Professional Documents
Culture Documents
'
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
0(, -
P?W t-I
a,1,-~II
, '1.1 2011
FOR
Undersecretaries
Assistant Secretaries
Bureau Directors
Regional Directors
Service Directors
Project Directors/Managers
District Engineers
SUBJECT
In line with the Department's continuing effort to upgrade the design standards for
adaptation to climate change to minimize flooding, all concerned offices shall adopt the
following guidelines in the design of flood control and road drainage facilities/structures:
1. The minimum flood return periods to be used for the design of flood control
androad drainage facilities shall be as follows:
a.
Drainage pipes
b. Culverts
i. Box
ii.
c.
Pipe
Esteros/creeks
d. Rivers
shall be 20 meters.
OGELIO L. SINGSON
Secretary
I """"" I
WIN1 R00491
Mydoc./JMC2011/climate
change2
guidelines
in the