Professional Documents
Culture Documents
Indikator Progres
Bobot
B04
Rencana
Jml
(%)
Realisasi
TTB (%)
Jml
(%)
Rencana
TTB (%)
Jml
(%)
B05
Realisasi
TTB (%)
Jml
B06
Rencana
(%)
TTB (%)
Jml
(%)
Realisasi
TTB (%)
Jml
(%)
TTB (%)
1 Sosialisasi
5.00%
15.00
9.20%
0.460%
20
12.27%
0.613%
163.00
100.0%
4.540%
51
31.3%
0.95%
37.42%
0.307%
2 Penetapan Lokasi
5.00%
15.00
9.20%
0.460%
1.84%
0.092%
30.00
18.4%
0.460%
29
17.79%
0.80%
60.00
36.81%
0.920%
53
32.52%
0.037%
3 Pembentukan KSM
5.00%
8.00
4.91%
0.245%
10
6.13%
0.307%
16.00
9.8%
0.245%
15
9.20%
0.15%
75.00
46.01%
1.810%
42
25.77%
0.041%
0.000%
0.00%
0.000%
0.000%
0.00%
0.00%
8.00
4.91%
1.718%
0.00%
0.000%
4 Penyusunan RKM
35.00%
61
Rencana
Jml
Realisasi
(%)
TTB (%)
Jml
0.00%
163.00
130.00
15.00
60
(%)
TTB (%)
36.81%
-0.03%
100.00%
3.16%
69
42.3%
0.49%
79.75%
1.69%
59
36.20%
0.52%
9.20%
1.50%
0.61%
0.21%
0.00%
0.00%
0.00%
0.25%
0.00%
0.00%
5 Pembentukan Pengelola
5.00%
0.000%
0.00%
0.000%
0.000%
0.00%
0.00%
0.000%
0.00%
0.000%
6 Kontrak Kerja
5.00%
0.000%
0.00%
0.000%
0.000%
0.00%
0.00%
0.000%
0.00%
0.000%
35.00%
0.000%
0.00%
0.000%
0.000%
0.00%
0.00%
0.000%
0.00%
0.000%
0.00%
0.00%
0.00%
5.00%
0.000%
0.00%
0.000%
0.000%
0.00%
0.00%
0.000%
0.00%
0.000%
0.00%
0.00%
0.00%
100.00%
1.166%
1.012%
5.245%
1.902%
4.45%
0.385%
6.60%
7 Progres Fisik
8 Ujicoba
Kumulatif Progres Pemberdayaan
Total Lokasi Wilayah II (TA.2013)
163 lokasi
8.00
4.91%
1.20%
REKAPITULASI PROGRES PENCAPAIAN PELAKSANAAN INFRASTRUKTUR SANITASI BERBASIS MASYARAKAT TAHUN ANGGA
100.00%
100.00%
90.00%
80.00%
70.00%
66.93%
63.44%
61.72%
60.00%
50.89%
50.00%
40.00%
33.90%
30.00%
25.91%
20.00%
17.45%
1.17%
0.00% 1.01%
1
6.41%
2.91%
2
13.42%
13.42%
13.42%
4.50%
3.30%
3
17.32%
13.30%
10.86%
10.00%
Progres Rencana
10
Indikator Progres
Bobot
Rencana
Jml
(%)
0.000%
97
59.51%
1.13%
5.00%
0.000%
126
77.30%
1.75%
3 Pembentukan KSM
5.00%
163.00
100.00%
1.012%
119
73.0%
1.84%
35.00%
80.00
49.08%
13.957%
20
12.27%
4.08%
5 Pembentukan Pengelola
5.00%
16.00
9.82%
0.491%
0.00%
0.00%
6 Kontrak Kerja
5.00%
40.00
24.54%
0.982%
0.00%
0.00%
35.00%
0.000%
0.00%
0.00%
5.00%
0.000%
0.00%
0.00%
100.00%
16.442%
REKAPITULASI PROGRES PENCAPAIAN PELAKSANAAN INFRASTRUKTUR SANITASI BERBASIS MASYARAKAT TAHUN ANGGARAN 2013
100.00%
100.00%
90.00%
80.00%
70.00%
66.93%
63.44%
50.89%
40.00%
33.90%
30.00%
25.91%
20.00%
17.45%
1.17%
0.00% 1.01%
1
6.41%
2.91%
2
13.42%
13.42%
13.42%
4.50%
3.30%
3
17.32%
13.30%
10.86%
10.00%
Progres Rencana
TTB (%)
5.00%
8 Ujicoba
50.00%
(%)
2 Penetapan Lokasi
7 Progres Fisik
61.72%
Jml
1 Sosialisasi
4 Penyusunan RKM
60.00%
Realisasi
TTB (%)
10
8.80%
Indikator Progres
Bobot
B09
Rencana
Jml
(%)
Realisasi
TTB (%)
Jml
(%)
B10
Rencana
TTB (%)
Jml
(%)
Realisasi
TTB (%)
Jml
(%)
B11
Rencana
TTB (%)
Jml
(%)
Realisasi
TTB (%)
Jml
(%)
Rencana
TTB (%)
Jml
(%)
Realisasi
TTB (%)
Jml
(%)
TTB (%)
1 Sosialisasi
5.00%
0.00%
120
73.62%
0.00%
0.00%
131
80.37%
0.34%
0.00%
0.00%
-4.02%
0.00%
0.00%
0.00%
2 Penetapan Lokasi
5.00%
0.00%
126
77.30%
0.00%
0.00%
134
82.21%
0.25%
0.00%
0.00%
-4.11%
0.00%
0.00%
0.00%
3 Pembentukan KSM
5.00%
0.00%
122
74.85%
3.74%
0.00%
142
87.12%
0.61%
0.00%
0.00%
-4.36%
0.00%
0.00%
0.00%
10.74%
29
17.79%
0.00%
163.00
