HARGA SATUAN UPAH, SEWA PERALATAN & BAHAN

Satker
Pekerjaan
Lokasi
Tahun Anggaran
No. Paket

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWESI UTARA


: PDAM YANG MEMPEROLEH PEMBINAAN
P/P JARINGAN PERPIPAAN
: KABUPATEN KEPULAUAN TALAUD
: 2012 (APBN)
: 5

A. UPAH TENAGA KERJA


No.
A.
1
2
3
4
5
6
7
8
9
10
11
12
13

URAIAN
U P A H
Mandor
Kepala Tukang
Operator Alat/Mesin
Tukang Batu
Tukang Besi
Tukang Cat
Tukang Gali
Tukang Kayu
Tukang Las
Tukang Pipa
Tukang Alumunium
Penjaga
Pekerja

HRG. SAT/JAM
6,545.00
7,990.00
8,500.00
7,225.00
7,225.00
7,225.00
7,225.00
7,225.00
7,225.00
7,225.00
8,500.00
5,100.00
5,100.00

O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam

B. SEWA PERALATAN/ MESIN


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

URAIAN
Excavator
Buldozer
Molen
Dump Truk
Mesin Las
Alat Sambung Pipa PE
Alat Tes Tekan Pipa
Stampler
Wheel Loeder
AMP
Generator Set
Asphalt Finiser
Tandem Roller
Tyred Roller

HRG SATUAN/JAM
289,000.00
552,500.00
34,000.00
232,050.00
37,187.50
53,125.00
21,250.00
21,250.00
282,115.00
3,800,010.00
293,250.00
256,700.00
212,500.00
262,650.00

/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam

C. HARGA BAHAN/MATERIAL BANGUNAN


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56

URAIAN
Tanah Tambun
Pasir Urug
Pasir Saring
Pasir Kuarsa
Pasir Pasang
Pasir Beton
Kerikil Sungai
Sirtu Klas A (Halus)
Sirtu Klas B (Kasar)
Batu Gunung 15-20 cm
Kerikil 5/7 Cm
Kerikil 3/5 Cm
Kerikil 2/3 Cm
Kerikil 1/2 Cm
Split Halus (Abu Batu)
Batu Bata
Paving Block Abu-abu
Paving Block Warna
Canstein Block (15x30x40 cm)
Kayu Lokal Klas II
Kayu Bekesting (Kayu Klas III)
Papan Bekesting
Ijuk
Semen PC (50 Kg)
Semen Warna (50 Kg)
Besi Beton
Baja Profil
Kawat Beton
Besi Strip
Kawat Bronjong (25 m)
Pagar BRC (120x240 cm)
Kawat Duri (25 m')
Paku
Paku Seng
Seng Gelombang BJLS 0,25
Seng Plat 25 cm
Genteng Metal
Tripleks 3 mm x 120 mm x 240 mm
Lem Kayu
Playwood tebal 9 mm
Bambu ( 10-15 x 6 m )
Plamir
Profil Alluminium
Sekrup Fixer
Sealant
Profil Kaca
Cat Tembok
Cat Waterproof
Cat Besi
Cat Kayu
Cat Atap Seng
Minyak Cat
Minyak Bekisting
Menie
Amplas
Aspal

SATUAN
M
M
M
kg
M
M
M
M
M
M
M
M
M
M
M
Bh
Bh
Bh
Bh
M
M
M
Kg.
Zak
Zak
Kg
Kg
Kg
Kg
Roll
Lbr
Roll
Kg
Kg
Lbr
Lbr
Lbr
Lbr
Ltr
Lbr
Btg
Kg
M
Bh
Tube
M
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Lbr
Kg

57
58
59
60
61

Tegel Keramik Uk. 30x30 cm


Tegel Keramik Uk. 20x20 cm
Kaporit
Soda Ash
Asam Sulfat

Buah
Buah
Kg
Kg
Kg

D. HARGA PENGADAAN PIPA GIP-PVC-PE & ACCESSORIES


No.
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
8
9
10
11
12
13
14

URAIAN
a. Pipa GIP (Medium SII)
Pipa 12"
Pipa 10"
Pipa 8"
Pipa 6"
Pipa 4"
Pipa 3"
Pipa 2"
b. Pipa PVC S-10
Pipa 12" RR
Pipa 10" RR
Pipa 8" RR
Pipa 6" RR
Pipa 4" RR
Pipa 3" RR
Pipa 2" RR
c. Pipa PVC S-12,5
Pipa 12" RR
Pipa 10" RR
Pipa 8" RR
Pipa 6" RR
Pipa 4" RR
Pipa 3" RR
Pipa 2" RR
d. Pipa PE S8-SDR17 (PN10)
Pipa 12" (315 mm)
Pipa 10" (250 mm)
Pipa 8" (200 mm)
Pipa 6" (160 mm)
Pipa 4" (110 mm)
Pipa 3" (90 mm)
Pipa 2" (63 mm)
e. Accessories Pipa
Gate Valve Double Flanged CI 2"
Gate Valve Double Flanged CI 3"
Gate Valve Double Flanged CI 4"
Gate Valve Double Flanged CI 6"
Gate Valve Double Flanged CI 8"
Gate Valve Double Flanged CI 10"
Gate Valve Double Flanged CI 12"
Stop Kran 100 mm
Stop Kran 75 mm
Stop Kran 50 mm
Stop Kran 20 mm
Check Valve (Non Return Valve) 4"
Check Valve (Non Return Valve) 6"
Check Valve (Non Return Valve) 8"

SATUAN
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
buah
buah
buah
buah
buah
buah
buah
unit
unit
unit
unit
unit
unit
unit

15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70

Check Valve (Non Return Valve) 10"


Check Valve (Non Return Valve) 12"
DF. Water Meter 2"
DF. Water Meter 3"
DF. Water Meter 4"
DF. Water Meter 6"
DF. Water Meter 8"
DF. Water Meter 10"
DF. Water Meter 12"
Air Relief Valve 25 mm
Flanged Air Relief Valve 50 mm
Air Vent GIP 3"
All Flanged Tee PVC 4" x 4"
All Flanged Tee PVC 3" x 3"
All Flanged Tee PVC 3" x 2"
All Flanged Tee CI 12" X 12"
All Flanged Tee CI 12" X 8"
All Flanged Tee CI 12" X 2"
All Flanged Tee CI 12" x 12"
All Flanged Tee CI 10" x 10"
All Flanged Tee CI 8" x 8"
All Flanged Tee CI 6" x 6"
All Flanged Tee CI 6" x 4"
All Flanged Tee CI 4" x 4"
All Flanged Tee CI 4" x 3"
All Flanged Tee CI 4" x 2"
All Flanged Tee CI 3" x 2"
All Flanged Tee CI 2" x 2"
All Flanged Tee Y Cl 12" X 12"
Socket Tee PVC (All RR) 6" x 6"
Socket Tee PVC (All RR) 6" x 4"
Socket Tee PVC (All RR) 4" x 4"
Socket Tee PVC (All RR) 4" x 3"
Socket Tee PVC (All RR) 4" x 2"
Socket Tee PVC (All RR) 3" X 3"
Socket Tee PVC (All RR) 3" X 2"
Socket Tee PVC (All RR) 2" X 2"
Baut Moor 5/8" x 3"
Baut Moor 5/8" x 4"
Blind Flanged 12"
Blind Flanged 8"
Clem Besi Plat 4" X 2 mm
Dop PVC 2"
Dop PVC 3"
Double Flanged Bend CI 12" X 11,25
Double Flanged Bend CI 12" X 22,5
Double Flanged Bend CI 12" X 45
Double Flanged Bend CI 12" X 90
Double Flanged Bend CI 8" x 22,5
Double Flanged Bend CI 8" x 45
Double Flanged Bend CI 8" x 90
Double Flanged Bend CI 6" x 22,5
Double Flanged Bend CI 6" x 45
Double Flanged Bend CI 6" x 90
Double Flanged Bend CI 4" x 11,5
Double Flanged Bend CI 4" x 22,5

unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah

71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126

Double Flanged Bend CI 4" x 45


Double Flanged Bend CI 4" x 90
Double Flanged Bend CI 3" x 22,5
Double Flanged Bend CI 3" x 45
Double Flanged Bend CI 3" x 90
Double Flanged Bend CI 2" x 22,5
Double Flanged Bend CI 2" x 45
Double Flanged Bend CI 2" x 90
Double Flanged Pipe GIP 3" x 60 cm.
Double Flanged Pipe GIP 3" x 80 cm.
Double Flanged Pipe GIP 3" x 100 cm.
Double Flanged Pipe GIP 3" x 120 cm.
Double Flanged Pipe GIP 3" x 200 cm.
Double Flanged Pipe GIP 4" x 60 cm.
Double Flanged Pipe GIP 4" x 80 cm.
Double Flanged Pipe GIP 4" x 100 cm.
Double Flanged Pipe GIP 4" x 120 cm.
Double Flanged Pipe GIP 4" x 180 cm.
Flanged Pipe GIP 3" x 60 cm.
Flanged Pipe GIP 3" x 100 cm.
Flanged Pipe GIP 3" x 200 cm.
Flanged Pipe GIP 4" x 60 cm.
Flanged Pipe GIP 4" x 100 cm.
Flanged Pipe GIP 4" x 200 cm.
Flanged Pipe GIP 6" x 60 cm.
Flanged Pipe GIP 6" x 80 cm.
Flanged Pipe GIP 6" x 100 cm.
Flanged Pipe GIP 6" x 200 cm.
Double Socket Bend CI for PVC 6" x 11,25
Double Socket Bend CI for PVC 6" x 22,5
Double Socket Bend CI for PVC 6" x 45
Double Socket Bend CI for PVC 6" x 90
Flanged Air Relief Valve 2"
Bend Doble Socet PVC 12" X 11,25
Bend Doble Socet PVC 12" X 22,5
Bend Doble Socet PVC 12" X 45
Bend Doble Socet PVC 12" X 90
Bend Doble Socet PVC 8" x 22,5
Bend Doble Socet PVC 8" x 45
Bend Doble Socet PVC 8" x 90
Bend Doble Socet PVC 6" x 22,5
Bend Doble Socet PVC 6" x 45
Bend Doble Socet PVC 6" x 90
Bend Doble Socet PVC 4" x 11,5
Bend Doble Socet PVC 4" x 22,5
Bend Doble Socet PVC 4" x 45
Bend Doble Socet PVC 4" x 90
Bend Doble Socet PVC 3" x 22,5
Bend Doble Socet PVC 3" x 45
Bend Doble Socet PVC 3" x 90
Bend Doble Socet PVC 2" x 22,5
Bend Doble Socet PVC 2" x 45
Bend Doble Socet PVC 2" x 90
Flanged Socket PVC RRJ 2"
Flanged Socket PVC RRJ 3"
Flanged Socket PVC RRJ 4"

buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah

127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182

Flanged Socket PVC RRJ 6"


Flanged Socket PVC RRJ 8"
Flanged Socket PVC RRJ 10"
Flanged Socket PVC RRJ 12"
Flanged Spigot PVC 2"
Flanged Spigot PVC 3"
Flanged Spigot PVC 4"
Flanged Spigot PVC 6"
Flanged Spigot PVC 8"
Flanged Spigot PVC 12"
Flanged Steel PN 10 2"
Flanged Steel PN 10 3"
Flanged Steel PN 10 4"
Flanged Steel PN 10 6"
Flanged Steel PN 10 8"
Flanged Steel PN 10 10"
Flanged Steel PN 10 12"
Flanged Strainer CI 3"
Flanged Strainer CI 4"
Flanged Strainer CI 6"
Fleksible Joint "Tosen" 4
Fleksible Joint "Tosen" 6
Fleksible Joint "Tosen" 8
Fleksible Joint "Tosen" 10
Fleksible Joint "Tosen" 12
Manhole 80 x 80 Cm.
Paking Karet 2"
Paking Karet 3"
Paking Karet 4"
Paking Karet 6"
Paking Karet 8"
Paking Karet 10"
Paking Karet 12"
Piet Kran Baal Valve Dia 3/4 "
DF Pipa GIP 3" x 60 cm.
DF Pipa GIP 3" x 100 cm.
Pressure Reducing Valve 6"
Repair Socket PVC 2"
Socket Repair PVC 6"
Rubber Expansiont Joint 6"
Rubber Water Stop 30 Cm
Socket GIP 2"
Socket GIP 3"
Socket GIP 4"
Socket GIP 6"
Socket Reducer PVC (All RR) 3" x 2"
Socket Reducer PVC (All RR) 4" x 3"
Socket Reducer PVC (All RR) 4" x 2"
Socket Reducer PVC (All RR) 6" x 3"
Socket Reducer PVC (All RR) 6" x 4"
Socket Reducer PVC (All RR) 12" x 8"
Socket Spigot Bend PVC 12" X 90
Socket Spigot Bend PVC 12" X 45
Socket Spigot Bend PVC 12" X 22,5
Socket Spigot Bend PVC 12" X 11,25
Socket Spigot Bend PVC 8" x 22,5

buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
unit
buah
buah
buah
buah
buah
buah
buah
unit
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah

183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238

Socket Spigot Bend PVC 8" x 45


Socket Spigot Bend PVC 8" x 90
Socket Spigot Bend PVC 6" x 22,5
Socket Spigot Bend PVC 6" x 45
Socket Spigot Bend PVC 6" x 90
Socket Spigot Bend PVC (S-10) 4" x 22,5
Socket Spigot Bend PVC (S-10) 4" x 45
Socket Spigot Bend PVC (S-10) 4" x 90
Socket Spigot Bend PVC ( S-10) 3" x 90
Socket Spigot Bend PVC ( S-10) 3" x 45
Socket Spigot Bend PVC ( S-10) 3" x 22,5
Socket Spigot Bend PVC ( S-10) 2" x 90
Socket Spigot Bend PVC ( S-10) 2" x 45
Socket Spigot Bend PVC ( S-10) 2" x 22,5
Tangki Fiberglass 2 m
Tutup Manhole 0,80 x 0,80
Tutup Manhole 1 x 0,80
Socket Reducer HDPE 10" x 8"
Socket Reducer HDPE 8" x 6"
Socket Reducer HDPE 6" x 4"
Socket Reducer HDPE 4" x 3"
Socket Reducer HDPE 3" x 2"
Elbow HDPE 10" x 90
Elbow HDPE 8" x 90
Elbow HDPE 6" x 90
Elbow HDPE 4" x 90
Elbow HDPE 3" x 90
Elbow HDPE 2" x 90
Tee HDPE 90 10"
Tee HDPE 90 8"
Tee HDPE 90 6"
Tee HDPE 90 4"
Tee HDPE 90 3"
Tee HDPE 90 2"
Bend HDPE 90 10"
Bend HDPE 90 8"
Bend HDPE 90 6"
Bend HDPE 90 4"
Bend HDPE 90 3"
Bend HDPE 90 2"
Bend HDPE 45 10"
Bend HDPE 45 8"
Bend HDPE 45 6"
Bend HDPE 45 4"
Bend HDPE 45 3"
Bend HDPE 45 2"
Stub End HDPE 10"
Stub End HDPE 8"
Stub End HDPE 6"
Stub End HDPE 4"
Stub End HDPE 3"
Stub End HDPE 2"
Flange HDPE 10"
Flange HDPE 8"
Flange HDPE 6"
Flange HDPE 4"

buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
unit
unit
unit
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah

239
240
241
242
243
244
245

Flange HDPE 3"


Flange HDPE 2"
Cap/Dop HDPE 8"
Cap/Dop HDPE 6"
Cap/Dop HDPE 4"
Cap/Dop HDPE 3"
Cap/Dop HDPE 2"

buah
buah
buah
buah
buah
buah
buah

Mengetahui/ Menyetujui :
PT/CV ........................

............., .....................2011
Dibuat oleh :

.............................
DIREKTUR

.............................
PIMPINAN TEKNIK

UPAH, SEWA PERALATAN & BAHAN

ENGELOLAAN AIR MINUM PROVINSI SULAWESI UTARA

HRG. SAT/HARI
52,360.00 O/Hari
63,920.00 O/Hari
68,000.00 O/Hari
57,800.00 O/Hari
57,800.00 O/Hari
57,800.00 O/Hari
57,800.00 O/Hari
57,800.00 O/Hari
57,800.00 O/Hari
57,800.00 O/Hari
68,000.00 O/Hari
40,800.00 O/Hari
40,800.00 O/Hari

HRG SATUAN/HARI
2,312,000.00 /Hari
4,420,000.00 /Hari
272,000.00 /Hari
1,856,400.00 /Hari
297,500.00 /Hari
425,000.00 /Hari
170,000.00 /Hari
170,000.00 /Hari
2,256,920.00 /Hari
30,400,080.00 /Hari
2,346,000.00 /Hari
2,053,600.00 /Hari
1,700,000.00 /Hari
2,101,200.00 /Hari

HARGA SATUAN
46,870.00
133,300.00
135,450.00
3,870.00
135,450.00
133,300.00
225,148.00
75,680.00
68,800.00
129,000.00
183,610.00
218,526.00
218,526.00
231,770.00
164,948.00
688.00
3,440.00
3,870.00
21,500.00
2,838,000.00
1,548,000.00
1,548,000.00
32,250.00
58,050.00
107,500.00
9,890.00
12,470.00
14,620.00
12,470.00
537,500.00
215,000.00
154,800.00
14,491.00
21,500.00
40,850.00
40,850.00
38,700.00
51,600.00
21,500.00
84,710.00
12,900.00
17,200.00
68,800.00
645.00
77,400.00
116,100.00
13,416.00
55,900.00
30,100.00
27,520.00
30,100.00
10,750.00
10,320.00
20,640.00
3,870.00
8,170.00

5,160.00
2,580.00
17,200.00
8,600.00
6,450.00

HARGA SATUAN
1,078,920.00
807,165.00
543,105.00
403,380.00
248,265.00
172,125.00
103,680.00
539,662.50
338,296.50
218,214.00
139,846.50
66,136.50
43,983.00
21,748.50
440,275.50
276,615.00
177,268.50
113,764.50
53,257.50
36,693.00
17,577.00
632,124.00
397,467.00
255,636.00
163,782.00
78,489.00
52,569.00
25,920.00
526,500.00
1,010,880.00
1,443,420.00
2,673,000.00
4,082,400.00
4,898,880.00
6,771,600.00
688,500.00
405,000.00
204,120.00
97,200.00
2,592,000.00
3,240,000.00
3,888,000.00

4,665,600.00
5,598,720.00
1,944,000.00
2,624,400.00
3,304,800.00
4,665,600.00
6,220,800.00
9,720,000.00
23,328,000.00
464,130.00
648,000.00
348,300.00
432,135.00
384,912.00
365,666.40
2,916,000.00
2,527,200.00
2,109,240.00
3,280,500.00
2,187,000.00
1,458,000.00
972,000.00
902,340.00
835,920.00
579,150.00
558,090.00
445,500.00
202,500.00
2,883,600.00
797,040.00
692,064.00
428,490.00
388,800.00
320,760.00
256,608.00
227,448.00
155,520.00
6,480.00
9,720.00
656,100.00
526,500.00
36,450.00
20,250.00
28,350.00
1,871,100.00
1,879,200.00
1,887,300.00
1,895,400.00
1,231,200.00
1,274,907.60
1,338,930.00
648,000.00
671,004.00
704,700.00
607,500.00
594,864.00

521,964.00
510,300.00
495,720.00
461,700.00
434,970.00
326,227.50
339,276.60
347,976.00
465,588.00
555,012.00
689,148.00
733,860.00
1,136,268.00
386,337.60
470,318.40
596,289.60
638,280.00
890,222.40
400,464.00
579,312.00
1,026,432.00
546,750.00
775,440.00
1,461,510.00
880,470.00
1,151,820.00
1,368,900.00
2,562,840.00
1,108,080.00
1,117,800.00
1,185,840.00
1,302,480.00
1,240,920.00
1,166,400.00
1,231,200.00
1,417,500.00
2,030,670.00
348,300.00
392,040.00
461,700.00
191,160.00
227,043.00
250,290.00
82,620.00
87,480.00
94,770.00
102,870.00
52,731.00
60,021.00
67,554.00
26,973.00
29,160.00
32,967.00
104,733.00
144,180.00
190,188.00

350,811.00
565,299.00
579,798.00
889,380.00
97,524.00
134,460.00
171,153.00
335,664.00
522,612.00
777,519.00
65,610.00
87,480.00
121,500.00
174,960.00
233,280.00
279,936.00
349,920.00
931,500.00
1,215,000.00
1,502,550.00
1,049,760.00
1,312,200.00
1,574,640.00
1,889,568.00
2,267,481.60
364,500.00
19,602.00
23,166.00
34,749.00
48,600.00
76,950.00
91,125.00
105,300.00
64,800.00
335,340.00
491,832.00
48,600,000.00
76,950.00
405,000.00
1,409,400.00
315,900.00
40,500.00
56,700.00
68,040.00
186,300.00
134,136.00
214,812.00
206,550.00
348,300.00
417,960.00
913,680.00
2,857,680.00
2,566,080.00
2,078,136.00
1,749,600.00
723,420.72

847,020.24
974,255.04
386,856.00
452,952.00
520,992.00
177,876.00
191,484.00
212,868.00
170,100.00
150,660.00
133,164.00
100,845.00
92,631.60
82,620.00
4,860,000.00
364,500.00
688,500.00
526,500.00
295,650.00
133,650.00
76,950.00
60,750.00
1,182,600.00
643,950.00
403,380.00
182,250.00
127,980.00
56,700.00
1,244,160.00
765,450.00
481,950.00
218,700.00
127,980.00
56,700.00
2,155,369.50
885,411.00
624,429.00
243,729.00
150,417.00
65,002.50
2,046,627.00
845,437.50
494,383.50
205,659.00
130,977.00
59,535.00
1,117,800.00
797,850.00
510,300.00
303,750.00
259,200.00
158,760.00
1,800,022.50
663,754.50
416,259.00
270,013.50

176,661.00
108,013.50
275,683.50
141,021.00
58,522.50
20,007.00
13,324.50

............., .....................2011
Dibuat oleh :

.............................
PIMPINAN TEKNIK

DAFTAR ANALISA SATUAN PEKERJAAN


Satker
Pekerjaan
Lokasi
Tahun Anggaran
No. Paket
NO.

