REKAPITULASI PROGRES PENCAPAIAN

PELAKSANAAN INFRASTRUKTUR SANITASI BERBASIS MASYARAKAT TAHUN ANGGARAN 2013


PT. Waseco Tirta
Wilayah II (Jawa)
Status : 20/September/2013
B03
No

Indikator Progres

Bobot

B04

Rencana
Jml

(%)

Realisasi

TTB (%)

Jml

(%)

Rencana

TTB (%)

Jml

(%)

B05

Realisasi
TTB (%)

Jml

B06

Rencana
(%)

TTB (%)

Jml

(%)

Realisasi
TTB (%)

Jml

(%)

TTB (%)

1 Sosialisasi

5.00%

15.00

9.20%

0.460%

20

12.27%

0.613%

163.00

100.0%

4.540%

51

31.3%

0.95%

37.42%

0.307%

2 Penetapan Lokasi

5.00%

15.00

9.20%

0.460%

1.84%

0.092%

30.00

18.4%

0.460%

29

17.79%

0.80%

60.00

36.81%

0.920%

53

32.52%

0.037%

3 Pembentukan KSM

5.00%

8.00

4.91%

0.245%

10

6.13%

0.307%

16.00

9.8%

0.245%

15

9.20%

0.15%

75.00

46.01%

1.810%

42

25.77%

0.041%

0.000%

0.00%

0.000%

0.000%

0.00%

0.00%

8.00

4.91%

1.718%

0.00%

0.000%

4 Penyusunan RKM

35.00%

61

Rencana
Jml

Realisasi

(%)

TTB (%)

Jml

0.00%
163.00
130.00
15.00

60

(%)

TTB (%)

36.81%

-0.03%

100.00%

3.16%

69

42.3%

0.49%

79.75%

1.69%

59

36.20%

0.52%

9.20%

1.50%

0.61%

0.21%

0.00%

0.00%

0.00%

0.25%

0.00%

0.00%

5 Pembentukan Pengelola

5.00%

0.000%

0.00%

0.000%

0.000%

0.00%

0.00%

0.000%

0.00%

0.000%

6 Kontrak Kerja

5.00%

0.000%

0.00%

0.000%

0.000%

0.00%

0.00%

0.000%

0.00%

0.000%

35.00%

0.000%

0.00%

0.000%

0.000%

0.00%

0.00%

0.000%

0.00%

0.000%

0.00%

0.00%

0.00%

5.00%

0.000%

0.00%

0.000%

0.000%

0.00%

0.00%

0.000%

0.00%

0.000%

0.00%

0.00%

0.00%

100.00%

1.166%

1.012%

5.245%

1.902%

4.45%

0.385%

6.60%

7 Progres Fisik
8 Ujicoba
Kumulatif Progres Pemberdayaan
Total Lokasi Wilayah II (TA.2013)

163 lokasi

8.00

4.91%

1.20%

REKAPITULASI PROGRES PENCAPAIAN PELAKSANAAN INFRASTRUKTUR SANITASI BERBASIS MASYARAKAT TAHUN ANGGA

100.00%

100.00%

90.00%
80.00%
70.00%

66.93%

63.44%

61.72%

60.00%
50.89%

50.00%
40.00%
33.90%

30.00%

25.91%

20.00%

17.45%

1.17%
0.00% 1.01%
1

6.41%
2.91%
2

13.42%

13.42%

13.42%

4.50%

3.30%
3

17.32%

13.30%

10.86%

10.00%

Progres Rencana

10

REKAPITULASI PROGRES PENCAPAIAN


KTUR SANITASI BERBASIS MASYARAKAT TAHUN ANGGARAN 2013

REKAPITULASI PROGRES PENCAPAIAN


PELAKSANAAN INFRASTRUKTUR SANITASI BERBASIS MASYARAKA

PT. Waseco Tirta


Wilayah II (Jawa)
Status : 20/September/2013
B07
No

Indikator Progres

Bobot

Rencana
Jml

(%)

0.000%

97

59.51%

1.13%

5.00%

0.000%

126

77.30%

1.75%

3 Pembentukan KSM

5.00%

163.00

100.00%

1.012%

119

73.0%

1.84%

35.00%

80.00

49.08%

13.957%

20

12.27%

4.08%

5 Pembentukan Pengelola

5.00%

16.00

9.82%

0.491%

0.00%

0.00%

6 Kontrak Kerja

5.00%

40.00

24.54%

0.982%

0.00%

0.00%

Kumulatif Progres Pemberdayaan


Total Lokasi Wilayah II (TA.2013)

35.00%

0.000%

0.00%

0.00%

5.00%

0.000%

0.00%

0.00%

100.00%

16.442%

REKAPITULASI PROGRES PENCAPAIAN PELAKSANAAN INFRASTRUKTUR SANITASI BERBASIS MASYARAKAT TAHUN ANGGARAN 2013

100.00%

100.00%

90.00%
80.00%
70.00%

66.93%

63.44%

50.89%

40.00%
33.90%

30.00%

25.91%

20.00%

17.45%

1.17%
0.00% 1.01%
1

6.41%
2.91%
2

13.42%

13.42%

13.42%

4.50%

3.30%
3

17.32%

13.30%

10.86%

10.00%

Progres Rencana

TTB (%)

5.00%

8 Ujicoba

50.00%

(%)