7.09%
47
28.83%
3.87%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4 Penyusunan RKM
35.00%
130.00
5 Pembentukan Pengelola
5.00%
130.00
79.75%
3.50%
5.52%
0.28%
163.00
100.00%
1.01%
70
42.94%
1.87%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
6 Kontrak Kerja
5.00%
130.00
79.75%
2.76%
0.00%
0.00%
163.00
100.00%
1.01%
54
33.13%
1.66%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
8.00
4.91%
1.72%
0.00%
0.00%
0.00%
0.00%
30.00
18.40%
3.01%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
16.00
9.82%
0.49%
0.00%
0.00%
8.59%
1.72%
7 Progres Fisik
8 Ujicoba
Kumulatif Progres Pemberdayaan
Total Lokasi Wilayah II (TA.2013)
79.75%
100.00%
35.00%
0.00%
0.00%
0.00%
5.00%
0.00%
0.00%
0.00%
0.00%
100.00%
16.99%
4.02%
10.83%
16.00
9.82%
1.72%
-12.48%
3.50%
0.00%
Indikator Progres
Bobot
Rencana
Jml
(%)
Realisasi
TTB (%)
Jml
(%)
TTB (%)
1 Sosialisasi
5.00%
0.00%
0.00%
0.00%
2 Penetapan Lokasi
5.00%
0.00%
0.00%
0.00%
3 Pembentukan KSM
5.00%
0.00%
0.00%
0.00%
35.00%
0.00%
0.00%
0.00%
5 Pembentukan Pengelola
5.00%
0.00%
0.00%
0.00%
6 Kontrak Kerja
5.00%
0.00%
0.00%
0.00%
4 Penyusunan RKM
7 Progres Fisik
8 Ujicoba
Kumulatif Progres Pemberdayaan
Total Lokasi Wilayah II (TA.2013)
35.00%
163.00
100.00%
28.56%
0.0%
0.00%
5.00%
163.00
100.00%
4.51%
0.0%
0.00%
100.00%
33.07%
0.00%
64,200.0
Banten
Kab Serang
131.00
134.00
142.00
47.00
70.00
FOTO
LONGTITUDE
(E)
TITIK KOORDINAT
LATITUDE
(N/S)
FISIK
KEUANGAN
B 12
KOMULATIF (%)
B 11
B 10
B 09
B 08
B 07
(X1.000.000,-)
UJI COBA
KEC/KEL/LINGKUNGAN
PROGRES
FISIK
163
KONTRAK
KERJA
KAB/KOTA
58
PENYUSUNAN
RKM
(X1.000.000,-)
PILIHAN
SISTEM
PROVINSI
KEGIATAN
PEMBENTUKA
N KSM
NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI
SOSIALISASI
LOKASI
54.00
Kp. Bojong Tengah RT/RW. 12/04 Desa Bojong Menteng Barat Kec.
Tanjung Teja
E. 10613'09,08"
S. 618'03,68"
400.0
11-May
17-May
E. 10616'51,42"
S. 601'26,59"
400.0
24-Apr
18-Jun
25-Jun
Kp. Lebak Gaga RT/RW. 09/03 Desa Lebak Wangi Kec. Lebak Wangi
E. 10616'45,71"
S. 604'33,35"
400.0
2
Kab Pandeglang
11-May
13-May
E. 10605'31,07"
S. 618'01,64"
400.0
10-Apr
28-Apr
29-May
E. 10607'06,62"
S. 620'32,47"
400.0
5-Apr
25-Apr
27-May
E. 10550'31,79"
S. 622'04,27"
400.0
2-Apr
30-Apr
29-May
E. 10549'27,19"
S. 622'26,47"
400.0
3
Kota Serang
8-Apr
26-Apr
28-May
MCK ++
S. 6 6' 7,0"
400.0
13-Jun
S. 6 6' 4,7"
Kombinasi
400.0
(1)Kp. Sidapurna Barat RT/RW 2/3 & (2)Kp. Kawunen RT/RW 2/2,
Kelurahan Teritih, Kec. Walantaka
1. E. 10612'44,0"
2. E. 10612'30,2"
1. S. 6 6' 40,8"
6 6' 14,8"
MCK +
400.0
4
Kab Tangerang
MCK ++
400.0
2. S.
10-Jun
1-May
20-May
E. 10625'14"
S. 6 14' 31,4"
MCK +
400.0
1-Apr
30-Apr
E. 10627'43,5"
S. 6 10' 23,0"
MCK +
400.0
0%
50%
100%
Status : 20/September/2013
64,200.0
Kab Lebak
131.00
134.00
142.00
47.00
70.00
FOTO
LONGTITUDE
(E)
TITIK KOORDINAT
LATITUDE
(N/S)
FISIK
KEUANGAN
B 12
KOMULATIF (%)
B 11
B 10
B 09
B 08
B 07
UJI COBA
(X1.000.000,-)
PROGRES
FISIK
KEC/KEL/LINGKUNGAN
163
KONTRAK
KERJA
KAB/KOTA
58
PENYUSUNAN
RKM
(X1.000.000,-)
PILIHAN
SISTEM
PROVINSI
KEGIATAN
PEMBENTUKA
N KSM
NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI
SOSIALISASI
LOKASI
54.00
RT. 02 RW. 04 Kp. Babakan Nambo Seng. Kel. Cijoro Lebak, Kec.
Rangkas Bitung.