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVIN


: PDAM YANG MEMPEROLEH PEMBINAAN
### P/P JARINGAN PERPIPAAN
: KABUPATEN KEPULAUAN TALAUD
: 2012 (APBN)
: 5
URAIAN PEKERJAAN

VOL.

Pekerjaan Pengukuran dan Pembongkaran


1

1 M' Pengukuran dan Pemasangan Bouwplank


Bahan
Kayu 5/7
Paku Biasa 2" - 5"
Kayu Papan 3/20
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.012
0.020
0.007

m3
kg
m3

0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

1 M3 Bongkaran Beton Bertulang


Tenaga
Pekerja
Mandor

6.667
0.333

Oh
Oh

1 M3 Bongkaran Dinding Batu Bata


Tenaga
Pekerja
Mandor

6.667
0.333

Oh
Oh

NO.

URAIAN PEKERJAAN

VOL.

Pekerjaan Tanah
1

1 M3 Galian Tanah Biasa sedalam 1 Meter


Tenaga
Pekerja
Mandor

0.750
0.025

Oh
Oh

1 M3 Galian Tanah Biasa sedalam 2 Meter


Tenaga
Pekerja
Mandor

0.900
0.045

Oh
Oh

1 M3 Galian Tanah Keras sedalam 1 Meter


Tenaga
Pekerja
Mandor

1.000
0.032

Oh
Oh

1 M3 Galian Tanah Cadas sedalam 1 Meter


Tenaga
Pekerja
Mandor

1.500
0.060

Oh
Oh

1 M3 Pembuangan Tanah sejauh 15 Meter


Tenaga
Pekerja
Mandor

0.330
0.010

Oh
Oh

1 M3 Urugan Kembali
Tenaga
Pekerja
Mandor

0.250
0.008

Oh
Oh

1 M3 Pemadatan Tanah (Tebal per 20 cm)


Tenaga

NO.

URAIAN PEKERJAAN
Pekerja
Mandor

10

VOL.
0.500
0.050

Oh
Oh

1.200

M3

0.300
0.010

Oh
Oh

1.200

M3

0.250
0.025

Oh
Oh

1.200

M2

0.150
0.015

Oh
Oh

1m' Galian Tanah untuk Pemasangan Pipa


Pipa 300 mm (12")
Pipa 250 mm (10")
Pipa 200 mm (8")
Pipa 150 mm (6")
Pipa 100 mm (4")
Pipa 75 mm (3")
Pipa 50 mm (2")
Pipa 25 mm (1")

0.803
0.737
0.581
0.545
0.360
0.304
0.245
0.165

M3
M3
M3
M3
M3
M3
M3
M3

1m' Urugan Pasir untuk Pemasangan Pipa


Pipa 300 mm (12")
Pipa 250 mm (10")
Pipa 200 mm (8")
Pipa 150 mm (6")
Pipa 100 mm (4")

0.138
0.138
0.113
0.113
0.088

M3
M3
M3
M3
M3

1 M3 Urugan Pasir
Bahan
Pasir urug
Tenaga
Pekerja
Mandor

1 M3 Urugan Sirtu
Bahan
Sirtu
Tenaga
Pekerja
Mandor

1 M2 Pemasangan Lapisan Ijuk tebal 10 cm


Bahan
Ijuk
Tenaga
Pekerja
Mandor

Pekerjaan Pemasangan Pipa PVC, GIP & HDPE


1

NO.

URAIAN PEKERJAAN
Pipa 75 mm (3")
Pipa 50 mm (2")
Pipa 25 mm (1")
3

0.088
0.088
0.063

M3
M3
M3

1m' Urugan Tanah Kembali Pemasangan Pipa


Pipa 300 mm (12")
Pipa 250 mm (10")
Pipa 200 mm (8")
Pipa 150 mm (6")
Pipa 100 mm (4")
Pipa 75 mm (3")
Pipa 50 mm (2")
Pipa 25 mm (1")

0.523
0.468
0.383
0.383
0.207
0.179
0.154
0.140

M3
M3
M3
M3
M3
M3
M3
M3

1m' Pemadatan Tanah Kembali Pemasangan Pipa


Pipa 300 mm (12")
Pipa 250 mm (10")
Pipa 200 mm (8")
Pipa 150 mm (6")
Pipa 100 mm (4")
Pipa 75 mm (3")
Pipa 50 mm (2")
Pipa 25 mm (1")

0.523
0.468
0.383
0.383
0.207
0.179
0.154
0.140

M3
M3
M3
M3
M3
M3
M3
M3

1.000
1.000
1.000

Ls.
Btg
Set

4.000
1.500
0.750
0.050

hk
hk
hk
hk

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

1.013
0.101
0.608
0.061

hk
hk
hk
hk

Pemasangan Pipa PVC 250 mm (10")

1.000

m'

6 m' Pemasangan Pipa PVC 200 mm (8")


Bahan
Pelicin Pipa

1.000

Ls.

6 m' Pemasangan Pipa PVC 300 mm (12")


Bahan
Pelicin Pipa
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PVC 300 mm (12")


6

VOL.

6 m' Pemasangan Pipa PVC 250 mm (10)


Bahan
Pelicin Pipa
Pengangkutan Pipa dari Gudang ke Lokasi Pas
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

NO.

URAIAN PEKERJAAN

Pengangkutan Pipa dari Gudang ke Lokasi Pas


Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

1.000
1.000

Btg
Set

0.675
0.068
0.405
0.041

hk
hk
hk
hk

Pemasangan Pipa PVC 200 mm (8")

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

0.450
0.045
0.270
0.027

hk
hk
hk
hk

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

0.300
0.030
0.180
0.018

hk
hk
hk
hk

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

0.225
0.023
0.135
0.014

hk
hk
hk
hk

6 m' Pemasangan Pipa PVC 150 mm (6")


Bahan
Pelicin Pipa
Pengangkutan Pipa dari Gudang ke Lokasi Pas
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PVC 150 mm (6")


9

6 m' Pemasangan Pipa PVC 100 mm (4")


Bahan
Pelicin Pipa
Pengangkutan Pipa dari Gudang ke Lokasi Pas
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PVC 100 mm (4")


10

VOL.

6 m' Pemasangan Pipa PVC 75 mm (3")


Bahan
Pelicin Pipa
Pengangkutan Pipa dari Gudang ke Lokasi Pas
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

NO.

URAIAN PEKERJAAN

Pemasangan Pipa PVC 75 mm (3")


11

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

0.169
0.017
0.101
0.010

hk
hk
hk
hk

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

0.127
0.013
0.076
0.008

hk
hk
hk
hk

1.000

m'

5.652
1.000
1.000
94.200

m2
Set
Btg
cm

0.683
1.139
0.114
0.034

hk
hk
hk
hk

Pemasangan Pipa GIP 300 mm (12")

1.000

m'

6 m' Pemasangan Pipa GIP 250 mm (10")


Bahan
Cat Menie Besi
Alat Bantu

4.710
1.000

m2
Set

6 m' Pemasangan Pipa PVC 50 mm (2")


Bahan
Pelicin Pipa
Pengangkutan Pipa dari Gudang ke Lokasi Pas
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PVC 50 mm (2")


12

6 m' Pemasangan Pipa PVC 35 mm (1")


Bahan
Lem Pipa
Pengangkutan Pipa dari Gudang ke Lokasi Pas
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PVC 35 mm (1")


13

14

VOL.

6 m' Pemasangan Pipa GIP 300 mm (12")


Bahan
Cat Menie Besi
Alat Bantu
Pengangkutan Pipa dari Gudang ke Lokasi Pemasangan
Pengelasan
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

NO.

URAIAN PEKERJAAN
Pengangkutan Pipa dari Gudang ke Lokasi Pemasangan
Pengelasan
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa GIP 250 mm (10")


15

6 m' Pemasangan Pipa GIP 200 mm (8")


Bahan
Cat Menie Besi
Alat Bantu
Pengangkutan Pipa dari Gudang ke Lokasi Pemasangan
Pengelasan
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa GIP 200 mm (8")


16

6 m' Pemasangan Pipa GIP 150 mm (6")


Bahan
Cat Menie Besi
Alat Bantu
Pengangkutan Pipa dari Gudang ke Lokasi Pemasangan
Pengelasan
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa GIP 150 mm (6")


17

6 m' Pemasangan Pipa GIP 100 mm (4")


Bahan
Cat Menie Besi
Alat Bantu
Pengangkutan Pipa dari Gudang ke Lokasi Pemasangan
Pengelasan
Tenaga
Pekerja
Tukang Pipa

VOL.
1.000
78.500

Btg
cm

0.456
0.759
0.076
0.023

hk
hk
hk
hk

1.000

m'

3.768
1.000
1.000
62.800

m2
Set
Btg
cm

0.304
0.506
0.051
0.015

hk
hk
hk
hk

1.000

m'

2.826
1.000
1.000
47.100

m2
Set
Btg
cm

0.203
0.338
0.034
0.010

hk
hk
hk
hk

1.000

m'

1.884
1.000
1.000
31.400

m2
Set
Btg
cm

0.135
0.225

hk
hk

NO.

18

URAIAN PEKERJAAN
Kepala Tukang
Mandor

0.023
0.007

hk
hk

Pemasangan Pipa GIP 100 mm (4")

1.000

m'

1.413
1.000
1.000
23.550

m2
Set
Btg
cm

0.101
0.169
0.017
0.005

hk
hk
hk
hk

1.000

m'

0.942
1.000
1.000
15.700

m2
Set
Btg
cm

0.076
0.127
0.013
0.004

hk
hk
hk
hk

1.000

m'

0.110
1.000
1.000
10.990

m2
Set
Btg
cm

0.057
0.095
0.009
0.003

hk
hk
hk
hk

6 m' Pemasangan Pipa GIP 75 mm (3")


Bahan
Cat Menie Besi
Alat Bantu
Pengangkutan Pipa dari Gudang ke Lokasi Pemasangan
Pengelasan
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa GIP 75 mm (3")


19

6 m' Pemasangan Pipa GIP 50 mm (2")


Bahan
Cat Menie Besi
Alat Bantu
Pengangkutan Pipa dari Gudang ke Lokasi Pemasangan
Pengelasan
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa GIP 50 mm (2")


20

VOL.

6 m' Pemasangan Pipa GIP 35 mm (1")


Bahan
Cat Menie Besi
Alat Bantu
Pengangkutan Pipa dari Gudang ke Lokasi Pemasangan
Pengelasan
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

NO.

URAIAN PEKERJAAN
Pemasangan Pipa GIP 35 mm (1")

21

6 m' Pemasangan Pipa PE 300 mm (12")


Bahan
Alat Sambung PE
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PE 300 mm (12")


22

6 m' Pemasangan Pipa PE 250 mm (10)


Bahan
Alat Sambung PE
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PE 250 mm (10")


23

6 m' Pemasangan Pipa PE 200 mm (8")


Bahan
Alat Sambung PE
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PE 200 mm (8")


24

6 m' Pemasangan Pipa PE 150 mm (6")


Bahan
Alat Sambung PE
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu
Tenaga
Pekerja
Tukang Pipa

VOL.
1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

4.000
1.500
0.750
0.050

hk
hk
hk
hk

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

3.600
1.350
0.675
0.045

hk
hk
hk
hk

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

3.240
1.215
0.608
0.041

hk
hk
hk
hk

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

2.592
0.972

hk
hk

NO.

25

URAIAN PEKERJAAN
Kepala Tukang
Mandor

0.486
0.032

hk
hk

Pemasangan Pipa PE 150 mm (6")

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

1.944
0.729
0.365
0.024

hk
hk
hk
hk

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

0.300
0.030
0.180
0.018

hk
hk
hk
hk

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

0.300
0.030
0.180
0.018

hk
hk
hk
hk

1.000

m'

6 m' Pemasangan Pipa PE 100 mm (4")


Bahan
Alat Sambung PE
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PE 100 mm (4")


26

6 m' Pemasangan Pipa PE 75 mm (3")


Bahan
Alat Sambung PE
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PE 75 mm (3")


27

6 m' Pemasangan Pipa PE 50 mm (2")


Bahan
Alat Sambung PE
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PE 50 mm (2")


28

VOL.

6 m' Pemasangan Pipa PE 35 mm (1")

NO.

URAIAN PEKERJAAN
Bahan
Alat Sambung PE
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PE 35 mm (1")

VOL.

1.000
1.000
1.000

Ls.
Btg
Set

0.300
0.030
0.180
0.018

hk
hk
hk
hk

1.000

m'

1.200
4.040
0.485

m3
Zak
m3

1.500
0.750
0.075
0.075

Oh
Oh
Oh
Oh

1.200
3.260
0.520

m3
Zak
m3

1.500
0.750
0.075
0.075

Oh
Oh
Oh
Oh

1.200
0.432

m3
kg

0.780
0.390
0.039

Oh
Oh
Oh

Pekerjaan Pondasi Batu Kali


1

1 M3 Pasangan Batu Kali Camp. 1 : 3


Bahan
Batu Belah 15/20
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M3 Pasangan Batu Kali Camp. 1 : 4


Bahan
Batu Belah 15/20
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M3 Pasangan Batu Kosong


Bahan
Batu Belah 15/20
Pasir Urug
Tenaga
Pekerja
Tukang Batu
Kepala Tukang

NO.

URAIAN PEKERJAAN
Mandor

1 M Pasangan Bronjong
Bahan
Batu Kali
Kawat Bronjong
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

VOL.
0.039

Oh

1.200 M
0.333 Rool
0.100
0.200
4.500
0.075

Oh
Oh
Oh
Oh

Pekerjaan Pasangan Dinding


1

1 M2 Pasangan Batu Merah Tebal Bata, Camp 1 : 2


Bahan
Bata Bata 5 x 11 x 22
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Pasangan Batu Merah Tebal Bata, Camp 1 : 4


Bahan
Bata Merah 5 x 11 x 22
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Pekerjaan Plesteran
1

1 M2 Plesteran Tebal 15 mm, Camp 1 : 2


Bahan

70.000 Buah
0.379 Zak
0.038 kg
0.300
0.100
0.010
0.015

Oh
Oh
Oh
Oh

70.000 Buah
0.230 Zak
0.043 kg
0.300
0.100
0.010
0.015

Oh
Oh
Oh
Oh

NO.

URAIAN PEKERJAAN
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Plesteran Tebal 15 mm, Camp 1 : 4


Bahan
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Plesteran Tebal 20 mm, Camp 1 : 2


Bahan
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Plesteran Tebal 20 mm, Camp 1 : 4


Bahan
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Plesteran Beton Tebal 15 mm, Camp 1 : 2

VOL.
0.170
0.017

Zak
m3

0.200
0.150
0.015
0.010

Oh
Oh
Oh
Oh

0.104
0.020

Zak
m3

0.200
0.150
0.015
0.010

Oh
Oh
Oh
Oh

0.286
0.023

Zak
m3

0.250
0.020
0.020
0.010

Oh
Oh
Oh
Oh

0.174
0.028

Zak
m3

0.250
0.020
0.020
0.013

Oh
Oh
Oh
Oh

NO.

URAIAN PEKERJAAN
Bahan
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Plesteran Beton Tebal 15 mm, Camp 1 : 3


Bahan
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Plesteran Siar, Camp 1 : 2


Bahan
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Acian dengan Saus Semen


Bahan
Semen PC
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

9 100 M2 Lapisan Aspal + Pasir


Bahan

VOL.

0.186
0.018

Zak
m3

0.260
0.200
0.020
0.013

Oh
Oh
Oh
Oh

0.141
0.021

Zak
m3

0.260
0.200
0.020
0.013

Oh
Oh
Oh
Oh

0.086
0.016

Zak
m3

0.150
0.070
0.007
0.008

Oh
Oh
Oh
Oh

0.035

Zak

0.040
0.080
0.008
0.002

Oh
Oh
Oh
Oh

NO.

URAIAN PEKERJAAN
Aspal
Pasir
Kayu bakar
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Lapisan Aspal + Pasir

VOL.
175.000
0.300
0.050

kg
m3
m3

15.000
5.000
0.800
0.500

Oh
Oh
Oh
Oh

1.000

M2

5.520
0.592
0.750
215.000

Zak
M3
M3
Liter

Pekerjaan Beton
1

1 M3 Beton Tumbuk K-125


Bahan
Semen PC
Pasir Beton
Koral Beton (Kerikil)
Air
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M3 Beton Tumbuk K-100


Bahan
Semen PC
Pasir Beton
Koral Beton (Kerikil)
Air
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M3 Beton K-225
Bahan
Semen PC
Pasir Beton
Koral Beton (Kerikil)
Tenaga

1.650
0.275
0.028
0.083

4.940
0.621
0.740
215.000

Oh
Oh
Oh
Oh

Zak
M3
M3
Liter

1.650
0.275
0.028
0.083

Oh
Oh
Oh
Oh

7.420
0.499
0.776

Zak
M3
M3

NO.

URAIAN PEKERJAAN
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M3 Beton K-250
Bahan
Semen PC
Pasir Beton
Split 2/3
Air
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

10 Kg Pembesian dengan Besi Polos atau Besi Ulir


Bahan
Besi Beton (Polos atau Ulir)
Kawat Beton
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

VOL.
1.650
0.275
0.028
0.083

7.680
0.494
0.770
215.000

Oh
Oh
Oh
Oh

Zak
M3
M3
Liter

1.650
0.275
0.028
0.083

Oh
Oh
Oh
Oh

10.500
0.150

Kg
Kg

0.070
0.070
0.007
0.004

Oh
Oh
Oh
Oh

1 M3 Pondasi Beton Bertulang K-225 (150 kg besi + Bekisting)


Bahan
Kayu Bekesting (Kayu Klas III)
0.200
Paku Biasa 2" - 5"
1.500
Minyak Bekisting
0.400
Besi Beton (Polos atau Ulir)
157.500
Kawat Beton
2.250
Semen PC
6.720
Pasir Beton
0.540
Koral Beton (Kerikil)
0.810
Tenaga
Pekerja
5.300
Tukang Batu
0.275

M3
Kg
Ltr
Kg
Kg
zak
M3
M3
Oh
Oh

NO.

URAIAN PEKERJAAN
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

1 M3 Sloof Beton Bertulang K-225 (200 kg besi + Bekisting)


Bahan
Kayu Bekesting (Kayu Klas III)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton (Polos atau Ulir)
Kawat Beton
Semen PC
Pasir Beton
Koral Beton (Kerikil)
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

VOL.
1.300
1.050
0.262
0.265

Oh
Oh
Oh
Oh

0.270
2.000
0.600
210.000
3.000
6.720
0.540
0.810

M3
Kg
Ltr
Kg
Kg
zak
M3
M3

5.650
0.275
1.560
1.400
0.323
0.283

Oh
Oh
Oh
Oh
Oh
Oh

1 M3 Dinding, Kolom & Plat Beton Bertulang K-225 (150 kg besi + Bekisting)
Bahan
Kayu Bekesting (Kayu Klas III)
0.240 M3
Paku Biasa 2" - 5"
3.200 Kg
Minyak Bekisting
1.600 Ltr
Besi Beton (Polos atau Ulir)
157.500 Kg
Kawat Beton
2.250 Kg
Semen PC
6.720 zak
Pasir Beton
0.540 M3
Koral Beton (Kerikil)
0.810 M3
Balok Kayu Kls II
0.160 M3
Playwood tebal 9 mm
2.800 Lbr
Dolken kayu galam 8 - 10 panjang 4 m
24.000 Btg
Tenaga
Pekerja
5.300 Oh
Tukang Batu
0.275 Oh
Tukang Kayu
1.300 Oh
Tukang Besi
1.050 Oh
Kepala Tukang
0.262 Oh
Mandor
0.265 Oh

NO.

URAIAN PEKERJAAN

VOL.

1 M3 Dinding dan Kolom Beton Bertulang K-225 (200 kg besi + Bekisting)


Bahan
Kayu Bekesting (Kayu Klas III)
0.320
Paku Biasa 2" - 5"
3.200
Minyak Bekisting
1.600
Besi Beton (Polos atau Ulir)
210.000
Kawat Beton
3.000
Semen PC
6.720
Pasir Beton
0.540
Koral Beton (Kerikil)
0.810
Balok Kayu Kls II
0.140
Playwood tebal 9 mm
2.800
Dolken kayu galam 8 - 10 panjang 4 m
16.000
Tenaga
Pekerja
6.350
Tukang Batu
0.275
Tukang Kayu
1.650
Tukang Besi
1.400
Kepala Tukang
0.333
Mandor
0.318

M3
Kg
Ltr
Kg
Kg
zak
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh

Pekerjaan Pengecatan
1

1 M3 Pek. Mencat Waterproofing


Bahan
Cat waterproofing
Minyak cat
Amplas
Plamur
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

10 M2 Pek. Mencat Menie Besi


Bahan
Cat meni besi
Minyak cat
Amplas besi

0.400
0.220
1.000
0.100

kg
Ltr
lbr
kg

0.250
0.038
0.038
0.013

Oh
Oh
Oh
Oh

1.640
0.440
0.500

kg
Ltr
lbr

NO.

URAIAN PEKERJAAN

VOL.