2 Penetapan Lokasi

7 Progres Fisik

61.72%

Jml

1 Sosialisasi

4 Penyusunan RKM

60.00%

Realisasi
TTB (%)

10

8.80%

REKAPITULASI PROGRES PENCAPAIAN


PELAKSANAAN INFRASTRUKTUR SANITASI BERBASIS MASYARAKAT TAHUN ANGGARAN 2013
PT. Waseco Tirta
Wilayah II (Jawa)
Status : 20/September/2013
B08
No

Indikator Progres

Bobot

B09

Rencana
Jml

(%)

Realisasi
TTB (%)

Jml

(%)

B10

Rencana

TTB (%)

Jml

(%)

Realisasi
TTB (%)

Jml

(%)

B11

Rencana
TTB (%)

Jml

(%)

Realisasi
TTB (%)

Jml

(%)

Rencana

TTB (%)

Jml

(%)

Realisasi

TTB (%)

Jml

(%)

TTB (%)

1 Sosialisasi

5.00%

0.00%

120

73.62%

0.00%

0.00%

131

80.37%

0.34%

0.00%

0.00%

-4.02%

0.00%

0.00%

0.00%

2 Penetapan Lokasi

5.00%

0.00%

126

77.30%

0.00%

0.00%

134

82.21%

0.25%

0.00%

0.00%

-4.11%

0.00%

0.00%

0.00%

3 Pembentukan KSM

5.00%

0.00%

122

74.85%

3.74%

0.00%

142

87.12%

0.61%

0.00%

0.00%

-4.36%

0.00%

0.00%

0.00%

10.74%

29

17.79%

0.00%

163.00

7.09%

47

28.83%

3.87%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

4 Penyusunan RKM

35.00%

130.00

5 Pembentukan Pengelola

5.00%

130.00

79.75%

3.50%

5.52%

0.28%

163.00

100.00%

1.01%

70

42.94%

1.87%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

6 Kontrak Kerja

5.00%

130.00

79.75%

2.76%

0.00%

0.00%

163.00

100.00%

1.01%

54

33.13%

1.66%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

8.00

4.91%

1.72%

0.00%

0.00%

0.00%

0.00%

30.00

18.40%

3.01%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

16.00

9.82%

0.49%

0.00%

0.00%

8.59%

1.72%

7 Progres Fisik
8 Ujicoba
Kumulatif Progres Pemberdayaan
Total Lokasi Wilayah II (TA.2013)

79.75%

100.00%

35.00%

0.00%

0.00%

0.00%

5.00%

0.00%

0.00%

0.00%

0.00%

100.00%

16.99%

4.02%

10.83%

16.00

9.82%

1.72%

-12.48%

3.50%

0.00%

REKAPITULASI PROGRES PENCAPAIA


PELAKSANAAN INFRASTRUKTUR SANITASI BERBASIS MASYARA
PT. Waseco Tirta
Wilayah II (Jawa)
Status : 20/September/2013
B12
No

Indikator Progres

Bobot

Rencana
Jml

(%)

Realisasi
TTB (%)

Jml

(%)

TTB (%)

1 Sosialisasi

5.00%

0.00%

0.00%

0.00%

2 Penetapan Lokasi

5.00%

0.00%

0.00%

0.00%

3 Pembentukan KSM

5.00%

0.00%

0.00%

0.00%

35.00%

0.00%

0.00%

0.00%

5 Pembentukan Pengelola

5.00%

0.00%

0.00%

0.00%

6 Kontrak Kerja

5.00%

0.00%

0.00%

0.00%

4 Penyusunan RKM

7 Progres Fisik
8 Ujicoba
Kumulatif Progres Pemberdayaan
Total Lokasi Wilayah II (TA.2013)

35.00%

163.00

100.00%

28.56%

0.0%

0.00%

5.00%

163.00

100.00%

4.51%

0.0%

0.00%

100.00%

33.07%

0.00%

PROGRAM PRIORITAS NASIONAL


PELAKSANAAN INFRASTRUKTUR SANIMAS TA 2013 (WILAYAH - II, JAWA)
Status : 20/September/2013

64,200.0

Banten

Kab Serang

131.00

134.00

142.00

47.00

70.00

FOTO
LONGTITUDE
(E)

TITIK KOORDINAT

LATITUDE
(N/S)

FISIK

KEUANGAN

B 12

KOMULATIF (%)

B 11

B 10

B 09

B 08

B 07

(X1.000.000,-)

UJI COBA

KEC/KEL/LINGKUNGAN

PROGRES
FISIK

163

KONTRAK
KERJA

KAB/KOTA

CAPAIAN FISIK (%)


PEMBENTUKA
N PENGELOLA

58

PENYUSUNAN
RKM

(X1.000.000,-)

PILIHAN
SISTEM

PROVINSI

KEGIATAN
PEMBENTUKA
N KSM

NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI

NILAI PAGU (RP.)

