DECISION MODELS
BADAR-UL-ISMAL (13007054010)
ROMAISA KHAN (13007054013)
ANILA MUSHTAQ (14019030011)
SANA KHALID (14019030003)
DANISH NAEEM KHAN (13048005086)
Decision Variable:
Let A be the number of W0075C to be produced.
Let B be the number of W0033C to be produced.
Let C be the number of W0005C to be produced.
Let D be the number of W0007C to be produced.
Objective:
Maximize (Z) = 34(A) + 30(B) + 60(C) + 25(D)
Subject To:
1. Meet key customer demand
Product W0075C 150 Units
Product W0007C 600 Units
2. Plant Capacity
Hours available for drawing 4000 Hours
Hours available for excursion 4200 Hours
Hours available for winding 2000 Hours
Hours available for packaging 2300 Hours
3. Received orders constraints
W0075C 1400
W0033C 250
W0005C 1510
W0007C 2300
Drawing
Extrusio
n
Winding
Inspecti
on
Packagi
ng
Note: After Inspection well working products are packaged and sent to finished
product inventory and the defected products are stored separately until they are
repaired.