E. 10615'01,07"
S. 620'52,91"
400.0
12-Mar
10-Mar
8-May
E. 10615'36,83"
S. 621'15,62"
400.0
26-Apr
27-May
3-Jun
Kp. Cimesir RT/RW. 02/04 Desa Rangkas Bitung Timur, Kec. Rangkas
Bitung
E. 10615'52,65"
S. 621'56,22"
400.0
6
Kota Tangerang
Selatan)
10-Apr
10-May
25-May
6-Apr
23-Apr
a
400.0
a
400.0
a
400.0
DKI Jakarta
Jakarta Selatan
MCK+
400.0
MCK++
400.0
1060 50,35413'
Perpipaan
8-Apr
8-Apr
17-Jul
60 20,484'
300.0
6-Oct
8-Apr
8-Apr
17-Jul
60 20,49844'
1060 50,39312'
Perpipaan
300.0
6-Oct
8-Apr
8-Apr
17-Jul
60 20,49844'
1060 50,40467'
Perpipaan
Kab. Bekasi
6-Oct
1060 50,39312'
Perpipaan
300.0
300.0
6-Oct
8-Apr
8-Apr
17-Jul
60 20,48753'
107 0 10,78263'
MCK +
300.0
9-Apr
26-Apr
26-Apr
17-Jul
60 17,01310'
1. 1070 10,83653'
1. 60 17,02885'
MCK +
300.0
9-Apr
26-Apr
26-Apr
17-Jul
2. 60 16,99574'
Kawasan Kanal
Banjir Timur (KBT)
Rawamangun
Rawamangun
300.0
300.0
Jakarta Timur
2. 107 0 10,78813'
24-Sep
300.0
300.0
3
Jawa Barat
Kota Bogor
Kp. Cilendek Timur RT/RW 03/01 Kel. Cilendek Timur Kec. Bogor
Barat
60 34' 27,0''
Kombinasi
400.0
31-Oct
0%
50%
100%
Status : 20/September/2013
64,200.0
131.00
134.00
142.00
47.00
70.00
FOTO
LONGTITUDE
(E)
TITIK KOORDINAT
LATITUDE
(N/S)
FISIK
KEUANGAN
B 12
KOMULATIF (%)
B 11
B 10
B 09
B 08
(X1.000.000,-)
B 07
KEC/KEL/LINGKUNGAN
UJI COBA
163
PROGRES
FISIK
KAB/KOTA
KONTRAK
KERJA
(X1.000.000,-)
PILIHAN
SISTEM
Kota Bogor
58
PENYUSUNAN
RKM
KEGIATAN
PEMBENTUKA
N KSM
Jawa PROVINSI
Barat
NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI
SOSIALISASI
LOKASI
54.00
Kp. Sindangbarang Loji RT/RW 03/13 Kel. Loji Kec. Bogor Barat
60 35' 17,7''
Kombinasi
400.0
31-Oct
9-Mar
5-Mar
Kp. Bojong Kidul RT/RW 06/02 Kel. Bojong Kerta Kec Bogor Selatan
60 40' 24,0''
a
a
Kombinasi
400.0
31-Oct
20-Mar
30-Mar
Kp. Bakom Pesantren Kel. Bojong Kerta RT/RW 01/05, Kec. Bogor
Selatan
1. 60 40' 03,5''
Kombinasi
400.0
31-Oct
23-Mar
30-Mar
2. 1060 50' 24,2''
2. 60 40' 06,4''
60 35' 59,2''
Kombinasi
400.0
31-Oct
4-May
9-May
60 40'26,4''
Kombinasi
400.0
31-Oct
24-Mar
31-Mar
Gang Nasedin Kp. Kaum RT/RW 02/02 Kel. Cilendek Barat Kec. Bogor
Barat
60 34' 40''
Kombinasi
400.0
31-Oct
26-Feb
1-Apr
Kp. Sindangsari RT/RW 05/07 Kel Kebon Kelapa Kec Bogor Tengah
60 35' 26,2''
Kombinasi
400.0
31-Oct
1-Apr
16-Mar
Kp. Wanjun Asri RT/RW 03/01 Kel. Sindangsari Kec. Bogor Timur
Kombinasi
400.0
31-Oct
3-Apr
4-Apr
Jl. Haji Hamid Kp. Cimanggu Lamping RT/RW 01/03 Kel. Kedung
Waringin Kec. Tanah Sareal
60 33' 50,6''
Kombinasi
400.0
31-Oct
13-Mar
5-Apr
60 32' 16,6''
Kombinasi
400.0
31-Oct
16-Mar
17-Mar
Jl. Kedung Halang Kp. Sugih Lamping RT/RW 04/07 Kel. Sukaresmi
Kec. Tanah Sareal
60 33' 12,6''
a
2
Kota Tasikmalaya
Kombinasi
400.0
MCK++
MCK++
31-Oct
6-Mar
12-Mar
400.0
14-Mar
14-Mar
400.0
15-Mar
15-Mar
a
Kp. Sukahurip, RT/RW 01/05 Kel. Gunung Tandala Kec. Kawalu
0%
50%
100%
Kota Tasikmalaya
Status : 20/September/2013
64,200.0
131.00
134.00
142.00
47.00
70.00
FOTO
LONGTITUDE
(E)
TITIK KOORDINAT
LATITUDE
(N/S)
FISIK
KEUANGAN
B 12
KOMULATIF (%)
B 11
B 10
B 09
B 08
B 07
(X1.000.000,-)
UJI COBA
KEC/KEL/LINGKUNGAN
PROGRES
FISIK
163
KONTRAK
KERJA
KAB/KOTA
58
PENYUSUNAN
RKM