SOSIALISASI

LOKASI

54.00

Kp. Bojong Tengah RT/RW. 12/04 Desa Bojong Menteng Barat Kec.
Tanjung Teja

E. 10613'09,08"

S. 618'03,68"

400.0

11-May

17-May

Kp. Begag Pasar RT. 09/RW. 02 Desa Singorajan Kec. Pontang

E. 10616'51,42"

S. 601'26,59"

400.0

24-Apr

18-Jun

25-Jun

Kp. Lebak Gaga RT/RW. 09/03 Desa Lebak Wangi Kec. Lebak Wangi

E. 10616'45,71"

S. 604'33,35"

400.0
2

Kab Pandeglang

11-May

13-May

RT.06 RW.07 Kel. Cicadas Kel. Pandeglang Kec. Pandeglang

E. 10605'31,07"

S. 618'01,64"

400.0

10-Apr

28-Apr

29-May

RT. 02 RW. 05 Kp. Pabuaran Kel Kadomas Kec. Pandeglang

E. 10607'06,62"

S. 620'32,47"

400.0

5-Apr

25-Apr

27-May

Kp. Baru RT. 02 RW. 01 Desa Banyu Mekar Kec. Labuhan

E. 10550'31,79"

S. 622'04,27"

400.0

2-Apr

30-Apr

29-May

Kp. Nelayan 2 RT. 02/RW.12 Desa Teluk Kec. Labuhan

E. 10549'27,19"

S. 622'26,47"

400.0
3

Kota Serang

8-Apr

26-Apr

28-May

Kp. Kubang Apu RT/RW 2/2, Kel. Terondol, Kec. Serang

E. 106 12' 44,1"

MCK ++

S. 6 6' 7,0"

400.0

13-Jun

Lingkungan Jeranak Rt/RW 1/2, Kel. Banjarsari, Kec. Cipocok Jaya

E. 106 11' 53,0"

S. 6 6' 4,7"

Kombinasi

400.0

(1)Kp. Sidapurna Barat RT/RW 2/3 & (2)Kp. Kawunen RT/RW 2/2,
Kelurahan Teritih, Kec. Walantaka

1. E. 10612'44,0"
2. E. 10612'30,2"
1. S. 6 6' 40,8"
6 6' 14,8"

MCK +

400.0
4

Kab Tangerang

Kp. Bebutak Lor RT 6 - RW 3, Desa Margamulya, Kec. Mauk

Kp. Nagreg RT/RW 4/2, Desa Cibugel, Kec. Cisok

MCK ++

400.0

2. S.

10-Jun

1-May

20-May
E. 10625'14"

S. 6 14' 31,4"

MCK +

400.0

1-Apr

30-Apr

Kp. Pekong Senggereng RT/RW 5/1, Kel. Saga, Kec. Balaraja

E. 10627'43,5"

S. 6 10' 23,0"

MCK +

400.0

0%

50%

100%

Status : 20/September/2013

64,200.0

Kab Lebak

131.00

134.00

142.00

47.00

70.00

FOTO
LONGTITUDE
(E)

TITIK KOORDINAT

LATITUDE
(N/S)

FISIK

KEUANGAN

B 12

KOMULATIF (%)

B 11

B 10

B 09

B 08

B 07

UJI COBA

(X1.000.000,-)

PROGRES
FISIK

KEC/KEL/LINGKUNGAN

163

KONTRAK
KERJA

KAB/KOTA

CAPAIAN FISIK (%)


PEMBENTUKA
N PENGELOLA

58

PENYUSUNAN
RKM

(X1.000.000,-)

PILIHAN
SISTEM

PROVINSI

KEGIATAN
PEMBENTUKA
N KSM

NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI

NILAI PAGU (RP.)

SOSIALISASI

LOKASI

54.00

RT. 02 RW. 04 Kp. Babakan Nambo Seng. Kel. Cijoro Lebak, Kec.
Rangkas Bitung.

E. 10615'01,07"

S. 620'52,91"

400.0

12-Mar

10-Mar

8-May

Kp. Barambang Atas atau Kp. Kompdik W. 13 Kel, Muara Ujung


Timur, Kec. Muara Ujung Timur

E. 10615'36,83"

S. 621'15,62"

400.0

26-Apr

27-May

3-Jun

Kp. Cimesir RT/RW. 02/04 Desa Rangkas Bitung Timur, Kec. Rangkas
Bitung

E. 10615'52,65"

S. 621'56,22"

400.0
6

Kota Tangerang
Selatan)

10-Apr

10-May

25-May

6-Apr

23-Apr

a
400.0

a
400.0

a
400.0

DKI Jakarta

Jakarta Selatan

Pondok Pesantren AL Amanah Al Gontoru, RT 3, RW 5, Kelurahan


Perigi Baru, Kecamatan Pondok Aren

Kampung Koceak RT 6, RW 2, Kelurahan Kerangan, Kecamatan Setu

RT/RW 01/09 Kelurahan Lenteng Agung, Kecamatan Jagakarsa

RT/RW 04/09 Kelurahan Lenteng Agung, Kecamatan Jagakarsa

RT/RW 06/09 Kelurahan Lenteng Agung, Kecamatan Jagakarsa

RT/RW 07/09 Kelurahan Lenteng Agung, Kecamatan Jagakarsa

Jl. Simpangan Kp. Poponcol RT/RW 02/03, Desa Simpangan,


Kecamatan Cikarang Utara

Jl. Simpangan Kp. Cibeber RT/RW 01/04, Desa Simpangan,


Kecamatan Cikarang Utara

MCK+

400.0

MCK++

400.0

1060 50,35413'

Perpipaan

8-Apr

8-Apr

17-Jul

60 20,484'

300.0

6-Oct

8-Apr

8-Apr

17-Jul

60 20,49844'
1060 50,39312'

Perpipaan

300.0

6-Oct

8-Apr

8-Apr

17-Jul

60 20,49844'
1060 50,40467'

Perpipaan
Kab. Bekasi

6-Oct

1060 50,39312'

