.


(ii) Approval letter alongwith approved layout plan of the Housing Scheme by
LDA/Local Government / Civic Authority (TMA).
(iii) NOC from City District Government.

Please note that Design of external electrification of any Housing


Scheme should not be submitted to this office without above documents, in future.

Addl. Manager (Planning)


For Chief Engineer (P&D)

To: M/s Hamza Engineers,


139-A/F Raja Centre,
Main Market, Gulberg, Lahore.

Info: 1. M/s Shaheen Housing Scheme, G.T. Rod Ferozewala Distt. Sheikhupura for
necessary action as above.

2. Master file.

No.______________/DRW/1447/LESCO Dated____/10/2013

Hamid/dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
OFFICE OF CHIEF ENGINEER (P&D)
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

Subject: ONE POINT BULK SUPPLY FOR SHEIKHU GARDENS HOUSING


SCHEME LAHORE ROAD SHEIKHUPURA

Reference: M/s Power Com letter No.Sheikhu Garden/Skp/Sup/05 dated 4-10-2013


addressed to this office and copy to you.

Earlier on receipt of your request to allow One Point Bulk Supply for the
subjected Housing Scheme, you were advised vide letter No. 334 dated 25-7-2013 to
provide NOC / Distribution license from NEPRA for sale of power, but nothing has been
heard so far. Therefore mode of metering may be got settled before asking for grant of
permission for execution of work of external electrification through WAPDA approved
Contractors.

CHIEF ENGINEER (P&D)


( RAO ZAMEER-UD-DIN)

To: M/s Pebbles (Pvt.) Ltd.


Sheikhu Gardens Housing Scheme,
Lahore Road, Sheikhupura.

Info: 1. M/s Power Com Consultants, Suit No. 1 Ist Floor Khurram Shopping
Centre, Wahdat Road, Lahore.

2. Master file.

No.____________/DRW/1322/LESCO Dated______/10/2013

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

Subject: IMPLEMENTATION STATUS OF SCHEMES UNDER PEOPLES WORKS


PROGRAMME – 1 (2008-13)

Enclosed please find herewith a copy of letter received from Director


(Coordination) Cabinet Division, Cabinet Secretariat (Tameer-e-Pakistan Programme)
Government of Pakistan alongwith its enclosure.

Please go through the contents of enclosed letter and submit the requisite
information on the prescribed format without further loss of time.

DA / As above Matter Most Urgent

Chief Engineer (P&D)


(Rao Zameer-ul-Haq)

To: Sr. Manager (Construction) LESCO

Info: Master file.

No._____________/DRW/ Dated______/11/2013

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

Subject: IMPLEMENTATION STATUS OF SCHEMES UNDER PEOPLES WORKS


PROGRAMME – 1 (2008-13)

Reference: Cabinet Division’s U.O. No. 2(5)/13/Dir(Coord)/PWP-Prog Islamabad


dated 22-10-2013

The requisite information as received from PD (Construction) LESCO vide


letter No. 3634-38/PDC/LHR dated 5-11-2013 is enclosed herewith as desired by your
office please.

DA / As above

Chief Engineer (P&D)


(Rao Zameer-ul-Haq)

To: Director (Coord.)


Cabinet Division (Tameer-E-Pakistan Programme)
Cabinet Secretariat, Govt. of Pakistan,
Islamabad.

Info: 1. Sr. Manager (Construction) LESCO with reference to above.


2. Master file.

No._____________/P&D/VE Dated______/11/2013

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF GULSHAN-E-SARDAR


HOUSING SCHEME MAIN COLLEGE ROAD, G.T. ROAD
FEROZEWALA DISTT. SHEIKHUPURA

Reference: Your letter No. HE-344-01 dated 9-10-2013.

While checking the Design of subject Housing Scheme following


documents found missing, which may be supplied to this office to proceed further:

(i) Power of Attorney on stamp paper amounting Rs.500/- in favour of Sponsor


from the owners of land issued the Registrar.
(ii) Approval letter alongwith approved layout plan of the Housing Scheme by
LDA/Local Government / Civic Authority (TMA).
(iii) NOC from City District Government.

As already advised in case of Shaheen Housing Scheme, it is once again


reiterated not to submit the Design of external electrification of any Housing Schemes
without above documents, in future.

Addl. Manager (Planning)


For Chief Engineer (P&D)

To: M/s Hamza Engineers,


139-A/F Raja Centre,
Main Market, Gulberg, Lahore.

Info: 1. M/s Gulshan-e-Sardar Housing Scheme, near Shah Khalid Town, Main
College Road, G.T. Road Ferozewala Distt. Sheikhupura, for necessary
action as above.

2. Master file.

No.______________/DRW/724/LESCO Dated____/11/2013
Hamid/dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF CANAL HOUSING SCHEME


NEAR SUFFA EDUCATIONAL COMPLEX OKARA (ULTIMATE
DEMAND 38.11 KW)

Reference: 1. Your letter No. 3548-51 dated 19-9-2008


2. This office letter No. 7005-09 dated 9-10-2008.

Please let this office know about latest status of work of external
electrification of subject Housing Scheme as well as differential cost of material to be
recovered from the Sponsor, if any.

Addl. Manager (Planning)


For Chief Engineer (P&D)

To: Sr. Manager Construction LESCO.

Info: Master file.

No.______________/DRW/1072/LESCO Dated____/11/2013

Hamid/dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: VERIFICATION OF APPROVAL / SUB-DIVISION OF S.A GARDEN


HOUSING SCHEME G.T ROAD KALA SHAH KAKU TEHSIL
FEROZWALA D ISTT SHEIKHUPURA.

Photocopy of approval letter issued by your office vide No. TO/(P&C) 378
dated 19-05-04 alongwith approved layout plan of the subject Housing Scheme is sent
herewith. Please check your record and confirm authenticity / genuiness of the requisite
documents to proceed further.

DA – As above Chief Engineer (P&D)


(Engr. Ehsan Elahi)

To: Town Officer (Planning & Coordination)


TMA Ferowala, Distt Sheikhupura.

Info: 1. District Coordination Officer Sheikhupura with the request to direct officer
concerned to confirm the genuiness of documents as mentioned above
(copies enclosed).

2. Master file.
DA – As above (Sr. No.1)

No._____________/DRW/1278/LESCO Dated_______/04/2010.

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: STARRED SENATE QUESTION DIARY NO. 6 (3) (98 TH SESSION


15TH GROUP) MOVED BY HAJI GHULAM ALI, SENATOR

Reference: Your office Endst. No. 4446/S&I/LESCO (HQs) dated 20-11-2013

Point-wise reply to the Starred Senate Question as mentioned in the subject


is as under:

(a) As per prevailing policy, New Connections to Private Buildings are


provided on cost deposit basis and all expenditures for installation of electric
poles, transformers and metering equipments etc. are being borne by the
Sponsors. Such connections are to be provided within one month subject to
availability of material and construction of source feed line; were required.

(b) There is no proposal under consideration to allow the said owners /


businessmen to purchase poles and metering equipment by themselves.
However they are being allowed to purchase Transformers, which are not
available with LESCO, at their own from WAPDA/LESCO approved
Manufacturers and inspected by Chief Engineer (Material Inspection).

Chief Engineer (P&D)


(Engr. Rao Zamir-ud-Din)

To: Manager (S&I) LESCO

Info: Master file.

No._____________/DRW/ Dated_______/11/2013.

Hamid / dak-h4

Pending Issues
1. New connection of M/s Nishat for 14 MW load was approved in 11/2011
subject to completion of following work as clearly mentioned at clause-4 of
technical clearance issued by this office vide No. 12462-80 dated
23-11-2011:-
(a) Completion of reconductoring of 132 kV S/C Sarfraz Nagar to Kasur
transmission line to a D/C transmission line on Rail Conductor
(b) Construction of 132 kV Ellahabad – Khudian transmission line.
(c) Reconductoring of Manga-Chak-65 line.

(Work pending with PD GSC)

2. Work of transmission line of Nishat Chunian is also pending with PD (GSC)

3. As the grid station is being constructed by the consumers themselves,


therefore on receipt of completion from them, a Special Committee is to be
constituted regarding checking, testing and commissioning of grid station.

4. As practice in vogue D.N. of security will be issued by P&D after completion


of work of transmission line by PD (GSC).
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: UNDERGROUND EXTERNAL ELECTRIFICATION OF SHEIKHU


GARDENS HOUSING SCHEME LAHORE ROAD SHEIKHUURA

Photo copies of 09 No. Valuation Reports of 09 No. commercial plots


situated in Sheikhu Gardens for mortgage in the name of LESCO in lieu of Bank
Guarantee, received through M/s Power Com Consultants, are sent herewith for vetting
and early returned to this office.

DA / As above
Chief Engineer (P&D)
(Engr. Rao Zameer-ud-Din)

To: Legal Director LESCO

Info: 1. M/s Power Com Consultants, Suit No. 1 Ist Floor Khurram Shopping
Centre, Wahdat Road, Lahore M/s Pebbles (Pvt.) Ltd. 35-A Empress Road,
Lahore.

2. M/s Pebbles (Pvt.) Ltd. 35-A Empress Road, Lahore

3. Master file.

No._____________/DRW/1322/LESCO Dated______/11/2012
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF YASIN GARDEN HOUSING


SCHEME SHAHDARA BY PASS LAHORE

As per record following amounts are outstanding against your Housing


Scheme, which may please be deposited with Chief Financial Officer LESCO under
intimation to this office.

(i) Amount outstanding against existing installed material Rs.295,682/-

(ii) Updated amount of 2nd installment pertaining to work


yet to be executed regarding installation of remaining Rs.20,52,203/-
1 No. 200 kVA and 1 No. 100 kVA Transformers).

Chief Engineer (P&D)


LESCO Ltd. Lahore

To: Mursal Ali,


Sponsor/Attorney,
Yaseen Garden Housing Scheme,
Shahdara By Pass Road, Shahdara Lahore

Info: 1. Chief Financial Officer LESCO


2. PD (Construction) LESCO.
3. Master file.

No._____________/DRW/1023/LESCO Dated______/12/2013

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF YASIN GARDEN HOUSING


SCHEME SHAHDARA BY PASS LAHORE

As pointed out by PD (Construction) LESCO, an amount of Rs.295,682/-


is yet to be paid pertaining to work already executed in your Housing Scheme against first
installment of capital cost: Rs.12,44,027/-.

Therefore the requisite amount of Rs.295,682/- may please be deposited


with Chief Financial Officer LESCO under intimation to this office.

Technical Director
LESCO

To: Mursal Ali,


Sponsor/Attorney,
Yaseen Garden Housing Scheme,
Shahdara By Pass Road, Shahdara Lahore

Info: 1. Chief Financial Officer LESCO. As soon as payment is received, the same
may be transferred to PD (Construction) LESCO through Credit Advice
under intimation to this office.
2. PD (Construction) LESCO with reference to his office letter No. 2087-88
dated 10-12-2013.
3. Manager (Op.) Northern Circle LESCO.
4. DM (O) Ferozewala Divn. LESO.
5. DM (Construction) North LESCO.
6. Master file.

No._____________/DRW/1023/LESCO Dated______/12/2013

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: NEW INDUSTRIAL CONNECTION AGAINST APP. NO.


14624/2295/B-1 DATED 18-1-2013 IN THE NAME OF SAIF ULLAH
S/O MIAN FEROZE DIN AT ZAIN PARK UNDER THE AREA OF
FAIZPUR SUB-DIVISION

Reference: Your office letter No. 7766-68 dated 4-12-2013.

It is not understood as to why the case has been referred to this


office inspite of the fact that instructions of the department are very much clear on
the subject. Anyhow as per policy of the department, new connections cannot be
granted in un-electrified areas / Housing Schemes.

