CHECKSHEET for AHU - 1 (Coils) CONTRACTOR coils are connected to the piping by flanges or union. Water piping for dual type coil is piped according to 18 the drawings. Obtain certificate of inspection for pressure testing 19 of chilled water piping.
CHECKSHEET for AHU - 1 (Coils) CONTRACTOR coils are connected to the piping by flanges or union. Water piping for dual type coil is piped according to 18 the drawings. Obtain certificate of inspection for pressure testing 19 of chilled water piping.
CHECKSHEET for AHU - 1 (Coils) CONTRACTOR coils are connected to the piping by flanges or union. Water piping for dual type coil is piped according to 18 the drawings. Obtain certificate of inspection for pressure testing 19 of chilled water piping.
PROJECT #: M627-Phase 3 *1 Answer "A" for Approved and "N" for Not Approved “N/A” for Not Applicable (describe on the back of this sheet why system is not approved). CSM Plant Engineer shall authorize any duplication of this form. (Resides at the Colorado School of Mines.) # ITEM COMMENTS CONTRACTOR 1 Hot and chilled water coils can be pulled out within the pulled out spaces indicated on the drawings. 2 Pressure/temperature (P/T) taps are supplied and installed. 3 Coil fins are not damaged or obstructed. 4 Isolation valves are provided for isolation chilled and hot water supply and returns to the coils. 5 Coils are piped according to the drawings (two way or 3 way piping). 6 Piping to the coils installed correctly. Counter flow and water flow upwards. 7 Control valves are installed, sized (check Cv) and selected based on the contract documents. 8 Automated control valves can be changed to hand operated manual control in the case of control failure. 9 Control valves are installed in direction of flow as marked on the valves. 10 Control valves are installed upright as suggested by the manufacturer. 11 Control valves are installed in accessible locations for replacement and maintenance. 12 Manual air vent is installed at high point of the piping feeding the coils. 13 Coil air vent is furnished with coils. 14 Drain valve is installed for the coils to drain the coil and piped to the nearest drain. 15 Circuit setter is installed at the return pipe from the coil as per contract. 16 Chilled water coil’s pan is piped to the nearest floor drain in Mechanical room. 17 Coils are connected to the piping by flanges or union. 18 Water piping for dual type coil is piped according to the drawings. 19 Obtain certificate of inspection for pressure testing of chilled water piping. 20 Piping is insulated according to the contract for insulation thickness and type. 21 Obtained balancing report for hot water, chilled water and condenser water system. Prepared By: Hooshang Salehizadeh