Perpipaan

300.0

300.0

6-Oct

8-Apr

8-Apr

17-Jul

60 20,48753'
107 0 10,78263'

MCK +

300.0

9-Apr

26-Apr

26-Apr

17-Jul

60 17,01310'
1. 1070 10,83653'

1. 60 17,02885'

MCK +

300.0

9-Apr

26-Apr

26-Apr

17-Jul
2. 60 16,99574'

Kawasan Kanal
Banjir Timur (KBT)

RW 01 Kel. Cipinang Besar Selatan Kec. Jatinegara Jakarta Timur

RW 09 Kel. Cipinang Besar Selatan Kec. Jatinegara Jakarta Timur

Rawamangun

Rawamangun

300.0
300.0

Jakarta Timur

2. 107 0 10,78813'

24-Sep

300.0
300.0
3

Jawa Barat

Kota Bogor

Kp. Cilendek Timur RT/RW 03/01 Kel. Cilendek Timur Kec. Bogor
Barat

1060 46' 21,8''

60 34' 27,0''

Kombinasi

400.0

31-Oct

0%

50%

100%

Status : 20/September/2013

64,200.0

131.00

134.00

142.00

47.00

70.00

FOTO
LONGTITUDE
(E)

TITIK KOORDINAT

LATITUDE
(N/S)

FISIK

KEUANGAN

B 12

KOMULATIF (%)

B 11

B 10

B 09

B 08

(X1.000.000,-)

B 07

KEC/KEL/LINGKUNGAN

UJI COBA

163

PROGRES
FISIK

KAB/KOTA

KONTRAK
KERJA

(X1.000.000,-)

PILIHAN
SISTEM

Kota Bogor

CAPAIAN FISIK (%)


PEMBENTUKA
N PENGELOLA

58

PENYUSUNAN
RKM

KEGIATAN
PEMBENTUKA
N KSM

Jawa PROVINSI
Barat

NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI

NILAI PAGU (RP.)

SOSIALISASI

LOKASI

54.00

Kp. Sindangbarang Loji RT/RW 03/13 Kel. Loji Kec. Bogor Barat

1060 45' 50,6''

60 35' 17,7''

Kombinasi

400.0

31-Oct

9-Mar

5-Mar

Kp. Bojong Kidul RT/RW 06/02 Kel. Bojong Kerta Kec Bogor Selatan

1060 50' 19,5''

60 40' 24,0''

a
a

Kombinasi

400.0

31-Oct

20-Mar

30-Mar

Kp. Bakom Pesantren Kel. Bojong Kerta RT/RW 01/05, Kec. Bogor
Selatan

1. 1060 50' 23,4''

1. 60 40' 03,5''

Kombinasi

400.0

31-Oct

23-Mar

30-Mar
2. 1060 50' 24,2''

2. 60 40' 06,4''

Kp. Kramat RT/RW 05/01 Kel. Panaragan Kec. Bogor Tengah

1060 47' 18,6''

60 35' 59,2''

Kombinasi

400.0

31-Oct

4-May

9-May

Kp. Pabuaran RT/RW 01/02 Kel. Rancamaya Kec. Bogor Selatan

1060 49' 26,4''

60 40'26,4''

Kombinasi

400.0

31-Oct

24-Mar

31-Mar

Gang Nasedin Kp. Kaum RT/RW 02/02 Kel. Cilendek Barat Kec. Bogor
Barat

1060 46' 13''

60 34' 40''

Kombinasi

400.0

31-Oct

26-Feb

1-Apr

Kp. Sindangsari RT/RW 05/07 Kel Kebon Kelapa Kec Bogor Tengah

1060 46' 43,5''

60 35' 26,2''

Kombinasi

400.0

31-Oct

1-Apr

16-Mar

Kp. Wanjun Asri RT/RW 03/01 Kel. Sindangsari Kec. Bogor Timur

1060 50' 42,3''

060 39' 8,4''

Kombinasi

400.0

31-Oct

3-Apr

4-Apr

Jl. Haji Hamid Kp. Cimanggu Lamping RT/RW 01/03 Kel. Kedung
Waringin Kec. Tanah Sareal

1060 47' 1,2''

60 33' 50,6''

Kombinasi

400.0

31-Oct

13-Mar

5-Apr

Kp. Cimanggis RT/RW 04/01 Kel. Mekarwangi Kec. Tanah Sareal

1060 46' 50,7''

60 32' 16,6''

Kombinasi

400.0

31-Oct

16-Mar

17-Mar

Jl. Kedung Halang Kp. Sugih Lamping RT/RW 04/07 Kel. Sukaresmi
Kec. Tanah Sareal

1060 48' 7,9''

60 33' 12,6''

a
2

Kota Tasikmalaya

Kombinasi

400.0

MCK++

MCK++

31-Oct

6-Mar

12-Mar

400.0

14-Mar

14-Mar

400.0

15-Mar

15-Mar

Kp. Ampera, RT/RW 01/07 Kel. Panglayungan Kec. Cipedes

a
Kp. Sukahurip, RT/RW 01/05 Kel. Gunung Tandala Kec. Kawalu

0%

50%

100%

Kota Tasikmalaya

Status : 20/September/2013

64,200.0

131.00

134.00

142.00

47.00

70.00

FOTO
LONGTITUDE
(E)

TITIK KOORDINAT

LATITUDE
(N/S)

FISIK

KEUANGAN

B 12

KOMULATIF (%)

B 11

B 10

B 09

B 08

B 07

(X1.000.000,-)

UJI COBA

KEC/KEL/LINGKUNGAN

PROGRES
FISIK

163

KONTRAK
KERJA

KAB/KOTA

CAPAIAN FISIK (%)


PEMBENTUKA
N PENGELOLA

58

PENYUSUNAN
RKM

(X1.000.000,-)

PILIHAN
SISTEM

PROVINSI

KEGIATAN
PEMBENTUKA
N KSM

NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI

NILAI PAGU (RP.)