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.500
0.750
0.075
0.025

Oh
Oh
Oh
Oh

Pekerjaan Menie Besi Untuk 1 M2

1.000

M2

0.400
0.440

kg
Ltr

0.200
0.075
0.008
0.010

Oh
Oh
Oh
Oh

0.436
0.016
1.000

kg
kg
lbr

0.050
0.075
0.008
0.003

Oh
Oh
Oh
Oh

1 M2 Pek. Mencat Besi


Bahan
Cat besi
Minyak cat
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pek. Mencat Dinding Tembok/Plafond


Bahan
Cat tembok
Plamir Tembok
Amplas
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Pekerjaan Kayu dan Aluminium


1

1 M Pasang Kusen Pintu dan Jendela Alluminium


Bahan
Profil Alluminium
Sekrup Fixer
Sealant
Tenaga
Pekerja
Tukang Alumunium
Kepala Tukang
Mandor

1.100 M'
2.000 Bh
0.060 Tube
0.043
0.043
0.004
0.002

Oh
Oh
Oh
Oh

NO.

URAIAN PEKERJAAN

1 M2 Pasang Pintu dan Jendela Alluminium Strip Lebar 8 cm


Bahan
Profil Alluminium
Sekrup Fixer
Tenaga
Pekerja
Tukang Alumunium
Kepala Tukang
Mandor

1 M2 Pasang Pintu Kaca Rangka Alluminium


Bahan
Pintu Alluminium
Profil Kaca
Sealant
Tenaga
Pekerja
Tukang Alumunium
Kepala Tukang
Mandor

1 M2 Pasang Pintu dan Jendela Kaca


Bahan
Kayu Papan
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Pintu dan Jendela Jalusi


Bahan
Kayu Papan
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

VOL.

4.400
14.600

M'
Bh

0.085
0.085
0.009
0.004

Oh
Oh
Oh
Oh

4.400 M'
4.500 M'
0.270 Tube
0.085
0.085
0.009
0.005

Oh
Oh
Oh
Oh

0.035

M3

0.800
2.000
0.200
0.040

Oh
Oh
Oh
Oh

0.064

M3

1.000
3.000
0.300
0.300

Oh
Oh
Oh
Oh

NO.

URAIAN PEKERJAAN

1 M2 Pasang Pintu Playwood Rangkap


Bahan
Kayu Papan
Paku Biasa " - 1"
Lem Kayu
Play Wood 4" x 3" x 4mm
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M3 Pasang Konstruksi Kuda-Kuda


Bahan
Kayu Balok
Besi Strip
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Kaso + Reng Genteng


Bahan
Kayu Balok
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Rangka Langit-Langit Ukur. 1 x 1 m


Bahan
Kayu Balok
Paku Biasa 2" - 5"
Tenaga
Pekerja

VOL.

0.020
0.030
0.300
1.000

M3
Kg
Ltr
Lbr

1.000
3.000
0.300
0.300

Oh
Oh
Oh
Oh

1.100
15.000
0.800

M3
Kg
Ltr

4.000
12.000
1.200
0.200

Oh
Oh
Oh
Oh

0.012
1.500

M3
Ltr

0.100
0.100
0.001
0.005

Oh
Oh
Oh
Oh

0.012
0.100

M3
Ltr

0.150

Oh

NO.

URAIAN PEKERJAAN
Tukang Kayu
Kepala Tukang
Mandor

10

11

12

13

1 M2 Pasang Rangka Langit-Langit Ukur. 30 x 60 cm


Bahan
Kayu Balok
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Rangka Langit-Langit Ukur. 30 x 30 cm


Bahan
Kayu Balok
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Lisplang Ukur. 3 x 20 cm


Bahan
Kayu Papan
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Lisplank Ukur. 3 x 30 cm


Bahan
Kayu Papan
Paku Biasa 2" - 5"
Tenaga

VOL.
0.250
0.025
0.075

Oh
Oh
Oh

0.023
0.150

M3
Ltr

0.200
0.300
0.030
0.010

Oh
Oh
Oh
Oh

0.027
0.200

M3
Ltr

0.250
0.350
0.035
0.013

Oh
Oh
Oh
Oh

0.007
0.050

M3
Ltr

0.100
0.200
0.025
0.005

Oh
Oh
Oh
Oh

0.011
0.050

M3
Ltr

NO.

URAIAN PEKERJAAN
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

14

15

16

17

1 M2 Pasang Lisplang Ukur. 2 x ( 2 x 20 cm )


Bahan
Kayu Papan
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Lisplang Ukur. 2 x ( 3 x 20 cm )


Bahan
Kayu Papan
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Atap Genteng Pelentong Kecil


Bahan
Genteng Pelentong
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Atap Genteng Bubung Pelentong


Bahan
Genteng Pelentong
Semen PC
Pasir Pasing

VOL.
0.110
0.220
0.022
0.005

Oh
Oh
Oh
Oh

0.009
0.060

M3
Ltr

0.100
0.100
0.010
0.050

Oh
Oh
Oh
Oh

0.015
0.060

M3
Ltr

0.150
0.250
0.025
0.075

Oh
Oh
Oh
Oh

25.000

Bh

0.150
0.075
0.008
0.008

Oh
Oh
Oh
Oh

25.000
0.160
0.032

Bh
Zak
M3

NO.

URAIAN PEKERJAAN
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

18

19

20

21

1 M2 Pasang Atap Bubung Genteng Pelentong


Bahan
Genteng Pelentong
Semen PC
Pasir Pasing
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Atap Asbes Gelombang 2,5 x 0,92 x 5 mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Bubung Steel Gelombang 0,92


Bahan
Bubung Steel Gelombang
Paku Sekrup 3,5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Nok Steel Gelombang 1,05


Bahan

VOL.

0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

4.000
0.160
0.032

Bh
Zak
M3

0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

0.500
0.120

Lbr
Kg

0.140
0.075
0.008
0.008

Oh
Oh
Oh
Oh

2.400
6.000

Lbr
Kg

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

NO.

URAIAN PEKERJAAN
Nok Steel Gelombang
Paku Sekrup 3,5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

22

23

24

1 M2 Pasang Atap Genteng Metal


Bahan
Genteng Metal
Paku
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Atap Seng Gelombang


Bahan
Seng Gelombang 3" x 6" BJLS 28
Paku Biasa 1" - 1"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M1 Pasang Atap Nok Seng


Bahan
Seng Plat 3" x 6" BJLS 28
Paku Biasa 1" - 1"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

VOL.
2.100
6.000

Lbr
Kg

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

2.100
0.300

Lbr
Kg

0.200
0.100
0.010
0.010

Oh
Oh
Oh
Oh

0.700
0.020

Lbr
Kg

0.150
0.070
0.008
0.006

Oh
Oh
Oh
Oh

0.300
4.000

Bh
Kg

0.150
0.070
0.008
0.006

Oh
Oh
Oh
Oh

NO.

URAIAN PEKERJAAN

VOL.

Pekerjaan Langit-Langit
1

1 M2 Langit-Langit Asbes Tebal 3,5 mm


Bahan
Pelat Asbes Tebal 3,5 mm
Paku 2" - 2,5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Langit-Langit Akustik 30 x 30 cm
Bahan
Akustik Ukuran 30 x 30 cm
Paku 2" - 2,5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Langit-Langit Playwood 30 x 60 cm tebal 0,4 cm


Bahan
Playwood 4" x 8" x 4 mm
Paku 2" - 2,5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Langit-Langit Playwood 60 x 120 cm tebal 0,4 cm


Bahan
Playwood 4" x 8" x 4 mm
Paku 2" - 2,5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.100
0.010

Bh
Kg

0.030
0.070
0.007
0.002

Oh
Oh
Oh
Oh

11.500
0.050

Lbr
Kg

0.060
0.120
0.012
0.003

Oh
Oh
Oh
Oh

0.360
0.030

Lbr
Kg

0.070
0.100
0.010
0.004

Oh
Oh
Oh
Oh

0.375
0.030

Lbr
Kg

0.070
0.100
0.010
0.004

Oh
Oh
Oh
Oh

NO.

URAIAN PEKERJAAN

VOL.

Pekerjaan Drainase & Lainnya


1

1 M3 Galian Untuk Drainase Selokan dan Saluran Air


Bahan
Peralatan
Excavator
Dump Truck
Alat Bantu
Tenaga
Mandor
Pekerja

1 M2 Pasangan Paving Stone/Block


Bahan
Paving Stone Warna
Pasir Urug
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M1 Pasangan Canstein 40x40x15


Bahan
Canstein
Pasir
Semen PC
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M Pembuatan Pagar BRC


Galian Tanah
Urugan Pasir
Pas. Batu Kali 1:4
Beton K 225
Pagar BRC + Tiang GIP dia. 2"

0.035
0.030
1.000

Jam
Jam
Ls

0.090
0.900

Jam
Jam

36.000
0.110

Bh
Kg

0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

2.500
0.015
0.035

Bh
Kg
Zak

0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

0.150
0.020
0.100
0.030
1.000

M3
M3
M3
M3
M'

NO.

URAIAN PEKERJAAN

VOL.

1 M Saluran Air uk. 30 x 30 cm


Galian Tanah
Urugan Pasir
Pas. Batu Kali 1:4
Plesteran 1:3
Acian

0.360
0.025
0.110
1.100
1.100

M3
M3
M3
M
M

1 M Saluran Air uk. 40 x 50 cm


Galian Tanah
Urugan Pasir
Pas. Batu Kali 1:4
Plesteran 1:3
Acian

0.560
0.030
0.140
1.400
1.400

M3
M3
M3
M
M

12.000
0.196
0.045
0.026

Bh
Zak
M3
Zak

0.250
0.125
0.013
0.013

Oh
Oh
Oh
Oh

1.000
0.100
1.000

Phn
Kg
Ls

0.030
0.050
0.005

Oh
Oh
Oh

1 M2 Pasang Lantai Keramik Ukur. 30 x 30 cm


Bahan
Keramik Uk.30x30 cm
Semen PC
Pasir Pasang
Semen Warna
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 Bh Penanaman Pohon Palm


Bahan
Pohon Palm t= 1,5 - 2 m
Pupuk
Tanah Humus
Tenaga
Pekerja
Tukang Kebun
Mandor

NO.

URAIAN PEKERJAAN

Mengetahui/ Menyetujui :
PT/CV ........................

.............................
DIREKTUR

VOL.

............., .....................

AN PEKERJAAN

LOLAAN AIR MINUM PROVINSI SULAWESI UTARA

HARGA SATUAN

Rp
Rp
Rp

JUMLAH HARGA

2,838,000
14,491
2,838,000

34,056.00
289.82
19,866.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

4,080.00
5,780.00
639.20
261.80
64,972.82
3,248.64
68,220.00

Rp
40,800
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

272,013.60
17,435.88
289,449.48
14,472.47
303,920.00

Rp
Rp
Jumlah
Biaya Umum

272,013.60
17,435.88
289,449.48
14,472.47

40,800
52,360

5.0%

HARGA SATUAN
Hrg Satuan Pek.

JUMLAH HARGA
303,920.00

Rp
40,800
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

30,600.00
1,309.00
31,909.00
1,595.45
33,500.00

Rp
40,800
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

36,720.00
2,356.20
39,076.20
1,953.81
41,030.00

Rp
40,800
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

40,800.00
1,675.52
42,475.52
2,123.78
44,590.00

Rp
40,800
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

61,200.00
3,141.60
64,341.60
3,217.08
67,550.00

Rp
40,800
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

13,464.00
523.60
13,987.60
699.38
14,680.00

Rp
40,800
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

10,200.00
436.33
10,636.33
531.82
11,160.00

5.0%

HARGA SATUAN
Rp
40,800
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

Rp

JUMLAH HARGA
20,400.00
2,618.00
23,018.00
1,150.90
24,160.00

133,300

159,960.00

Rp
40,800
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

12,240.00
523.60
172,723.60
8,636.18
181,350.00

Rp

75,680

90,816.00

Rp
40,800
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

10,200.00
1,309.00
102,325.00
5,116.25
107,440.00

Rp

12,500

15,000.00

Rp
40,800
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

6,120.00
785.40
21,905.40
1,095.27
23,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

41,030
41,030
41,030
33,500
33,500
33,500
33,500
33,500

32,900.00
30,200.00
23,800.00
18,200.00
12,000.00
10,100.00
8,200.00
5,500.00

Rp
Rp
Rp
Rp
Rp

181,350
181,350
181,350
181,350
181,350

24,900.00
24,900.00
20,400.00
20,400.00
15,800.00

5.0%

HARGA SATUAN

JUMLAH HARGA

Rp
Rp
Rp

181,350
181,350
181,350

15,800.00
15,800.00
11,300.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

11,160
11,160
11,160
11,160
11,160
11,160
11,160
11,160

5,800.00
5,200.00
4,200.00
4,200.00
2,300.00
1,900.00
1,700.00
1,500.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

24,160
24,160
24,160
24,160
24,160
24,160
24,160
24,160

12,600.00
11,200.00
9,200.00
9,200.00
4,900.00
4,300.00
3,700.00
3,300.00

Rp
Rp
Rp

3,500
37,500
20,000

3,500.00
37,500.00
20,000.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
379,530

163,200.00
86,700.00
47,940.00
2,618.00
361,458.00
18,072.90
379,530.00
63,200.00

Rp
Rp
Rp

3,500
30,000
15,000

3,500.00
30,000.00
15,000.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
144,550

41,310.00
5,852.25
38,831.40
3,180.87
137,674.52
6,883.73
144,550.00
24,000.00

Rp

3,500

3,500.00

5.0%

37.50

30.00

HARGA SATUAN
Rp
Rp

JUMLAH HARGA

25,000
7,500

25,000.00
7,500.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
100,220

27,540.00
3,901.50
25,887.60
2,120.58
95,449.68
4,772.48
100,220.00
16,700.00

Rp
Rp
Rp

2,000
10,000
6,500

2,000.00
10,000.00
6,500.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
61,030

18,360.00
2,601.00
17,258.40
1,413.72
58,133.12
2,906.66
61,030.00
10,100.00

Rp
Rp
Rp

1,000
6,500
5,000

1,000.00
6,500.00
5,000.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
40,860

12,240.00
1,734.00
11,505.60
942.48
38,922.08
1,946.10
40,860.00
6,800.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Biaya Umum

750
3,500
3,500

750.00
3,500.00
3,500.00

40,800
57,800
63,920
52,360

9,180.00
1,300.50
8,629.20
706.86
27,566.56
1,378.33

5.0%
25.00

9.38

6.25

3.13

2.25
10

HARGA SATUAN
Hrg Satuan Pek.
Rp
28,940

Rp
Rp
Rp

JUMLAH HARGA
28,940.00
4,800.00

500
2,500
1,500

500.00
2,500.00
1,500.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
20,330

6,885.00
975.38
6,471.90
530.15
19,362.42
968.12
20,330.00
3,300.00

Rp
Rp
Rp

250
1,750
1,000

250.00
1,750.00
1,000.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
14,850

5,163.75
731.53
4,853.93
397.61
14,146.82
707.34
14,850.00
2,400.00

Rp
Rp
Rp
Rp

11,580
25,000
95,000
1,500

65,450.16
25,000.00
95,000.00
141,300.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
451,030

27,884.25
65,837.81
7,280.89
1,802.49
429,555.60
21,477.78
451,030.00
75,100.00

Rp
Rp

11,580
20,000

5.0%

54,541.80
20,000.00

2.21

1.67

93.75

HARGA SATUAN
Rp
Rp

JUMLAH HARGA

65,000
1,500

65,000.00
117,750.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
325,829

18,589.50
43,891.88
4,853.93
1,201.66
325,828.76
16,291.44
342,120.00
54,300.00

Rp
Rp
Rp
Rp

11,580
15,000
45,000
1,500

43,633.44
15,000.00
45,000.00
94,200.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
243,525

12,393.00
29,261.25
3,235.95
801.11
243,524.75
12,176.24
255,700.00
40,500.00

Rp
Rp
Rp
Rp

11,580
6,000
30,000
1,500

32,725.08
6,000.00
30,000.00
70,650.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
178,320

8,262.00
19,507.50
2,157.30
534.07
169,835.95
8,491.80
178,320.00
29,700.00

Rp
Rp
Rp
Rp

11,580
4,000
12,500
1,500

21,816.72
4,000.00
12,500.00
47,100.00

Rp
Rp

40,800
57,800

5,508.00
13,005.00

5.0%
62.50

41.67

30.00

12.50

HARGA SATUAN
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
111,010

Rp
Rp
Rp
Rp

JUMLAH HARGA

5.0%

1,438.20
356.05
105,723.97
5,286.20
111,010.00
18,500.00

11,580
4,000
8,500
1,500

16,362.54
4,000.00
8,500.00
35,325.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
79,418

4,131.00
9,753.75
1,078.65
267.04
79,417.98
3,970.90
83,380.00
13,200.00

Rp
Rp
Rp
Rp

11,580
3,000
7,000
1,500

10,908.36
3,000.00
7,000.00
23,550.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
55,881

3,098.25
7,315.31
808.99
200.28
55,881.19
2,794.06
58,670.00
9,300.00

Rp
Rp
Rp
Rp

11,580
1,500
5,000
1,500

1,272.64
1,500.00
5,000.00
16,485.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

2,323.69
5,486.48
606.74
150.21
32,824.76
1,641.24
34,460.00

8.33

6.82

4.69

HARGA SATUAN

JUMLAH HARGA

Rp

32,825

5,400.00

Rp
Rp
Rp

20,000
37,500
20,000

20,000.00
37,500.00
20,000.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
396,850

163,200.00
86,700.00
47,940.00
2,618.00
377,958.00
18,897.90
396,850.00
66,100.00

Rp
Rp
Rp

15,000
30,000
15,000

15,000.00
30,000.00
15,000.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
346,930

146,880.00
78,030.00
43,146.00
2,356.20
330,412.20
16,520.61
346,930.00
57,800.00

Rp
Rp
Rp

12,500
25,000
7,500

12,500.00
25,000.00
7,500.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
302,780

132,192.00
70,227.00
38,831.40
2,120.58
288,370.98
14,418.55
302,780.00
50,400.00

Rp
Rp
Rp

8,000
9,500
6,500

8,000.00
9,500.00
6,500.00

Rp
Rp

40,800
57,800

105,753.60
56,181.60

5.0%

37.50

30.00

25.00

9.38

HARGA SATUAN
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
229,630

Rp
Rp
Rp

JUMLAH HARGA
31,065.12
1,696.46
218,696.78
10,934.84
229,630.00
38,200.00

5,000
6,500
5,000

5,000.00
6,500.00
5,000.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
170,640

79,315.20
42,136.20
23,298.84
1,272.35
162,522.59
8,126.13
170,640.00
28,400.00

Rp
Rp
Rp

4,000
3,500
3,500

4,000.00
3,500.00
3,500.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
39,290

12,240.00
1,734.00
11,505.60
942.48
37,422.08
1,871.10
39,290.00
6,500.00

Rp
Rp
Rp

5.0%

3,000
2,500
1,500

3,000.00
2,500.00
1,500.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
35,090

12,240.00
1,734.00
11,505.60
942.48
33,422.08
1,671.10
35,090.00
5,800.00

6.25

3.13

2.21

HARGA SATUAN

Rp
Rp
Rp

JUMLAH HARGA

2,500
2,000
1,000

2,500.00
2,000.00
1,000.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
33,510

12,240.00
1,734.00
11,505.60
942.48
31,922.08
1,596.10
33,510.00
5,500.00

Rp
Rp
Rp

129,000
58,050
135,450

154,800.00
234,522.00
65,693.25

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

61,200.00
43,350.00
4,794.00
3,927.00
568,286.25
28,414.31
596,700.00

Rp
Rp
Rp

129,000
58,050
135,450

154,800.00
189,243.00
70,434.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

61,200.00
43,350.00
4,794.00
3,927.00
527,748.00
26,387.40
554,130.00

Rp
Rp

129,000
135,450

154,800.00
58,514.40

Rp
Rp
Rp

40,800
57,800
63,920

31,824.00
22,542.00
2,492.88

5.0%

1.67

HARGA SATUAN

JUMLAH HARGA

Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

2,042.04
272,215.32
13,610.77
285,820.00

Rp
Rp

129,000
537,500

154,800.00
179,148.75

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

4,080.00
11,560.00
287,640.00
3,927.00
641,155.75
32,057.79
673,210.00

Rp
Rp
Rp

688
58,050
135,450

48,160.00
22,000.95
5,147.10

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

12,240.00
5,780.00
639.20
785.40
94,752.65
4,737.63
99,490.00

Rp
Rp
Rp

688
58,050
135,450

48,160.00
13,351.50
5,824.35

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

12,240.00
5,780.00
639.20
785.40
86,780.45
4,339.02
91,110.00

5.0%

HARGA SATUAN
Rp
Rp

JUMLAH HARGA

58,050
135,450

9,891.72
2,302.65

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

8,160.00
8,670.00
958.80
523.60
30,506.77
1,525.34
32,030.00

Rp
Rp

58,050
135,450

6,037.20
2,709.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

8,160.00
8,670.00
958.80
523.60
27,058.60
1,352.93
28,410.00

Rp
Rp

58,050
135,450

16,579.08
3,115.35

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

10,200.00
1,156.00
1,278.40
523.60
32,852.43
1,642.62
34,490.00

Rp
Rp

58,050
135,450

10,077.48
3,792.60

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

10,200.00
1,156.00
1,278.40
654.50
27,158.98
1,357.95
28,510.00

5.0%

HARGA SATUAN

Rp
Rp

JUMLAH HARGA

58,050
135,450

10,797.30
2,438.10

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

10,608.00
11,560.00
1,278.40
680.68
37,362.48
1,868.12
39,230.00

Rp
Rp

58,050
135,450

8,208.27
2,844.45

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

10,608.00
11,560.00
1,278.40
680.68
35,179.80
1,758.99
36,930.00

Rp
Rp

58,050
135,450

5,015.52
2,167.20

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

6,120.00
4,046.00
447.44
418.88
18,215.04
910.75
19,120.00

Rp

58,050

2,031.75

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

1,632.00
4,624.00
511.36
104.72
8,903.83
445.19
9,340.00

5.0%

HARGA SATUAN
Rp
Rp
Rp

JUMLAH HARGA

8,170
135,450
1,548,000

1,429,750.00
40,635.00
77,400.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
2,652,400

