Professional Documents
Culture Documents
PTLF Bangsattt
PTLF Bangsattt
Routing sheet
kapasitas
mesin
(unit/jam)
12
6
12
12
4
12
12
nama
operasi
nama
mesin
material
disiapkan
O-19
O-18
O-5
O-4
O-3
O-2
O-1
gerinda
las 2
gerinda
press
bench
bubut
potong
984.21
984.21
1036.01
1036.01
1036.01
1151.12
1279.02
O-17
O-16
O-8
O-7
O-6
gerinda
las 1
bench
bubut
potong
1036.01
1036.01
2072.02
2302.24
2558.04
12
6
4
12
12
107.92
215.84
647.51
239.82
266.46
108
216
648
240
267
O-11
O-10
O-9
meja
perakitan
gerinda
freis
gerinda
1036.01
2181.08
2423.42
2550.97
4
12
4
12
323.75
227.2
757.32
265.73
324
228
758
266
O-14
O-13
O-12
bor
pres
potong
4362.16
4362.16
4846.84
6
6
12
908.78
908.78
504.88
total
909
909
505
6481
O-15
Perhitungan
KPTmaks = 935 unit/jam
Komp A
O-19 DS =
935
10,05 =984,21
DM=984,21
O-18 DS =
984,21
10 =984,21
DM=984,21
O-5 DS =
984,21
10,05 =1036,01
DM=1036,01
O-4 DS =
1036,01
=1036,01 DM=1036,01
10
O-3 DS =
1036,01
=1036,01 DM=1036,01
10
efisiensi 80%
teoritis Actual
102.52
103
205.04
206
107.92
108
107.92
108
323.75
324
119.91
120
133.23
134
O-2 DS =
1036,01
10,1 =1151,12 DM=1151,12
O-1 DS =
1151,12
10,1 =1279,02 DM=1279,02
Komp B (2)
O-17 DS =
O-16 DS =
984,21
10,05 =1036,01 DM=1036,01
1036,01
=1036,01 DM=1036,01
10
O-8 DS =
1036,01
=1036,01 X 2 =2072,02 DM=2072,02
10
O-7 DS =
2072,01
10,1 =2302,24 DM=2302,24
O-6 DS =
2302,24
10,1 =2558,04 DM=2558,04
Komp c (2)
O-15 DS =
1036,01
=1036,01 DM=1036,01
10
O-11 DS =
1036,01
10,05 =1090,54 X 2 =2181,08 DM=2181,08
O-10 DS =
2181,08
10,1 =2423,42 DM=2423,42
O-17 DS =
2423,42
10,05 =2550,97 DM=2550,97
Komp d (4)
O-14 DS =
1036,01
10,05 =1090,54 X 4 =4362,16 DM=4362,16
O-12 DS =
4362,16
10, =4362,16
O-12 DS =
4362,16
10,1 =4846,84 DM=4846,84
Kapasitas mesin
O-19 = 60/5 = 12
O-18 = 60/10 = 6
O-5 = 60/5 = 12
O-4 = 60/5 = 12
O-3 = 60/15 = 4
O-2 = 60/5 = 12
O-1 = 60/5 = 12
DM=4362,16
O-17 = 60/5 = 12
O-16 = 60/10 = 6
O-8 = 60/15 = 4
O-7 = 60/5 = 12
O-6= 60/5 = 12
O-15 = 60/15 = 4
O-11= 60/5 = 12
O-10 = 60/15 = 4
O-9 = 60/5 = 12
O-14 = 60/10 = 6
O-13 = 60/10 = 6
O-12= 60/5 = 12
Jumlah mesin
O-19 =
984,21
12 x 0,8 =102,52 Aktual =103
O-18 =
984,21
6 x 0,8 =205,04 Aktual =206
O-5=
1036,01
12 x 0,8 =107,92 Aktual =108
O-4=
1036,01
12 x 0,8 =107,92 Aktual =108
O-3=
1036,01
4 x 0,8 =323,75 Aktual =324
O-2=
1151,12
12 x 0,8 =119,91 Aktual =120
O-1=
1279,02
12 x 0,8 =133,23 Aktual =134
O-17=
1036,01
12 x 0,8 =107,92 Aktual =108
O-16=
1036,01
6 x 0,8 =215,83 Aktual =216
O-8=
2072,02
4 x 0,8 =647,51 Aktual =645
O-7=
2302,24
12 x 0,8 =239,82 Aktual =240
O-6=
2558,04
12 x 0,8 =266,46 Aktual =267
O-15=
1036,01
4 x 0,8 =323,75 Aktual =324
O-11=
2181,08
12 x 0,8 =227,20 Aktual =228
O-10=
2423,42
4 x 0,8 =757,32 Aktual =758
O-9=
2550,97
12 x 0,8 =265,73 Aktual =266
O-14=
4362,16
6 x 0,8 =908,78 Aktual =909
O-13=
4362,16
6 x 0,8 =908,78 Aktual =909
O-12=
4846,84
12 x 0,8 =504,88 Aktual =505
2.mppc
=55200 + 165600
=220800 cm
=22,08 m
14960
= ( 150 ) x (100x50) = allowance 300%
50
=24935000 + 74805000
=99740000 cm
=9974 m
=150,75 m
Mesin Bubut
= 120x(150x50cm)
=900000 cm
=90 m
Mesin Bench
=324x(150x100cm)
=4860000 cm
=468 m
Mesin press
=108 x(150x100cm)
=1620000 cm
Mesin gerinda
=108x(75x75cm)
=162 m
=607500 cm
=60,75 m
Departemen B
Mesin Potong
=267x(150x75cm)
=3003750 cm
=300,375 m
Mesin Bubut
=240x(150x50cm)
=1800000 cm
=180 m
Mesin bench
648x(150x100cm)
=9720000 cm
=972 m
Luas Dept B
= 300,375+180+972+allowance 300%
=1452,375+4357,125
=5809,5 m
Departemen C
Mesin gerinda
=266x(75x75cm)
=1496250 cm
= =149,625 m
Mesin freis
=758x(175x100cm)
=13265000 cm
=1326,5 m
Mesin gerinda
=228x(75x75cm)
1282500 cm
=128,25 m
Luas dept C
=149,625+1326,5+128,25+allowance300%
=1604,375 +4813,125
=6417,5 m
Departemen D
Mesin Potong
=505x(150x75cm)
=568150 cm
=568,125 m
Mesin press
=909x(150x100cm)
=13635000
cm 2 =1363,5 m 2
Mesin Bor
=909x(50x50cm)
=2272500 cm
=227,25 m
Luas departemen D
=568,125+1363,5+227,25+allowance300%
=2158,875+6476,625
=8635,5
Departemen A1
Meja perakitan
=324x(175x100cm)
=5670000 cm
=567 m
Luas depatemen A1
=567 m
+allowance 300%
=567+1701
=2268 m