SOSIALISASI

LOKASI

54.00

Kp. Sambonghilir, RT/RW 03/05 Kel. Sambong Jaya Kec. Mangkubumi

MCK++

a
3

Kab Bogor

400.0

13-Mar

13-Mar

Jl. Raya Tenjo, Kp. Cikadu Ranca Riung RT/RW 01/03, Desa
Singabraja, Kec. Tenjo

10626,021'

621,200'

MCK++

400.0

4-Mar

25-Mar

26-Mar

Kp. Pasir Nangka/Bone Bojong Meros RT/RW 01/02, Desa


Cikopomayak, Kecamatan Jasinga

10626,021'

626,95879'

MCK++

400.0

4-Mar

25-Mar

26-Mar

Kp. Kiara Pandak RT/RW 001/007, Desa Kiara Pandak, Kecamatan


Sukajaya

10627,58210'

637,61397'

MCK++

a
4

Kab Indramayu

400.0

4-Mar

25-Mar

26-Mar

RT/RW 11/05 Kel. Kertanegara Kec. Haurgeulis

E 10755' 44,4"

S 6 27' 1,55"

MCK++

400.0

4-Apr

8-Apr

8-Apr

22-Jul

RT/RW 02/01 Ds. Cemara Kec. Cantigi

E 108 13' 33,6"

S 6 19' 23,88"

MCK++

400.0

1-Apr

4-Apr

4-Apr

22-Jul

RT/RW 12/03 Ds. Weru Kec. Lohbener

E 108 15' 18"

S 6 25' 6,82"

MCK++

400.0

2-Apr

5-Apr

5-Apr

22-Jul

RT/RW 03/06 Ds. Jatimunggul Kec. Terisi

E 108 7' 37,2"

S 6 30' 41,18"

MCK++

a
5

Kab Karawang

400.0

3-Apr

6-Apr

6-Apr

22-Jul

Dsn Tirtasari RT/RW 01/01 Ds. Sedari Kec. Cibuaya

E 107 18 25,5

S 5 57 43,2

MCK+

400.0

1-Mar

18-Mar

26-Mar

Dsn Gadangmanggala RT/RW 10/04 Ds. Cilewo Kec. Telagasari

E 107 25 50

S 6 16 39,8

MCK+

400.0

5-Mar

18-Mar

27-Mar

Dsn Poponcol RT/RW 11/4 Ds. Ciwulan Kec. Telagasari

E 107 26 27,5

S 6 15 21,6

MCK+

400.0

5-Mar

18-Mar

27-Mar

Dsn Karokrok RT/RW 01/01 Ds. Kalisari Kec. Telagasari

E 107 25 37,1

S 6 15 35,0

Kombinasi

400.0

5-Mar

18-Mar

27-Mar

RT/RW 9/3 Dusun 2, Ds. Kali Buaya Kec. Telagasari

E 107 23 34,6

S 6 15 55,5

MCK++

a
6

Kab Bekasi

400.0

5-Mar

18-Mar

27-Mar

Kampung Sampora RT/RW 13/06, Desa Jayamulya, Kecamatan


Serang Baru

E. 10704,512921"

S. 624'19190"

MCK++

400.0

19-Mar

23-Apr

0%

50%

100%

Status : 20/September/2013

64,200.0

131.00

134.00

142.00

47.00

70.00

FOTO
LONGTITUDE
(E)

TITIK KOORDINAT

LATITUDE
(N/S)

FISIK

KEUANGAN

B 12

KOMULATIF (%)

B 11

B 10

B 09

B 08

B 07

(X1.000.000,-)

UJI COBA

KEC/KEL/LINGKUNGAN

PROGRES
FISIK

163

KONTRAK
KERJA

KAB/KOTA

CAPAIAN FISIK (%)


PEMBENTUKA
N PENGELOLA

(X1.000.000,-)

PILIHAN
SISTEM

Kab Bekasi

PENYUSUNAN
RKM

58

KEGIATAN
PEMBENTUKA
N KSM

NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI

PROVINSI

NILAI PAGU (RP.)