612,000.00
289,000.00
51,136.00
26,180.00
2,526,101.00
126,305.05
2,652,400.00
26,520.00

Rp
Rp
Rp
Rp

58,050
133,300
225,148
100

320,436.00
78,913.60
168,861.00
21,500.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

67,320.00
15,895.00
1,789.76
4,345.88
679,061.24
33,953.06
713,010.00

Rp
Rp
Rp
Rp

58,050
133,300
225,148
100

286,767.00
82,741.21
166,609.52
21,500.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

67,320.00
15,895.00
1,789.76
4,345.88
646,968.37
32,348.42
679,310.00

Rp
Rp
Rp

430,731.00
66,459.57
174,614.78

58,050
133,300
225,148

5.0%

HARGA SATUAN

JUMLAH HARGA

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

67,320.00
15,895.00
1,789.76
4,345.88
761,155.99
38,057.80
799,210.00

Rp
Rp
Rp
Rp

58,050
133,300
218,526
100

445,824.00
65,888.29
168,184.08
21,500.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

67,320.00
15,895.00
1,789.76
4,345.88
790,747.01
39,537.35
830,280.00

Rp
Rp

9,890
14,620

103,845.00
2,193.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek. 10 Kg
Hrg Satuan Pek. 1 Kg

2,856.00
4,046.00
447.44
209.44
113,596.88
5,679.84
119,270.00
11,927.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,548,000
14,491
10,320
9,890
14,620
58,050
133,300
225,148

309,600.00
21,736.50
4,128.00
1,557,675.00
32,895.00
390,096.00
71,982.00
182,369.88

Rp
Rp

40,800
57,800

216,240.00
15,895.00

5.0%

HARGA SATUAN

JUMLAH HARGA

Rp
57,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

75,140.00
60,690.00
16,747.04
13,875.40
2,969,069.82
148,453.49
3,117,520.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,548,000
14,491
10,320
9,890
14,620
58,050
133,300
225,148

417,960.00
28,982.00
6,192.00
2,076,900.00
43,860.00
390,096.00
71,982.00
182,369.88

Rp
40,800
Rp
57,800
Rp
57,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

230,520.00
15,895.00
90,168.00
80,920.00
20,646.16
14,817.88
3,671,308.92
183,565.45
3,854,870.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,548,000
14,491
10,320
9,890
14,620
58,050
133,300
225,148
2,838,000
84,710
12,900

371,520.00
46,371.20
16,512.00
1,557,675.00
32,895.00
390,096.00
71,982.00
182,369.88
454,080.00
237,188.00
309,600.00

Rp
Rp
Rp
Rp
Rp
Rp

40,800
57,800
57,800
57,800
63,920
52,360

216,240.00
15,895.00
75,140.00
60,690.00
16,747.04
13,875.40

5.0%

HARGA SATUAN

JUMLAH HARGA

Jumlah
Biaya Umum
Hrg Satuan Pek.

4,068,876.52
203,443.83
4,272,320.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,548,000
14,491
10,320
9,890
14,620
58,050
133,300
225,148
2,838,000
84,710
12,900

495,360.00
46,371.20
16,512.00
2,076,900.00
43,860.00
390,096.00
71,982.00
182,369.88
397,320.00
237,188.00
206,400.00

Rp
40,800
Rp
57,800
Rp
57,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

259,080.00
15,895.00
95,370.00
80,920.00
21,285.36
16,650.48
4,653,559.92
232,678.00
4,886,230.00

Rp
Rp
Rp
Rp

65,000
10,750
3,870
17,200

26,000.00
2,365.00
3,870.00
1,720.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

10,200.00
2,167.50
2,428.96
680.68
49,432.14
2,471.61
51,900.00

Rp
Rp
Rp

33,849.60
4,730.00
1,935.00

20,640
10,750
3,870

5.0%

HARGA SATUAN

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
115,880

Rp
Rp

JUMLAH HARGA

20,400.00
43,350.00
4,794.00
1,309.00
110,367.60
5,518.38
115,880.00
11,580.00

30,100
10,750

12,040.00
4,730.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

8,160.00
4,335.00
511.36
523.60
30,299.96
1,515.00
31,810.00

Rp
Rp
Rp

13,416
17,200
3,870

5,849.38
275.20
3,870.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

2,040.00
4,335.00
511.36
157.08
17,038.02
851.90
17,880.00

Rp
Rp
Rp

68,800
645
77,400

75,680.00
1,290.00
4,644.00

Rp
Rp
Rp
Rp

40,800
68,000
63,920
52,360

1,754.40
2,924.00
274.86
109.96

5.0%

HARGA SATUAN
Jumlah
Biaya Umum
Hrg Satuan Pek.

Rp
Rp

JUMLAH HARGA
86,677.21
4,333.86
91,010.00

68,800
645

302,720.00
9,417.00

Rp
40,800
Rp
68,000
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

3,468.00
5,780.00
543.32
219.91
322,148.23
16,107.41
338,250.00

Rp
Rp
Rp

68,800
116,100
77,400

302,720.00
522,450.00
20,898.00

Rp
40,800
Rp
68,000
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

3,468.00
5,780.00
575.28
261.80
856,153.08
42,807.65
898,960.00

Rp

2,838,000

99,330.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

32,640.00
115,600.00
12,784.00
2,094.40
262,448.40
13,122.42
275,570.00

Rp

2,838,000

181,632.00

40,800
57,800
63,920
52,360

40,800.00
173,400.00
19,176.00
15,708.00
430,716.00

Rp
Rp
Rp
Rp
Jumlah

5.0%

HARGA SATUAN

JUMLAH HARGA

Biaya Umum
Hrg Satuan Pek.

21,535.80
452,250.00

Rp
Rp
Rp
Rp

2,838,000
14,491
21,500
120,000

55,624.80
434.73
6,450.00
120,000.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

40,800.00
173,400.00
19,176.00
15,708.00
431,593.53
21,579.68
453,170.00

Rp
Rp
Rp

2,838,000
12,470
14,491

3,121,800.00
187,050.00
11,592.80

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

163,200.00
693,600.00
76,704.00
10,472.00
4,264,418.80
213,220.94
4,477,630.00

Rp
Rp

2,838,000
14,491

34,056.00
21,736.50

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

4,080.00
5,780.00
63.92
261.80
65,978.22
3,298.91
69,270.00

Rp
Rp

2,838,000
14,491

34,056.00
1,449.10

Rp

40,800

6,120.00

5.0%

HARGA SATUAN

JUMLAH HARGA

Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

14,450.00
1,598.00
3,927.00
61,600.10
3,080.01
64,680.00

Rp
Rp

2,838,000
14,491

65,274.00
2,173.65

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

8,160.00
17,340.00
1,917.60
523.60
95,388.85
4,769.44
100,150.00

Rp
Rp

2,838,000
14,491

76,626.00
2,898.20

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

10,200.00
20,230.00
2,237.20
654.50
112,845.90
5,642.30
118,480.00

Rp
Rp

2,838,000
14,491

20,433.60
724.55

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

4,080.00
11,560.00
1,598.00
261.80
38,657.95
1,932.90
40,590.00

Rp
Rp

31,218.00
724.55

2,838,000
14,491

5.0%

HARGA SATUAN

JUMLAH HARGA

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

4,488.00
12,716.00
1,406.24
261.80
50,814.59
2,540.73
53,350.00

Rp
Rp

2,838,000
14,491

24,406.80
869.46

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

4,080.00
5,780.00
639.20
2,618.00
38,393.46
1,919.67
40,310.00

Rp
Rp

2,838,000
14,491

41,151.00
869.46

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

6,120.00
14,450.00
1,598.00
3,927.00
68,115.46
3,405.77
71,520.00

Rp

2,250

56,250.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

6,120.00
4,335.00
511.36
418.88
67,635.24
3,381.76
71,010.00

Rp
Rp
Rp

56,250.00
9,288.00
4,334.40

2,250
58,050
135,450

5.0%

HARGA SATUAN

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

Rp
Rp
Rp

JUMLAH HARGA

16,320.00
11,560.00
1,278.40
104.72
99,135.52
4,956.78
104,090.00

2,250
58,050
135,450

9,000.00
9,288.00
4,334.40

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

16,320.00
11,560.00
1,278.40
104.72
51,885.52
2,594.28
54,470.00

Rp
Rp

37,500
25,000

18,750.00
3,000.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

5,712.00
4,335.00
511.36
418.88
32,727.24
1,636.36
34,360.00

Rp
Rp

25,000
12,500

60,000.00
75,000.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

3,427.20
7,225.00
830.96
209.44
146,692.60
7,334.63
154,020.00

5.0%

HARGA SATUAN
Rp
Rp

JUMLAH HARGA

25,000
12,500

52,500.00
75,000.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

3,427.20
7,225.00
830.96
209.44
139,192.60
6,959.63
146,150.00

Rp
Rp

38,700
14,491

81,270.00
4,347.30

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

8,160.00
5,780.00
639.20
523.60
100,720.10
5,036.01
105,750.00

Rp
Rp

40,850
14,491

28,595.00
289.82

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

6,120.00
4,046.00
511.36
314.16
39,876.34
1,993.82
41,870.00

Rp
Rp

40,850
14,491

12,255.00
57,964.00

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

6,120.00
4,046.00
511.36
314.16
81,210.52
4,060.53
85,270.00

5.0%

0.48

2.08

HARGA SATUAN

Rp
Rp

JUMLAH HARGA

35,000
14,491

38,500.00
144.91

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

1,224.00
4,046.00
447.44
78.54
44,440.89
2,222.04
46,660.00

Rp
Rp

17,500
14,491

201,250.00
724.55

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

2,448.00
6,936.00
767.04
157.08
212,282.67
10,614.13
222,890.00

Rp
Rp

55,000
14,491

19,800.00
434.73

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

2,856.00
5,780.00
639.20
183.26
29,693.19
1,484.66
31,170.00

Rp
Rp

55,000
14,491

20,625.00
434.73

Rp
Rp
Rp
Rp
Jumlah

40,800
57,800
63,920
52,360

2,856.00
5,780.00
639.20
183.26
30,518.19

5.0%

HARGA SATUAN
Biaya Umum
Hrg Satuan Pek.

1,525.91
32,040.00

289,000.00
1,856,400.00
1,000.00

10,115.00
55,692.00
1,000.00

6,545.00
5,100.00

589.05
4,590.00
71,986.05
3,599.30
75,580.00

Jumlah
Biaya Umum
Hrg Satuan Pek.

Rp
Rp

JUMLAH HARGA

3,870
135,450

139,320.00
14,899.50

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

16,320.00
11,560.00
1,278.40
104.72
183,482.62
9,174.13
192,650.00

Rp
Rp
Rp

21,500
135,450
58,050

53,750.00
2,031.75
2,031.75

Rp
40,800
Rp
57,800
Rp
63,920
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

16,320.00
11,560.00
1,278.40
104.72
87,076.62
4,353.83
91,430.00

Rp
Rp
Rp
Rp
Rp
Jumlah

33,500
181,350
554,130
4,886,230
215,000

5,025.00
3,627.00
55,413.00
146,586.90
215,000.00
425,651.90

5.0%

HARGA SATUAN

JUMLAH HARGA

Biaya Umum
Hrg Satuan Pek.

21,282.60
446,930.00

Rp
33,500
Rp
181,350
Rp
554,130
Rp
36,930
Rp
9,340
Jumlah
Biaya Umum
Hrg Satuan Pek.

12,060.00
4,533.75
60,954.30
40,623.00
10,274.00
128,445.05
6,422.25
134,860.00

Rp
33,500
Rp
181,350
Rp
554,130
Rp
36,930
Rp
9,340
Jumlah
Biaya Umum
Hrg Satuan Pek.

18,760.00
5,440.50
77,578.20
51,702.00
13,076.00
166,556.70
8,327.84
174,880.00

5,160
58,050
135,450
107,500

61,920.00
11,377.80
6,095.25
2,795.00

40,800
57,800
63,920
52,360

10,200.00
7,225.00
830.96
654.50
101,098.51
5,054.93
106,150.00

Jumlah
Biaya Umum
Hrg Satuan Pek.

Rp
Rp
Rp

85,000
6,000
2,000

85,000.00
600.00
2,000.00

Rp
40,800
Rp
57,800
Rp
52,360
Jumlah
Biaya Umum
Hrg Satuan Pek.

1,224.00
2,890.00
261.80
91,975.80
4,598.79
96,570.00

5.0%

HARGA SATUAN

............., .....................2011
Dibuat oleh :

.............................
PIMPINAN TEKNIK

JUMLAH HARGA

5.0%

DAFTAR ANALISA LUMPSUM


Satker
Pekerjaan

:
:

Lokasi
Tahun Anggaran
No. Paket

:
:
:

PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWES


PDAM YANG MEMPEROLEH PEMBINAAN
P/P JARINGAN PERPIPAAN
KABUPATEN KEPULAUAN TALAUD
2012 (APBN)
5

Analisa lumpsum : 1 UNIT, PENGAD-PEMAS KRAN UMUM


Satuan : Unit
NO.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

URAIAN PEKERJAAN

Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)
Plesteran 1pc:4ps
Acian
Pengecatan
Begel pipa 75 MM
Nepel Drat PVC 1/2 INCH
Elbow PVC 1/2 INCH
Socket Drat PVC 1/2 INCH
Stop Kran Kuningan 1/2 INCH
Pipa PVC 1/2 INCH
Tee-Stuck PVC 1/2 INCH
Mata Kran Vernekel 1/2 INCH
TBA uk. Sedang
Tegel Keramik 20/25
Biaya Pemasangan Pipa & Acc

VOL.

0.3000
0.1000
0.0500
1.7000
1.7000
1.2000
1.0000
1.0000
2.0000
5.0000
0.0050
6.0000
1.0000
2.0000
1.0000
2.2000
1.0000

m3
m3
m3
m2
m2
m2
bh
bh
bh
bh
bh
m1
bh
bh
pcs
m2
ls

Analisa lumpsum : 12 M, PENGAD-PEMAS JEMBATAN PIPA GIP 150 MM


Satuan : m1
NO.

1
2

URAIAN PEKERJAAN

Galian Tanah
Beton Tumbuk 1pc:3ps:5kr

VOL.

2.4000
0.1400

m3
m3

3
4
5
6
7
8
9
10
11
12
13

Tiang Penyangga Beton Bertulang 1pc:2ps:3kr, (besi 150 kg


Pasangan Batu, 1pc:4ps
Plesteran 1pc:4ps
Pengecatan
Pipa GIP 150 MM
Flanged GIP 150 MM
Flanged Socket 150 MM
Elbow GIP 150 MM
Bout 22 MM
Packing Karet MM
Erection

1 M, Pengad-Pemas Jembatan Pipa GIP 150 MM

0.3200
1.5000
6.4000
11.2000
12.0000
10.0000
2.0000
4.0000
72.0000
5.0000
1.0000

m3
m2
m2
m2
m1
bh
bh
bh
bh
bh
ls

1.0000

m1

Analisa lumpsum : 6 M, PENGAD-PEMAS JEMBATAN PIPA GIP 100 MM


Satuan : m1
NO.

1
2
3
4
5
6
7
8
9
10
11
12
13

URAIAN PEKERJAAN

Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Tiang Penyangga Beton Bertulang 1pc:2ps:3kr, (besi 150 kg
Pasangan Batu, 1pc:4ps
Plesteran 1pc:4ps
Pengecatan
Pipa GIP 100 MM
Flanged GIP 100 MM
Flanged Socket 100 MM
Elbow GIP 100 MM
Bout 18 MM
Packing Karet MM
Erection

1 M, Pengad-Pemas Jembatan Pipa GIP 100 MM

VOL.

2.4000
0.1400
0.3200
1.5000
6.4000
11.2000
12.0000
10.0000
2.0000
4.0000
72.0000
5.0000
1.0000

m3
m3
m3
m2
m2
m2
m1
bh
bh
bh
bh
bh
ls

1.0000

m1

Analisa lumpsum : 6 M, PENGAD-PEMAS JEMBATAN PIPA GIP 75 MM


Satuan : m1
NO.

1
2
3
4

URAIAN PEKERJAAN

Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Tiang Penyangga Beton Bertulang 1pc:2ps:3kr, (besi 150 kg
Pasangan Batu, 1pc:4ps

VOL.

2.4000
0.1400
0.3200
1.5000

m3
m3
m3
m2

5
6
7
8
9
10
11
12
13

Plesteran 1pc:4ps
Pengecatan
Pipa GIP 75 MM
Flanged GIP 75 MM
Flanged Socket 75 MM
Elbow GIP 75 MM
Bout 18 MM
Packing Karet MM
Erection

1 M, Pengad-Pemas Jembatan Pipa GIP 75 MM

6.4000
11.2000
12.0000
10.0000
2.0000
4.0000
72.0000
5.0000
1.0000

m2
m2
m1
bh
bh
bh
bh
bh
ls

1.0000

m1

Analisa lumpsum : 6 M, PENGAD-PEMAS PIPA CROSSING JALAN GIP 150 MM


Satuan : m1
NO.

1
2
3
4
5
6
7
8
9
10

URAIAN PEKERJAAN

Bongkar Jl. Aspal & Batu, Galian tanah


Pas. Batu Dasar Jalan
Pasir Urug
Aspal
Pipa GIP 150 MM
Flanged GIP 150 MM
Flanged Socket PVC 150 MM
Bout 18 MM
Packing Karet MM
Erection

1 M, Pengad-Pemas Crossing Pipa GIP 150 MM

VOL.

2.5200
1.5000
0.7400
5.2500
6.0000
2.0000
2.0000
16.0000
2.0000
1.0000

m3
m3
m3
kg
m1
bh
bh
bh
bh
ls

1.0000

m1

Analisa lumpsum : 6 M, PENGAD-PEMAS CROSSING PIPA GIP 100 MM


Satuan : m1
NO.

1
2
3
4
5
6
7
8
9
10

URAIAN PEKERJAAN

Bongkar Jl. Aspal & Batu, Galian tanah


Pas. Batu Dasar Jalan
Pasir Urug
Aspal
Pipa GIP 100 MM
Flanged GIP 100 MM
Flanged Socket PVC 100 MM
Bout 18 MM
Packing Karet MM
Erection

VOL.

1.6200
1.5000
0.5400
5.2500
6.0000
2.0000
2.0000
16.0000
2.0000
1.0000

m3
m3
m3
kg
m1
bh
bh
bh
bh
ls

1 M, Pengad-Pemas Crossing Pipa GIP 100 MM

1.0000

m1

Analisa lumpsum : 6 M, PENGAD-PEMAS CROSSING PIPA GIP 75 MM


Satuan : m1
NO.

1
2
3
4
5
6
7
8
9
10

URAIAN PEKERJAAN

Bongkar Jl. Aspal & Batu, Galian tanah


Pas. Batu Dasar Jalan
Pasir Urug
Aspal
Pipa GIP 75 MM
Flanged GIP 75 MM
Flanged Socket PVC 75 MM
Bout 16 MM
Packing Karet MM
Erection

1 M, Pengad-Pemas Crossing Pipa GIP 75 MM

VOL.

1.4500
0.9000
0.4200
5.2500
6.0000
2.0000
2.0000
16.0000
2.0000
1.0000

m3
m3
m3
kg
m1
bh
bh
bh
bh
ls

1.0000

m1

Analisa lumpsum : 1 UNIT, PENGAD-PEMAS PENUTUP CHAMBER-MANHOLE PLAT EZER 3 MM, Uk. 7
Satuan : unit
NO.

1
2
3
4
5
6

URAIAN PEKERJAAN

Besi plat ezer 3 mm


Besi Siku 3.50.50 mm
Hengsel besi
Angker/handdel besi 16 mm, pjg 30 cm
Kunci/Gembok Kuningan
Erection & pengelasan

VOL.

0.8000
2.8000
2.0000
7.0000
3.0000
1.0000

m2
m1
bh
pcs
pcs
ls

Analisa lumpsum : 1 M, PENGAD-PEMAS BARSCREEN BESI RAM # 3 CM, BESI 12 MM


Satuan : m2
NO.

1
2
3
4
5

URAIAN PEKERJAAN

Besi 12 mm
Besi Siku 3.50.50 mm
Hengsel besi
Angker/handdel besi 16 mm, pjg 30 cm
Kunci/Gembok Kuningan

VOL.

16.8000
1.4000
2.0000
7.0000
3.0000

kg
m1
bh
pcs
pcs

Erection & pengelasan

1.0000

ls

Analisa lumpsum : 1 UNIT, BAK CHAMBER PAS. 1/2 BATA, Uk. 80x80x120 CM
Satuan : unit
NO.

1
2
3
4
5
6
7

URAIAN PEKERJAAN

Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

VOL.

3.2400
0.1000
0.0810
3.8000
8.8000
8.8000
4.2000

m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, BAK CHAMBER PAS. 1/2 BATA, Uk. 80x150x120 CM
Satuan : unit
NO.

1
2
3
4
5
6
7

URAIAN PEKERJAAN

Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

VOL.

5.4000
0.1400
0.0967
6.9600
16.8000
16.8000
8.0000

m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, PENGAD-PEMAS PIPA UDARA GIP 75 MM


Satuan : unit
NO.

1
2
3

URAIAN PEKERJAAN

Pipa GIP 75 mm
Angker besi 12 mm, pjg 30 cm
Erection & pengelasan

Analisa lumpsum : 10 M, PAGAR DURI, t = 150 CM, 6 JARING


Satuan : m1

VOL.

