You are on page 1of 3

Appendix 3

(A typical specimen of table of contents)


TABLE OF CONTENTS
CHAPTER NO.

TITLE
ABSTRACT
LIST OF TABLE
LIST OF FIGURES
LIST OF GRAPHS

1.

INTRODUCTION
1.1SHOP-1
1.1.1 CHASSIS ASSEMBLY
1.1.2 ZF GEARBOX
1.2SHOP-1 LAYOUT
1.3GEAR BOX PROCESS FLOW
1.4COMPONENTS OF GEAR BOX
1.4.1 SHAFTS
1.4.1.1 MAIN SHAFT
1.4.1.2 LAY SHAFT
1.4.1.3 INPUT SHAFT
1.4.2 GEARS
1.4.2.1 MAIN SHAFT GEAR
1.4.2.2 LAY SHAFT GEAR
1.4.3 GEAR BOX CASING

2.

GEAR BOX ASSEMBLY


2.1 ASSEMBLY

PAGE NO.

2.2 SEQUENCE OF OPERATION


2.3 TESTING
2.4 TYPES OF NOISES
2.5 IMPORTANCE OF THE PROBLEM
2.6 PROCESS FLOW DIAGRAM
3.

TESTING AND RECTIFICATION DETAILS


3.1 ZFGB TESTING REJECTION DETAILS
FROM APRIL 13 TO MARCH 14
3.2 TYPES OF NOISE REJECTIONS FROM
APRIL 13 TO MARCH 14
3.3 GEAR BOX TESTING REJECTIONS FROM
APRIL 13 TO MARCH 14
3.4 TEST BED REPORT FOR
DECEMBER 14
3.5 TEST BED REPORT FOR
JANUARY 15
3.6 RECTIFICATION DATA
FOR DECEMBER 14
3.7 RECTIFICATION DATA
FOR JANUARY 15

4.

ANALYSIS
4.1 GEARBOX TSTING ANALYSIS
4.2 BRAIN STROMING
4.2.1 POTENTIAL CAUSES
4.2.2 CAUSE AND EFFECT DIAGRAM
4.2.2.1 FOR MEN
4.2.2.2 FOR MACHINE

4.2.2.3 FOR MATERIAL


4.2.2.4 FOR METHOD
4.3 IMPORVEMENTS
4.3.1 HANDLING IMPROVEMENTS
IN STORE FOR SYNCHRO PARTS
4.3.2 HANDLING IMPROVEMENTS IN
ZF GEAR BOX ASSEMBLY
4.3.3 ONE POINT LESSON TO IMPROVE
HANDLING
4.4 CONTROL
4.4.1 REJECTION TREND MONITORING
5.

CONCLUSION
5.1 FEASIBLE SOLUTIONS
5.2 CONCERN OF ASSOCIATES

You might also like