(X1.000.000,-)
PILIHAN
SISTEM
PROVINSI
KEGIATAN
PEMBENTUKA
N KSM
NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI
SOSIALISASI
LOKASI
54.00
MCK++
a
3
Kab Bogor
400.0
13-Mar
13-Mar
Jl. Raya Tenjo, Kp. Cikadu Ranca Riung RT/RW 01/03, Desa
Singabraja, Kec. Tenjo
10626,021'
621,200'
MCK++
400.0
4-Mar
25-Mar
26-Mar
10626,021'
626,95879'
MCK++
400.0
4-Mar
25-Mar
26-Mar
10627,58210'
637,61397'
MCK++
a
4
Kab Indramayu
400.0
4-Mar
25-Mar
26-Mar
E 10755' 44,4"
S 6 27' 1,55"
MCK++
400.0
4-Apr
8-Apr
8-Apr
22-Jul
S 6 19' 23,88"
MCK++
400.0
1-Apr
4-Apr
4-Apr
22-Jul
S 6 25' 6,82"
MCK++
400.0
2-Apr
5-Apr
5-Apr
22-Jul
S 6 30' 41,18"
MCK++
a
5
Kab Karawang
400.0
3-Apr
6-Apr
6-Apr
22-Jul
E 107 18 25,5
S 5 57 43,2
MCK+
400.0
1-Mar
18-Mar
26-Mar
E 107 25 50
S 6 16 39,8
MCK+
400.0
5-Mar
18-Mar
27-Mar
E 107 26 27,5
S 6 15 21,6
MCK+
400.0
5-Mar
18-Mar
27-Mar
E 107 25 37,1
S 6 15 35,0
Kombinasi
400.0
5-Mar
18-Mar
27-Mar
E 107 23 34,6
S 6 15 55,5
MCK++
a
6
Kab Bekasi
400.0
5-Mar
18-Mar
27-Mar
E. 10704,512921"
S. 624'19190"
MCK++
400.0
19-Mar
23-Apr
0%
50%
100%
Status : 20/September/2013
64,200.0
131.00
134.00
142.00
47.00
70.00
FOTO
LONGTITUDE
(E)
TITIK KOORDINAT
LATITUDE
(N/S)
FISIK
KEUANGAN
B 12
KOMULATIF (%)
B 11
B 10
B 09
B 08
B 07
(X1.000.000,-)
UJI COBA
KEC/KEL/LINGKUNGAN
PROGRES
FISIK
163
KONTRAK
KERJA
KAB/KOTA
(X1.000.000,-)
PILIHAN
SISTEM
Kab Bekasi
PENYUSUNAN
RKM
58
KEGIATAN
PEMBENTUKA
N KSM
NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI
PROVINSI
SOSIALISASI
LOKASI
54.00
E. 10711,23948"
S. 65'4600"
MCK++
400.0
25-Mar
28-Apr
E. 1077,67101"
S. 624'89158"
MCK++
a
7
Kab Bandung
400.0
26-Mar
7-May
10745'50,73"
400.0
6-Apr
6-Apr
23-Apr
15-May
13-May
76'6,45"
a
Kp. Cijengkol RT/RW. 04/13 Desa Cipaku Kec. Paseh
10747'21,2"
400.0
23-Apr
23-Apr
2-May
15-May
14-May
73'52,8"
a
RT. 02 RW, 01 Kp. Cikoneng Desa Cibiru Wetan Kec. Cilenyi
10725'4,09"
400.0
22-Apr
26-Apr
30-Apr
15-May
13-May
653'47,91"
a
8
10744'38,74"
647'13,53"
400.0
18-Apr
15-May
20-May
Kp. Cibacang Hilir RT. 2 & 3 RW. 7 Desa Cipeundeuy. Kec. Padalarang
10729'0,43"
652'13,76"
400.0
9-Apr
21-May
10745' 50,73"
649'30,75"
400.0
a
9
Kab Cianjur
25-Apr
15-May
17-May
06o 48,538'
107o 08,139'
400.0
28-Mar
10-May
17-May
06o 49,339'
107o 17,401'
400.0
27-Mar
25-Apr
29-Apr
06o 44,628'
107o 12,743'
400.0
a
10
Kab Tasikmalaya
25-Mar
12-Apr
12-Apr
70 29' 40,4''
MCK+
400.0
11-Mar
12-Mar
13-Mar
70 7' 27,9''
MCK+
400.0
2-Mar
12-Mar
13-Mar
70 26' 17,1''
MCK+
400.0
11-Mar
15-Mar
25-Mar
0%
50%
100%
Status : 20/September/2013
64,200.0
11
Kab Ciamis
131.00
134.00
142.00
47.00
70.00
FOTO
LONGTITUDE
(E)
TITIK KOORDINAT
LATITUDE
(N/S)
FISIK
KEUANGAN
B 12
KOMULATIF (%)
B 11
B 10
B 09
B 08
B 07
(X1.000.000,-)
UJI COBA
KEC/KEL/LINGKUNGAN
PROGRES
FISIK
163
KONTRAK
KERJA
KAB/KOTA
58
PENYUSUNAN
RKM
(X1.000.000,-)
PILIHAN
SISTEM
PROVINSI
KEGIATAN
PEMBENTUKA
N KSM
NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI
SOSIALISASI
LOKASI
54.00
107o 33 52,6
6o 55 39,8
Kombinasi
400.0
Kombinasi
400.0
a
a
1. 108o 55 36(RT 7)
1. 7o 21 34,3(RT 7)
Kombinasi
400.0
2. 107o 33 52,6(RT 5)
2. 6o 55 39,8(RT5)
12
Kab Cirebon