1.0000
2.0000
1.0000

m1
pcs
ls

NO.

1
2
3
4

URAIAN PEKERJAAN

Galian Tanah
Tiang pipa GIP dia. 2"
Kawat duri
Erection

1 M, Pagar duri t=150 cm, 6 jaring

VOL.

0.1000
6.0000
64.0000
1.0000

m3
m1
m1
ls

1.0000

m1

Analisa lumpsum : 1 UNIT, PENGADAAN-PEMASANGAN WATER METER 150 MM + CHAMBER


Satuan : unit
NO.

1
2
3
4
5
6
7
8
9
10
11
12
13

URAIAN PEKERJAAN

Water Meter 150 mm


Pipa GIP 150 MM
Flanged GIP 150 MM
Bout 18 MM
Packing Karet MM
Erection
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

VOL.

1.0000
1.0000
6.0000
32.0000
4.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000

bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, PENGADAAN-PEMASANGAN WATER METER 100 MM + CHAMBER


Satuan : unit
NO.

1
2
3
4
5
6
7
8
9
10
11
12
13

URAIAN PEKERJAAN

Water Meter 100 mm


Pipa GIP 100 MM
Flanged GIP 100 MM
Bout 18 MM
Packing Karet MM
Erection
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 139.5 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

VOL.

1.0000
1.0000
6.0000
32.0000
4.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000

bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, WASH OUT 150 MM + CHAMBER


Satuan : unit
NO.

1
2
3
4
5
6
7
8
9
10
11
12
13
14

URAIAN PEKERJAAN

All Flange Tee GIP 150 mm


Gate Valve 150 mm
Pipa GIP 150 MM
Flanged GIP 150 MM
Bout 18 MM
Packing Karet MM
Erection
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 139.5 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

VOL.

1.0000
1.0000
1.0000
6.0000
32.0000
4.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000

bh
bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, WASH OUT 100 MM + CHAMBER


Satuan : unit
NO.

1
2
3
4
5
6
7
8
9
10
11
12
13
14

URAIAN PEKERJAAN

All Flange Tee GIP 100 mm


Gate Valve 100 mm
Pipa GIP 100 MM
Flanged GIP 100 MM
Bout 18 MM
Packing Karet MM
Erection
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 139.5 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

VOL.

1.0000
1.0000
1.0000
6.0000
32.0000
4.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000

bh
bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, WASH OUT 75 MM + CHAMBER


Satuan : unit
NO.

1
2
3
4
5
6
7
8
9
10
11
12
13
14

URAIAN PEKERJAAN

All Flange Tee GIP 75 mm


Gate Valve 75 mm
Pipa GIP 75 MM
Flanged GIP 75 MM
Bout 16 MM
Packing Karet MM
Erection
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 139.5 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

VOL.

1.0000
1.0000
1.0000
6.0000
32.0000
4.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000

bh
bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, SINGLE AIR VALVE 150 MM + CHAMBER


Satuan : unit
NO.

1
2
3
4
5
6
7
8
9
10
11
12
13

URAIAN PEKERJAAN

Air Valve 150 mm


Pipa GIP 150 MM
Flanged GIP 150 MM
Bout 18 MM
Packing Karet MM
Erection
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

VOL.

1.0000
1.0000
4.0000
16.0000
2.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000

bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, SINGLE AIR VALVE 100 MM + CHAMBER


Satuan : unit
NO.

1
2
3

URAIAN PEKERJAAN

Air Valve 100 mm


Pipa GIP 100 MM
Flanged GIP 100 MM

VOL.

1.0000
1.0000
4.0000

bh
m1
bh

4
5
6
7
8
9
10
11
12
13

Bout 18 MM
Packing Karet MM
Erection
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 139.5 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

16.0000
2.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000

bh
bh
ls
m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, SINGLE AIR VALVE 75 MM + CHAMBER


Satuan : unit
NO.

1
2
3
4
5
6
7
8
9
10
11
12
13

URAIAN PEKERJAAN

Air Valve 75 mm
Pipa GIP 75 MM
Flanged GIP 75 MM
Bout 16 MM
Packing Karet MM
Erection
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 139.5 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

VOL.

1.0000
1.0000
4.0000
16.0000
2.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000

bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, ANGKER TANGGA BESI 22 mm


Satuan : unit
NO.

1
2

URAIAN PEKERJAAN

Angker besi 22 mm
Erection & pengelasan

VOL.

17.0500
1.0000

Analisa lumpsum : 1 UNIT, PINTU AIR TYPE 60


Satuan : unit
NO.

URAIAN PEKERJAAN

VOL.

kg
ls

1
2
3
4
5

Pintu Air
Besi Siku 3.50.50 mm
Angker/handdel besi 16 mm, pjg 30 cm
Erection & pengelasan
Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)

1.0000
5.6000
8.0000
1.0000
0.0360

Unit
m1
pcs
ls
m3

Analisa lumpsum : 1 UNIT TANGKI CLORINASI KAP 500 LTR


Satuan : unit
NO.

1
2
3
4
5

URAIAN PEKERJAAN

Tangki fibreglass 500 ltr


Cor beton tumbuk 1:3:5
Plesteran 1:4
Acian
Pipa 1/2 inch, kran & Acc pipa

Mengetahui/ Menyetujui :
PT/CV ........................

.............................
DIREKTUR

VOL.

1.0000
0.5700
1.8000
1.8000
1.0000

unit
m3
m2
m2
ls

............., ..................

MPSUM

NUM PROVINSI SULAWESI UTARA

HARGA SATUAN

33,500.00
679,310.00
3,117,520.00
28,510.00
9,340.00
17,880.00
65,000.00
6,000.00
6,500.00
7,000.00
37,500.00
3,997.00
10,000.00
45,000.00
5,000.00
106,150.00
350,000.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

HARGA SATUAN

33,500.00 Rp
679,310.00 Rp

10,050.00
67,931.00
155,876.00
48,467.00
15,878.00
21,456.00
65,000.00
6,000.00
13,000.00
35,000.00
187.50
23,982.00
10,000.00
90,000.00
5,000.00
233,530.00
350,000.00
1,151,357.50
57,567.88
1,208,925.38

JUMLAH HARGA

80,400.00
95,103.40

3,117,520.00
554,130.00
28,510.00
17,880.00
425,500.00
188,900.00
378,800.00
350,000.00
9,000.00
15,000.00
1,000,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

997,606.40
831,195.00
182,464.00
200,256.00
5,106,000.00
1,889,000.00
757,600.00
1,400,000.00
648,000.00
75,000.00
1,000,000.00
13,262,624.80
663,131.24
13,925,756.04

1,160,479.67 Rp

1,160,479.67

Jumlah
Biaya Umum
Hrg Satuan Pek.

HARGA SATUAN

33,500.00
679,310.00
3,117,520.00
554,130.00
28,510.00
17,880.00
261,900.00
131,200.00
205,400.00
300,000.00
7,500.00
12,000.00
850,000.00

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

80,400.00
95,103.40
997,606.40
831,195.00
182,464.00
200,256.00
3,142,800.00
1,312,000.00
410,800.00
1,200,000.00
540,000.00
60,000.00
850,000.00
9,902,624.80
495,131.24
10,397,756.04

866,479.67 Rp

866,479.67

Jumlah
Biaya Umum
Hrg Satuan Pek.

HARGA SATUAN

33,500.00
679,310.00
3,117,520.00
554,130.00

JUMLAH HARGA

Rp
Rp
Rp
Rp

80,400.00
95,103.40
997,606.40
831,195.00

28,510.00
17,880.00
181,500.00
94,400.00
155,700.00
250,000.00
7,500.00
9,000.00
750,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

182,464.00
200,256.00
2,178,000.00
944,000.00
311,400.00
1,000,000.00
540,000.00
45,000.00
750,000.00
8,155,424.80
407,771.24
8,563,196.04

713,599.67 Rp

713,599.67

Jumlah
Biaya Umum
Hrg Satuan Pek.

HARGA SATUAN

44,590.00
554,130.00
181,350.00
8,170.00
425,500.00
188,900.00
378,800.00
7,500.00
15,000.00
500,000.00

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

112,366.80
831,195.00
134,199.00
42,892.50
2,553,000.00
377,800.00
757,600.00
120,000.00
30,000.00
500,000.00
5,459,053.30
272,952.67
5,732,005.97

955,334.33 Rp

955,334.33

Jumlah
Biaya Umum
Hrg Satuan Pek.

HARGA SATUAN

44,590.00
554,130.00
181,350.00
8,170.00
261,900.00
131,200.00
205,400.00
7,500.00
12,000.00
400,000.00

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

72,235.80
831,195.00
97,929.00
42,892.50
1,571,400.00
262,400.00
410,800.00
120,000.00
24,000.00
400,000.00

Jumlah
Biaya Umum
Hrg Satuan Pek.

Rp
Rp
Rp

3,832,852.30
191,642.62
4,024,494.92

670,749.15 Rp

670,749.15

HARGA SATUAN

44,590.00
554,130.00
181,350.00
8,170.00
181,500.00
94,400.00
155,700.00
6,500.00
9,000.00
300,000.00

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

64,655.50
498,717.00
76,167.00
42,892.50
1,089,000.00
188,800.00
311,400.00
104,000.00
18,000.00
300,000.00
2,693,632.00
134,681.60
2,828,313.60

471,385.60 Rp

471,385.60

Jumlah
Biaya Umum
Hrg Satuan Pek.

LE PLAT EZER 3 MM, Uk. 70x70 cm


HARGA SATUAN

185,000.00
19,000.00
40,000.00
3,500.00
55,000.00
150,000.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

148,000.00
53,200.00
80,000.00
24,500.00
165,000.00
150,000.00
620,700.00
31,035.00
651,735.00

BESI 12 MM
HARGA SATUAN

9,890.00
19,000.00
40,000.00
3,500.00
55,000.00

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp

166,152.00
26,600.00
80,000.00
24,500.00
165,000.00

150,000.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

Rp
Rp
Rp
Rp

HARGA SATUAN

33,500.00
679,310.00
3,117,520.00
91,110.00
28,510.00
9,340.00
17,880.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

HARGA SATUAN

33,500.00
679,310.00
3,117,520.00
91,110.00
28,510.00
9,340.00
17,880.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

150,000.00
612,252.00
30,612.60
642,864.60

108,540.00
67,931.00
252,519.12
346,218.00
250,888.00
82,192.00
75,096.00
1,183,384.12
59,169.21
1,242,553.33

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

HARGA SATUAN

181,500.00 Rp
3,500.00 Rp
75,000.00 Rp
Jumlah
Rp
Biaya Umum
Rp
Hrg Satuan Pek.
Rp

180,900.00
95,103.40
301,464.18
634,125.60
478,968.00
156,912.00
143,040.00
1,990,513.18
99,525.66
2,090,038.84

JUMLAH HARGA

181,500.00
7,000.00
75,000.00
263,500.00
13,175.00
276,675.00

HARGA SATUAN

33,500.00
109,300.00
7,200.00
80,000.00

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,350.00
655,800.00
460,800.00
80,000.00
1,199,950.00
59,997.50
1,259,947.50

125,994.75 Rp

125,994.75

Jumlah
Biaya Umum
Hrg Satuan Pek.

150 MM + CHAMBER
HARGA SATUAN

5,038,800.00
425,500.00
188,900.00
7,500.00
15,000.00
100,000.00
33,500.00
679,310.00
3,117,520.00
91,110.00
28,510.00
9,340.00
17,880.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,038,800.00
425,500.00
1,133,400.00
240,000.00
60,000.00
100,000.00
108,540.00
67,931.00
405,277.60
346,218.00
250,888.00
82,192.00
75,096.00
8,333,842.60
416,692.13
8,750,534.73

100 MM + CHAMBER
HARGA SATUAN

3,569,100.00
261,900.00
131,200.00
7,500.00
12,000.00
100,000.00
33,500.00
679,310.00
3,117,520.00
91,110.00
28,510.00
9,340.00
17,880.00

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,569,100.00
261,900.00
787,200.00
240,000.00
48,000.00
100,000.00
108,540.00
67,931.00
405,277.60
346,218.00
250,888.00
82,192.00
75,096.00

Jumlah
Biaya Umum
Hrg Satuan Pek.

Rp
Rp
Rp

HARGA SATUAN

1,049,700.00
2,886,800.00
425,500.00
188,900.00
7,500.00
15,000.00
100,000.00
33,500.00
679,310.00
3,117,520.00
91,110.00
28,510.00
9,340.00
17,880.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

HARGA SATUAN

902,700.00
1,558,800.00
261,900.00
131,200.00
7,500.00
12,000.00
100,000.00
33,500.00
679,310.00
3,117,520.00
91,110.00
28,510.00
9,340.00
17,880.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

6,342,342.60
317,117.13
6,659,459.73

1,049,700.00
2,886,800.00
425,500.00
1,133,400.00
240,000.00
60,000.00
100,000.00
108,540.00
67,931.00
405,277.60
346,218.00
250,888.00
82,192.00
75,096.00
7,231,542.60
361,577.13
7,593,119.73

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

902,700.00
1,558,800.00
261,900.00
787,200.00
240,000.00
48,000.00
100,000.00
108,540.00
67,931.00
405,277.60
346,218.00
250,888.00
82,192.00
75,096.00
5,234,742.60
261,737.13
5,496,479.73

HARGA SATUAN

481,100.00
1,091,700.00
181,500.00
94,400.00
6,500.00
9,000.00
100,000.00
33,500.00
679,310.00
3,117,520.00
91,110.00
28,510.00
9,340.00
17,880.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

HARGA SATUAN

2,851,200.00
261,900.00
131,200.00
7,500.00
15,000.00
100,000.00
33,500.00
679,310.00
3,117,520.00
91,110.00
28,510.00
9,340.00
17,880.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

481,100.00
1,091,700.00
181,500.00
566,400.00
208,000.00
36,000.00
100,000.00
108,540.00
67,931.00
405,277.60
346,218.00
250,888.00
82,192.00
75,096.00
4,000,842.60
200,042.13
4,200,884.73

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

HARGA SATUAN

1,539,648.00 Rp
354,941.17 Rp
162,000.00 Rp

2,851,200.00
261,900.00
524,800.00
120,000.00
30,000.00
100,000.00
108,540.00
67,931.00
405,277.60
346,218.00
250,888.00
82,192.00
75,096.00
5,224,042.60
261,202.13
5,485,244.73

JUMLAH HARGA

1,539,648.00
354,941.17
648,000.00

7,500.00
12,000.00
100,000.00
33,500.00
679,310.00
3,117,520.00
91,110.00
28,510.00
9,340.00
17,880.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

HARGA SATUAN

1,078,240.00
181,500.00
94,400.00
6,500.00
9,000.00
100,000.00
33,500.00
679,310.00
3,117,520.00
91,110.00
28,510.00
9,340.00
17,880.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

HARGA SATUAN

Rp
9,890
Rp
80,000
Jumlah
Biaya Umum
Hrg Satuan Pek.

HARGA SATUAN

120,000.00
24,000.00
100,000.00
108,540.00
67,931.00
405,277.60
346,218.00
250,888.00
82,192.00
75,096.00
4,122,731.77
206,136.59
4,328,868.36

1,078,240.00
181,500.00
377,600.00
104,000.00
18,000.00
100,000.00
108,540.00
67,931.00
405,277.60
346,218.00
250,888.00
82,192.00
75,096.00
3,195,482.60
159,774.13
3,355,256.73

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp

168,625
80,000
248,625
12,431.23
261,056

JUMLAH HARGA

5,000,000.00
19,000.00
3,500.00
150,000.00
3,117,520.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

Rp
Rp
Rp
Rp
Rp

5,000,000.00
106,400.00
28,000.00
150,000.00
112,230.72

Rp
Rp
Rp

5,284,400.00
264,220.00
5,548,620.00

HARGA SATUAN

1,500,000.00
679,310.00
28,510.00
9,340.00
60,000.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp

1,500,000.00
387,206.70
51,318.00
16,812.00
60,000.00

Rp
Rp
Rp

1,955,336.70
97,766.84
2,053,103.54

............., .....................2011
Dibuat oleh :

.............................
PIMPINAN TEKNIK

5.0%

Lampiran 1

ANALISA HARGA LUMP SUM UNTUK PENGADAAN PIPA


Satker
Pekerjaan

:
:

PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PR


PDAM YANG MEMPEROLEH PEMBINAAN
P/P JARINGAN PERPIPAAN
: KABUPATEN KEPULAUAN TALAUD
: 2012 (APBN)
: 5

Lokasi
Tahun Anggaran
No. Paket
NO.
1

URAIAN PEKERJAAN

HARGA

per 1 M'
3

A Pengadaan Pipa GIP (Medium SII)


1 Pipa 12"
2 Pipa 10"
3 Pipa 8"
4 Pipa 6"
5 Pipa 4"
6 Pipa 3"
8 Pipa 2"

Rp 1,078,920.00
Rp
807,165.00
Rp
543,105.00
Rp
403,380.00
Rp
248,265.00
Rp
172,125.00
Rp
103,680.00

B Pengadaan Pipa PVC S-10


1 Pipa 12" (315 mm) RR
2 Pipa 10" (250 mm) RR
3 Pipa 8" (200 mm) RR
4 Pipa 6" (160 mm) RR
5 Pipa 4" (110 mm) RR
6 Pipa 3" (90 mm) RR
8 Pipa 2" (63 mm) RR

Rp
Rp
Rp
Rp
Rp
Rp
Rp

539,662.50
338,296.50
218,214.00
139,846.50
66,136.50
43,983.00
21,748.50

C Pengadaan Pipa PVC S-12,5


1 Pipa 12" (315 mm) RR
2 Pipa 10" (250 mm) RR
3 Pipa 8" (200 mm) RR
4 Pipa 6" (160 mm) RR

Rp
Rp
Rp
Rp

440,275.50
276,615.00
177,268.50
113,764.50

NO.
1

URAIAN PEKERJAAN

HARGA

per 1 M'
3

5 Pipa 4" (110 mm) RR


6 Pipa 3" (90 mm) RR
8 Pipa 2" (63 mm) RR
D Pengadaan Pipa PE S8-SDR17 (PN10)
1 Pipa 12" (315 mm)
2 Pipa 10" (250 mm)
3 Pipa 8" (200 mm)
4 Pipa 6" (160 mm)
5 Pipa 4" (110 mm)
6 Pipa 3" (90 mm)
8 Pipa 2" (63 mm)

Mengetahui/ Menyetujui :
PT/CV ........................

.............................
DIREKTUR

Rp
Rp
Rp

53,257.50
36,693.00
17,577.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

632,124.00
397,467.00
255,636.00
163,782.00
78,489.00
52,569.00
25,920.00

UM UNTUK PENGADAAN PIPA GIP-PVC-PE

KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWESI UTARA


PEROLEH PEMBINAAN

LAUAN TALAUD

ASURANSI %

ONGKOS KIRIM

JLH HARGA

per 1 M'
4

per 1 M'
5

per 1 M'
6

Rp
Rp
Rp
Rp
Rp
Rp
Rp

32,367.60
24,214.95
16,293.15
12,101.40
7,447.95
5,163.75
3,110.40

Rp
Rp
Rp
Rp
Rp
Rp
Rp

26,973.00
20,179.13
13,577.63
10,084.50
6,206.63
4,303.13
2,592.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,138,200.00
851,500.00
572,900.00
425,500.00
261,900.00
181,500.00
109,300.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

16,189.88
10,148.90
6,546.42
4,195.40
1,984.10
1,319.49
652.46

Rp
Rp
Rp
Rp
Rp
Rp
Rp

13,491.56
8,457.41
5,455.35
3,496.16
1,653.41
1,099.58
543.71

Rp
Rp
Rp
Rp
Rp
Rp
Rp

569,300.00
356,900.00
230,200.00
147,500.00
69,700.00
46,400.00
22,900.00

Rp
Rp
Rp
Rp

13,208.27
8,298.45
5,318.06
3,412.94

Rp
Rp
Rp
Rp

11,006.89
6,915.38
4,431.71
2,844.11

Rp
Rp
Rp
Rp

464,400.00
291,800.00
187,000.00
120,000.00

ASURANSI %

ONGKOS KIRIM

JLH HARGA

per 1 M'
4

per 1 M'
5

per 1 M'
6

Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,597.73 Rp
1,100.79 Rp
527.31 Rp

18,963.72
11,924.01
7,669.08
4,913.46
2,354.67
1,577.07
777.60

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,331.44 Rp
917.33 Rp
439.43 Rp

15,803.10
9,936.68
6,390.90
4,094.55
1,962.23
1,314.23
648.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

............., .....................2011
Dibuat oleh :

.............................
PIMPINAN TEKNIK

56,100.00
38,700.00
18,500.00

666,800.00
419,300.00
269,600.00
172,700.00
82,800.00
55,400.00
27,300.00

Lampiran 2

ANALISA HARGA LUMP SUM UNTUK PENGADAAN ACCESSO


Satker
Pekerjaan
Lokasi
Tahun Anggaran
No. Paket

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULA


: PDAM YANG MEMPEROLEH PEMBINAAN
### P/P JARINGAN PERPIPAAN
: KABUPATEN KEPULAUAN TALAUD
: 2012 (APBN)
: 5

No.

