Professional Documents
Culture Documents
2. TECHNICAL ISSUES
2.1 HOLE CLEANING 2.1.1 MONITORING CUTTINGS RETURNS AT THE SHAKERS 2.1.2 HOLE CLEANING 2.1.3 GENERAL FACTORS EFFECTING HOLE CLEANING 2.1.4 RIG SITE MONITORING 2.1.5 VERTICAL AND NEAR VERTICAL WELLS 2.1.6 HIGH ANGLE, EXTENDED-REACH WELLS
3. BEST PRACTICE
3.1 PREVENTION OF STUCK PIPE DURING ROUTINE OPERATIONS 3.1.1 REAMING & BACKREAMING GUIDELINES 3.1.2 TRIPPING - DEVIATED HOLE 3.1.3 CONNECTION GUIDELINES 3.1.4 SURVEYING -- STUCK PIPE AVOIDANCE WHILE SURVEYING 3.1.5 DRILLING 3.1.6 CASING & CEMENTING 3.1.7 LOGGING 3.1.8 CORING 3.1.9 WELL CONTROL 3.1.10 LOST CIRCULATION 3.1.11 AIR/FOAM DRILLING 3.1.12 DRILLING WITHC OILED TUBING. 3.2 PREVENTING DRILL STRING FAILURES - A CAUSE OF STUCK PIPE 3.2.1 CARE OF TUBULARS 3.3 SECONDARY FREEING PROCEDURES 3.3.1 FREEING FLOWCHART 3.3.2 PIPE RELEASE AGENTS (PRA) 3.3.3 ACID 3.3.4 FRESH WATER PILLS 3.3.5 FREE POINT INDICATORS (FPI) 3.3.6 BACK-OFFS 3.3.7 INFORMATION REQUIRED BEFORE FREEING OPERATIONS START
4.6.1 GUIDELINES FOR USE OF JARS IN VERTICAL WELLS 4.6.2 GUIDELINES FOR USE OF JARS IN DEVIATED & HORIZONTAL WELLS
5. COMMUNICATION
5.1.1 MEETINGS 5.1.2 HANDOVERS 5.1.3 REPORTING
6. APPENDICES
6.1 STUCK PIPE INCIDENT REPORT 6.2 PIPE STRETCH CALCULATION EXAMPLE 6.3 TORQUE AND PULL CALCULATION EXAMPLE 6.4 JARRING CALCULATION FORMULAE