It is further added not to make direct correspondence with this office


by ignoring the normal channel of hierarchy

Technical Director
LESCO

To: DM (O) Ferozewala Divn. LESCO.

Info: 1. Manager (Op.) Northern Circle LESCO.


2. Master file.

No.____________/ DRW/11139/Ist Dated______/12/2013

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF CH. GHULAM ABBAS KASHMIR


HOUSNG COLONY PURAB MURIDKE DISTT. SHEIKHUPURA

Reference: Your letter No. D-9/2/2002-AJKC dated 19-11-2013

The requirements already conveyed vide this office letter No. 21044 dated
13-1-2009 are mandatory. Therefore needful may be done accordingly so as to proceed
further.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: Project Director


Azad Jammu & Kashmir Council Sectt.
House No. 39 St. No. 28 Sector F-6/1
Islamabad.

Info: Master file.

No.___________/P&D/DRW/609/LESCO Dated____/1/2014

Hamid / Dak-h6
To,

The Deputy Manager (Admn.),


LESCO, Lahore.

Subject: GRANT OF MOTORCYCLE ALLOWANCE

Respected Sir,

It is submitted that I am serving in WAPDA/LESCO as Line Superintendent


for the last about 11 years. Presently I am working as LS/I in the office of Chief Engineer
(P&D) LESCO.

As per Manager (HR) LESCO letter No. HRD/Estb/21112-15 dated


27-12-2013, approval for grant of Motorcycle allowance to the tune of Rs. 600/- per
month to Line Superintendent working in LESCO has been issued. Sine I am also holding
Motorcycle bearing Registration No. LEK-07-5874. Photocopy of Registration is enclosed
for ready reference.

In view of above, grant of motorcycle allowance as admissible under the


rules may also be allowed to undersigned.

Thanking you in anticipation.

Yours obediently,

(Muhammad Zaheer Babar)


LS/I (Planning Section)
LESCO HQ. Lahore.
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: GRANT OF MOTORCYCLE ALLOWANCE

Enclosed please find herewith application of Mr. Muhammad Zaheer Babar,


LS/I (Planning Section) LESCO for grant of Motorcycle allowance, as admissible under
the rules, duly recommended, for further necessary action.

DA /As above
Addl. Manager (Planning)
For Chief Engineer (P&D)

To: Dy. Manager (Admn.) LESCO

Info: Master file.

No.__________________/P&D/ Dated____/01/2014

To,
The Chief Executive Officer,
LESCO, Lahore.

Subject: External Electrification of State Life Housing Society, Lahore (Phase-I)

Reference your office letter No. 14128-30 dated 14-6-2013.

While thanking for the support and favour always being provided for
resolving our problems, we would like to inform you that in the first instance the design
for external electrification of Housing Scheme consisting 2504 kanals, duly approved by
Distt. Council was submitted during year 1993 (which was competent civic authority at
that time) was submitted and approved by WAPDA/LESCO. Latter the revised design
was also approved by your office vide No. 18255-64 dated:09-05-2008. Accordingly with
the approval of WAPDA/LESCO, the work of electrification in the approved has been
executed through private Contractor after getting material vetted by your office, except
installation of following Transformers:
1. 68x100 kVA
2. 51x200 kVA
3. 1x50 kVA

We have already placed Purchase Orders for the above Transformers,


however its vetting is pending in your office. We request therefore request your good
honour to kindly vetted the above material as already asked for (copy enclosed) in order to
resolve the problems of already approved areas.
As regard the matter of change in location of grid station land, it is
submitted that this change has not affect the already approved design of external
electrification. However the change in design of route of 11 kV feeders will be submitted
in due course of time alongwith approval of left over area of the Housing Scheme for
which we have already taken up the matter with concerned Authority.
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF ALLAH WALA GARDENS


HOUSING SCHEME CHAK 84/RB SHEIKHUPURA FAISALABAD ROAD
SHAHKOT

Reference: Your office letter No. 9600-01/PDC/Lhr. dated 3-1-2013.

If no additional material is required and revised scope of work is to be


completed within the deposit in hand, then the work may be completed and after
completion of work financial closure alongwith drawing as per actual built may be
submitted to this office.

Otherwise estimate alognwith revised scope of work, also showing the same
on sketch may be submitted to this office to proceed further in the matter.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: PD (Construction) LESCO

Info: 1. DM Sheikhupura Construction Divn. LESCO for necessary action as above.


2. Master file.

No.___________/P&D/DRW/1374/LESCO Dated____/1/2014

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Corrigendum
Subject: EXTERNAL ELECTRIFICATION OF AL-MURAD BLOCK HOUSING
SCHEME CHAK NO. 1/4-L ROAD OKARA

In continuation to this office letter No. 7708-15 dated 19-12-2013.

AM (Construction) concerned during his visit to this office has intimated


that no additional material is required to complete the revised scope of work. If so, the
work may be completed and after completion of work financial closure alongwith drawing
as per actual built may be submitted to this office. Otherwise revised estimate alognwith
revised scope of work may be submitted to this office to proceed further in the matter.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: PD (Construction) LESCO

Info: 1. DM Sheikhupura Construction Divn. LESCO for necessary action as above.


2. Master file.

No.___________/P&D/DRW/1374/LESCO Dated____/1/2014

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: VERIFICATION OF APPROVAL / SUB-DIVISION OF JEWAN


CITY HOUSING SCHEME PATTI KARPAL SINGH MANAWALA
SHEIKHUPURA

Enclosed please find herewith photocopy approval letter issued by your


office vide No. 1575/TMA/SKP-13 dated 25-06-2013 alongwith approved layout plan of
the subject Housing Scheme.

Please check your record and confirm authenticity / genuiness of the


enclosed documents so as to proceed further.

DA – As above Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: Tehsil Officer (P&C)


Tehsil Municipal Administration,
Sheikhupura.

Info: Master file.

No._____________/DRW/1458/LESCO Dated_______/01/2014

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: UNDERGROUND EXTERNAL ELECTRIFICATION OF SHEIKHU


GARDENS HOUSING SCHEME LAHORE ROAD SHEIKHUURA

Enclosed please find herewith “Rahan Nama’ (in original) received from the
Sponsors of subject Housing Scheme regarding mortgage of plots in lieu of Bank
Guarantee, for vetting and early return to this office.

DA / As above
Chief Engineer (P&D)
(Rao Zameer-ud-Din)

To: Legal Director LESCO.

Info: 1. M/s Power Com Consultants. Suit No. 1 Ist Floor Khurram Shopping
Centre, Wahdat Road, Lahore.
2. M/s Pebbles (Pvt.) Ltd. 35-A Empress Road, Lahore.
3. Master file.

No._____________/DRW/1322/LESCO Dated______/2/2014

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph./Fax: 99204818-19
E-mail: srmanpd@lesco.gov.pk

Final Notice

Subject: EXTERNAL ELECTRIFICATION OF

Reference: This office letter No. ___________________ dated __________

The case of external electrification of subject Housing Scheme is pending


due to non-attending the observations / shortcomings already conveyed to you vide above
referred letter. You are finally requested to attend the same within 10 days, failing which
the case will be closed without any further notice.

Addl. Manager (Planning)


For Chief Engineer (P&D)
LESCO, Lahore.

To: M/s ___________________________

Info: 1. M/s __________________


2. Master file.

No._____________/DRW/LESCO/ Dated______/3/2014
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION SYSTEM FOR COMMERCIAL


BUILDIGN AT PLOT NO. 75-L GULBERG-III LAHORE

Reference: Your letter No. HE/352-01 dated 7-3-2014.

The design of external electrification of Commercial Building at Plot No.


75-L Gulberg-III, Lahore, received alongwith your above referred letter, is returned
herewith in original because your Registration with Pakistan Engineering Council has
already been expired on 31-12-2012.

The same may be submitted alongwith renewal letter of your firm as and
when issued by Pakistan Engineering Council.

DA/Design Book (Original)


Chief Engineer (P&D)
(Rao Zameer-ud-Din)

To: M/s Hamza Engineers, 139-A/F Raja Centre


Main Market Gulberg-II, Lahore.

Info: 1. Mr. Wasif Ali Khan 75-L Gulberg-III, Lahore.


2. Master file.

No._____________/DRW/ Dated______/3/2014
dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF LAND SUB-DIVISION


“MODEL TOWN” MAIN CANAL ROAD NEAR HIGHER
SECONDARY SCHOOL RENALA KHURD

Reference: Your letter dated 28-3-2014.

While checking the Design of subject Housing Scheme following


documents found missing, which may be supplied to this office to proceed further:

Fresh ‘Fard’ duly attested.

Addl. Manager (Planning)


For Chief Engineer (P&D)

To: M/s Power Com Consultants,


Suit No. 1 Ist Floor Khurram Shopping Centre,
Wahdat Road, Lahore.

Info: 1. Mr. Muhammad Sana Ullah, Attorney, Land Sub-Division Model Town,
Main Canal Road, Renala Khurd for necessary action as above.

2. Master file

No.____________/P&D/DRW/1472/LESCO Dated____/4/2012

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: COMPLAINT LODGED BY M/S BAJAJ SPINNING (PVT.) LTD. 18-KM


SHEIKHUPURA FAISAL ABAD ROAD FEROZE WATTOWAN DISTT.
SHEIKHUPURA

Enclosed please find herewith a copy of complaint received from the subject
consumer regarding low voltages etc.

Please go through the contents of complaint, investigate the matter and


submit a detailed report to this office besides redressing the genuine grievances of the
complainant/consumer.

DA / Complaint
Chief Engineer (P&D)
( Rao Zameer-ud-Din)

To: Manager (Op.) LESCO,


Sheikhupura Circle,

Info: Master file.

No.______________/DRW/407/Skp. Dated_____/5/2014

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: VERIFICATION OF APPROVAL / SANCTION OF HOUSING


SCHEME ‘BUKHARI TOW’ CHAK NO. 88-R.B TEHSIL SHAHKOT
DISTT. NANKANA SAHIB

Photocopy of approval letter issued by your office vide No. 589/TMA-


SKT/2013 dated 30-11-2013 alongwith approved layout plan of the subject Housing
Scheme is sent herewith. Please check your record and confirm authenticity / genuiness of
the requisite documents to proceed further.

DA – As above Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: Town Municipal Administration,


Shahkot Distt. Nankana

Info: Master file.

No._____________/DRW/1478/LESCO Dated_______/05/2014

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF AL-HASEEB BLOCK


HOUSING SCHEME NEAR NOOR SHAH ROAD GAMBER OKARA

Reference: 1. This office letter No. 109-10 dated 25-1-2010.


2. This office letter No. 11714-15 dated 3-3-2014
3. This office letter No. 12867-68 dated 27-3-2014

Despite repeated reminders & issuance of Final Notice, you have failed
to attend the observations / provide the required documents; as such the case is hereby
closed / filed.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: M/s Jansons Engineering Services,


IEP Building Liberty Roundabout Gulberg-III,
Lahore.

Info: 1. M/s Al-Haseeb Block Housing Scheme near Noor Shah Road Adda Gamber
Distt. Okara.

2. Master file.

No._____________/DRW/1258/LESCO Dated______/5/2014

Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

OFFICE ORDER

Duty of Despatcher of P&D Directorate is hereby assigned to


Mr. Muhammad Ashraf, Tracer with immediate effect and till further order.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

Info: 1. Head Clerk


2. HDM
3. Official concerned.
4. Master file.

No._____________/ Dated______/5/2014

Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF GREEN VIEW HOUSING


SOCIEITY LAHORE SHEIKHUPURA ROAD LAHORE

Reference: This office letter No. 15177 dated 31-1-2007.