URAIAN PEKERJAAN

HARGA PABRIK

ONGKOS KIRIM

(a)

(b)

(c)

(e)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Gate Valve Double Flanged CI 2"


Gate Valve Double Flanged CI 3"
Gate Valve Double Flanged CI 4"
Gate Valve Double Flanged CI 6"
Gate Valve Double Flanged CI 8"
Gate Valve Double Flanged CI 10"
Gate Valve Double Flanged CI 12"
Stop Kran 50 mm
Stop Kran 20 mm
Check Valve (Non Return Valve) 4"
Check Valve (Non Return Valve) 6"
Check Valve (Non Return Valve) 8"
Check Valve (Non Return Valve) 10"
Check Valve (Non Return Valve) 12"
DF. Water Meter 2"
DF. Water Meter 3"
DF. Water Meter 4"
DF. Water Meter 6"
DF. Water Meter 8"
DF. Water Meter 10"
DF. Water Meter 12"
Air Relief Valve 25 mm
Flanged Air Relief Valve 50 mm
Air Vent GIP 3"
All Flanged Tee PVC 4" x 4"
All Flanged Tee PVC 3" x 3"
All Flanged Tee PVC 3" x 2"
All Flanged Tee CI 12" X 12"
All Flanged Tee CI 12" X 8"
All Flanged Tee CI 12" X 2"

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

526,500.00 Rp
1,010,880.00 Rp
1,443,420.00 Rp
2,673,000.00 Rp
4,082,400.00 Rp
4,898,880.00 Rp
6,771,600.00 Rp
204,120.00 Rp
97,200.00 Rp
2,592,000.00 Rp
3,240,000.00 Rp
3,888,000.00 Rp
4,665,600.00 Rp
5,598,720.00 Rp
1,944,000.00 Rp
2,624,400.00 Rp
3,304,800.00 Rp
4,665,600.00 Rp
6,220,800.00 Rp
9,720,000.00 Rp
23,328,000.00 Rp
464,130.00 Rp
648,000.00 Rp
348,300.00 Rp
432,135.00 Rp
384,912.00 Rp
365,666.40 Rp
2,916,000.00 Rp
2,527,200.00 Rp
2,109,240.00 Rp

26,325.00
50,544.00
72,171.00
133,650.00
204,120.00
244,944.00
338,580.00
10,206.00
4,860.00
129,600.00
162,000.00
194,400.00
233,280.00
279,936.00
97,200.00
131,220.00
165,240.00
233,280.00
311,040.00
486,000.00
1,166,400.00
23,206.50
32,400.00
17,415.00
21,606.75
19,245.60
18,283.32
145,800.00
126,360.00
105,462.00

No.
(a)
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83

URAIAN PEKERJAAN
(b)
All Flanged Tee CI 12" x 12"
All Flanged Tee CI 10" x 10"
All Flanged Tee CI 8" x 8"
All Flanged Tee CI 6" x 6"
All Flanged Tee CI 6" x 4"
All Flanged Tee CI 4" x 4"
All Flanged Tee CI 4" x 3"
All Flanged Tee CI 4" x 2"
All Flanged Tee CI 3" x 2"
All Flanged Tee CI 2" x 2"
All Flanged Tee Y Cl 12" X 12"
Socket Tee PVC (All RR) 6" x 6"
Socket Tee PVC (All RR) 6" x 4"
Socket Tee PVC (All RR) 4" x 4"
Socket Tee PVC (All RR) 4" x 3"
Socket Tee PVC (All RR) 4" x 2"
Socket Tee PVC (All RR) 3" X 3"
Socket Tee PVC (All RR) 3" X 2"
Socket Tee PVC (All RR) 2" X 2"
Baut Moor 5/8" x 3"
Baut Moor 5/8" x 4"
Blind Flanged 12"
Blind Flanged 8"
Clem Besi Plat 4" X 2 mm
Dop PVC 2"
Dop PVC 3"
Bend Doble Socet PVC 12" X 11,25
Bend Doble Socet PVC 12" X 22,5
Bend Doble Socet PVC 12" X 45
Bend Doble Socet PVC 12" X 90
Bend Doble Socet PVC 8" x 22,5
Bend Doble Socet PVC 8" x 45
Bend Doble Socet PVC 8" x 90
Bend Doble Socet PVC 6" x 22,5
Bend Doble Socet PVC 6" x 45
Bend Doble Socet PVC 6" x 90
Bend Doble Socet PVC 4" x 11,5
Bend Doble Socet PVC 4" x 22,5
Bend Doble Socet PVC 4" x 45
Bend Doble Socet PVC 4" x 90
Bend Doble Socet PVC 3" x 22,5
Bend Doble Socet PVC 3" x 45
Bend Doble Socet PVC 3" x 90
Bend Doble Socet PVC 2" x 22,5
Bend Doble Socet PVC 2" x 45
Bend Doble Socet PVC 2" x 90
Double Flanged Pipe GIP 3" x 60 cm.
Double Flanged Pipe GIP 3" x 80 cm.
Double Flanged Pipe GIP 3" x 100 cm.
Double Flanged Pipe GIP 3" x 120 cm.
Double Flanged Pipe GIP 3" x 200 cm.
Double Flanged Pipe GIP 4" x 60 cm.
Double Flanged Pipe GIP 4" x 80 cm.

HARGA PABRIK
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

ONGKOS KIRIM

(c)
3,280,500.00 Rp
2,187,000.00 Rp
1,458,000.00 Rp
972,000.00 Rp
902,340.00 Rp
835,920.00 Rp
579,150.00 Rp
558,090.00 Rp
445,500.00 Rp
202,500.00 Rp
2,883,600.00 Rp
797,040.00 Rp
692,064.00 Rp
428,490.00 Rp
388,800.00 Rp
320,760.00 Rp
256,608.00 Rp
227,448.00 Rp
155,520.00 Rp
6,480.00 Rp
9,720.00 Rp
656,100.00 Rp
526,500.00 Rp
36,450.00 Rp
20,250.00 Rp
28,350.00 Rp
1,440,000.00 Rp
1,520,000.00 Rp
1,750,000.00 Rp
2,507,000.00 Rp
430,000.00 Rp
484,000.00 Rp
570,000.00 Rp
236,000.00 Rp
280,300.00 Rp
309,000.00 Rp
102,000.00 Rp
108,000.00 Rp
117,000.00 Rp
127,000.00 Rp
65,100.00 Rp
74,100.00 Rp
83,400.00 Rp
33,300.00 Rp
36,000.00 Rp
40,700.00 Rp
465,588.00 Rp
555,012.00 Rp
689,148.00 Rp
733,860.00 Rp
1,136,268.00 Rp
386,337.60 Rp
470,318.40 Rp

(e)
164,025.00
109,350.00
72,900.00
48,600.00
45,117.00
41,796.00
28,957.50
27,904.50
22,275.00
10,125.00
144,180.00
39,852.00
34,603.20
21,424.50
19,440.00
16,038.00
12,830.40
11,372.40
7,776.00
324.00
486.00
32,805.00
26,325.00
1,822.50
1,012.50
1,417.50
72,000.00
76,000.00
87,500.00
125,350.00
21,500.00
24,200.00
28,500.00
11,800.00
14,015.00
15,450.00
5,100.00
5,400.00
5,850.00
6,350.00
3,255.00
3,705.00
4,170.00
1,665.00
1,800.00
2,035.00
23,279.40
27,750.60
34,457.40
36,693.00
56,813.40
19,316.88
23,515.92

No.

URAIAN PEKERJAAN

(a)
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136

(b)
Double Flanged Pipe GIP 4" x 100 cm.
Double Flanged Pipe GIP 4" x 120 cm.
Double Flanged Pipe GIP 4" x 180 cm.
Flanged Pipe GIP 3" x 60 cm.
Flanged Pipe GIP 3" x 100 cm.
Flanged Pipe GIP 3" x 200 cm.
Flanged Pipe GIP 4" x 60 cm.
Flanged Pipe GIP 4" x 100 cm.
Flanged Pipe GIP 4" x 200 cm.
Flanged Pipe GIP 6" x 60 cm.
Flanged Pipe GIP 6" x 80 cm.
Flanged Pipe GIP 6" x 100 cm.
Flanged Pipe GIP 6" x 200 cm.
Double Socket Bend CI for PVC 6" x 11,25
Double Socket Bend CI for PVC 6" x 22,5
Double Socket Bend CI for PVC 6" x 45
Double Socket Bend CI for PVC 6" x 90
Flanged Air Relief Valve 2"
Flanged Socket PVC RRJ 2"
Flanged Socket PVC RRJ 3"
Flanged Socket PVC RRJ 4"
Flanged Socket PVC RRJ 6"
Flanged Socket PVC RRJ 8"
Flanged Socket PVC RRJ 10"
Flanged Socket PVC RRJ 12"
Flanged Spigot PVC 2"
Flanged Spigot PVC 3"
Flanged Spigot PVC 4"
Flanged Spigot PVC 6"
Flanged Spigot PVC 8"
Flanged Spigot PVC 12"
Flanged Steel PN 10 2"
Flanged Steel PN 10 3"
Flanged Steel PN 10 4"
Flanged Steel PN 10 6"
Flanged Steel PN 10 8"
Flanged Steel PN 10 10"
Flanged Steel PN 10 12"
Flanged Strainer CI 3"
Flanged Strainer CI 4"
Flanged Strainer CI 6"
Fleksible Joint "Tosen" 4
Fleksible Joint "Tosen" 6
Fleksible Joint "Tosen" 8
Fleksible Joint "Tosen" 10
Fleksible Joint "Tosen" 12
Manhole 80 x 80 Cm.
Paking Karet 2"
Paking Karet 3"
Paking Karet 4"
Paking Karet 6"
Paking Karet 8"
Paking Karet 10"

HARGA PABRIK
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

ONGKOS KIRIM

(c)
596,289.60 Rp
638,280.00 Rp
890,222.40 Rp
400,464.00 Rp
579,312.00 Rp
1,026,432.00 Rp
546,750.00 Rp
775,440.00 Rp
1,461,510.00 Rp
880,470.00 Rp
1,151,820.00 Rp
1,368,900.00 Rp
2,562,840.00 Rp
1,108,080.00 Rp
1,117,800.00 Rp
1,185,840.00 Rp
1,302,480.00 Rp
1,240,920.00 Rp
104,733.00 Rp
144,180.00 Rp
190,188.00 Rp
350,811.00 Rp
565,299.00 Rp
579,798.00 Rp
889,380.00 Rp
97,524.00 Rp
134,460.00 Rp
171,153.00 Rp
335,664.00 Rp
522,612.00 Rp
777,519.00 Rp
65,610.00 Rp
87,480.00 Rp
121,500.00 Rp
174,960.00 Rp
233,280.00 Rp
279,936.00 Rp
349,920.00 Rp
931,500.00 Rp
1,215,000.00 Rp
1,502,550.00 Rp
1,049,760.00 Rp
1,312,200.00 Rp
1,574,640.00 Rp
1,889,568.00 Rp
2,267,481.60 Rp
364,500.00 Rp
19,602.00 Rp
23,166.00 Rp
34,749.00 Rp
48,600.00 Rp
76,950.00 Rp
91,125.00 Rp

(e)
29,814.48
31,914.00
44,511.12
20,023.20
28,965.60
51,321.60
27,337.50
38,772.00
73,075.50
44,023.50
57,591.00
68,445.00
128,142.00
55,404.00
55,890.00
59,292.00
65,124.00
62,046.00
5,236.65
7,209.00
9,509.40
17,540.55
28,264.95
28,989.90
44,469.00
4,876.20
6,723.00
8,557.65
16,783.20
26,130.60
38,875.95
3,280.50
4,374.00
6,075.00
8,748.00
11,664.00
13,996.80
17,496.00
46,575.00
60,750.00
75,127.50
52,488.00
65,610.00
78,732.00
94,478.40
113,374.08
18,225.00
980.10
1,158.30
1,737.45
2,430.00
3,847.50
4,556.25

No.

URAIAN PEKERJAAN

(a)
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189

(b)
Paking Karet 12"
Piet Kran Baal Valve Dia 3/4 "
DF Pipa GIP 3" x 60 cm.
DF Pipa GIP 3" x 100 cm.
Pressure Reducing Valve 6"
Repair Socket PVC 2"
Socket Repair PVC 6"
Rubber Expansiont Joint 6"
Rubber Water Stop 30 Cm
Socket GIP 2"
Socket GIP 3"
Socket GIP 4"
Socket GIP 6"
Socket Reducer PVC (All RR) 3" x 2"
Socket Reducer PVC (All RR) 4" x 3"
Socket Reducer PVC (All RR) 4" x 2"
Socket Reducer PVC (All RR) 6" x 3"
Socket Reducer PVC (All RR) 6" x 4"
Socket Reducer PVC (All RR) 12" x 8"
Socket Spigot Bend PVC 12" X 90
Socket Spigot Bend PVC 12" X 45
Socket Spigot Bend PVC 12" X 22,5
Socket Spigot Bend PVC 12" X 11,25
Socket Spigot Bend PVC 8" x 22,5
Socket Spigot Bend PVC 8" x 45
Socket Spigot Bend PVC 8" x 90
Socket Spigot Bend PVC 6" x 22,5
Socket Spigot Bend PVC 6" x 45
Socket Spigot Bend PVC 6" x 90
Socket Spigot Bend PVC (S-10) 4" x 22,5
Socket Spigot Bend PVC (S-10) 4" x 45
Socket Spigot Bend PVC (S-10) 4" x 90
Socket Spigot Bend PVC ( S-10) 3" x 90
Socket Spigot Bend PVC ( S-10) 3" x 45
Socket Spigot Bend PVC ( S-10) 3" x 22,5
Socket Spigot Bend PVC ( S-10) 2" x 90
Socket Spigot Bend PVC ( S-10) 2" x 45
Socket Spigot Bend PVC ( S-10) 2" x 22,5
Tangki Fiberglass 2 m
Tutup Manhole 0,80 x 0,80
Tutup Manhole 1 x 0,80
Socket Reducer HDPE 10" x 8"
Socket Reducer HDPE 8" x 6"
Socket Reducer HDPE 6" x 4"
Socket Reducer HDPE 4" x 3"
Socket Reducer HDPE 3" x 2"
Elbow HDPE 10" x 90
Elbow HDPE 8" x 90
Elbow HDPE 6" x 90
Elbow HDPE 4" x 90
Elbow HDPE 3" x 90
Elbow HDPE 2" x 90
Tee HDPE 90 10"

HARGA PABRIK
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

ONGKOS KIRIM

(c)
105,300.00 Rp
64,800.00 Rp
335,340.00 Rp
491,832.00 Rp
48,600,000.00 Rp
76,950.00 Rp
405,000.00 Rp
1,409,400.00 Rp
315,900.00 Rp
40,500.00 Rp
56,700.00 Rp
68,040.00 Rp
186,300.00 Rp
134,136.00 Rp
214,812.00 Rp
206,550.00 Rp
348,300.00 Rp
417,960.00 Rp
913,680.00 Rp
2,857,680.00 Rp
2,566,080.00 Rp
2,078,136.00 Rp
1,749,600.00 Rp
723,420.72 Rp
847,020.24 Rp
974,255.04 Rp
386,856.00 Rp
452,952.00 Rp
520,992.00 Rp
177,876.00 Rp
191,484.00 Rp
212,868.00 Rp
170,100.00 Rp
150,660.00 Rp
133,164.00 Rp
100,845.00 Rp
92,631.60 Rp
82,620.00 Rp
5,000,000.00 Rp
364,500.00 Rp
688,500.00 Rp
526,500.00 Rp
295,650.00 Rp
133,650.00 Rp
76,950.00 Rp
60,750.00 Rp
1,182,600.00 Rp
643,950.00 Rp
403,380.00 Rp
182,250.00 Rp
127,980.00 Rp
56,700.00 Rp
1,244,160.00 Rp

(e)
5,265.00
3,240.00
16,767.00
24,591.60
2,430,000.00
3,847.50
20,250.00
70,470.00
15,795.00
2,025.00
2,835.00
3,402.00
9,315.00
6,706.80
10,740.60
10,327.50
17,415.00
20,898.00
45,684.00
142,884.00
128,304.00
103,906.80
87,480.00
36,171.04
42,351.01
48,712.75
19,342.80
22,647.60
26,049.60
8,893.80
9,574.20
10,643.40
8,505.00
7,533.00
6,658.20
5,042.25
4,631.58
4,131.00
250,000.00
18,225.00
34,425.00
26,325.00
14,782.50
6,682.50
3,847.50
3,037.50
59,130.00
32,197.50
20,169.00
9,112.50
6,399.00
2,835.00
62,208.00

No.
(a)
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223

URAIAN PEKERJAAN
(b)
Tee HDPE 90 8"
Tee HDPE 90 6"
Tee HDPE 90 4"
Tee HDPE 90 3"
Tee HDPE 90 2"
Bend HDPE 90 10"
Bend HDPE 90 8"
Bend HDPE 90 6"
Bend HDPE 90 4"
Bend HDPE 90 3"
Bend HDPE 90 2"
Bend HDPE 45 10"
Bend HDPE 45 8"
Bend HDPE 45 6"
Bend HDPE 45 4"
Bend HDPE 45 3"
Bend HDPE 45 2"
Stub End HDPE 10"
Stub End HDPE 8"
Stub End HDPE 6"
Stub End HDPE 4"
Stub End HDPE 3"
Stub End HDPE 2"
Flange HDPE 10"
Flange HDPE 8"
Flange HDPE 6"
Flange HDPE 4"
Flange HDPE 3"
Flange HDPE 2"
Cap/Dop HDPE 8"
Cap/Dop HDPE 6"
Cap/Dop HDPE 4"
Cap/Dop HDPE 3"
Cap/Dop HDPE 2"

Mengetahui/ Menyetujui :
PT/CV ........................

.............................
DIREKTUR

HARGA PABRIK
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(c)
765,450.00
481,950.00
218,700.00
127,980.00
56,700.00
2,155,369.50
885,411.00
624,429.00
243,729.00
150,417.00
65,002.50
2,046,627.00
845,437.50
494,383.50
205,659.00
130,977.00
59,535.00
1,117,800.00
797,850.00
510,300.00
303,750.00
259,200.00
158,760.00
1,800,022.50
663,754.50
416,259.00
270,013.50
176,661.00
108,013.50
275,683.50
141,021.00
58,522.50
20,007.00
13,324.50

ONGKOS KIRIM
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(e)
38,272.50
24,097.50
10,935.00
6,399.00
2,835.00
107,768.48
44,270.55
31,221.45
12,186.45
7,520.85
3,250.13
102,331.35
42,271.88
24,719.18
10,282.95
6,548.85
2,976.75
55,890.00
39,892.50
25,515.00
15,187.50
12,960.00
7,938.00
90,001.13
33,187.73
20,812.95
13,500.68
8,833.05
5,400.68
13,784.18
7,051.05
2,926.13
1,000.35
666.23

............., .......

M UNTUK PENGADAAN ACCESSORIES PIPA

RJA PENGELOLAAN AIR MINUM PROVINSI SULAWESI UTARA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

ASURANSI

JML HARGA

(f)

(g)

15,795.00
30,326.40
43,302.60
80,190.00
122,472.00
146,966.40
203,148.00
6,123.60
2,916.00
77,760.00
97,200.00
116,640.00
139,968.00
167,961.60
58,320.00
78,732.00
99,144.00
139,968.00
186,624.00
291,600.00
699,840.00
13,923.90
19,440.00
10,449.00
12,964.05
11,547.36
10,969.99
87,480.00
75,816.00
63,277.20

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

568,600.00
1,091,700.00
1,558,800.00
2,886,800.00
4,408,900.00
5,290,700.00
7,313,300.00
220,400.00
104,900.00
2,799,300.00
3,499,200.00
4,199,000.00
5,038,800.00
6,046,600.00
2,099,500.00
2,834,300.00
3,569,100.00
5,038,800.00
6,718,400.00
10,497,600.00
25,194,200.00
501,200.00
699,800.00
376,100.00
466,700.00
415,700.00
394,900.00
3,149,200.00
2,729,300.00
2,277,900.00

ASURANSI
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(f)
98,415.00
65,610.00
43,740.00
29,160.00
27,070.20
25,077.60
17,374.50
16,742.70
13,365.00
6,075.00
86,508.00
23,911.20
20,761.92
12,854.70
11,664.00
9,622.80
7,698.24
6,823.44
4,665.60
194.40
291.60
19,683.00
15,795.00
1,093.50
607.50
850.50
43,200.00
45,600.00
52,500.00
75,210.00
12,900.00
14,520.00
17,100.00
7,080.00
8,409.00
9,270.00
3,060.00
3,240.00
3,510.00
3,810.00
1,953.00
2,223.00
2,502.00
999.00
1,080.00
1,221.00
13,967.64
16,650.36
20,674.44
22,015.80
34,088.04
11,590.13
14,109.55

JML HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(g)
3,542,900.00
2,361,900.00
1,574,600.00
1,049,700.00
974,500.00
902,700.00
625,400.00
602,700.00
481,100.00
218,700.00
3,114,200.00
860,800.00
747,400.00
462,700.00
419,900.00
346,400.00
277,100.00
245,600.00
167,900.00
6,900.00
10,400.00
708,500.00
568,600.00
39,300.00
21,800.00
30,600.00
1,555,200.00
1,641,600.00
1,890,000.00
2,707,500.00
464,400.00
522,700.00
615,600.00
254,800.00
302,700.00
333,700.00
110,100.00
116,600.00
126,300.00
137,100.00
70,300.00
80,000.00
90,000.00
35,900.00
38,800.00
43,900.00
502,800.00
599,400.00
744,200.00
792,500.00
1,227,100.00
417,200.00
507,900.00

ASURANSI
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(f)
17,888.69
19,148.40
26,706.67
12,013.92
17,379.36
30,792.96
16,402.50
23,263.20
43,845.30
26,414.10
34,554.60
41,067.00
76,885.20
33,242.40
33,534.00
35,575.20
39,074.40
37,227.60
3,141.99
4,325.40
5,705.64
10,524.33
16,958.97
17,393.94
26,681.40
2,925.72
4,033.80
5,134.59
10,069.92
15,678.36
23,325.57
1,968.30
2,624.40
3,645.00
5,248.80
6,998.40
8,398.08
10,497.60
27,945.00
36,450.00
45,076.50
31,492.80
39,366.00
47,239.20
56,687.04
68,024.45
10,935.00
588.06
694.98
1,042.47
1,458.00
2,308.50
2,733.75