SOSIALISASI

LOKASI

54.00

Kampung Bojong RT/RW 04/01, Desa Jayalaksana, Kecamatan


Cabang Bungin

E. 10711,23948"

S. 65'4600"

MCK++

400.0

25-Mar

28-Apr

Kampung Campaka RT/RW 05/03, Desa Naga Cipta, Kecamatan


Serang Baru

E. 1077,67101"

S. 624'89158"

MCK++

a
7

Kab Bandung

400.0

26-Mar

7-May

Kp. Paseh RT 03 RW. 02 Desa Ibun Kec. Ibun

10745'50,73"

400.0

6-Apr

6-Apr

23-Apr

15-May

13-May

76'6,45"

a
Kp. Cijengkol RT/RW. 04/13 Desa Cipaku Kec. Paseh

10747'21,2"

400.0

23-Apr

23-Apr

2-May

15-May

14-May

73'52,8"

a
RT. 02 RW, 01 Kp. Cikoneng Desa Cibiru Wetan Kec. Cilenyi

10725'4,09"

400.0

22-Apr

26-Apr

30-Apr

15-May

13-May

653'47,91"

a
8

Kab Bandung Barat

KP Cipicung RT/RW.01/03 Desa Sumur Bandung Susun Cidepong


Kec. Cipatat

10744'38,74"

647'13,53"

400.0

18-Apr

15-May

20-May

Kp. Cibacang Hilir RT. 2 & 3 RW. 7 Desa Cipeundeuy. Kec. Padalarang

10729'0,43"

652'13,76"

400.0

9-Apr

21-May

Kp. Cibayun RT. 01 RW. 15 Desa Cimanggu Kec. Ngamprah

10745' 50,73"

649'30,75"

400.0

a
9

Kab Cianjur

25-Apr

15-May

17-May

Kp. Ciharahas Desa Jamali Kec. Mande RT. 03 RW. 02

06o 48,538'

107o 08,139'

400.0

28-Mar

10-May

17-May

RT. 02 RW.05 Desa Mekarwangi Kec. Haur Wangi

06o 49,339'

107o 17,401'

400.0

27-Mar

25-Apr

29-Apr

RT. 3 RW. 20 Kel Bojong Herang Kec. Cianjur

06o 44,628'

107o 12,743'

400.0

a
10

Kab Tasikmalaya

25-Mar

12-Apr

12-Apr

Kp. Tuban RT/RW 05/01 Ds. Purwaraharja Kec. Bojong Gambir

1070 58' 50,9''

70 29' 40,4''

MCK+

400.0

11-Mar

12-Mar

13-Mar

Kp. Pamoyanan RT/RW 02/02 Ds. Pamoyanan Kec. Kadipaten

1080 8' 54,7''

70 7' 27,9''

MCK+

400.0

2-Mar

12-Mar

13-Mar

Kp. Citambal RT 18/ RW 05 Ds. Karanglayung Kec. Karangjaya

1080 21' 45,3''

70 26' 17,1''

MCK+

400.0

11-Mar

15-Mar

25-Mar

0%

50%

100%

Status : 20/September/2013

64,200.0

11

Kab Ciamis

131.00

134.00

142.00

47.00

70.00

FOTO
LONGTITUDE
(E)

TITIK KOORDINAT

LATITUDE
(N/S)

FISIK

KEUANGAN

B 12

KOMULATIF (%)

B 11

B 10

B 09

B 08

B 07

(X1.000.000,-)

UJI COBA

KEC/KEL/LINGKUNGAN

PROGRES
FISIK

163

KONTRAK
KERJA

KAB/KOTA

CAPAIAN FISIK (%)


PEMBENTUKA
N PENGELOLA

58

PENYUSUNAN
RKM

(X1.000.000,-)

PILIHAN
SISTEM

PROVINSI

KEGIATAN
PEMBENTUKA
N KSM

NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI

NILAI PAGU (RP.)

SOSIALISASI

LOKASI

54.00

RT 12 /RW 06 Dsn Galonggong, Kel Karanganyar, Kec Cijeungjing

107o 33 52,6

6o 55 39,8

Kombinasi

400.0

Kombinasi

400.0

RT 39 /RW 9 Dsn Salegok, Ds Ciparigi, Kec Sukadana

a
a

RT 05/ RW 03 Dsn Karangsari, Ds Kadupandak, Kec Tambaksari

1. 108o 55 36(RT 7)

1. 7o 21 34,3(RT 7)

Kombinasi

400.0
2. 107o 33 52,6(RT 5)

2. 6o 55 39,8(RT5)

12

Kab Cirebon

Jl. Cirebon KM 8 Desa Mundu Pesisir RT/RW 04/03, Kec. Mundu

E 108 35' 49,2"

MCK++

S 6 45' 26,03"

400.0

21-Mar

19-Mar

21-Mar

RT/RW 01/01 Ds. Ciawi Kec. Palimanan

E 108 26' 31,2"

MCK++

S 6 41' 47,8"

400.0

20-Mar

15-Mar

20-Mar

Jl. Cirebon - Tegal RT/RW 01/05 Ds. Pengarengan Kec. Pangenan

E 108 39' 0"

MCK++

400.0

a
13

Kab Subang

S 6 47' 18,3"

22-Mar

19-Mar

28-Mar

Kp. Neglasari RT/RW 07/03 Ds. Manyingsal Kec. Cipunagara

1070 50' 31,6''

60 30' 44''

MCK++

400.0

14-Mar

4-Apr

11-Apr

RT/RW 17/05 Dsn Krajan Ds. Batangsari Kec. Sukasari

1070 45' 2,7''

60 17' 44''

MCK++

400.0

13-Mar

3-Apr

4-Apr

Kp. Sindanglaya RT/RW 15/03 Ds. Sindang Laya Kec. Tanjungsiang

1070 48' 16''

60 43' 32,1''

MCK++

a
14

Kab Purwakarta

400.0

12-Mar

10-Apr

26-Apr

Kp. Nagrak RT/RW 05/03 Ds. Nagrak Kec. Darangdan

1070 24' 53,5''

60 39' 16,1''