Despite elapse of a period of about 07 years you have failed to attend


the observations till date; as such the case is hereby closed / filed.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: Director Operation,


M/s Hassan Associates
For Green View Housing Society,
Ist, 2nd Floor, Taj Arcade, 73-Jail Road, Lahore.

Info: Master file.

No._____________/DRW/1026/LESCO Dated______/5/2014

Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF SUBHAN GARDEN


HOUSING SCHEME MANAWALA SHEIKHUPURA FAISALABAD
ROAD TEHSIL SHAHKOT DISTT. NANKANA SAHIB

Reference: This office letter No. 20262-63 dated 9-7-2009.

Despite elapse of a period of about 02 years you have failed to attend


the observations / provide the required documents till date; as such the case is hereby
closed / filed.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: M/s Hamza Engineers,


139-A/F Raja Centre Main Market Gulberg-II,
Lahore.

Info: 1. M/s Subhan Garden Housing Scheme, Manawala Sheikhupura Faisalabad


Road, Tehsil Shahkot Distt. Nankana Saihib.

2. Master file.

No._____________/DRW/1206/LESCO Dated______/5/2014

Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF ROYAL TOWN HOUSING


SCHEME JARANWALA ROAD SHAHKOT

Reference: This office letter No. 17584-85 dated 25-4-2008.

Despite elapse of a period of about 06 years you have failed to submit the
revised design as mentioned in the above referred letter; as such the case is hereby closed /
filed.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: Mr. Muhammad Faheem Iqbal,


S/O Abdul Rasheed,
Street No. 88, Ward No. 5,
Shahkot.

Info: 1. M/s Orion Consultants, 25-Peshawar Block, Fortress Stadium, Lahore Cantt
2. Master file.

No._____________/DRW/1152/LESCO Dated______/5/2014

Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF FAWAD AVENUE HOUSING


SCHEME, GOVT. COLONY ROAD OKARA

Reference: This office letter No. 17748-49 dated 29-3-2012.

Despite elapse of a period of about 02 years, you have not yet


supplied approval letter and approved layout plan of the subject Housing Scheme by the
civic authority; as such the case is hereby closed / filed.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: Sponsor, Fawad Avenue Housing Scheme,


Government Colony Road, Okara.

Info: 1. M/s Power Com Consultants, Suit No. 1 Ist Floor Khurram Shopping
Centre, Wahdat Road, Lahore

2. Master file.

No._____________/DRW/1362/LESCO Dated______/6/2014

Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF SHAH NAWAZ TOWN


HOUSING SCHEME, CHAK NO. 51/2-L HOSPITAL ROAD OKARA

Reference: This office letter No. 18568-69 dated 16-4-2012.

Despite elapse of a period of about 02 years, you have failed to provide the
required documents as mentioned in the letter under reference; as such the case is hereby
closed / filed.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: M/s Power Com Consultants,


Suit No. 1 Ist Floor Khurram Shopping Centre,
Wahdat Road, Lahore

Info: 1. Mr. Shahbaz Khan, Attorney, Shah Nawaz Town Housing Scheme,
Distt. Hospital Road, Okara.

2. Master file.

No._____________/DRW/1361/LESCO Dated______/5/2014

Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF AL-RAHEEM GARDEN


HOUSING SCHEME LAHORE SHEIKHUPURA ROAD

Despite elapse of a period of about 01 year, you have failed to provide


approval letter alongwith approved layout plan of the subject Housing Scheme from the
concerned civic authority; as such the case is hereby closed / filed.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: M/s Jansons Engineering Survives, IEP Building Liberty Roundabout


Gulberg-III, Lahore

Info: 1. Sponsor, Al-Raheem Garden Housing Scheme, Lahore Sheikhupura Road.


2. Master file.

No._____________/DRW/1437/LESCO Dated______/5/2014

Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF SHER MUHAMMAD TOWN


CHAK NO. 2/4-L AKBAR ROAD OKARA

Reference: This office letter No. 18155-56 dated 10-4-2012.

Despite elapse of a period of about 02 years you have failed to provide


approval letter alongwith approved layout plan of the subject Housing Scheme from the
concerned Civic Authority; as such the case is hereby closed / filed.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: M/s Power Com Consultants, Suit No. 1 Ist Floor Khurram Shopping
Centre, Wahdat Road, Lahore

Info: 1. Mr. Liaqat Ali, Attorney, Sher Muhammad Town, Chak No. 2/4-L Akbar
Road, Okara.

2. Master file.

No._____________/DRW/1358/LESCO Dated______/5/2014

Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF NIAZI TOWN CHAK NO.


5/4-L G.T ROAD OKARA

Reference: This office letter No. 13491 dated 11-2-2009.

Despite elapse of a period of about 05 years you have failed to provide


approval letter alongwith approved layout plan of the subject Housing Scheme from the
concerned Civic Authority; as such the case is hereby closed / filed.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: M/s Power Com Consultants, Suit No. 1 Ist Floor Khurram Shopping
Centre, Wahdat Road, Lahore

Info: 1. Mr. Ali Raza Khan, Sponsor, Niazi Town, Chak No. 5/4-L, Chungi No. 6,
G.T. Road Okara.

2. Master file.

No._____________/DRW/1209/LESCO Dated______/5/2014

Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: SUPPLY OF POWER FOR GIVING NEW GENERAL SERVICE


CONNECTIONS IN REHMAN GARDEN HOUSING SCHEME
SHEIKHUPURA

Reference: This office letter No. 12424-27 dated 10-5-2013

Latest status regarding provision of new connections in the light of above


referred letter may please be intimated to this office.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: DM (O) City Divn. LESCO Sheikhupura.

Info: 1. Manager (Op.) LESCO Sheikhupura.


2. Master file.

No._____________/DRW/1421/LESCO Dated______/5/2014

Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF SHAHDARA (EXTENSION)


SCHEME OF LARECHS LTD. NEAR RAILWAY STATION SHAHDARA
LAHORE

Reference: 1. This office letter No. 11363-64 dated 26-1-2009.


2. This office letter No. 14942-43 dated 13-3-2009.
3. This office letter No. 4250-51 dated 11-5-2010
4. This office letter No. 1564 dated 4-3-2011.
5. This office letter No. 11752-53 dated 4-3-2014

Despite repeated reminders and elapse of a period of years


together you have failed to provide the required documents; as such the case is hereby
closed / filed.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: Secy. LARECHS Coop. Housing Society Ltd.,


LARECHS Building Railway HQ Office Lahore

Info: 1. M/s Power Com Consultants, Suit No. 1 Ist Floor Khurram Shopping
Centre, Wahdat Road, Lahore.

2. Master file.

No.___________/DRW/970/LESCO Dated_____/5/2014
Hamid / Dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF MADINA TOWN HOUSING


SCHEME DHAMKEY SHARQPUR

Reference: 1. This office letter No. 14856 dated 13-3-2008.


2. This office letter No. 1651-52 dated 28-7-2008.
3. This office letter No. 8569-70 dated 5-10-2008.
4. This office letter No. 4153-54 dated 10-5-2010.

Despite repeated reminders & issuance of Final Notice, you have failed
to attend the observations / provide the required documents; as such the case is hereby
closed / filed.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: Col. ® Muhammad Saeed S/O Late Islam-ud-Din,


resident of Dhamkey Jaranwala Road,
Tehsil Sharaqpur Distt. Sheikhupura.

Info: 1. M/s Orion Consultants, 25-Peshawar Block Fortress Stadium, Lahore.


2. Master file.

No.____________/P&D/DRW/1142/LESCO Dated____/5/2014

Hamid / Dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF REHMAN CITY (PHASE-II)


NEAR FAIZPUR INTERCHANGE SHARAQPUR ROAD LAHORE

Reference: 1. This office letter No. 4133-34 dated 10-5-2010.


2. This office letter No. 11712-13 dated 3-3-2014
3. This office letter No. 12878-79 dated 27-3-2014.

Despite repeated reminders & issuance of Final Notice, you have failed
to attend the observations / provide the required documents; as such the case is hereby
closed / filed.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: Mr. Abdul Rasheed,


Rehman City (Phase-II) near Faizpur Interchange,
Sharaqpur Road,Lahore.

Info: 1. M/s Hamza Engineers, 184-F Raja Centre, Gulberg-II, Lahore


2. Master file.

No.____________/P&D/DRW/1178/LESCO Dated____/5/2014

Hamid / Dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF AFTAB ASLAM TOWN


HOUSING SCHEME SHEIKHUPURA

Reference: 1. This office letter No. 26001-02 dated 12-11-2009.


2. This office letter No. 697-98 dated 6-2-2010
3. This office letter No. 4147 dated 10-5-2010
4. This office letter No. 3798-99 dated 21-8-2010

Despite repeated reminders & issuance of Final Notice, you have failed
to attend the observations / provide the required documents; as such the case is hereby
closed / filed.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: Mr. Aftab Aslam Town Housing Scheme,


Sheikhupura.

Info: 1. M/s Orion Consultants, 25-Peshawar Block, Fortress Stadium, Lahore Cantt
2. Master file.

No.____________/P&D/DRW/854/LESCO Dated____/5/2014

Hamid / Dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF NAZIR TOWN (PHASE-III)


NEAR KOTHI MAHRAB KHAN SHAH KHALID TOWN G.T. ROAD
SHAHDARA

Reference: 1. This office letter No. 11378 dated 18-4-2013.


2. This office letter No. 11744-45 dated 4-3-2014
3. This office letter No. 12876-77 dated 27-3-2014

Despite repeated reminders & issuance of Final Notice, you have failed
to attend the observations / provide the required documents; as such the case is hereby
closed / filed.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: Mr. Ijaz Hussain Malik S/O Malik Muhammad Nazir,


Nazir Town (Phase-III) near Kothi Mahrab Khan,
Shah Khalid Town, G.T. Road Shahdara, Lahore.

Info: 1. M/s Hamza Engineers, 184-F Raja Centre, Gulberg-II, Lahore.


2. Master file.

No.____________/P&D/DRW/1418/LESCO Dated____/5/2014

Hamid / Dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF DERA MEHAR ABBAS KOT


ABDUL MALIK LAHORE

Reference: 1. This office letter No. 3050-51 dated 12-9-2012


2. This office letter No. 11754-55 dated 4-3-2014
3. This office letter No. 12874-75 dated 27-3-2014

Despite repeated reminders & issuance of Final Notice, you have failed
to attend the observations / provide the required documents; as such the case is hereby
closed / filed.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: Malik Sajid Ali


Sponsor Dera Mehar Abbas Ali Sial
Mouza Thatha Khuda Yar, Tehsil Ferozewala
Distt. Sheikhupura.

Info: 1. M/s Orion Consultants, 25-Peshawar Block, Fortress Stadium, Lahore Cantt
2. Master file.

No.____________/P&D/DRW/1379/LESCO Dated____/5/2014

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF GARDEN CITY HOUSING


SCHEME MURIDKE

Reference: 1. This office letter No. 11742-43 dated 4-3-2014


2. This office letter No. 12869-70 dated 27-3-2014

Despite repeated reminders, you have failed to attend the observations /


provide the revised design; as such the case is hereby closed / filed.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: Mian Muhammad Ashraf S/O Muhammad Sharif,


Garden City Muridke

Info: 1. M/s Jansons Engineering Survives, IEP Building Liberty


Roundabout Gulberg-III, Lahore
2. Master file.