MCK++
S 6 45' 26,03"
400.0
21-Mar
19-Mar
21-Mar
MCK++
S 6 41' 47,8"
400.0
20-Mar
15-Mar
20-Mar
MCK++
400.0
a
13
Kab Subang
S 6 47' 18,3"
22-Mar
19-Mar
28-Mar
60 30' 44''
MCK++
400.0
14-Mar
4-Apr
11-Apr
60 17' 44''
MCK++
400.0
13-Mar
3-Apr
4-Apr
60 43' 32,1''
MCK++
a
14
Kab Purwakarta
400.0
12-Mar
10-Apr
26-Apr
60 39' 16,1''
MCK++
400.0
20-Mar
29-Mar
8-Apr
2-Sep
60 35' 17,7''
MCK++
400.0
21-Mar
27-Mar
11-Apr
2-Sep
60 41' 12,6''
MCK++
a
15
Kota Depok
400.0
19-Mar
26-Mar
3-Apr
2-Sep
E. 10657'1693"
S. 642'14072"
MCK++
400.0
0%
50%
100%
Status : 20/September/2013
64,200.0
131.00
134.00
142.00
47.00
70.00
FOTO
LONGTITUDE
(E)
TITIK KOORDINAT
LATITUDE
(N/S)
FISIK
KEUANGAN
B 12
KOMULATIF (%)
B 11
B 10
B 09
B 08
B 07
(X1.000.000,-)
UJI COBA
KEC/KEL/LINGKUNGAN
PROGRES
FISIK
163
KONTRAK
KERJA
KAB/KOTA
(X1.000.000,-)
PILIHAN
SISTEM
Kota Depok
PENYUSUNAN
RKM
58
KEGIATAN
PEMBENTUKA
N KSM
15
NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI
PROVINSI
SOSIALISASI
LOKASI
54.00
E. 10648'05030"
S. 626'83177"
IPAL Komunal+
Perpipaan
a
16
Kota Cimahi
400.0
6 55' 39,8"
IPAL Komunal+
Perpipaan
400.0
6 52' 54,9"
a
17
Kota Bekasi
IPAL Komunal
+ Perpipaan
400.0
MCK++
400.0
8-Apr
Kombinasi
400.0
29-Apr
a
Kelurahan Perwira RT 4 / RW 3, Kecamatan Bekasi Utara
a
4
JAWA TENGAH
Kab. Banjarnegara
7 26' 8,4"
IPAL Komunal+
Perpipaan
400.0
10-Apr
17-Apr
22-Apr
11-Sep
22-Apr
13-Sep
7 23' 54,6"
IPAL Komunal+
Perpipaan
400.0
10-Apr
18-Apr
28-Apr
11-Sep
28-Apr
13-Sep
7 22' 57,8"
IPAL Komunal+
Perpipaan
a
2
Kab. Temanggung
400.0
10-Apr
19-Apr
19-Apr
11-Sep
19-Apr
13-Sep
7 19' 57,6"
IPAL Komunal+
Perpipaan
400.0
9-Apr
26-Apr
11-May
16-May
Jl. Rama RT/RW 6/1 Dsn Brojolan Barat Kel. Temanggung 1, Kec.
Temanggung
7 18' 36,3"
IPAL Komunal+
Perpipaan
400.0
9-Apr
1-May
4-May
12-May
7 16' 41,5"
IPAL Komunal+
Perpipaan
a
3
Kab. Demak
400.0
9-Apr
4-May
5-May
8-May
E. 11033'5"
S. 655'44,9"
IPAL Komunal
+Perpipaan
400.0
24-Apr
9-May
10-May
15-May
MCK+
400.0
24-Apr
4-May
6-May
8-May
a
Dukuh Sayung Kulon, RT 2/4, Kec. Sayung
E. 11030'47"
S. 656'54"
IPAL Komunal
+Perpipaan
400.0
24-Apr
6-May
7-May
13-May
0%
50%
100%
Status : 20/September/2013
64,200.0
Kab. Pati
131.00
134.00
142.00
47.00
70.00
FOTO
LONGTITUDE
(E)
TITIK KOORDINAT
LATITUDE
(N/S)
FISIK
KEUANGAN
B 12
KOMULATIF (%)
B 11
B 10
B 09
B 08
B 07
(X1.000.000,-)
UJI COBA
KEC/KEL/LINGKUNGAN
PROGRES
FISIK
163
KONTRAK
KERJA
KAB/KOTA
58
PENYUSUNAN
RKM
(X1.000.000,-)
PILIHAN
SISTEM
PROVINSI
KEGIATAN
PEMBENTUKA
N KSM
NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI
SOSIALISASI
LOKASI
54.00
E. 11102'17"
S. 631'14,8"
Kombinasi
400.0
15-Apr
24-Apr
29-Apr
4-May
E. 11114'35"
S. 642'48"
Kombinasi
400.0
15-Apr
25-Apr
1-May
8-May
E. 11110'15"
S. 646'21"
Kombinasi
a
5
Kab. Batang
400.0
15-Apr
26-Apr
13-May
E. 10943'4,09"
Kombinasi
S. 654'08,98"
400.0
22-Apr
8-May
15-May
15-May
E. 10944'36,19"
S. 654'57,35"
IPAL Komunal+
Perpipaan
400.0
22-Apr
13-May
15-May
16-May
E. 10942'43,25"
S. 654'31,48"
IPAL Komunal+
Perpipaan
a
6
Kab. Pekalongan
400.0
22-Apr
7-May
11-May
11-May
Desa Jetak Kidul, RT. 11,12 (IPAL 1) RT. 09 (IPAL 2) / RW. 02, Kec.
