Safety Meeting Minutes 4/14/2015

Next Meeting is on 5/12/2015


Members present: Tim Hull, John Chesnut, Ray Stewart, Jeff Nyitrai, Chad Gregory, Chuck
Phillips, Daren Smith
Members not present: Jon Elsie, Adam Wilson, Dennis Ballewske, Jim Owen, Tracy Kuhn

OTIS Online Training: Monthly Completion Standard


(100%)
********Log on and Complete ********
Action Items Open/Follow-up:

Fire Alarm System Add another Amplifier and speakers for Fire alarm and make an
audible alert on paging system. Torrence Sound in Engineering and quote phase. (Tim
Hull) , Engineers at Torrence working on proposal.
Evacuation Rally Areas Place Placards for each area (FE, BE, QC, etc) (Ray
Stewart) Nothing done on this yet. In Process
Washer Training on Handling Chemicals Look into training (Minor/Stewart)
More Training on all other chemicals in Washer Area.
Pal/Depal Anti-fatigue mat (Jon Elsie) In Process
Contact Heritage ink bucket, Barrels, & Totes (Tim Hull, Chad Gregory) In
Process
Talk with ITO on forklift battery RS, JN
Blower guarding List in Shop, IN Process
Copper Sulfate Smaller bucket
2 Year award ( Suggestion of Shirts ) ( Ray Stewart & Daren Smith ) On Order
Order New Safety banners emphasizing personal ownership and elimination
of all communication barriers. In Process.

New Items:

Safety Conference item Counterfeiting of Mechanical & Electrical


parts. Only use Approved Vendors (Web Site)
Tornado Warning work on response time, Weather Alert System and
correct paperwork to be filed out. (Ray Stewart)
Security Gate improve gate access. ( Tim Hull )
Acid Tote Curtain leak curtain compared to existing system. (Tim
Hull)
Copper Sulfate get rid of bath, put different container in test area.
(Ray Stewart)

Web Site:
SAP Work Orders:

3 OPEN In system
12 Closed (Mar 2015)

On Hold Items:

Plate Bins Tracy Kuhn updated Committee on progress. Adding different style
Bin, (Tracy Kuhn) New turntable type bin (On hold), Table installed (Lehsten).
Get up a PPE station/shelf use stair area get pricing ON HOLD

Completed Items:

Washer HF incident and concerns reviewed.


Hard Hats
Sprayer Ladders
Sprayer Brakes
Safety Jackpot
Doors around plant being left open Basecoater 1

Back End Job Box


Necker Tooling
Site Security Deco Guarding
Blades being used for Date codes
Lockout / Tagout
Chemical Room Rack Storage
New Water Cups for Floor personnel
On Premise posting and KNOX BOX Install.
Uncoiler Material Stand
Stretch Wrapper Railing
Deco jog sequence
Safety website access on shop floor (Craig/Stewart)
Aries Welding re-certification passed
Safety review of fire tank removal process
Bottom Varnish Guarding
GFI Plugs for Waste Water Area
Wells/Chad Fremont Table top exercise for spills
IBO Safety (Best practices)
Headlights on Forklifts throughout plant
Discussion of swing gate at man doors by sorter and depal
Safety Program
Traffic Hazard ID Mapping
Konecranes Safety Summary List.
Safety conference with USW 8316
Boiler room
Pull vending machines go back to manual
Order custom fat heads for in house safety slogans
Safety Eyewear

You might also like