No.____________/P&D/DRW/724/Ist /LESCO Dated____/5/2014

Hamid / Dak-h6

Assistant Director Housing (Works) Lahore GHQ,AG’s Branch (Housing


Directorate) Army Officers Housing Complex Defence Road, Lahore
to arrange transfer of land of grid station in favour of LESCO. He is
further requested to coordinate with the Committee and provide all
original documents of purchase, inspection, gate passes, store
challans, sales tax payment receipts etc. for early finalization of the
matter.
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: DOCUMENTS OF PURCHASED TRANSFORMERS FOR LDA


AVENUE – 1 HOUSING SCHEME, LAHORE

While going the record, it has been observed that you have not supplied the
documents of purchased Transformers for LDA Avenue-1 Housing Scheme. Therefore
original documents of purchased Transformers i.e. invoices, gate passes, store challans,
sales tax payments receipts alongwith Inspection Certificates issued by Chief Engineer
(Material Inspection) etc. may please be provided to this office immediately.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: Director EME,LDA


U.D. Wing 468-D-2, Blockl-3
Ist Floor Khayaban-e-Firdosi,
M.A. Johar Town, Lahore.

Info: 1. Chief Engineer (Material Inspection) Sunny View,Lahore.


2. PD (Construction) LESCO.
3. Manager (Op.) Central Circle LESCO.
4. Master file.

No.____________/P&D/DRW/774/LESCO Dated____/5/2014

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: DOCUMENTS OF PURCHASED TRANSFORMERS FOR DHA


PHASE-VII HOUSING SCHEME LAHORE

While going the record, it has been observed that you have not supplied the
documents of purchased Transformers for DHA Phase-VII Housing Scheme. Therefore
documents of purchased Transformers i.e. invoices, gate passes, store challans, sales tax
payments receipts alongwith Inspection Certificates issued by Chief Engineer (Material
Inspection) etc. may please be provided to this office immediately.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: Chief Engineer,


Defence Housing Scheme Office Complex,
Sector-Y Commercial Phase-III,
Lahore Cantt.

Info: 1. Chief Engineer (Material Inspection) Sunny View,Lahore.


2. PD (Construction) LESCO.
3. Manager (Op.) Southern Circle LESCO.
4. Master file.

No.____________/P&D/DRW/1039/LESCO Dated____/5/2014

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: PURCHASE OF DISTRIBUTION TRANSFORMERS PRIVATELY


FROM APPROVED MANUFACTURERS

Reference: Your office letter No. 20846-53/LESCO dated 15-2-2013

In the light of your above referred letter, purchase of 100 kVA & 200 kVA
Transformers privately from approved Manufacturers is being allowed to the Sponsors of
Housing Schemes. Please let this office know about latest status of availability of requisite
Transformers and also intimate that may we continue this practice or otherwise.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: CE/Sr. Manager (MM)


LESCO HQ. Lahore.

Info: 1. Technical Director (LESCO)


2. Master file.

No.____________/P&D/DRW Dated____/5/2014

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF LANDA MARKET


WANDALA DIAL SHAH

Reference: Your office letter No. 29733-36 dated 20-5-2014

It is regretted to point that you have simply forwarded layout plan of Landa
Market without Design Book and relevant documents, which is just to shift the
responsibility on other shoulders.

Therefore if it is a case of external electrification of un-electrified area or


commercial building etc. having load above 500 kW, then Sponsors may be advised to
submit Design of external electrification through any of the Consultants registered with
Pakistan Engineering Council alongwith relevant documents so as to proceed further
accordingly.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: Manager (Op.)


Northern Circle LESCO

Info: 1. DM (O) Ferozewala Divn. LESCO


2. Mr. Aleem Shah S/O Raheem Shah, Landa Market Vandiala Dial Shah
with the request to submit Design of external electrification through any of
the Consultants registered with Pakistan Engineering Council.
3. Master file.

No.____________/P&D/DRW Dated____/5/2014

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF GREEN VALLEY HOUSING


SCHEME SARGODHA ROAD SHEIKHUPURA

Reference: 1. This office letter No. 10023-30 dated 1-12-2008.


2. Your request for issuance of Demand Notice of capital cost for
external electrification of subjected Housing Scheme.
The competent authority while acceding to your request given at
Reference-2 has allowed to:
(i) make payment of capital cost: Rs.21,43,676/- (excluding cost of 1 No. 200
kVA and 3 No. 100 kVA Transformers) & difference of design vetting
charges: Rs.21,393/-, which may be deposited with Finance Director
LESCO;
(ii) purchase 1 No. 200 kVA and 3 No. 100 kVA Transformers from WAPDA
approved Manufacturers duly inspected by Chief Engineer (Material
Inspection) as per WAPDA specification.
The scheme will be energized after completion of work and installation of
all Transformers (1 No. 200 kVA & 3 No. 100 kVA), which shall be ensured by PD
(Construction) & DM (O) City Divn. LESCO Sheikhupura.

All other contents of technical clearance given at Reference-1 will remain


intact

Addl. Manager (Planning)


For Chief Engineer (P&D)

To: Ch. Ameer Ali Minhas,


President Green Valley Welfare Association
Nabi Pura Sargodha Road, Sheikhupura.
Info: 1. Finance Director LESCO. Capital cost Rs. 21,43,676/- may be transferred to
PD (Construction) while difference of design vetting charges: Rs.21,393/-
may be kept in LESCO Income Account under intimation to this office.
2. Sr. Manager Construction LESCO. ) to ensure compliance of
3. Manager (Op.) Sheikhupura Circle LESCO. ) instructions given above.
DM (O) City Divn. LESCO Sheikhupura )
4. AM (O) Attabad Sub-Divn. LESCO.
5. Master file.
No._____________/P&D/DRW/1116/LESCO Dated____/5/2014
Hamid / Dak-h6

LAHORE ELECTRIC SUPPLY COMPANY LIMITED


TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: PENDING ISSUES OF OPF HOUSING SCHEME, RAIWIND ROAD


LAHORE

Before seeking appointment for meeting with CEO, LESCO, please let this
office know about latest of following pending issues/offer your comments:

1. Construction of 11 kV feeder from 132 kV WAPDA Town Grid station.


2. Re-calculation of cost of WAPDA stolen material.
3. Enhancement of load as stopgap arrangement.
4. Provision of land for construction of grid station.

Chief Engineer (P&D)


( Rao Zameer-ud-Din)

To: M/s OPF Housing Scheme,


Regional office Punjab,
1-M Gulberg-III, Lahore.

Info: Master file.

No.___________/P&D/DRW/30-A/LESCO Dated____/5/2014

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: IMMEDIATE LOAD DEMAND OF 800 KW FOR INDIVIDUAL


METERING THROUGH EXISTING 11 KV CANAL ROAD FEEDER
(MIXED LOAD) EMANATING FROM 132 KV AWT GRID STATION FOR
EDEN ABAD HOUSING SCHEME MOUZA HALLOKI DEFENCE ROAD
LAHORE AS AN INTERIM ARRANGEMENT

Reference: Your office letter No. EHL/2014/01/EA dated 6-5-2014.

The Chief Executive Officer, LESCO while acceding to your request has
approved immediate load demand of 800 kW for individual metering for energization of
Triangle Block of your Housing Scheme (as shown on the layout plan) through existing
11 mixed load Canal Road feeder emanating from 132 kV AWT grid station as an interim
arrangement till energization of your own 11 kV independent feeder from 132 DHA
Rahbar grid station with the following terms and conditions:

1. The Sponsor is liable to deposit capital cost: Rs.170,852/- with Finance Director
LESCO through cheque/Bank Draft/Pay Order within one month.

2. The detail of work to be executed by DM (O) /AM (O) concerned before allowing
individual connections is as under:

(i) From point Node No. 8-17-18 (as shown on the sketch) 70-Mtrs 4/0 AWG
cable will be installed (over head).
(ii) Already existing Capacitors at 11 kV Canal Road feeder will be relocated
from Node No.49-189-241 to 85-120-190.

3. DM (O) & AM (O) concerned will restrict the immediate load demand of
individual consumers upto load 800 kW from existing 11 kV Canal Road feeder
emanating from 132 kV AWT grid station till energization of independent feeder of
the Scheme.

4. Individual applicants are liable to deposit 25% grid sharing cost @ Rs. 1366/- per
kW alongwith cost of metering equipment and security charges etc. as per rules.

5. All other requirements and departmental formalities will be fulfilled as per


WAPDA /PEPCO/LESCO rules/instructions/policy, while allowing new
connections for individual metering by the concerned quarter / competent authority.
Cont….P/2
-2-

6. All other applicable conditions of technical clearance issued vide this office letter
No. 23830-38 dated 15-9-2009 will remain intact.

This issues with the approval of Chief Executive Officer LESCO.

DA/As above
Chief Engineer (P&D)
( Rao Zameer-ud-Din)

To: M/s Eden Abad Housing Scheme,


Mouza Halloki Defence Road, Lahore.

Info: 1. Finance Director LESCO. On payment of Rs.170,852/-, the amount may be


transferred to DM (O) Raiwind Divn. LESCO through credit advice under
intimation to this office.
2. Sr. Manager (Construction) LESCO.
3. Manager (Op.) Central Circle LESCO.
4. DM (O) Raiwind Divn. LESCO alongwith BOQ & sketch.
5. AM (O) Ali Raza Abad Sub-Divn. LESCO.
6. Master file.

No.___________/ P&D/DRW/1198/LESCO Dated______/05/2014

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: ESTIMATE FOR ELECTRIFICATION OF KACHI ABADI KNOWN


AS MOHALLAH ISLAM PURA NO. 2 MATCH FACTORY
SHAHDARA UNDER THE AREA OF G.T. ROAD SUB-DIVISION
LESCO

Reference: Your office letter No. 28424-26 dated 7-5-2014.

The Sponsors/residents may be advised to submit Design of external


electrification through any of the Consultants registered with Pakistan Engineering
Council alongwith relevant documents so as to proceed further accordingly.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: Manager (Op.)


Northern Circle LESCO

Info: 1. DM (O) Ferozewala Divn. LESCO


2. AM (O) G.T. Road Sub-Division LESCO.
3. Master file.

No.____________/P&D/DRW11148/Ist Dated____/6/2014

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF LANDA MARKET


WANDALA DIAL SHAH

Reference: This office letter No. 16050-52 dated 22-5-2014.

As already requested in the above referred letter, design of external


electrification of Landa Market, Wandala Dial Shah, prepared by any of the Consultants
registered with Pakistan Engineering Council alongwith relevant documents, may please
be supplied to this office to proceed further in the matter.

Addl. Manager (Planning)


For Chief Engineer (P&D)

To: Manager (Op.)


Northern Circle LESCO

Info: 1. DM (O) Ferozewala Divn. LESCO


2. Mr. Aleem Shah S/O Raheem Shah, Landa Market Vandiala Dial Shah
with the request to submit Design of external electrification through any of
the Consultants registered with Pakistan Engineering Council.
3. Master file.

No.____________/P&D/DRW/11145/Ist Dated____/6/2014

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF YASIN GARDEN HOUSING


SCHEME SHAHDARA BY PASS LAHORE

Reference: 1. This office letter No. 7616-21 dated 18-12-2013.


2. Your application dated 9-6-2014

The competent authority while acceding to your request has allowed to


deposit the leftover amount of Rs.295,682/- pertaining to work already executed in your
Housing Scheme against first installment of capital cost. Therefore the same may be
deposited with Chief Financial Officer LESCO upto 13-6-2014.

Addl. Manager (Planning)


For Chief Engineer (P&D)

To: Mr. Mursal Ali, Sponsor/Attorney,


(Through Mr. Muhammad Shabbir)
Yaseen Garden Housing Scheme,
Shahdara By Pass Road, Shahdara, Lahore

Info: 1. Chief Financial Officer LESCO. On payment of above amount, the same
may be transferred to PD (Construction) LESCO through credit advice
under intimation to this office.
7. PD (Construction) LESCO.
8. Manager (Op.) Northern Circle LESCO.
9. DM (O) Ferozewala Divn. LESCO
10. DM (Construction) North Division LESCO.
7. Master file.