Wonopringgo
1. E. 10937'37,2"
2. E. 10937'40,8"
1. S. 70'20,84"
2. S. 70'10,69"
Kombinasi
400.0
24-Apr
9-May
7-May
E. 10938'56,4"
S. 652'38,1"
MCK ++
400.0
24-Apr
6-May
13-May
E. 10936'46,8"
S. 653'3,77"
MCK ++
a
7
Kab. Kendal
400.0
24-Apr
14-May
8-May
E. 11015'44,9"
S. 658'36,1"
IPAL Komunal+
Perpipaan
400.0
17-Apr
28-Apr
3-May
2-May
E. 11016'37,1"
S. 76'10,1"
IPAL Komunal+
Perpipaan
400.0
17-Apr
28-Apr
7-May
28-Apr
E. 11017'7,7"
S. 76'21,5"
IPAL Komunal+
Perpipaan
a
8
Kab. Wonogiri
400.0
17-Apr
27-Apr
7-May
E. 11057'32,75"
S. 748'56,96"
IPAL Komunal+
Perpipaan
400.0
22-Apr
4-May
7-May
20-May
E. 11052'2,98"
S. 746'59,59"
IPAL Komunal+
Perpipaan
400.0
22-Apr
7-May
8-May
0%
50%
100%
Kab. Wonogiri
Status : 20/September/2013
64,200.0
131.00
134.00
142.00
47.00
70.00
FOTO
LONGTITUDE
(E)
TITIK KOORDINAT
LATITUDE
(N/S)
FISIK
KEUANGAN
B 12
KOMULATIF (%)
B 11
B 10
B 09
B 08
B 07
(X1.000.000,-)
UJI COBA
KEC/KEL/LINGKUNGAN
PROGRES
FISIK
163
KONTRAK
KERJA
KAB/KOTA
58
PENYUSUNAN
RKM
(X1.000.000,-)
PILIHAN
SISTEM
PROVINSI
KEGIATAN
PEMBENTUKA
N KSM
NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI
SOSIALISASI
LOKASI
54.00
E. 11057'32,75"
S. 750'06,96"
IPAL Komunal+
Perpipaan
a
9
Kab. Tegal
400.0
22-Apr
3-May
5-May
16-May
E. 1098'26,0"
S. 70'15,4"
IPAL Komunal+
Perpipaan
400.0
9-Apr
29-Apr
10-May
17-May
E. 1099'47,1"
S. 72'21,0"
IPAL Komunal+
Perpipaan
a
10
Kab. Pemalang
400.0
9-Apr
29-Apr
10-May
17-May
E. 10922'03,6"
Kombinasi
a
a
S. 0710'49,6"
400.0
9-Apr
28-Apr
6-May
Kombinasi
S. 7 9' 0,78"
400.0
a
9-Apr
6-May
17-May
17-May
E. 10928'26,4"
S. 655'21,76"
MCK ++
400.0
9-Apr
27-Apr
4-May
4-May
E. 10858'916"
11
Kab. Brebes
Kombinasi
S. 0654'000"
400.0
5
DI YOGYAKARTA
4-Apr
23-Apr
6-May
2-May
E:110 3511,9
S: 07 5824,1
IPAL Komunal+
Perpipaan
400.0
1-Apr
19-Apr
15-Aug
E: 110 3546,9
S:07 5847,8
IPAL Komunal+
Perpipaan
400.0
1-Apr
12-Apr
19-Apr
15-Aug
E:1100 3438,6
S: 070 5603,4
IPAL Komunal+
Perpipaan
a
2
400.0
1-Apr
19-Apr
25-Apr
15-Aug
E: 110 828,9
S: 7 5144,2
IPAL Komunal+
Perpipaan
400.0
27-Mar
2-Jun
4-Jun
15-Aug
E: 110 96,5
S: 7 5215,0
IPAL Komunal+
Perpipaan
400.0
27-Mar
17-Apr
1-May
15-Aug
E: 110 831,1
S: 7 5313,8
IPAL Komunal+
Perpipaan
a
6
JAWA TIMUR
Kab. Pasuruan
400.0
27-Mar
18-Apr
23-Jun
15-Aug
Dusun Kampung Baru Barat RT/RW 2/9, Desa Tambak Lekok, Kec.
Lekok
1120 58 58,8
MCK+
400.0
1-Apr
17-Apr
22-Apr
24-Jul
2-May
21-Aug
70 39 39,1
0%
50%
100%
Status : 20/September/2013
64,200.0
131.00
134.00
142.00
47.00
70.00
54.00
1130 4 19,2
MCK+
a
2
FOTO
LONGTITUDE
(E)
TITIK KOORDINAT
LATITUDE
(N/S)
FISIK
KEUANGAN
B 12
KOMULATIF (%)
B 11
B 10
B 09
B 08
B 07
(X1.000.000,-)
UJI COBA
KEC/KEL/LINGKUNGAN
163
PROGRES
FISIK
KAB/KOTA
KONTRAK
KERJA
(X1.000.000,-)
PILIHAN
SISTEM
Kab. Pasuruan
58
PENYUSUNAN
RKM
KEGIATAN
PEMBENTUKA
N KSM
JAWAPROVINSI
TIMUR
NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI
SOSIALISASI
LOKASI
400.0
1-Apr
23-Apr
24-Apr
19-Jul
14-May
21-Aug
70 40 56,32
Kab. Sidoarjo
1120 29 33,03
Jl. Kedung Bacok No.1, Dsn Kedung Klinter,Ds Kedung Bacok, Kec
Tarik
MCK+
400.0
20-Apr
24-Apr
29-Apr
19-Jul
24-Jun
21-Aug
70 27 12,26
Kab. Pacitan
MCK+
400.0
22-Jul
29-Jul
5-Aug
19-Aug
6-Aug
21-Aug
111o 04 15
MCK+
400.0
12-Mar
24-Apr
25-Apr
19-Jul
25-Apr
21-Aug
8o 09 15,1
a
Ponpes Al Falah, RT 2/RW 5, Dusun Trobakal, Desa Karangrejo,
Kecamatan Arjosari
111o 8 7,35
Kombinasi
400.0
12-Mar
23-Apr
25-Apr
19-Jul
25-Apr
21-Aug
8o 05 15,8
a
4
Kab. Trenggalek
111o 30 30
MCK+
400.0
30-Apr
30-Apr
7-May
25-Jul
7-May
21-Aug
8o 18 33,9
a
RT 9 / RW 2, Dsn Ketawang, Desa Tasikmadu, Kecamatan Watulimo,
111o 43 36
Kombinasi
400.0
30-Apr
6-May
3-Jun
19-Jul
6-Jun
21-Aug
8o 17 6,4
a
5
Kab. Lumajang
1130 13 44,4
Kombinasi
400.0
28-Mar
20-May
7-Jun
24-Jul
10-Jun
21-Aug
80 7 29,42
a
Dsn Krajan RT/RW 3/1, Desa Wonorejo, Kecamatan Kedungjajang
1130 14 16,8
IPAL Komunal+
Perpipaan
400.0
28-Mar
20-May