JML HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(g)
643,900.00
689,300.00
961,400.00
432,500.00
625,600.00
1,108,500.00
590,400.00
837,400.00
1,578,400.00
950,900.00
1,243,900.00
1,478,400.00
2,767,800.00
1,196,700.00
1,207,200.00
1,280,700.00
1,406,600.00
1,340,100.00
113,100.00
155,700.00
205,400.00
378,800.00
610,500.00
626,100.00
960,500.00
105,300.00
145,200.00
184,800.00
362,500.00
564,400.00
839,700.00
70,800.00
94,400.00
131,200.00
188,900.00
251,900.00
302,300.00
377,900.00
1,006,000.00
1,312,200.00
1,622,700.00
1,133,700.00
1,417,100.00
1,700,600.00
2,040,700.00
2,448,800.00
393,600.00
21,100.00
25,000.00
37,500.00
52,400.00
83,100.00
98,400.00

ASURANSI
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(f)
3,159.00
1,944.00
10,060.20
14,754.96
1,458,000.00
2,308.50
12,150.00
42,282.00
9,477.00
1,215.00
1,701.00
2,041.20
5,589.00
4,024.08
6,444.36
6,196.50
10,449.00
12,538.80
27,410.40
85,730.40
76,982.40
62,344.08
52,488.00
21,702.62
25,410.61
29,227.65
11,605.68
13,588.56
15,629.76
5,336.28
5,744.52
6,386.04
5,103.00
4,519.80
3,994.92
3,025.35
2,778.95
2,478.60
150,000.00
10,935.00
20,655.00
15,795.00
8,869.50
4,009.50
2,308.50
1,822.50
35,478.00
19,318.50
12,101.40
5,467.50
3,839.40
1,701.00
37,324.80

JML HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(g)
113,700.00
69,900.00
362,100.00
531,100.00
52,488,000.00
83,100.00
437,400.00
1,522,100.00
341,100.00
43,700.00
61,200.00
73,400.00
201,200.00
144,800.00
231,900.00
223,000.00
376,100.00
451,300.00
986,700.00
3,086,200.00
2,771,300.00
2,244,300.00
1,889,500.00
781,200.00
914,700.00
1,052,100.00
417,800.00
489,100.00
562,600.00
192,100.00
206,800.00
229,800.00
183,700.00
162,700.00
143,800.00
108,900.00
100,000.00
89,200.00
5,400,000.00
393,600.00
743,500.00
568,600.00
319,300.00
144,300.00
83,100.00
65,600.00
1,277,200.00
695,400.00
435,600.00
196,800.00
138,200.00
61,200.00
1,343,600.00

ASURANSI
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(f)
22,963.50
14,458.50
6,561.00
3,839.40
1,701.00
64,661.09
26,562.33
18,732.87
7,311.87
4,512.51
1,950.08
61,398.81
25,363.13
14,831.51
6,169.77
3,929.31
1,786.05
33,534.00
23,935.50
15,309.00
9,112.50
7,776.00
4,762.80
54,000.68
19,912.64
12,487.77
8,100.41
5,299.83
3,240.41
8,270.51
4,230.63
1,755.68
600.21
399.74

JML HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

............., .....................2011
Dibuat oleh :

.............................
PIMPINAN TEKNIK

(g)
826,600.00
520,500.00
236,100.00
138,200.00
61,200.00
2,327,700.00
956,200.00
674,300.00
263,200.00
162,400.00
70,200.00
2,210,300.00
913,000.00
533,900.00
222,100.00
141,400.00
64,200.00
1,207,200.00
861,600.00
551,100.00
328,000.00
279,900.00
171,400.00
1,944,000.00
716,800.00
449,500.00
291,600.00
190,700.00
116,600.00
297,700.00
152,300.00
63,200.00
21,600.00
14,300.00

DAFTAR KUANTITAS DAN HARGA


Satker
Pekerjaan

:
:

Lokasi
Tahun Anggaran
No. Paket

:
:
:

PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SUL


PDAM YANG MEMPEROLEH PEMBINAAN
P/P JARINGAN PERPIPAAN
KABUPATEN KEPULAUAN TALAUD
2012 (APBN)
5

No.

Uraian Jenis Pekerjaan

Satuan

Volume

I.

PEKERJAAN PERSIAPAN
1 Sewa direksi keet & gudang
2 Pengobatan/P3K, Keselamatan Kerja
3 Papan nama proyek

Ls
Ls
Bh

1.00
1.00
1.00

a. Pipa GIP 6" (gali,pasang,timbun)


1 Pengadaan/pas Pipa GIP 6" Medium SII

M1
M1

30.00
30.00

b. Pipa PVC 6" (gali,pasang,timbun)


Galian Tanah
Urugan Pasir
Urugan Tanah
Pemadatan Tanah
Pengadaan/pas Pipa PVC 6" (S-10)

M1
M
M
M
M
M1

1,000.00
435.60
90.00
306.00
306.00
1,000.00

c. Pipa GIP 4" (gali,pasang,timbun)


1 Pengadaan/pas Pipa GIP 4" Medium SII

M1
M1

60.00
60.00

d. Pipa PVC 4" (gali,pasang,timbun)


1 Galian Tanah

M1
M

3,400.00
979.20

II.

PEK. JARINGAN PIPA

1
2
3
4
5

2
3
4
5

Urugan Pasir
Urugan Tanah
Pemadatan Tanah
Pengadaan/pas Pipa PVC 4" (S-10)

e. Pipa GIP 3" (gali,pasang,timbun)


1 Pengadaan/pas Pipa GIP 3" Medium SII

1
2
3
4
5

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
III.

f. Pipa PVC 3" (gali,pasang,timbun)


Galian Tanah
Urugan Pasir
Urugan Tanah
Pemadatan Tanah
Pengadaan/pas Pipa PVC 3" (S-10)
g. Accessories Pipa
Gate Valve 6" + Acc (terpasang)
Gate Valve 4" + Acc (terpasang)
Gate Valve 3" + Acc (terpasang)
Flanged Steel PN 10 6"
Flanged Steel PN 10 4"
Flanged Steel PN 10 3"
Socket Reducer PVC 6" x 4"
Socket Tee PVC 6" x 4"
Socket Tee PVC 4" x 4"
Socket Tee PVC 3" x 3"
Bend Double Socket PVC 6" x 45
Bend Double Socket PVC 4" x 45
Bend Double Socket PVC 3" x 45
Single Air Valve 4" dgn chamber lengkap
Wash Out 4" dgn chamber lengkap
Jembatan Pipa
Block Beton Bertulang Penahan Pipa camp. 1:2:3

PEKERJAAN AKHIR
1 Pembersihan akhir, Laporan-laporan
2 Pengetesan Pipa/Jaringan

Terbilang :

M
M
M
M1

238.00
561.68
561.68
3,400.00

M1
M1

48.00
48.00

M1
M
M
M
M
M1

3,000.00
729.60
210.00
428.40
428.40
3,000.00

Unit
Unit
Unit
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Unit
M1
M

1.00
1.00
2.00
12.00
18.00
22.00
1.00
1.00
2.00
4.00
2.00
5.00
8.00
1.00
1.00
12.00
1.05

Ls
Ls

1.00
1.00

Mengetahui/ Menyetujui :
PT/CV ........................

.............................
DIREKTUR

............., ...........

..................
PIMPINAN T

REKAPITULASI DAFTAR KUANTITAS DAN HAR


Satker
Pekerjaan

:
:

Lokasi
Tahun Anggaran

:
:

PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SUL


PDAM YANG MEMPEROLEH PEMBINAAN
P/P JARINGAN PERPIPAAN
KABUPATEN KEPULAUAN TALAUD
2012 (APBN)

Uraian Pekerjaan

I.

PEKERJAAN PERSIAPAN

II.

PEK. JARINGAN PIPA

III.

PEKERJAAN AKHIR

Terbilang :
0

Mengetahui/ Menyetujui :
PT/CV ........................

.............................
DIREKTUR

............., ...........

PIMPINAN T

HARGA

UM PROVINSI SULAWESI UTARA

Harga
Satuan
( Rp. )
e

1,800,000.00
1,200,000.00
500,000.00

Jumlah
Harga
( Rp. )
f
3,500,000.00
1,800,000.00
1,200,000.00
500,000.00

868,246,945.73
455,200.00

13,656,000.00
13,656,000.00

33,500.00
181,350.00
11,160.00
24,160.00
157,600.00

199,322,020.00
14,592,600.00
16,321,500.00
3,414,960.00
7,392,960.00
157,600,000.00

280,400.00

16,824,000.00
16,824,000.00

33,500.00

355,903,037.60
32,803,200.00

d. Pipa PVC 3" (gali,pas


1 Galian Tanah

181,350.00
11,160.00
24,160.00
76,500.00

43,161,300.00
6,268,348.80
13,570,188.80
260,100,000.00

194,700.00

9,345,600.00
9,345,600.00

33,500.00
181,350.00
11,160.00
24,160.00
51,200.00

231,256,188.00
24,441,600.00
38,083,500.00
4,780,944.00
10,350,144.00
153,600,000.00

2,886,800.00
1,558,800.00
1,091,700.00
188,900.00
131,200.00
94,400.00
451,300.00
747,400.00
462,700.00
277,100.00
302,700.00
126,300.00
80,000.00
4,328,868.36
5,496,479.73
866,479.67
3,117,520.00

41,940,100.13
2,886,800.00
1,558,800.00
2,183,400.00
2,266,800.00
2,361,600.00
2,076,800.00
451,300.00
747,400.00
925,400.00
1,108,400.00
605,400.00
631,500.00
640,000.00
4,328,868.36
5,496,479.73
10,397,756.04
3,273,396.00

2,000,000.00
3,000,000.00

5,000,000.00
2,000,000.00
3,000,000.00

Jumlah
PPn 10%
Total
Dibulatkan

Rp
Rp
Rp
Rp

876,746,945.73
87,674,694.57
964,421,640.30
964,400,000.00

2
3
4
5

1,185,800,000.00
81.33
18.67

Urugan Pasir
Urugan Tanah
Pemadatan Tanah
Pengadaan/pas Pipa PVC

............., .....................2011
Dibuat oleh :

.............................
PIMPINAN TEKNIK

AS DAN HARGA

UM PROVINSI SULAWESI UTARA

Jumlah
Harga
( Rp. )
3,500,000.00
868,246,945.73
5,000,000.00
Jumlah
PPn 10%
Total
Dibulatkan

Rp
Rp
Rp
Rp

............., .....................2011
Dibuat oleh :

.............................
PIMPINAN TEKNIK

876,746,945.73
87,674,694.57
964,421,640.30
964,400,000.00

Pipa PVC 3" (gali,pasang,timbun)


ian Tanah

M1
M

4,000.00
972.80

gan Pasir
gan Tanah
madatan Tanah
ngadaan/pas Pipa PVC 3" (S-10)

M
M
M
M1

280.00
571.20
571.20
4,000.00

JADWAL WAKTU PELAKSANAA


Satker
Pekerjaan

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWESI UTARA


: PDAM YANG MEMPEROLEH PEMBINAAN
P/P JARINGAN PERPIPAAN
: KABUPATEN KEPULAUAN TALAUD
: 2012 (APBN)
:5

Lokasi
Tahun Anggaran
No. Paket

NO.

JENIS PEKERJAAN

I.

PEKERJAAN PERSIAPAN

II.

PEK. JARINGAN PIPA

III.

PEKERJAAN AKHIR

BOBOT
(%)

0.40

99.03

0.57

WAKTU PELAK
1

4.95

4.95

4.95

4.95

4.95

4.95

4.95

4.95

0.40

RENCANA KEMAJUAN (%)

100.00

RENCANA KUMULATIF (%)

Mengetahui/ Menyetujui :
PT/CV ........................

.............................
DIREKTUR

0.40

4.95

4.95

4.95

4.95

4.95

4.95

4.95

4.95

0.40

5.35

10.30

15.25

20.21

25.16

30.11

35.06

40.01

U PELAKSANAAN ( KURVA S )

PROSEN
TASE

WAKTU PELAKSANAAN (MINGGU)


10

11

12

13

14

15

16

17

18

19

20

21

22

100
90
80
70
60

4.95

4.95

4.95

4.95

4.95

4.95

4.95

4.95

4.95

4.95

4.95

4.95

50
40
30

0.29

0.29

20
10
0

20
10
0

4.95

4.95

4.95

4.95

4.95

4.95

4.95

4.95

4.95

4.95

4.95

5.24

0.29

44.96

49.91

54.87

59.82

64.77

69.72

74.67

79.62

84.58

89.53

94.48

99.71

100.00

............., .....................2011
Dibuat oleh :

.............................
PIMPINAN TEKNIK

KETERANGAN

100

Waktu Pelaksanaan :

90

150 (Seratus lima

80

puluh) Hari Kalender

70
60
50
40

Masa Pemeliharaan :

30

180 (seratus delapan

20

puluh) Hari Kalender

10
0

20
10
0

SKEMA TENAGA
Satker
Pekerjaan

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWESI UTARA


: PDAM YANG MEMPEROLEH PEMBINAAN
P/P JARINGAN PERPIPAAN
: KABUPATEN KEPULAUAN TALAUD
: 2012 (APBN)
:5

Lokasi
Tahun Anggaran
No. Paket

NO.

WAKTU PELAKSANAAN (MINGGU)

URAIAN
1

10

11

12

13

14

15

Pekerja

12

12

12

12

24

24

24

24

40

40

40

40

40

40

40

Mandor

Tukang

Kepala Tukang

Penjaga

17

17

19

19

31

35

35

35

53

53

53

53

53

53

53

JUMLAH

Mengetahui/ Menyetujui :
PT/CV ........................

.............................
DIREKTUR

KETERANGAN
16

17

18

19

20

21

22

40

40

40

40

40

20

20 Waktu Pelaksanaan :
150 (Seratus lima

puluh) Hari Kalender

Masa Pemeliharaan :
180 (seratus delapan

53

52

53

53

53

30

28

puluh) Hari kalender

............., .....................2011
Dibuat oleh :

.............................
PIMPINAN TEKNIK

SKEMA BAHAN
Satker
Pekerjaan
Lokasi
Tahun Anggaran
No. Paket

NO.

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWESI UTARA


: PDAM YANG MEMPEROLEH PEMBINAAN
P/P JARINGAN PERPIPAAN
: KABUPATEN KEPULAUAN TALAUD
: 2012 (APBN)
:5
WAKTU PELAKSANAAN (MINGGU)

JENIS PEKERJAAN
1

Material Alam / Galian


(Batu, Pasir, Kerikil, dll.)

Material Non Galian/Bahan Toko


(Semen, Kawat Beton, Besi, dll.)

Bahan - Bahan Lain yang di


perlukan

10

11

12

13

14

15

16

Mengetahui/ Menyetujui :
PT/CV ........................

.............................
DIREKTUR

KETERANGAN
17

18

19

20

21

22

Waktu Pelaksanaan :
150 (Seratus lima
puluh) Hari Kalender
Masa Pemeliharaan :
180 (seratus delapan
puluh) Hari kalender

............., .....................2011
Dibuat oleh :

.............................
PIMPINAN TEKNIK

METODE PELAKSANAAN
Satker
Pekerjaan
Lokasi
Tahun Anggaran

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWESI U


: PDAM YANG MEMPEROLEH PEMBINAAN
P/P JARINGAN PERPIPAAN
: KABUPATEN KEPULAUAN TALAUD
: 2012 (APBN)

I.

Pendahuluan
Dengan dibuatnya Metode Pelaksanaan Pekerjaan ini, pekerjaan bisa dilaksanakan dengan teratur,
pekerjaan sesuai spesifikasi teknis, yang mencakup antara lain adalah Kuatitas, Kualitas, Ekonomi
yang tersedia pada alokasi paket pekerjaan ini bisa diselesaikan 100 % sesuai jangka waktu yang ter

II.

Pekerjaan Persiapan
Pengukuran, Pemasangan Patok, Pembersihan lokasi yang akan dilaksanakan pekerjaan, Mobilisasi
Material, Pemasangan Papan Nama Pengenal Proyek, Pembuatan Kantor Direksi, Gudang &
dimulainya pekerjaan atau yag biasa disebut Foto dokumentasi 0%.

Pekerjaan persiapan dilaksanakan secepatnya setelah dikeluarkan Surat Perintah Mulai Kerja ole
tersedia dalam pelaksanaan bisa dimanfaatkan sedemikian rupa sesuai jadual kerja yang telah dibua
III.

Pekerjaan Bangunan Penangkap dan Reservoar :


a. Pertama-tama galian tanah untuk pembuatan Bangunan Penangkap dan Reservoar dilanjutkan
lantai kerja sesuai dengan petunjuk gambar.
b. Setelah pekerjaan diatas selesai dilanjutkan dengan cor beton bertulang pada lantai dan dinding
bestek yang ada. Pada saat pengecoran berlangsung, direksi lapangan dan pengawas harus berad
cor beton pada saat pengecoran akan diperiksa oleh laboratorium Dinas PU Sulut.

c. Material yang digunakan harus disetujui oleh direksi. Baru digunakan untuk pekerjaan yang dimaks
d. Pekerjaan pipa dan accessories pada pembuatan Bangunan Penangkap dan Reservoar harus
pelaksanaan dari direksi.
IV.

Pelaksanaan Jaringan Perpipaan :

Pekerjaan Pemasangan Pipa dan Accessories


1 Setelah dikeluarkannya SPMK, dilanjutkan dengan pemesanan pipa di pabrik untuk dikirim
pemasangan pipa sudah bisa dilaksanakan. Pipa yang digunakan adalah Pipa HD
Accessoriesnya.
2 Diawali dengan proses galian tanah pada jalur yang akan dipasang jaringan pipa sesuai ya
direksi pekerjaan dan telah mendapat persetujuan atau ijin dari pemerintah setempat.
3 Setelah galian tanah sudah dilaksanakan dan panjang mencukupi untuk dilakukan pe
diperintahkan untuk melaksanakan pemasangan pipa dan sebagian tetap melaksanakan p
4 Pemasangan pipa HDPE dilakukan dengan Butt Welding HDPE perlu diperhatikan pada w
jangan sampai dikemudian sambungan bisa bocor oleh sebab itu pada saat akan dipa
dahulu pipa dibersihkan dari kotoran dibagian ujung pipa yang akan disambungkan.

5 Sebelum pipa dipasang dalam lubang galian dibagian bawah galian terlebih dahulu diuru
juga dibagian samping dan atas pipa ditimbunkan pasir, diatas pasir baru lah ditimbun den

6 Maksud dari timbunan pasir dibagian selimut pipa, agar pipa tidak mudah pecah apabila
diakibatkan dari beban luar.
7 Setelah dilakukan secara berkesinambungan sampai pemasangan pipa selesai sepanjan
lelang.
8 Pada titik tertentu perlu dipasangkan accessories sesusi dalam gambar atau kebutuha
Reducer PVC, Single Air Valve, Wash Out, dll

9 Setelah pipa HDPE serta accessories terpasang semuanya kemudian dilakukan pemer
kuantitas pekerjaan yaitu panjang pemasangan pipa dan accesoriesnya.
10 Setelah pemasangan pipa HDPE serta accessories terpasang semuanya dan telah
dilakukan pengujian pipa atau test tekanan dan uji kebocoran untuk diketahui kualitasnya,
perbaikan.

11 Di ambil foto untuk laporan dokumentasi setiap pelaksanaan pekerjaan sedang berlangsu
telah selesai dilaksanakan disebut foto 100 %.
V.

PEKERJAAN AKHIR
1 Melakukan pembersihan akhir pada lokasi dimana telah dilaksanakan pekerjaan agar
mengganggu lalu lintas umum.
2 Demikian Metode Pelaksanaan ini dibuat sebagai dasar sementara dalam pelaksanaan
adanya metoda pelaksanaan ini bisa menjadi acuan dalam melaksanakan pekerjaan, pek
tepat mutu dan kuantitas terpenuhi agar pembangunan dapat bermanfaat bagi kita semua.

Mengetahui/ Menyetujui :
PT/CV ........................

.............................
DIREKTUR

AN

ROVINSI SULAWESI UTARA

nakan dengan teratur, tertata sesuai dengan urut - urutan


as, Kualitas, Ekonomis dan Tetap Waktu dalam arti dana
jangka waktu yang tersedia.

pekerjaan, Mobilisasi Peralatan, Tenaga Kerja & Bahan /


Direksi, Gudang & Loos dan Foto dokumentasi akan

rintah Mulai Kerja oleh Penyedia Jasa agar waktu yang


kerja yang telah dibuat.

Reservoar dilanjutkan dengan pembuatan pondasi dan

ada lantai dan dinding. Pengecoran harus sesuai dengan


pengawas harus berada di lokasi pekerjaan. Dan sample
ulut.

ekerjaan yang dimaksud.


dan Reservoar harus mengikuti gambar serta petunjuk

di pabrik untuk dikirim. Setelah pipa dikirim maka proses


an adalah Pipa HDPE dia. 75 mm & 50 mm serta

aringan pipa sesuai yang ditentukan oleh pengguna jasa /


erintah setempat.
i untuk dilakukan pemasangan maka sebagian pekerja
tetap melaksanakan pekerjaan galian.
lu diperhatikan pada waktu pemasangan harus hati - hati
pada saat akan dipasangkan pada sambungan terlebih
disambungkan.

terlebih dahulu diurugkan pasir setebal 15-20 cm begitu


baru lah ditimbun dengan tanah dan dipadatkan.

mudah pecah apabila terjadi gesekan atau getaran yang

pipa selesai sepanjang yang tercantum dalam dokumen

ambar atau kebutuhan dilapangan seperti : Gate Valve,

dian dilakukan pemeriksaan pekerjaan dan pengukuran


nya.
semuanya dan telah dilakukan pengukuran, kemudian
diketahui kualitasnya, jika ada kebocoran akan dilakukan

aan sedang berlangsung disebut foto 50% dan pekerjaan

akan pekerjaan agar kembali seperti semula dan tidak

a dalam pelaksanaan pekerjaan, harapan kami dengan


nakan pekerjaan, pekerjaan bisa terlaksana tepat waktu,
nfaat bagi kita semua.