No._____________/DRW/1023/LESCO Dated______/6/2014

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: REQUEST OF M/S BAHRIA TOWN (PVT.) LTD. FOR ALLOWING


CONSTRUCTION OF NEW 132 KV GRID STATION
INDEPENDENT GRID STATION AT BAHRIA TOWN ORCHARD
17-KM RAIWIND ROAD LAHORE

Enclosed please find herewith a copy of M/s Bahria Town (Pvt.) Ltd. letter
dated 12-6-2014 vide which they intimated that the case of granting Distribution License
to Bahria Town, Lahore is under process with NEPRA and they will abide by the decision
of NEPRA. They have further requested that since issuance of Distribution License by
NEPRA will take some more time, therefore they may be allowed to construct their own
another 132 kV independent grid station for Bahria Orchard Housing Scheme.

Keeping in view the position explained by M/s Bahria Town in the above
referred letter and letter dated 26-3-2014 (copy enclosed) may LESCO allow them to
construct their own another new 132 kV independent grid station for which they have
already submitted design of proposed 132/11 kV grid station comprising 2x10x13 MVA
Power Transformers prepared by M/s ME Consult.

It is further requested that the case of M/s Bahria Town (Pvt.) Ltd. regarding
issuance of Distribution License etc. may kindly be finalized at the earliest to avoid any
complication at later stage.

DA / As above
Chief Engineer (P&D)
( Rao Zameer-ud-Din)

To: The Registrar, NEPRA,


2nd Floor OPF Building G-5/2 Islamabad.

Info: 1. M/s Bahria Town (Pvt.) Ltd. Lahore with reference to above.
2. Master file.

No.____________/P&D/DRW/456/LESCO Dated______/6/2014
Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: IMMEDIATE LOAD DEMAND OF 800 KW FOR INDIVIDUAL


METERING THROUGH EXISTING 11 KV CANAL ROAD FEEDER
(MIXED LOAD) EMANATING FROM 132 KV AWT GRID STATION FOR
EDEN ABAD HOUSING SCHEME MOUZA HALLOKI DEFENCE ROAD
LAHORE AS AN INTERIM ARRANGEMENT

In continuation to this office letter No. 16487-92 dated 28-5-2014 & No.
17122-25 dated 11-6-2014.

Individual connections for immediate load demand of 800 kW may be given


after handing over / taking over of the system of relevant Block of the Housing Scheme as
per clause – 16 of this office letter No. 6217-26 dated 29-6-2010 and completing all other
departmental formalities.

Chief Engineer (P&D)


(Rao Zamir-ud-Din)

To: Manager (Op.) Central Circle LESCO

Info: 1. Sr. Manager (Construction) LESCO.


2. Sr. Manager (MM) LESCO
3. DM (O) Raiwind Divn. LESCO.
4. AM (O) Ali Raza Abad Sub-Divn. LESCO.
5. M/s Eden Abad Housing Scheme, Mouza Halloki Defence Road, Lahore.
6. Master file.

No.___________/ P&D/DRW/1198/LESCO Dated______/06/2014

dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF MADINA TOWN HOUSING


SCHEME MOUZA VANDALA DAYYAL SHAH, TEHSIL
FEROZEWALA DISTT. SHEIKHUPURA

Reference: 1. This office letter No. 17973-74 dated 14-5-2009.


2. This office letter No. 4163-64 dated 10-5-2010
3. This office letter No. 11709-10 dated 3-3-2014

Despite repeated reminders & issuance of Final Notice, you have failed
to attend the observations / provide the required documents; as such the case is hereby
closed / filed.

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: Mr. Muhammad Muslim Khan,


Attorney, Madina Town Housing Scheme,
Mouza Vandala Dayyal Shah Tehsil Ferozewala
Distt. Sheikhpura.

Info: 1. M/s Power Com Consultants, Suit No. 1 Ist Floor Khurram Shopping
Centre, Wahdat Road, Lahore

2. Master file.

No._____________/DRW/1237/LESCO Dated______/6/2014

Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph./Fax: 99204818
E-mail: srmanpd@lesco.gov.pk

Subject: BANK GUARANTEE NO. BOP/2010/486 DATED 30-12-2010


FURNISHED REGARDING EXTERNAL ELECTRIFICATION OF
PAKISTAN MEDICAL CO0OPERATIVE HOUSING SCHEME
NEAR SHARIF CITIY OFF-RAIWIND ROAD LAHORE

Enclosed please find herewith photocopy of Bank Guarantee bearing


No. BOP/2010/486 dated 30-12-2010 for Rs. 05 Millions which has already been expired
on 29-12-2011. It is requested that the requisite amount may please be released to the
Sponsors as they have already furnished new Bank Guarantee No. BOP/2014/15 dated
20-1-2014 & No. BOP/2014/66 dated 21-2-2014 for the revised amount of Rs.19,54,120/-.

DA / As above

Chief Engineer (P&D)


(Rao Zameer-ud-Din)

To: AVP, The Bank of Punjab,


Main Branch 7-Egerton Road,
Lahore.

Info: 1. M/s Pakistan Medical Cooperative Housing Scheme,


Near Sharif City Off-Raiwind Road, Lahore.

2. M/s Orion Consultants, 25-Peshawar Block, Fortress Stadium, Lahore Cantt

3. Master file.

No._____________/DRW/1281/LESCO Dated______/7/2014

Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph./Fax: 99204818
E-mail: srmanpd@lesco.gov.pk

Subject: BANK GUARANTEE NO. BOP/2014/66 DATED 21-2-2014


FURNISHED REGARDING EXTERNAL ELECTRIFICATION OF
PAKISTAN MEDICAL CO-OPERATIVE HOUSING SCHEME
NEAR SHARIF CITIY OFF-RAIWIND ROAD LAHORE

Reference: Your letter No. PMCHS/598/14 dated 22-2-2014.

While going the record it has been observed that you have furnished Bank
Guarantee only for Rs.154,120/- instead of Rs.19,54,120/-. Therefore original Bank
Guarantee No. BOP/2010/486 dated 30-12-2010 for Rs. 154,120/- is returned herewith
with the requested that new Bank Guarantee valid for the period of execution of work may
please be furnished to this office for Rs.19,54,120/-

DA / As above

Manager (P&D)
(Muhammad Ramzan Ghuman)

To: M/s Pakistan Medical Cooperative Housing Scheme,


Near Sharif City Off-Raiwind road, Lahore.

Info: 1. AVP, The Bank of Punjab, Main Branch 7-Egerton Road, Lahore.

2. M/s Commercial Construction Company 137-B Model Town, Lahore.

3. M/s Orion Consultants, 25-Peshawar Block, Fortress Stadium, Lahore Cantt

4. Master file.

No._____________/DRW/1281/LESCO Dated______/7/2014

Hamid/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: VERIFICATION OF APPROVAL / SUB-DIVISION OF REHMAN CITY


(PHASE-VI) HOUSING SCHEME MAIN LAHORE–GUJRANWALA
ROAD MOUZA BHULLAY DASANWAL)

Photocopy of approval letter issued by your office vide No. TMA/F/13/140


dated 8-7-2013 of the subject Housing Scheme is sent herewith. Please check your record
and confirm authenticity / genuiness of the requisite documents to proceed further
accordingly.

DA – As above Addl. Manager (Planning)


For Chief Engineer (P&D)

To: The Administrator,


Tehsil Municipal Administration (TMA),
Ferozewala

Info: 1. Tehsil Municipal Officer, Ferozewala with reference to above.


2. Master file.

No._____________/DRW/T-837/Ist Dated_______/07/2014

Hamid / dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Final Notice

Subject: EXTERNAL ELECTRIFICATION OF ANSAAR MODEL CITY,


KALA SHAH KAKU TEHSIL FEROZEWALA DISTT.
SHEIKHUPURA

Despite elapse a period of more than 03 years, you have failed to provide the
following documents:
1. Fresh ‘Fard’.
2. Your Registration with PEC.
3. Form-29 & Form-A
4. Approval letter alongwith approved layout plan by TMA concerned.

You are finally requested to provide the requisite documents within 10 days
otherwise your case will cancelled/closed without any further notice.

Chief Engineer (P&D)


(Rao (Zamir-ud-Din)

To: M/s FKS Building Services,


14-Auto Market, Near Kent Homeopathic Clinic,
Sialkot Road, Gujranwala.

Info: 1. M/s Ansar Model City, Kala Shah Kaku Tehsil Ferozewala Distt.
Sheikhupura for necessary action as above.

2. Master file.

No._____________/DRW/1318/LESCO Dated_________/2014
/Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: srmanpd@lesco.gov.pk

Subject: LEFTOVER WORK OF EXTERNAL ELECTRIFICATION OF


YASIN GARDEN HOUSING SCHEME SHAHDARA BY PASS
LAHORE

Reference: Your office letter No. 2087-88/LESCO/PDC/B&AO dated 10-12-2013.

As per this office record, the Sponsor had already deposited capital cost
Rs.15,39,709/-, therefore detail of material yet to be installed at site and its estimated cost
may please be intimated to this office, so that Sponsor may be requested to deposit the
same.

Chief Engineer (P&D)


(Rao Zamir-ud-Din)

To: PD (Construction) LESCO.

Info: Master file.

No._____________/DRW/1023/LESCO Dated______/2/2015

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF AREA DEVELOPMENT


SCHEME RENALA KHURD

Reference: Your letter No. IC/14/515 dated 26-11-2014.

Please coordinate with the undersigned for site visit on any working day
during office hours.

(Engr. Bashir Ahmad)


Addl. Manager (Planning)
For Chief Engineer (P&D)

To: M/s In Consult (Pvt.) Ltd.


80-Aurangzeb Block
New Garden Town, Lahore

Info: Master file.

No.______________/DRW/1503/LESCO Dated____/12/2014

Hamid/dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: PROPOSAL / ESTIMATE FOR HANDING OVER RAILWAY


COLONIES TO LESCO FOR DIRECT BILLING

Reference: Your letter No. PSEC/052/2211 dated 22-11-2014.

Please depute your representative well conversant with the subject


case to coordinate with the undersigned for site visit on any working day during office
hours.

(Engr. Bashir Ahmad)


Addl. Manager (Planning)
For Chief Engineer (P&D)

To: M/s Power System Engineering Consultant (Pvt.) Ltd.


SPEC 31/2-B, Abu Bakar Block Raja Market New Garden Town,
Lahore.

Info: Master file.

No.______________/DRW/1510/LESCO Dated____/12/2014

Hamid/dak-h4
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: E.MAIL TO ADNAN TAREEN

It is submitted for information that approval of PC-1 is under process with


BOD and some positive progress is completed Please coordinate with the undersigned for
site visit on any working day during office hours.

(Engr. Bashir Ahmad)


Addl. Manager (Planning)
For Chief Engineer (P&D)

To: M/s In Consult (Pvt.) Ltd.


80-Aurangzeb Block
New Garden Town, Lahore

Info: Master file.

No.______________/DRW/1503/LESCO Dated____/12/2014

Hamid/dak-h4
To,

The Chief Engineer (P&D)


LESCO, Lahore

Subject: EXTERNAL ELECTRIFICATION OF IMAD GARDEN HOUSING


SCHEME AT KAHNA NAU FEROZEPUR ROAD LAHORE

Reference: Your office letter No. 2543-44 dated 27-8-2014.

Point-wise reply to the observations made by your aforementioned


letter is as under:

1. No. of streets have been re-planned at site as per design book


already submitted. Therefore there is no change is required in the BOQ /
Estimate.

2. Necessary boundary of the scheme has been constructed as per


approved layout plan.

3. Technical analysis of the feeder has been carried out as per LESCO
requirement.

4&5 The points have been attended to as per observation.