11-Jun
24-Jul
13-Jun
21-Aug
80 4 31,51
6
Kab. Jember
MCK+
400.0
28-May
23-Apr
14-May
29-Jul
14-May
21-Aug
80 8' 28,7''
Ponpes Addimyati Jl. A Yani 164, Dsn Pondok lalang, Ds Wonojati,
Kec Jenggawah
MCK+
400.0
28-May
23-Apr
10-May
29-Jul
10-May
21-Aug
80 17' 2,9''
7
Kab. Banyuwangi
1140 13 22,8
MCK+
400.0
11-Mar
17-May
29-May
23-Jul
29-May
21-Aug
80 30 48,06
a
Desa Grogol Kec. Giri
MCK+
400.0
11-Mar
17-May
16-Jun
23-Jul
16-Jun
21-Aug
a
8
Kab. Nganjuk
E 112 02 35
MCK+
400.0
28-Mar
10-Apr
20-May
26-Jul
27-May
21-Aug
S 7 35 8,0
0%
50%
100%
Status : 20/September/2013
64,200.0
131.00
134.00
142.00
47.00
70.00
54.00
E 112 02 57
MCK+
Kab. Lamongan
a
a
10
Kab Situbondo
400.0
28-Mar
20-Apr
20-May
26-Jul
27-May
21-Aug
S 7 41 36
1120 24 34,72
MCK+
400.0
19-Mar
22-Mar
1-May
27-Jul
16-May
21-Aug
MCK+
400.0
19-Mar
22-Mar
1-May
18-Jul
6-May
21-Aug
70 7 57,85
Ponpes Walisongo Jl. Basuki Rahmat no.7 Kel. Mimbaan, Kec. Panji
MCK+
400.0
9-Apr
2-Apr
22-Apr
18-Jun
23-Apr
21-Aug
7 41' 58,4"
MCK+
a
11
FOTO
LONGTITUDE
(E)
TITIK KOORDINAT
LATITUDE
(N/S)
FISIK
KEUANGAN
B 12
KOMULATIF (%)
B 11
B 10
B 09
B 08
B 07
(X1.000.000,-)
UJI COBA
KEC/KEL/LINGKUNGAN
PROGRES
FISIK
163
KONTRAK
KERJA
KAB/KOTA
(X1.000.000,-)
PILIHAN
SISTEM
Kab. Nganjuk
PENYUSUNAN
RKM
58
KEGIATAN
PEMBENTUKA
N KSM
NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI
PROVINSI
SOSIALISASI
LOKASI
400.0
9-Apr
15-May
20-May
18-Jun
20-May
21-Aug
7 45' 15,9"
Kab Bangkalan
11258'39,50"
400.0
5-Apr
10-Apr
21-May
12-Jul
23-May
21-Aug
MCK+
653'55,19"
112046'13,45"
400.0
5-Apr
10-Apr
8-May
12-Jul
9-May
21-Aug
MCK+
12
700'11,94"
Kab Probolinggo
1130 23 38,4
MCK+
400.0
10-Apr
26-Apr
16-May
26-Jun
17-May
21-Aug
70 46 4,94
1130 25 37,2
Blok Pasar sore RT/RW 04/04, Kel. Kraksaan Wetan, Kec. Kraksaan
MCK+
400.0
10-Apr
29-Apr
20-May
26-Jun
21-May
21-Aug
70 45 24,08
13
Kab Sumenep
1130 38 8,01
MCK+
400.0
10-Apr
10-Apr
16-May
10-Jul
17-May
21-Aug
70 4 40,49
1140 5 35,06
MCK+
400.0
10-Apr
10-Apr
17-May
10-Jul
18-May
21-Aug
60 38 47,35
14
Kab Kediri
1120 8 53,99
Dusun Kalasan, Desa Jarak RT. 02,03 dan 04, Kecamatan Plosoklaten
400.0
11-Apr
23-Apr
3-May
24-Jul
8-May
21-Aug
70 52 59,30
1120 3 59,64
400.0
16-Apr
23-Apr
6-May
24-Jul
6-May
21-Aug
70 48 30,48
15
Kab Pamekasan
1130 27 14,44
MCK=
400.0
19-Mar
1-Apr
20-Apr
19-Jul
20-Apr
21-Aug
70 10 10,70
0%
50%
100%
Status : 20/September/2013
64,200.0
131.00
134.00
142.00
47.00
70.00
FOTO
LONGTITUDE
(E)
TITIK KOORDINAT
LATITUDE
(N/S)
FISIK
KEUANGAN
B 12
KOMULATIF (%)
B 11
B 10
B 09
B 08
B 07
(X1.000.000,-)
UJI COBA
KEC/KEL/LINGKUNGAN
PROGRES
FISIK
163
KONTRAK
KERJA
KAB/KOTA
(X1.000.000,-)
PILIHAN
SISTEM
Kab Pamekasan
PENYUSUNAN
RKM
58
KEGIATAN
PEMBENTUKA
N KSM
15
NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI
PROVINSI
SOSIALISASI
LOKASI
54.00
1130 28 17,80
MCK+
400.0
19-Mar
1-Apr
9-Apr
16-Jul
9-Apr
21-Aug
70 13 6,95
16
Kab Tuban
1120 4 42,10
MCK+
17
Kab Ngawi
Kab Sampang
5-May
21-Jun
23-Jul
25-Jun
21-Aug
60 53 42,66
1120 3 33,91
MCK+
400.0
30-Apr
5-May
10-May
23-Jul
16-May
21-Aug
MCK+
400.0
5-Apr
10-Apr
17-May
26-Jul
17-May
21-Aug
60 53 33,97
E 111 25 0,35
400.0
5-Apr
10-Apr
16-May
26-Jul
16-May
21-Aug
S 7 26 15,4
11316'14,71"
400.0
30-Apr
MCK+
18
400.0
17-Apr
17-Apr
25-May
18-Jul
25-May
21-Aug
74'8,10"
11314'58,13"
400.0
17-Apr
17-Apr
25-May
18-Jul
25-May
21-Aug
711'56,00"
0%
50%
100%
KETERANGAN
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa
idem
idem
idem
idem
idem
idem
idem
idem
idem
idem
idem
idem
KETERANGAN
idem
idem
idem
3 lokasi di Kota Cilegon dibatalkan dan rencananya dipindahkan ke Kota Tangerang Selatan
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa
idem
idem
idem
idem
idem
idem
idem
idem
idem
Lokasi pada awalnya adalah lokasi di Jakarta Utara (Pademangan Utara) Lokasi masih dalam tahap sosialisasi
idem
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa.