MCK++

400.0

20-Mar

29-Mar

8-Apr

2-Sep

Kp. Ciseuti RT/RW 01/01 Ds. Tajursindang Kec. Sukatani

1070 23' 02,7''

60 35' 17,7''

MCK++

400.0

21-Mar

27-Mar

11-Apr

2-Sep

Kp. Cilimus RT/RW 20/09 Ds. Mekar Sari Kec. Darangdan

1070 22' 51,4''

60 41' 12,6''

MCK++

a
15

Kota Depok

400.0

19-Mar

26-Mar

3-Apr

2-Sep

Jl. Pelopor II, RT/RW 02/08, Kel. Curug, Kec. Bojongsari

E. 10657'1693"

S. 642'14072"

MCK++

400.0

0%

50%

100%

Status : 20/September/2013

64,200.0

131.00

134.00

142.00

47.00

70.00

FOTO
LONGTITUDE
(E)

TITIK KOORDINAT

LATITUDE
(N/S)

FISIK

KEUANGAN

B 12

KOMULATIF (%)

B 11

B 10

B 09

B 08

B 07

(X1.000.000,-)

UJI COBA

KEC/KEL/LINGKUNGAN

PROGRES
FISIK

163

KONTRAK
KERJA

KAB/KOTA

CAPAIAN FISIK (%)


PEMBENTUKA
N PENGELOLA

(X1.000.000,-)

PILIHAN
SISTEM

Kota Depok

PENYUSUNAN
RKM

58

KEGIATAN
PEMBENTUKA
N KSM

15

NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI

PROVINSI

NILAI PAGU (RP.)

SOSIALISASI

LOKASI

54.00

RT/RW 02/12 Kel. Bojong Pondok Terong Kec. Cipayung

E. 10648'05030"

S. 626'83177"
IPAL Komunal+
Perpipaan

a
16

Kota Cimahi

400.0

RT 01 / RW 13, Kel Melong, Kec Cimahi Selatan

107 33' 52,6"

6 55' 39,8"
IPAL Komunal+
Perpipaan

400.0

RT 05 / RW 05, Kel Setiamanah, Kec Cimahi Tengah

107 32' 55,0"

6 52' 54,9"

a
17

Kota Bekasi

IPAL Komunal
+ Perpipaan

400.0

MCK++

400.0

8-Apr

Kombinasi

400.0

29-Apr

Ujung Menteng, Kebon Sayur RT 1, RW 8, Kelurahan Medan Satria,


Kecamatan Medan Satria

a
Kelurahan Perwira RT 4 / RW 3, Kecamatan Bekasi Utara

a
4

JAWA TENGAH

Kab. Banjarnegara

Dsn Purwanegara RT/RW 1/3 Ds Purwonegoro, kec. Purwonegoro

109 33' 14"

7 26' 8,4"
IPAL Komunal+
Perpipaan

400.0

10-Apr

17-Apr

22-Apr

11-Sep

22-Apr

13-Sep

Dsn Bantarmeneng RT/RW 1/1 kel. Semampir Kec Banjarnegara

109 40' 7"

7 23' 54,6"
IPAL Komunal+
Perpipaan

400.0

10-Apr

18-Apr

28-Apr

11-Sep

28-Apr

13-Sep

Dsn Kutayasa RT/RW 2/2 , Ds Kutayasa, Kec. Madukara

109 44' 33,2"

7 22' 57,8"
IPAL Komunal+
Perpipaan

a
2

Kab. Temanggung

400.0

10-Apr

19-Apr

19-Apr

11-Sep

19-Apr

13-Sep

Kp. Kalibaru RW 2, Kel. Purworejo, Kec. Temanggung

110 10' 22,7"

7 19' 57,6"
IPAL Komunal+
Perpipaan

400.0

9-Apr

26-Apr

11-May

16-May

Jl. Rama RT/RW 6/1 Dsn Brojolan Barat Kel. Temanggung 1, Kec.
Temanggung

110 10' 38,9"

7 18' 36,3"
IPAL Komunal+
Perpipaan

400.0

9-Apr

1-May

4-May

12-May

Dsn Panjangsaribaru RT/RW 4/10 Kel. Parakan Wetan, Kec. Parakan

110 6' 8,3"

7 16' 41,5"
IPAL Komunal+
Perpipaan

a
3

Kab. Demak

400.0

9-Apr

4-May

5-May

8-May

Desa Batu RT 1/4, Kec. Karangtengah

E. 11033'5"

S. 655'44,9"

IPAL Komunal
+Perpipaan

400.0

24-Apr

9-May

10-May

15-May

MCK+

400.0

24-Apr

4-May

6-May

8-May

Dusun Ruwit RT 1/3, Kel. Ruwit, Kec. Wedung

a
Dukuh Sayung Kulon, RT 2/4, Kec. Sayung

E. 11030'47"

S. 656'54"

IPAL Komunal
+Perpipaan

400.0

24-Apr

6-May

7-May

13-May

0%

50%

100%

Status : 20/September/2013

64,200.0

Kab. Pati

131.00

134.00

142.00

47.00

70.00

FOTO
LONGTITUDE
(E)

TITIK KOORDINAT

LATITUDE
(N/S)

FISIK

KEUANGAN

B 12

KOMULATIF (%)

B 11

B 10

B 09

B 08

B 07

(X1.000.000,-)

UJI COBA

KEC/KEL/LINGKUNGAN

PROGRES
FISIK

163

KONTRAK
KERJA

KAB/KOTA

CAPAIAN FISIK (%)


PEMBENTUKA
N PENGELOLA

58

PENYUSUNAN
RKM

(X1.000.000,-)

PILIHAN
SISTEM

PROVINSI

KEGIATAN
PEMBENTUKA
N KSM

NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI

NILAI PAGU (RP.)