It is further stated that the Sponsor has given an undertaking on non-


judicial paper (copy enclosed) that he abide by rules and regulations while issuing
the formal approval.

With bestregards,
Yours faithfully
For Orion Consultants

Thanking you in anticipation


LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: STOP / DISCONTINUE THE PROVISION OF ELECTRICITY TO


ILLEGAL EXTENSION OF AL-RAZIQ GARDEN HOUSING SCHEME
NEAR FAIZPUR MOTORWAY INTERCHANGE MAIN SHARAQPUR
ROAD TEHSIL FEROZEWALA SHEIKHUPURA

Enclosed please find herewith a copy of letter No. LDA/DMP-1/523 dated


17-3-2016 received from Director (MP-1) LDA, Lahore vide which it has been intimated
that the subject Housing Scheme was approved on the area measuring 367-Kanals &
15-Marlas. But now the Sponsor has illegally extended the area of the Scheme towards
eastern side of approved layout plan without prior approval from the LDA. He has further
requested that LESCO staff may be advised to stop/discontinue electricity and issuance of
D.N. of New Connections to illegal extension.

Keeping in view the position explained above, concerned staff may be


directed to be vigilant and not to give supply/connections in the illegally extended area
otherwise they will be held responsible for the consequences.

DA / As above
Chief Engineer (P&D)
( Rao Zamir-ud-Din )

To: DM (O) Ferozewala Divn. LESCO

Info: 1. PD (Construction) LESCO for information and vigilance please.

2. Manager (Op.) Northern Circle ) for information and


3. AM (O) Sharaqpur Sub-Divn. LESCO ) similar action.

4. Master file.

No.___________/DRW/1473/LESCO Dated_____/4/2016
Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: REVISION OF DEPOSIT WORK OF AL-RAZIQ GARDEN HOUSING


SCHEME NEAR FAIZPUR MOTORWAY INTERCHANGE MAIN
SHARAQPUR ROAD TEHSIL FEROZEWALA SHEIKHUPURA

Reference: Your office letter No. 13364-65/PDC/LHR dated 12-5-2016.

The estimate of proposed work may be prepared and submitted to this office
in order to proceed further in the matter.

Chief Engineer (P&D)


( Mazhar-ul-Ibad )

To: PD (Construction) LESCO

Info: 1. DM (Construction) Sheikhupura Divn. with reference to above.


2. Master file.

No.___________/DRW/1473/LESCO Dated_____/6/2016

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: ILLEGAL EXTENSION OF AL-RAZIQ GARDEN HOUSING SCHEME


NEAR FAIZPUR MOTORWAY INTERCHANGE MAIN SHARAQPUR
ROAD TEHSIL FEROZEWALA SHEIKHUPURA

As pointed out by Director (MP-1) LDA, Lahore vide letter No. LDA/DMP-
1/523 dated 17-3-2016 you have extended the area of Scheme illegally towards eastern
side of approved layout plan without prior approval from LDA.

Accordingly Deputy Manager (Planning) of this office visited the site on


1-9-2016 and above report of LDA found correct. Therefore detail of illegally extended
area and its approval by LDA may be submitted to this office in order to proceed further
in the matter.

In addition to above, validity period of your Bank Guarantee No. L.G No.
03738GA000087 has already been expired on 8-6-2015. Therefore renewed Bank
Guarantee valid upto completion of work may be furnished to this office immediately.

Chief Engineer (P&D)


( Mazhar-ul-Ibad )

To: Mr. Muhammad Mushtaq,


For M/s Al-Raziq Garden Housing Scheme,
Main Sharaqpur Road, Near Faizpur Interchange,
Distt. Sheikhupura.

Info: 1. PD (Construction) LESCO.


2. DM (Construction) LESCO Sheikhupura Division.
3. Master file.

No.________________/DRW/1473/LESCO Dated_____/9/2016

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: REVISION OF DEPOSIT WORK OF AL-RAZIQ GARDEN HOUSING


SCHEME NEAR FAIZPUR MOTORWAY INTERCHANGE MAIN
SHARAQPUR ROAD TEHSIL FEROZEWALA SHEIKHUPURA

Reference: 1. This office letter No. 2871-73 dated 2-9-2016.


2. PD (Construction) LESCO letter No. 1084-85 dated 17-8-16.

The estimate of additional material required for execution of subject work,


prepared by XEN (Construction) LESCO Sheikhupura Division amounting Rs.7,67,058/-
has been approved by Chief Executive Officer LESCO. Therefore difference of capital
cost: Rs.767,058/- may please be deposited with Chief Financial Officer LESCO so that
the work may be taken in hand.

In addition to above, detail of illegally extended area and renewed Bank


Guarantee, as already requested vide this office letter given at Reference-1, may also be
furnished to this office immediately.

Chief Engineer (P&D)


( Mazhar-ul-Ibad )

To: Mr. Muhammad Mushtaq,


For M/s Al-Raziq Garden Housing Scheme,
Main Sharaqpur Road, near Faizpur Interchange,
Distt. Sheikhupura.

Info: 1. Chief Financial Officer LESCO. On payment of difference of capital cost:


Rs.767,058/- the same may be transferred to PD (Construction) LESCO
through Credit Advice under intimation to this office.

2. PD (Construction) LESCO. ) The work may be taken in


3. DM (Construction) LESCO Sheikhupura Divn. ) on realization of diff. of
) capital cost:
Rs.767,058/- )under
intimation to T/O.

4. Master file.

No._____________/DRW/1473/LESCO Dated_____/9/2016

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: REVISION OF DEPOSIT WORK OF AL-RAZIQ GARDEN HOUSING


SCHEME NEAR FAIZPUR MOTORWAY INTERCHANGE MAIN
SHARAQPUR ROAD TEHSIL FEROZEWALA SHEIKHUPURA

Reference: Your letter dated 28-9-2016.

Your letter under reference does not serve the purpose. Therefore as already
requested vide this office letter No.3722-25 dated 19-9-2016, the needful may be done as
under:

1. Cost of additional material amounting Rs. 767,058/- may be


deposited with Chief Financial Officer LESCO

2. Renewed Bank Guarantee for the period of completion of work may


be submitted to this office.

3. Design of extended area alongwith relevant document including LDA


approval may be submitted to this office.

Chief Engineer (P&D)


( Mazhar-ul-Ibad )

To: Mr. Muhammad Mushtaq,


For M/s Al-Raziq Garden Housing Scheme,
Main Sharaqpur Road, near Faizpur Interchange,
Distt. Sheikhupura.

Info: 1. Chief Financial Officer LESCO. On payment of difference of capital cost:


Rs.767,058/- the same may be transferred to PD (Construction) LESCO
through Credit Advice under intimation to this office.

2. PD (Construction) LESCO. ) The work may be taken in


3. DM (Construction) LESCO Sheikhupura Divn. ) on realization of diff. of
) capital cost:
Rs.767,058/- )under
intimation to T/O.

4. Master file.

No._____________/DRW/1473/LESCO Dated_____/10/2016
Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: STOP / DISCONTINUE THE PROVISION OF ELECTRICITY TO


ILLEGALLY EXTENDED AREA OF THE LAND SUB-DIVISION
KNOWN AS SHAHEEN VALLEY LOCATED AT RACHNA TOWN
MOUZA & TEHSIL FEROZEWALA DISTT. SHEIKHUPURA

Enclosed please find herewith a copy of letter No. LDA/DMP-1/1578 dated


28-10-2016 received from Director Metropolitan (P-1) LDA, Lahore vide which it has
been intimated that the subject Housing Scheme was approved on the area measuring
83-Kanals & 15-Marlas. But now the Sponsor has illegally extended the area of the
Scheme without seeking prior approval from the Competent Authority. He has further
requested that LESCO staff may be advised to stop/discontinue electricity and issuance of
D.N. of New Connections to illegal extension.

Keeping in view the position explained above, concerned staff may be


directed to be vigilant and not to give supply/connections in the illegally extended area
otherwise they will be held responsible for the consequences.

DA / As above
Chief Engineer (P&D)
( Mazhar-ul-Ibad )

To: DM (O) Ferozewala Divn. LESCO

Info: 1. Manager (Op.) Northern Circle ) for information and


2. AM (O) Rachna Town Sub-Divn. LESCO) similar action.

3. Mrs. Nusrat Fouzia, Sponsor of Shaheen Valley Housing Scheme, G.T Road
Rachna Town Tehsil Ferozewala Distt. Sheikhupura to provide detail of
illegally extended area.

4. Master file.

No._____________/DRW/1460/LESCO Dated_____/11/2016

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF TAYYABA GARDEN MOUZA


FAIZPUR KHURD TEHSIL FEROZEWALA DISTT. SHEIKHUPURA

Reference: Your letter No. Nil dated 14-11-2016 received in this office on 7-12-2016.

While checking the Design of subject Housing Scheme, it has been observed
that you have not supplied the following documents, which are mandatory to proceed
further in the matter:
(1) Approval letter alongwith approved layout plan of the Housing Scheme issued by
LDA.
(2) Copy of Consultant Registration Certificate with PEC duly renewed for the current
year.
(3) Undertaking on non-judicial paper worth RS.20/- from the Sponsor regarding
inclusion of complete area of the Housing Scheme in the Design / Engineering
report of the Consultants duly attested.
(4) Copy of NIC of the Sponsor duly attested.
(5) Authority letter of Sponsor in favour of Consultants.
(6) Updated single line key diagram duly attested by concerned AM (O) LESCO of 11
kV feeder with existing / proposed analysis.
(7) Power of Attorney in favour of Sponsor from the Registrar on non-judicial paper
worth Rs.1200/-
You are requested to provide the above documents immediately, so that the
case of external electrification may be processed and approved accordingly.

Chief Engineer (P&D)


( Mazhar-ul-Ibad )

To: Syed Farooq Hashmi,


Advocate High Court,
Resident of Tayyaba Garden Mouza Faizpur Khurd,
Tehsil Ferozewala Distt. Sheikhupura.

Info: 1. M/s True Consulting, Office No. 9, Ist Floor Hajveri Centre 15-Queens
Road near LESCO Head office, Lahore for necessary action as above.
2. Master file.
No.______________/DRW/1647/LESCO Dated____/12/2016
Hamid/dak-h6

LAHORE ELECTRIC SUPPLY COMPANY LIMITED


TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF AL-RAZIQ GARDEN HOUSING


SCHEME NEAR FAIZPUR MOTORWAY INTERCHANGE MAIN
SHARAQPUR ROAD TEHSIL FEROZEWALA SHEIKHUPURA

As per financial closure of the subject work of received from PD


(Construction) LESCO vide letter No. 1053-54 dated 7-2-2017, difference of capital cost
amounting Rs. 20,96,566/- is recoverable from you. Therefore the requisite amount may
please be deposited with Chief Financial Officer LESCO under intimation to this office.

Chief Engineer (P&D)


( Mazhar-ul-Ibad )

To: Mr. Muhammad Mushtaq,


For M/s Al-Raziq Garden Housing Scheme,
Main Sharaqpur Road, near Faizpur Interchange,
Distt. Sheikhupura.

Info: 1. Chief Financial Officer LESCO. On payment of difference of capital cost:


Rs.20,96,566/- the same may be transferred to PD (Construction) LESCO
through Credit Advice under intimation to this office.
2. PD (Construction) LESCO.
3. DM (Construction) LESCO Sheikhupura Divn.
4. Master file.