Penetapan lokasi dilakukan tahun 2012
KETERANGAN
idem
idem
idem
idem
idem
idem
idem
idem
idem
idem
idem
idem
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa
idem
KETERANGAN
idem
idem
idem
idem
idem
idem
idem
idem
idem
idem
idem
idem
idem
idem
KETERANGAN
idem
idem
idem
idem
idem
idem
idem
idem
idem
idem
KETERANGAN
idem
idem
idem
idem
idem
idem
Tidak dilakukan sosialisasi kabupaten, lokasi ditentukan berdasarkan surat minat dari kepala desa yang masuk
ke Dinas Tata Ruang Permukiman dan Kebersihan. Sosialisasi yang dilakukan tingkat desa
idem
idem
Tidak dilakukan sosialisasi kabupaten, sosialisasi dilakukan di tingkat desa,lokasi ditentukan berdasarkan
proposal yang masuk ke Dinas Cipta Karya dan Tata Ruang.
Idem
Idem
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa
KETERANGAN
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa
idem
idem
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa.
Penetapan lokasi dilakukan tahun 2012
Idem
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa.
Penetapan lokasi dilakukan tahun 2012
idem
idem
idem
idem
idem
idem
idem
idem
KETERANGAN
idem
idem
idem
idem
idem
Idem
idem
idem
idem
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat
desa.Penentuan lokasi berdasar SSK Kabupaten, RPA diikuti 3 kampung dalam 1 desa yang sama
idem
idem
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat dusun.
Penetapan lokasi dari awal sudah dilakukan
idem
KETERANGAN
idem
idem
idem
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa.
idem
idem
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa.
Lokasi dari daftar SSK
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa.
Idem
Idem
Idem
Idem
Idem
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat
desa.RPA hanya pada lokasi yang telah terpilih
KETERANGAN
Idem
idem
Lokasi Pengganti dari Jl. Desa Simo Ketawang, Dsn Jarakan, Kec Wonoayu. penggantian lokasi berdasarkan
surat DPU CKTR Kab Sidoarjo tgl 29 Juli 2013
Idem
Idem
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat
desa.lokasi berdasarkan lokasi SSK
idem
idem
idem
Tidak ada sosialisasi kota/kabupaten, sosialisasi dilakukan tingkat desa dikarenakan keterlambatan informasi
dari dinas terkait penentuan lokasi diambil dari lokasi DAK. Kriteria berdasarkan data dari BAPPEDA dan
Dinkes Kab Jember
Idem
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat
desa.RPA hanya pada lokasi yang telah terpilih
Baru akan melakukan Tahap Sosialisasi, pada saat kunjungan pertama Lokasi belum bisa ditentukan karena
pergantian kepala desa
Dinas tidak melakukan sosialisasi kota/kabupaten karena keterlambatan pengetahuan program SANIMAS oleh
pihak Cipta Karya, sosialisasi dilakukan di tingkat desa terpilih. Penentuan lokasi berdasar buku putih
KETERANGAN
idem
Penentuan lokasi berdasarkan SSK. TFL sedang menganalisa/merencakan pengembangan sistem kombinasi
dan perpipaan dengan memanfaatkan MCK eksisting dengan lahan calon lokasi sanimas. Lokasi berada di
daerah rawan air, Dinas PU Cipta karya Kab. Lamongan TA. 2013 tengah membangunan fasilitas sumur bor
untuk dapat melayani wilayah sekitar lokasi sanimas.
Penentuan lokasi berdasarkan SSK . Jarak antar rumah berjauhan dan tata letak rumah yang tidak beraturan,
topografi wilayah memiliki kemiringan 5%<i<10%. TFL sedang menganalisa/merencakan pengembangan
sistem kombinasi dan perpipaan.
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat
desa.Penentuan lokasi berdasarkan SSK Kabupaten dengan menunjuk wilayah yang padat penduduknya serta
fasilitas yang dirasa kurang, tanpa melakukan RPA.
idem
lokasi berdasar wilayah/daerah kumuh, PPSP baru berjalan th 2013, sosialisasi dilakukan di 1 kelurahan antar
RT
Idem
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat
desa.RPA hanya pada lokasi yang telah terpilih
idem
idem
Idem
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa.
Lokasi dari daftar SSK
idem
KETERANGAN
idem
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat
desa.RPA hanya pada lokasi yang telah terpilih
Idem
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat
desa.RPA hanya pada lokasi yang telah terpilih. Lokasi berdasarkan PPSP
Idem
Sosialisasi dilakukan di 1 kelurahan antar kampung. Lokasi berada di wilayah perkotaan, padat penduduk dan
rawan sanitasi. Direncanakan bangunan sanimas akan dibuat dengan bentuk untuk dapat digunakan oleh
pesantren dan umum.
idem