............., .....................2011
Dibuat oleh :

.............................
PIMPINAN TEKNIK

SPESIFIKASI TEKNIS
PIPA HDPE PE 100 (MRS 100)
UNTUK AIR BERSIH BERTEKANAN
STANDARD SNI 06-4829-2005/ISO 4427.96
Satker
Pekerjaan
Lokasi
Tahun Anggaran

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWESI U


: PDAM YANG MEMPEROLEH PEMBINAAN
P/P JARINGAN PERPIPAAN
: KABUPATEN KEPULAUAN TALAUD
: 2012 (APBN)

ND
(INCH)
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
7"
8"
9"
10"
12"
14"
16"
18"
20"
24"
28"
32"
36"
40"
48"

OD
(MM)
20
25
32
40
50
63
75
90
110
125
160
180
200
225
250
315
355
400
450
500
630
710
800
900
1000
1200

S-8, SDR-17
TEBAL (MM)
3.0
3.8
4.5
5.4
6.6
7.4
9.5
10.7
11.9
13.4
14.8
18.7
21.1
23.7
26.7
29.6
37.2
42.1
47.4
53.5
59.3

Waktu Kegagalan
Minimum (jam)
165
219
283
394
533
727
1000

Tegangan
Mpa
5.5
5.4
5.3
5.2
5.1
5.0

PE 80
Tegangan
Mpa
4.6
4.5
4.4
4.3
4.2
4.1
4.0

PE 100

Jenis Bahan
PE 100
PE 80

Mengetahui/ Menyetujui :
PT/CV ........................

.............................
DIREKTUR

100 Jam Pada


20 C
12.4
9.0

Tegangan Uji (MPa)


165 Jam Pada
80 C
5.5
4.6

............., .....................2

.............................
PIMPINAN TEKNIK

UM PROVINSI SULAWESI UTARA

KET.

PE 100
Waktu Kegagalan
Minimum (jam)
165
233
332
476
688
1000

ngan Uji (MPa)


1000 Jam Pada
80 C
5.0
4.0

............., .....................2011
Dibuat oleh :

.............................
PIMPINAN TEKNIK

BAGIAN PEKERJAAN YANG DISUBKONTRA


Satker
Pekerjaan
Lokasi
Tahun Anggaran

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWES


: PDAM YANG MEMPEROLEH PEMBINAAN
P/P JARINGAN PERPIPAAN
: KABUPATEN KEPULAUAN TALAUD
: 2012 (APBN)

MATA

PROSENTASE
URAIAN

PEMBAYARAN

HARGA TOTAL MATA


PEMBAYARAN (%)

============ TIDAK ADA ============

TOTAL %

Mengetahui/ Menyetujui :
PT/CV ........................

.............................
DIREKTUR

SUBKONTRAKKAN

M PROVINSI SULAWESI UTARA

PROSENTASE DARI

NAMA SUB KONTRAKTOR

HARGA PENAWARAN

(JIKA DIRASA PERLU)

0.00

............., .....................2011
Dibuat oleh :

.............................
PIMPINAN TEKNIK

METODE PELAKSANAAN
Satker
Pekerjaan
Lokasi
Tahun Anggaran

I.

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWESI UT


: PDAM YANG MEMPEROLEH PEMBINAAN
P/P JARINGAN PERPIPAAN
: KABUPATEN KEPULAUAN TALAUD
: 2012 (APBN)

Pendahuluan
Dengan dibuatnya Metode Pelaksanaan Pekerjaan ini, pekerjaan bisa dilaksanakan dengan ter
urutan pekerjaan sesuai spesifikasi teknis, yang mencakup antara lain adalah Kuatitas, Kualitas, E
arti dana yang tersedia pada alokasi paket pekerjaan ini bisa diselesaikan 100 % sesuai jangka wa

II. Pekerjaan Persiapan


Pengukuran, Pemasangan Patok, Pembersihan lokasi yang akan dilaksanakan pekerjaan, Mob
Bahan / Material, Pemasangan Papan Nama Pengenal Proyek, Pembuatan Kantor Direksi, Gud
alat Pengobatan/P3K sebagai syarat Keselamatan kerjan Foto dokumentasi akan dimulainya peke
dokumentasi 0%.

Pekerjaan persiapan dilaksanakan secepatnya setelah dikeluarkan Surat Perintah Mulai Kerja ole
tersedia dalam pelaksanaan bisa dimanfaatkan sedemikian rupa sesuai jadual kerja yang telah dib

III. Pekerjaan Broncaptering


1 Pertama galian tanah kemudian pemasangan batu 1:3 setelah selesai dilanjutkan dengan p
yang diberi lubang lateral di broncaptering serta accesoriesnya seperti Gate valve, Flange
broncaptering akan dibuat bak dari beton bertulang (besi 150 kg), setelah cor mengeras b
1:3 dan diaci dengan semen, setelah acian permukaan dinding dicat dengan cat waterproofi
2

Pada bagian pengambilan sumber air dipasang screen aluminium # 1 cm sebagai pen
masuk kesumber air, selain itu juga perlu dibuatkan saluran air hujan untuk mengalihkan ali
agar air kotor dari liar tidak masuk kemata air tersebut, kemudian juga dibuat bak chamb
ibuat dari pas. 1/2 bata uk.60x60x100 cm).

Ada juga pekerjaan lainnya yang termasuk pada pekerjaan bangunan broncaptering ad
udara, pembuatan chamber lengkap dgn accesoriesnya, serta pembuatan tangga angker dg

III. Pekerjaan Bangunan Reservoar kap. 80 M3


a Pekerjaan Tanah
a.1. Galian tanah
Galian tanah dilaksanakan seperti yag tertera dalam gambar, baik mengenai lebar, p
sebagainya, dan benar-benar waterpass. Kalau ternyata akan menimbulkan kesulit
dilaksanakan menurut gambar, Penyedia barang/jasa boleh mengajukan usul k
pelaksanaannya.Penggalian dilakukan dilakukan pada bagian-bagian yang lebih tinggi dari
Hasil-hasil galian dingkut ke tempat-tempat lain yang di setujui oleh direksi. galian tan
patok/bouwplank, pengalian harus sesuai dengan gambar dan elevasi yang tertera pada ga

a.2. Urugan Tanah


Semua pekerjaan urugan harus dilaksanakan lapis demi lapissecara horizontal dan dipada
15 cm dan selama proses pemadatan, harus dibasahi dengan air untuk mendapatkan hasil
Pemadatan harus dilakukan dengan alat pemadat mekanis (compactor) dan untuk peke
dipakai roller dan sebagainya, dengan kapasitas yang sesuai.Tanah harus dipisahkan terleb
dapat membahayakan, misalnya dapat merusak permukaan beton atau pun lapisan finishing
Pengurugan dilaksanakan sampai mencapai peil yang ditetapkan dan diratakan sampai n
cacat seperti turunnya permukaan, bergelombang dan sebagainya.

a.3. Urugan Pasir


Pada prinsipnya, pekerjaan pengurugan dengan pasir dilaksanakan sama seperti pada peng

b Pekerjaan Beton / Struktur


1 Beton bertulang tidak boleh diletakkan langsung dipermukaan tanah, kecuali jika ditetapk
kerja minimal 5 cm (1:3:5) diatas tanah sebelum tulangan beton ditempatkan.

setelah pekerjaan lantai kerja selesai maka menunggu beton mengeras maka disiapka
kemudian dilakukan Pemotongan Besi sesuai ukuran yang tertera pada gambar, kemud
2 setelah sesesai kemudian mulai pemasangan / merakit besi tersebut dan diperkuat / diikat d

3 Setelah pekerjaan diatas selesai dilanjutkan dengan cor beton bertulang pada dinding da
dengan bestek yang ada. Pada saat pengecoran berlangsung direksi dan pengawas harus
sampel Cor Beton akan diperiksa oleh laboratorium Dinas Pekerjaan Umum Sulawesi Utara

Material yang digunakan harus disetujui oleh direksi. Barulah kemudian digunakan untuk pe

5 Pelaksanaan Pembesian dilakukan foto dokumentasi 25%, 50%, 75%, 100%

c Pekerjaan pasangan, Plesteran & pengecatan


1 Pekerjaan Acian dilakukan pada bagian dinding saluran dan merupakan pekerjaan finishin
semen abu-abu dengan ketebalan 1,5 mm.
Pekerjaan pengecatan dilakukan dengan memperhatikan
2
Merek dan warna cat yang akan digunakan sesuai yang tercantum dalam kontrak atau dit
Bidang yang akan cat terlebih dahulu dibersihkan dan telah diplamur dan digosok hingga pe
3

Pengecetan dinding tembok bidang yang luas akan digunakan kuas roll sedangkan pada b
kuas biasa 3 inci.
Apabila kualitas cat belum maksimal maka akan dilakukan pengecetan kembali

Bagian dalam dan luar sebelum dicat harus digosok dengan amplas kemudian dicat dasar p
luar mengunakan cat dinding dan dinding bagian dalam mengunakan cat waterproofing Pro
secara baik

Pengencatan bagian Besi mengunakan cat khusus besi atau sesuai dengan petunjuk Direk
dengan terlebih dahulu membersihkan permukaan besi dari kotoran dan karat agar cat dapa

d. Pekerjaan Pipa & Acc Infiltrasi


1 Pipa GIP 3", medium A
2 Gate Valve 3" + Acc (terpasang)
3 Flanged Steel PN 10 3"
4 Elbow GIP 3"
5 All Flange Tee 3"

6
7
8
9

Bak Chamber (80x80x100cm)


Penutup Chamber/Manhole 70x70 Plat Eser 3 mm (lengkap)
Angker Tangga 22 mm
Pipa Udara GIP 75 mm

1
2
3
4
5

d. Pekerjaan Finishing, Dll


Pengecetan Dinding Luar
Pengecetan Dinding Dalam (Waterproofing)
Pengecetan Mani Besi
Saluran Air 30x30
Pagar BRC t=120 cm

IV. Pekerjaaan Pengadaan & Pemasangan Pipa HDPE (PE)


a Pipa HDPE uk. 100(dali, pasang, timbun)
Galian tanah
Galian tanah dilaksanakan seperti yag tertera dalam gambar, baik mengenai lebar, panjang, dalam
dan benar-benar waterpass. Kalau ternyata akan menimbulkan kesulitan-kesulitan pelaksanaan ka
gambar, Penyedia barang/jasa boleh mengajukan usul kepada direksi mengenai cara pelaksanaan
dilakukan pada bagian-bagian yang lebih tinggi dari elevasi tanah yang direncanakan. Hasil-hasil
lain yang di setujui oleh direksi. galian tanah di mulai setelah pemasangan patok/bouwplank, peng
gambar dan elevasi yang tertera pada gambar.

Urugan Tanah
Semua pekerjaan urugan harus dilaksanakan lapis demi lapis secara horizontal dan dipadatkan.Te
dan selama proses pemadatan, harus dibasahi dengan air untuk mendapatkan hasil pemadatan y
Pemadatan harus dilakukan dengan alat pemadat mekanis (compactor) dan untuk pekerjaan yang
roller dan sebagainya, dengan kapasitas yang sesuai.Tanah harus dipisahkan terlebih dahulu dari
membahayakan, misalnya dapat merusak permukaan beton atau pun lapisan finishing yang lain, P
mencapai peil yang ditetapkan dan diratakan sampai nantinya tidak akan timbul cacat-cacat seper
bergelombang dan sebagainya.

Urugan Pasir
Pada prinsipnya urugan pasir dilakukan sama dengan proses yang dilakukan pada urugan dengan
Pengadaan dan Pemasangan Pipa HDPE Uk 75 mm (S8, SDR 17)
1 Setelah dikeluarkannya SPMK maka proses pengadaan pipa sudah bisa dilaksanakan deng
pipa HDPE dia. 75 mm, 50 mm dan Accesoriesnya

2 Proses pengadaan pipa HDPE dia. 75 mm, 50 mm dan Accesoriesnya dan akan dila
melampaui target waktu yang dijadwalkan agar pekerjaan pemasangan bisa dilaksanakan s
3 Pipa yang akan kami diadakan adalah Pipa HDPE dia. 75 mm, 50 mm dan Accesoriesnya
disyaratkan.

4 Sesuai jadwal yang kami buat proses pengadaan pipa diperkirakan selama 1,5 bulan sud
toleransi hambatan, jika lebih cepat dalam pelaksanaannya lebih baik.

5 Pipa yang akan kami diadakan kemudian diinventarisir jumlahnya dan diperiksa kualita
kemudian akan dilakukan pemasangan.

7 Setelah pengadaan kami telah laksanakan maka kami siap melaksanakan pemasangan jar
mm dan Accesoriesnya.
8 Diawali dengan proses galian tanah pada jalur yang akan dipasang jaringan pipa sesua
jasa / direksi pekerjaan dan telah mendapat persetujuan atau ijin dari pemerintah setempat.

9 Galian tanah dilaksanakan sedemikian rupa agar tidak mengganggu lalu lintas atau masyara

10 Setelah galian tanah sudah dilaksanakan dan panjang mencukupi untuk dilakukan pema
diperintahkan untuk melaksanakan pemasangan pipa dan sebagian tetap melaksanakan pe

Setelah galian tanah sudah dilaksanakan dan panjang mencukupi untuk dilakukan pema
diperintahkan untuk melaksanakan pemasangan pipa dan sebagian tetap melaksanakan pe

11 Pemasangan pipa PVC dilakukan dengan sambungan karet pacing perlu diperhatikan pad
hati jangan sampai dikemudian sambungan bisa bocor oleh sebab itu pada saat akan dipas
dahulu pipa dibersihkan dari kotoran dibagian ujung pipa yang akan disambungkan.

12 Sebelum pipa dipasang dalam lubang galian dibagian bawah galian terlebih dahulu diurugk
juga dibagian samping dan atas pipa ditimbunkan pasir, diatas pasir baru lah ditimbun deng

13 Maksud dari timbunan pasir dibagian selimut pipa, agar pipa tidak mudah pecah apabila te
diakibatkan dari beban luar.

14 Setelah dilakukan secara berkesinambungan sampai pemasangan pipa selesai sepanjang


lelang khusus untuk pemasangan HDPE dia. 75 mm, 50 mm dan Accesoriesnya.

15 Pada titik tertentu perlu dipasangkan accessories sesusi dalam gambar atau kebutuhan dil
50 mm, Flange socket, Band 90 o dan 45 o dia. 75 mm dan 50 mm.

Setelah pipa HDPE dia. 75 mm, 50 mm dan Accesoriesnya terpasang semuanya k


16 pekerjaan dan pengukuran kuantitas pekerjaan yaitu panjang pemasangan pipa dan acceso

17 Setelah pemasangan pipa HDPE dia. 75 mm, 50 mm dan Accesoriesnya terpasang


pengukuran, kemudian dilakukan pengujian pipa atau test tekanan dan uji kebocoran unt
kebocoran akan dilakukan perbaikan.

18 Di ambil foto untuk laporan dokumentasi setiap pelaksanaan pekerjaan sedang berlangsun
telah selesai dilaksanakan disebut foto ; 0%, 25%, 50%, 75% dan 100 %.

V. PEKERJAAN AKHIR
1 Melakukan pembersihan akhir pada lokasi dimana telah dilaksanakan pekerjaan agar kemb
mengganggu lalu lintas umum.

2 Setelah seluruh bagian selesai dibuat maka dilakukan pengetasan dengan disaksikan oleh d
terkait lainnya

3 Pembuatan laporan-laporan dibuat harian, mingguan dan bulanan serta foto dokumentasi 0
dan melengkapi adminstrasi-adminstrasi proyek.

4 Demikian Metoda Pelaksanaan ini dibuat sebagai dasar sementara dalam pelaksanaan pek
adanya metoda pelaksanaan ini bisa menjadi acuan dalam melaksanakan pekerjaan, peker
tepat mutu dan kuantitas terpenuhi agar pembangunan dapat bermanfaat bagi kita semua.

Mengetahui/ Menyetujui :
PT/CV ........................

.............................
DIREKTUR

............., .............
Dibuat ole

.....................
PIMPINAN TE

AN

INSI SULAWESI UTARA

nakan dengan teratur, tertata sesuai dengan urut uatitas, Kualitas, Ekonomis dan Tetap Waktu dalam
% sesuai jangka waktu yang tersedia.

n pekerjaan, Mobilisasi Peralatan, Tenaga Kerja &


antor Direksi, Gudang & Loos dan serta penyiapan
n dimulainya pekerjaan atau yag biasa disebut Foto

ah Mulai Kerja oleh Penyedia Jasa agar waktu yang


erja yang telah dibuat.

anjutkan dengan pek. Pasang. Pipa GIP dia. 75 mm


Gate valve, Flanged dan Elbow dia. 75 mm karena
h cor mengeras baru dilanjutkan dengan plesteran
an cat waterproofing.

cm sebagai penutup bronc supaya kotoran tidak


uk mengalihkan aliran air yang diluar dari sumber air
dibuat bak chamber untuk pengamanan gate valve

broncaptering adalah seperti ; Pemasangan pipa


n tangga angker dgn besi dia. 22 mm.

mengenai lebar, panjang, dalam, kemiringan dan


nimbulkan kesulitan-kesulitan pelaksanaan kalau
ngajukan usul kepada direksi mengenai cara
g lebih tinggi dari elevasi tanah yang direncanakan.
direksi. galian tanah di mulai setelah pemasangan
ng tertera pada gambar.

izontal dan dipadatkan.Tebal dari tiap lapis diambil


endapatkan hasil pemadatan yang maksimum.
) dan untuk pekerjaan yang besar sifatnya, dapat
s dipisahkan terlebih dahulu dari bahan-bahan yang
un lapisan finishing yang lain.
diratakan sampai nantinya tidak akan timbul cacat-

seperti pada pengurugan dengan tanah timbunan.

cuali jika ditetapkan lain, maka harus dibuat lantai


kan.

as maka disiapkan besi polos dan kawat beton,


a gambar, kemudian dibengkokkan besi tersebut,
diperkuat / diikat dengan kawat beton dengan baik.

g pada dinding dan plat. Pengecoran harus sesuai


n pengawas harus berada di lokasi pekerjaan. Dan
um Sulawesi Utara.

gunakan untuk pekerjaan yang dimaksud

0%

pekerjaan finishing untuk bahannya menggunakan

m kontrak atau ditentukan lain oleh pemilik proyek,


digosok hingga permukaannya rata dan halus.

sedangkan pada bidang yang sempit menggunakan

udian dicat dasar paling sedikit dua kali, Cat dinding


waterproofing Proses pekerjaan pengecetan harus

gan petunjuk Direksi pekerjaan, pengecatan dimulai


arat agar cat dapat melekat dengan baik.

ar, panjang, dalam, kemiringan dan sebagainya,


an pelaksanaan kalau dilaksanakan menurut
i cara pelaksanaannya.Penggalian dilakukan
akan. Hasil-hasil galian dingkut ke tempat-tempat
k/bouwplank, pengalian harus sesuai dengan

dan dipadatkan.Tebal dari tiap lapis diambil 15 cm


hasil pemadatan yang maksimum.
tuk pekerjaan yang besar sifatnya, dapat dipakai
erlebih dahulu dari bahan-bahan yang dapat
nishing yang lain, Pengurugan dilaksanakan sampai
cacat-cacat seperti turunnya permukaan,

da urugan dengan mengunakan tanah

dilaksanakan dengan memesan di pabrik atau agen

ya dan akan dilaksanakan secepatnya agar tidak


sa dilaksanakan secepatnya

an Accesoriesnya dan kualitasnya baik sesuai yang

ama 1,5 bulan sudah diperhitungkan dengan waktu

n diperiksa kualitasnya oleh pengguna jasa yang

n pemasangan jaringan pipa HDPE dia. 75 mm, 50

ingan pipa sesuai yang ditentukan oleh pengguna


merintah setempat.

intas atau masyarakat umum disekitarnya.

k dilakukan pemasangan maka sebagian pekerjan


melaksanakan pekerjaan galian.

diperhatikan pada waktu pemasangan harus hati da saat akan dipasangkan pada sambungan terlebih
mbungkan.

bih dahulu diurugkan pasir setebal 15-20 cm begitu


lah ditimbun dengan tanah dan dipadatkan.

h pecah apabila terjadi gesekan atau getaran yang

selesai sepanjang yang tercantum dalam dokumen


iesnya.

atau kebutuhan dilapangan seperti : Gate Valve dia.

ang semuanya kemudian dilakukan pemeriksaan


n pipa dan accesoriesnya.

iesnya terpasang semuanya dan telah dilakukan


uji kebocoran untuk diketahui kualitasnya, jika ada

edang berlangsung disebut foto 50% dan pekerjaan

erjaan agar kembali seperti semula dan tidak

n disaksikan oleh direksi teknis dan pihak-pihak

oto dokumentasi 0%, 25%, 50%, 75% dan 100 %.

pelaksanaan pekerjaan, harapan kami dengan


n pekerjaan, pekerjaan bisa terlaksana tepat waktu,
bagi kita semua.

............., .....................2011
Dibuat oleh :

.............................
PIMPINAN TEKNIK