No._____________/DRW/1473/LESCO Dated_____/2/2017

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF S.A GARDENS (PHASE-II)


HOUSING SCHEME (ULTIMATE LOAD DEMAND 4427.79 KW) CHAK
NO. 37 G.T. ROAD KALA SHAH KAKU TEHSIL FEROZEWALA DISTT.
SHEIKHUPURA

The Competent Authority is pleased to accord provisional approval for external


electrification of S.A. Gardens (Phase-II) Housing Scheme consisting of only 03 Blocks namely
Kamran, Arslan & Shoaib Blocks at Chak No. 37 G.T. Road Kala Shah Kaku Tehsil Ferozewala
Distt. Sheikhupura through proposed 11 kV independent feeder from 132 kV Shamke grid station
for ultimate load demand of 4427.79 kW on individual metering.

The Sponsor of the Housing Scheme is liable to deposit the following amounts
with Chief Financial Officer LESCO within one month from the issuance of this letter as per GM
(PE&S) WAPDA Memo No. GM (PE&S)/CEDE/DDE/E-42/2163-81 dated 26-10-1993:

Description Amount
Cost of source feed line / grid end material Rs.58,27,163
Design vetting charges @ Rs.1.5% of total estimated cost Rs. 576,149/-
Supervision charges @ Rs.1.5% of work to be carried out by the Rs. 463,992/-
Sponsor
25% grid sharing cost @ Rs.1366/- per kW for load of 4427.79 kW Rs.60,48,361/-

The formal approval letter containing the details of design aspects shall be issued
on receipt of above recoverable amounts and 5 No. copies of Design Books, by incorporating the
discrepancies as pointed out by this office and on receipt of SFP from LDA.
The validity of this demand stands for one month only.
This is being issued with the approval of Chief Executive Officer LESCO.

Chief Engineer (P&D)


LESCO Lahore
To: M/s Power Com,
Suit No. 1 First Floor, Khurram Centre,
Wahdat Road, Lahore.
Info: 1. Operation Director LESCO to expedite finalization of land of proposed grid station
as already requested by this office vide letter No. 24684 dated 15-6-2017.
2. Chief Financial Officer LESCO
3. Manager (Op) LESCO Sheikhupura Circle
4. DM (O) Muridke Divn. LESCO
5. M/s S.A. Gardens (Phase-II) Chak No. 37 G.T. Road Kala Shah Kaku Tehsil
Ferozewala Distt. Sheikhupura
5. Master file.
No. ______________/DRW/1531/LESCO Dated_____/06/2017

LAHORE ELECTRIC SUPPLY COMPANY LIMITED


TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: STOP / DISCONTINUE THE PROVISION OF ELECTRICITY TO PAK


VALLEY HOUSING SCHEME SHARAQPUR ROAD FEROZEWALA
SHEIKHUPURA

A copy of letter No. LDA/DMP-1/1271 dated 10-8-2017 received from


Director Metropolitan (Planning-1) LDA, Lahore requesting therein to stop / discontinue
electricity and issuance of Demand Notice of new connections in the subject un-approved
Housing Scheme is sent herewith for information and further necessary action.

DA / As above
Chief Engineer (P&D)
( Mohsin Raza Khan )

To: DM (O) Ferozewala Divn. LESCO

Info: 1. Manager (Op.) Northern Circle LESCO


2. Master file.

No.______________/DRW/LESCO/ Dated_____/8/2017

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: STOP / DISCONTINUE THE PROVISION OF ELECTRICITY TO


SHADMAN ENCLAVE SHARAQPUR ROAD FEROZEWALA
SHEIKHUPURA

A copy of letter No. LDA/DMP-1/1265 dated 10-8-2017 received from


Director Metropolitan (Planning-1) LDA, Lahore requesting therein to stop / discontinue
electricity and issuance of Demand Notice of new connections in the subject un-approved
Housing Scheme is sent herewith for information and further necessary action.

DA / As above
Chief Engineer (P&D)
( Mohsin Raza Khan )

To: DM (O) Ferozewala Divn. LESCO

Info: 1. Manager (Op.) Northern Circle LESCO


2. Master file.

No.______________/DRW/LESCO/ Dated_____/8/2017

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: STOP / DISCONTINUE THE PROVISION OF ELECTRICITY TO AL-


QAYYUM GARDEN HOUSING SCHEME SHARAQPUR ROAD
FEROZEWALA SHEIKHUPURA

A copy of letter No. LDA/DMP-1/1268 dated 10-8-2017 received from


Director Metropolitan (Planning-1) LDA, Lahore requesting therein to stop / discontinue
electricity and issuance of Demand Notice of new connections in the subject un-approved
Housing Scheme is sent herewith for information and further necessary action.

DA / As above
Chief Engineer (P&D)
( Mohsin Raza Khan )

To: DM (O) Ferozewala Divn. LESCO

Info: 1. Manager (Op.) Northern Circle LESCO


2. Master file.

No.______________/DRW/LESCO/ Dated_____/8/2017

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF ‘NAYAB COLONY’


NAROWAL ROAD MURIDKE

Reference: Your office letter No. 7289-90 dated 25-7-2017.

It is not understood as to why the case has been referred to this


office inspite of the fact that instructions of the department regarding external
electrification of Housing Schemes are very much clear. Anyhow as per policy of
the department, electrification of all such Abadies / Housing Schemes is to be
carried out on cost deposit basis either borne by the Sponsors or residents after
submission of design through Consultants registered with Pakistan Engineering
Council alongwith relevant documents including approval letter and approved
layout plan by LDA.

In case the instant Colony/Scheme is an abandoned Housing


Scheme, then the residents may be advised to get it declared ‘Abandoned’ from
LDA so as to proceed further accordingly.

Chief Engineer (P&D)


(Mohsin Raza Khan)

To: DM (O) LESCO Muridke Division.

Info: 1. Manager (Op.) LESCO Sheikhupura Circle.


2. Master file.

No._______________/ DRW/1591/Skp. Dated______/9/2017

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF BUKSH TOWN HOUSING


SCHEME NEAR FAIZ PUR INTERCHANGE SHARAQ PUR ROAD
TEHSIL FEROZEWALA DISTT. SHEIKHUPURA

Reference: Your request on the above noted subject.

While checking the Design of subject Housing Scheme following


documents found missing, which may please be supplied to this office in order to proceed
further in the matter:

(1) Approval letter issued by LDA.


(2) Layout plan of the Housing Scheme duly approved by LDA.

Chief Engineer (P&D)


( Mohsin Raza Khan )

To: Mr. Abid Aslam S/O Muhammad Aslam,


Buksh Town Housing Scheme Near Faizpur Interchange
Sharaqpur Road Tehsil Ferozewala Distt. Sheikhupura.

Info: 1. Director Metropolitan (Plannig-1) Johar Town, Lahore to intimate the status
of subject Housing Scheme.

2. Master file.

No.________________/DRW/1647/LESCO Dated_____/9/2017

Hamid/dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: STOP / DISCONTINUE THE PROVISION OF ELECTRICITY TO


ILLEGAL HOUSING SCHEME NAMED AS MAKKAH CITY LOCATED
AT SHARAQPUR ROAD (NAZIR LABANA ROAD) TEHSIL & DISTT.
SHEIKHUPURA

A copy of letter No. LDA/DMP-1/111/09 dated 12-9-2017 received from


Director Metropolitan (Planning-III) CMP Wing LDA vide which he has desired to stop /
discontinue electricity and issuance of Demand Notice of new connections in the
subjected un-approved Housing Scheme is sent herewith for information and further
necessary action as desired thin.

DA / As above
Chief Engineer (P&D)
( Mohsin Raza Khan )

To: DM (O) Ferozewala Divn. LESCO

Info: 1. Manager (Op.) Northern Circle LESCO


2. Master file.

No.______________/DRW/LESCO/ Dated_____/9/2017

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: STOP / DISCONTINUE THE PROVISION OF ELECTRICITY TO


ILLEGAL HOUSING SCHEME NAMED AS NOOR PARK MAIN G.T.
ROAD MURIDKE SHEIKHUPURA

A copy of letter No. LDA/DMP-1/1357 dated 28-8-2017 received from


Director Metropolitan (Planning-I) LDA, Lahore vide which he has desired to stop /
discontinue electricity and issuance of Demand Notice of new connections in the
subjected un-approved Housing Scheme is sent herewith for information and further
necessary action as desired thin.

DA / As above
Chief Engineer (P&D)
( Mohsin Raza Khan )

To: DM (O) Ferozewala Divn. LESCO

Info: 1. Manager (Op.) Northern Circle LESCO


2. Master file.

No.______________/DRW/LESCO/ Dated_____/9/2017

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: INSTALLATION OF TRANSFORMER AT THQ HOSPITAL SHAHKOT

Reference: CEO Distt. Health Authority Nankana Sahib letter No. 25730-36 dated
14-9-2017 addressed to you with its copies to this office and others.

You are advised to expedite installation of Transformer / New Connection


as mentioned in the above referred letter under intimation to all concerned.

Chief Engineer (P&D)


( Mohsin Raza Khan )

To: DM (O) Shahkot Divn. LESCO

Info: 1. Manager (Op.) LESCO Sheikhupura Circle for information and necessary
action.

2. Master file.

No.______________/DRW/LESCO/ Dated_____/9/2017

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: STOP / DISCONTINUE THE PROVISION OF ELECTRICITY TO


ILLEGAL HOUSING SCHEME NAMED AS AJWA GARDEN LOCATED
AT SHARAQPUR ROAD (NAZIR LABANA ROAD) TEHSIL & DISTT.
SHEIKHUPURA

A copy of letter No. LDA/DMP-III/018 dated 12-9-2017 received from


Director Metropolitan (Planning-Iii) LDA, Lahore vide which he has desired to stop /
discontinue electricity and issuance of Demand Notice of new connections in the
subjected un-approved Housing Scheme is sent herewith for information and further
necessary action as desired therein.

DA / As above
Deputy Manager (Planning)
For Chief Engineer (P&D)

To: DM (O) Ferozewala Divn. LESCO

Info: 1. Manager (Op.) Northern Circle LESCO


2. Master file.

No.______________/DRW/LESCO/ Dated_____/10/2017

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: STOP / DISCONTINUE THE PROVISION OF ELECTRICITY TO LAND


UNDER CITY ESTATE ADVISORS, MAIN G.T. ROAD MURIDKE

A copy of letter No. LDA/DMP-III/173 dated 1-11-2017 received from


Director Metropolitan (Planning-III) LDA, Lahore requesting therein to stop / discontinue
electricity and issuance of Demand Notice of new connections in the subject un-approved
Housing Scheme is sent herewith for information and further necessary action.

DA / As above
Deputy Manager (Planning)
For Chief Engineer (P&D)

To: DM (O) Muridke Divn. LESCO

Info: 1. Manager (Op.) Sheikhupura Circle LESCO


2. Master file.

No.______________/DRW/LESCO/ Dated_____/12/2017

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: STOP / DISCONTINUE THE PROVISION OF ELECTRICITY TO


SHADMAN TOWN NEAR JOIYANWALA MORE AT LAHORE
SHEIKHUPRA ROAD TEHSIL & DISTT. SHEIKHUPURA

A copy of letter No. LDA/DMP-III/83 dated 16-10-2017 received from


Director Metropolitan (Planning-III) LDA, Lahore requesting therein to stop / discontinue
electricity and issuance of Demand Notice of new connections in the subject un-approved
Housing Scheme is sent herewith for information and further necessary action.

DA / As above
Deputy Manager (Planning)
For Chief Engineer (P&D)

To: DM (O) LESCO City Division Sheikhupura

Info: 1. Manager (Op.) Sheikhupura Circle LESCO


2. Master file.

No.______________/DRW/LESCO/ Dated_____/12/2017

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: STOP / DISCONTINUE THE PROVISION OF ELECTRICITY TO


AL-FAJAR GARDEN MAIN G.T. ROAD MURIDKE

A copy of letter No. LDA/DMP-1/262 dated 5-12-2017 received from


Director Metropolitan (Planning-III) LDA, Lahore requesting therein to stop / discontinue
electricity and issuance of Demand Notice of new connections in the subject un-approved
Housing Scheme is sent herewith for information and further necessary action.

DA / As above
Chief Engineer (P&D)
LESCO Lahore

To: DM (O) Ferozewala Divn. LESCO

Info: 1. Manager (Op.) Northern Circle LESCO


2. DM (O) Muridke Divn. LESCO.
3. Master file.

No.______________/DRW/LESCO/ Dated_____/12/2017

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF STAFF


ACCOMMODATIONS AT 1180 MW CCPP BHIKHI POWER
PLANT

Reference: Your letter No. QATPL/Admn.-2087/2017 dated 14-11-2017.

While checking the design of external electrification of Staff


Accommodations at 1180 MW CCPP Bhikhi Power Plant following documents found
missing, which may please be supplied to this office in order to proceed further in the
matter:
(1) Authority letter from the Sponsor in favour of Consultant.
(2) Electricity bill of the nearest consumer.
(3) Power of Attorney in favour of Sponsor from the owners of land on stamp paper of
Rs.1200/-

Chief Engineer (P&D)


LESCO Lahore

To: Mr. Khalid Parvaiz


General Manager (Admn.& HR)
Quaid-E-Azam Thermal Power (Pvt.) Ltd.
Ist Floor 7 C-1 Gulberg-III, Lahore.

Info: Master file.

No.________________/DRW/659/Skp. Dated_____/01/2018
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

Subject: PROVISIOIN / ENERGIZATION OF EX-AIR AVENUE HOUSING


SCHEME, DHA PHASE-VIII THROUGH 11 KV INDEPENDENT
FEEDER EMANATING FROM GHAZI GRID STATION

Reference: Your office letter No. 625/AA/AU-LESCO/11-12 dated 20-12-2017.

The feasibility report / proposal regarding stopgap arrangement as


mentioned in your above referred letter alongwith estimate of the same may be got
prepared and submitted to this office through Consultants in order to proceed further in
the matter.

Chief Engineer (P&D)


LESCO Lahore

To: M/s Urban Developers,


Urban Developers Complex,
Block-P Phase-VIII DHA Lahore Cantt.

Info: Master file.

No._____________/DRW/547/LESCO Dated______/1/2018

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
Ph: # 99204818 PBX: 99204820-30 (Ext.201)
E-mail: srmanpd@lesco.gov.pk

Subject: POSSESSION OF LAND FOR CONSTRUCTION OF 132 KV GRID


STATION AT WAPDA EMPLOYEES COOPERATIVE HOUSING
SOCIEITY SHEIKHUPURA

Enclosed please find herewith a copy of letter No. WECH/SKP/515 dated


28-12-2017 received from President WAPDA Town Cooperative Housing Socieity Ltd.
Sheikhupura vide which has intimated that land of grid station handed over LESCO
during year 2008 is still lying un-attended.

In this connection, your personal attention is invited towards this office


letter No. 18734-35 dated 15-5-2008 whereby while conveying the approval of worthy
CEO LESCO regarding acceptance of land for construction of grid station at the subjected
Housing Society, you were advised to proceed for taking the possession of land and
construction of boundary walls etc. but no action has so far been taken as intimated by the
Sponsors.

view thisplease wa ve eived SThe feasibility report / proposal regarding


stopgap arrangement as mentioned in your above referred letter alongwith estimate of the
same may be got prepared and submitted to this office through Consultants in order to
proceed further in the matter.

Chief Engineer (P&D)


LESCO Lahore

To: M/s Urban Developers,


Urban Developers Complex,
Block-P Phase-VIII DHA Lahore Cantt.

Info: Master file.

No._____________/DRW/547/LESCO Dated______/1/2018
Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: STOP / DISCONTINUE THE PROVISION OF ELECTRICITY TO HIRAN


MINAR CITY AT HIRAN MINAR MOTORWAY INTERCHANGE
TEHSIL & DISTT. SHEIKHUPURA

A copy of letter No. LDA/DMP-III/326 dated 18-12-2017 received from


Director Metropolitan (Planning-III) CMP Wing LDA, Lahore requesting therein to stop /
discontinue electricity and issuance of Demand Notice of new connections in the subject
un-approved Housing Scheme is sent herewith for information and further necessary
action.

DA / As above
Deputy Manager (Planning)
For Chief Engineer (P&D)

To: DM (O) City Divn. LESCO Sheikhupura.

Info: 1. Manager (Op.) Sheikhupura Circle LESCO


2. Master file.

No.______________/DRW/247/Skp. Dated_____/1/2018
Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: STOP / DISCONTINUE THE PROVISION OF ELECTRICITY TO


REHMAN CITY PH-V HOUSING SCHEME NEAR SHER-E-BANGAAL
COONY AHDIAN ROAD, FEROZEWLA

A copy of letter No. LDA/DMP-III/180 dated 2-11-2017 received from


Director Metropolitan (Planning-III) LDA, Lahore requesting therein to stop / discontinue
electricity and issuance of Demand Notice of new connections in the subject un-approved
Housing Scheme is sent herewith for information and further necessary action.

DA / As above
Deputy Manager (Planning)
For Chief Engineer (P&D)

To: DM (O) Ferozewala Divn. LESCO

Info: 1. Manager (Op.) Northern Circle LESCO


2. Master file.

No.______________/DRW/247/LESCO Dated_____/2/2018

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: STOP / DISCONTINUE THE PROVISION OF ELECTRICITY TO HIRAN


MINAR CITY HOUSING SCHEME AT HIRAN MINAR MOTORWAY
INTERCHANGE TEHSIL & DISTT. SHEIKHUPURA

A copy of letter No. LDA/DMP-III / 556 dated 15-3-2018 received from


Director Metropolitan (Planning-III) LDA, Lahore requesting therein to stop / discontinue
electricity and issuance of Demand Notice of new connections in the subject un-approved
Housing Scheme is sent herewith for information and further necessary action.

DA / As above
Dy. Manager (Planning)
For Chief Engineer (P&D)

To: Manager (Op.) Sheikhupura Circle

Info: 1. DM (O) LESCO City Division Sheikhupura for necessary action as above.
2. Master file.

No.______________/DRW/LESCO/ Dated_____/3/2018

Hamid / Dak-h6
Memo No. _________________/ Dated____/3/2018.

From,

The Deputy Manager (Op.)


Baghbanpura Division, LESCO
Lahore.

To,

Deputy Manager (P&D)


LESCO HQ Lahore.

Subject: Shifting of load of 11 kV Iqbal Furnace feeder to 11 kV Tulaspura


feeder

With reference to telephonic discussion dated 21-3-2018.

It is intimated that in 8/2017, 11 kV grid end cable of 11 kV Iqbal


Furnace feeder was burnt / damaged and load of the said feeder was shifted on
11 kV Tulaspura feeder due to which load recorded on 11 kV Tulaspura feeder in
8/2017 is 380-Amps

Deputy Manager (Operation)


Baghbanpura Division, LESCO
Lahore.
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: STOP / DISCONTINUE THE PROVISION OF ELECTRICITY TO HIRAN


MINAR CITY HOUSING SCHEME AT HIRAN MINAR MOTORWAY
INTERCHANGE TEHSIL & DISTT. SHEIKHUPURA

A copy of letter No. LDA/DMP-III / 556 dated 15-3-2018 received from


Director Metropolitan (Planning-III) LDA, Lahore requesting therein to stop / discontinue
electricity and issuance of Demand Notice of new connections in the subject un-approved
Housing Scheme is sent herewith for information and further necessary action.

DA / As above
Dy. Manager (Planning)
For Chief Engineer (P&D)

To: Manager (Op.) Sheikhupura Circle

Info: 1. DM (O) LESCO City Division Sheikhupura for necessary action as above.
2. Master file.

No.______________/DRW/LESCO/ Dated_____/3/2018

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 200) Ph:99204818 Fax:99204819
E-mail: srmanpd@lesco.gov.pk

Subject: STOP / DISCONTINUE THE PROVISION OF ELECTRICITY TO HIRAN


MINAR CITY HOUSING SCHEME AT HIRAN MINAR MOTORWAY
INTERCHANGE TEHSIL & DISTT. SHEIKHUPURA

A copy of letter No. LDA/DMP-III / 556 dated 15-3-2018 received from


Director Metropolitan (Planning-III) LDA, Lahore requesting therein to stop / discontinue
electricity and issuance of Demand Notice of new connections in the subject un-approved
Housing Scheme is sent herewith for information and further necessary action.

DA / As above
Dy. Manager (Planning)
For Chief Engineer (P&D)

To: Manager (Op.) Sheikhupura Circle

Info: 1. DM (O) LESCO City Division Sheikhupura for necessary action as above.
2. Master file.

No.______________/DRW/LESCO/ Dated_____/3/2018

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF KHADIM-E-PUNJAB REHAISHI


SCHEME (ADS-II) SHEIKHUPURA (ULTIMATE LOAD DEMAND 4595 KW

Reference: This office letter No.8361-67 dated 31-7-2018.

It is regretted to point out that discrepancies/shortcomings pointed out by


this office have not been incorporated in 05 No. Design Books received from your office.
Therefore the same are returned herewith with the remarks to re-submit the same after
necessary correction.

DA/As above
Deputy Manager (P&D)
LESCO Lahore

To: M/s Power Com Consultants,


Suit No. 1 Ist Floor Khurram Shopping Centre,
Wahdat Road, Lahore.

Info: 1. M/s Khadim-e-Punjab Rehaishi Scheme (ADS-II) Sharaqpur Road Sheikhupura.

2. Master file.

No.______________/P&D/DRW/1715/LESCO Dated____/10/2018

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXECUTION OF WORK FOR EXTERNAL ELECTRIFICATION


OF HOUSING SCHEMES HAVING LOAD 1000 KW AND ABOVE
INCLUDING SOURCE FEED LINE PRIVATELY THROUGH
PEPCO/LESCO APPROVED CONTRACTORS

In pursuance of approval accorded by LESCO BOD in its 206 th meeting held


on 25th April 2019, conveyed by Company Secretary vide letter No. LESCO/CS/E-M-
206 /BOD/200 dated 8-5-2019, in future, the work of external electrification for Housing
Schemes having load 1000 kW and above including source feed line will be carried out by
the Sponsors privately through PEPCO / LESCO approved Contractors.

However the work of HT/LT network for the Housing Schemes having load
less than 1000 kW will be executed as per policy in vogue.

GM / Technical Director
LESCO Lahore

Info: 1. S.O. to CEO LESCO.


2. Operation Director LESCO.
3. Company Secretary LESCO.
4. Chief Engineer (P&D) LESCO
5. CE O&M (Distribution), CE (T&G) LESCO
6. PD (Construction) LESCO.
7. All Managers (Operation) LESCO.
8. Master file.

No.___________________/ Dated_______/5/2019

Hamid / Dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph:9204818 Fax:9204819
E-mail: srmanpd@lesco.gov.pk

Subject: EXTERNAL ELECTRIFICATION OF AL-RAHIM GARDEN


HOUSING SCHEME JOYIANWALA MORE TEHSIL AND DISTT.
SHEIKHUPURA

Enclosed please find herewith photocopies of 02 No. different letters issued


by your office with same dispatch No. & date i.e. LDA/DMP-1/Skp./442 dated 8-5-2019.
Please check your office record and let this office which letter is correct.

In addition to above latest status of approval of subject Housing Scheme


may also be intimated to this office.

DA/As above

Deputy Manager (P&D)


LESCO Lahore

To: Director MP-I, LDA,


LDA Complex Johar Town,
Lahore.

Info: Master file.

No.___________________/DRW/1437/LESCO Dated____/5/2019

Hamid / Dak-h6