SOSIALISASI

LOKASI

54.00

Dukuh Winong, Desa Luwang RT 1/2 Kec. Tayu

E. 11102'17"

S. 631'14,8"

Kombinasi

400.0

15-Apr

24-Apr

29-Apr

4-May

Dukuh Mbancang RT/RW 8/2, Ds. Gajahkumpul, Kec. Batangan

E. 11114'35"

S. 642'48"

Kombinasi

400.0

15-Apr

25-Apr

1-May

8-May

Pondok Pesantren Nurul Hidayah RT 4/3 Dukuh Nanggungan Desa


Sidomulyo, Kec. Jakenan

E. 11110'15"

S. 646'21"

Kombinasi

a
5

Kab. Batang

400.0

15-Apr

26-Apr

13-May

RT. 04 RW. 03 Kel. Kasepuhan Kec. Batang

E. 10943'4,09"

Kombinasi

S. 654'08,98"

400.0

22-Apr

8-May

15-May

15-May

RT 01, 02 & 03 RW. 04 Kel. Sombong Kec. Batang

E. 10944'36,19"

S. 654'57,35"
IPAL Komunal+
Perpipaan

400.0

22-Apr

13-May

15-May

16-May

RT. 02 & RT. 05 RW 02 Dusun Sepatek Desa Kalipucang Kulon Kec.


Batang

E. 10942'43,25"

S. 654'31,48"
IPAL Komunal+
Perpipaan

a
6

Kab. Pekalongan

400.0

22-Apr

7-May

11-May

11-May

Desa Jetak Kidul, RT. 11,12 (IPAL 1) RT. 09 (IPAL 2) / RW. 02, Kec.
Wonopringgo

1. E. 10937'37,2"
2. E. 10937'40,8"
1. S. 70'20,84"
2. S. 70'10,69"

Kombinasi

400.0

24-Apr

9-May

7-May

Desa Tegaldowo, RT/RW 08/03, Kec. Tirto

E. 10938'56,4"

S. 652'38,1"

MCK ++

400.0

24-Apr

6-May

13-May

Desa Rowoyoso, RT/RW 14/05, Kec. Wonokerto

E. 10936'46,8"

S. 653'3,77"

MCK ++

a
7

Kab. Kendal

400.0

24-Apr

14-May

8-May

Dusun Nolokerten RT/RW 04/05, Desa Nolokerto, Kec. Kaliwungu

E. 11015'44,9"

S. 658'36,1"
IPAL Komunal+
Perpipaan

400.0

17-Apr

28-Apr

3-May

2-May

Dusun Jagalan RT/RW 03/01, Desa Boja, Kec. Boja

E. 11016'37,1"

S. 76'10,1"
IPAL Komunal+
Perpipaan

400.0

17-Apr

28-Apr

7-May

28-Apr

Dusun Krajan RT/RW 03/03, Desa Tampingan, Kec. Boja

E. 11017'7,7"

S. 76'21,5"
IPAL Komunal+
Perpipaan

a
8

Kab. Wonogiri

400.0

17-Apr

27-Apr

7-May

Lingkungan Keron RT. 1 & 2 RW. 07 Kel. Wuryorejo Kec. Wonogiri

E. 11057'32,75"

S. 748'56,96"
IPAL Komunal+
Perpipaan

400.0

22-Apr

4-May

7-May

20-May

RT. 03 RW. 02 Dusun Kadipaten Desa Jendi Kec. Selogiri

E. 11052'2,98"

S. 746'59,59"

IPAL Komunal+
Perpipaan

400.0

22-Apr

7-May

8-May

0%

50%

100%

Kab. Wonogiri

Status : 20/September/2013

64,200.0

131.00

134.00

142.00

47.00

70.00

FOTO
LONGTITUDE
(E)

TITIK KOORDINAT

LATITUDE
(N/S)

FISIK

KEUANGAN

B 12

KOMULATIF (%)

B 11

B 10

B 09

B 08

B 07

(X1.000.000,-)

UJI COBA

KEC/KEL/LINGKUNGAN

PROGRES
FISIK

163

KONTRAK
KERJA

KAB/KOTA

CAPAIAN FISIK (%)


PEMBENTUKA
N PENGELOLA

58

PENYUSUNAN
RKM

(X1.000.000,-)

PILIHAN
SISTEM

PROVINSI

KEGIATAN
PEMBENTUKA
N KSM

NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI

NILAI PAGU (RP.)

SOSIALISASI

LOKASI

54.00

Kel. Pokoh Kidul Dusun Jurug RT.02 Kec. Wonogiri

E. 11057'32,75"

S. 750'06,96"
IPAL Komunal+
Perpipaan

a
9

Kab. Tegal

400.0

22-Apr

3-May

5-May

16-May

RT/RW 03/08, Desa Penusupan, Kec. Pangkah

E. 1098'26,0"

S. 70'15,4"
IPAL Komunal+
Perpipaan

400.0

9-Apr

29-Apr

10-May

17-May

Dukuh Dawung RT/RW 01/01, Desa Dermasuci, Kec. Pangkah

E. 1099'47,1"

S. 72'21,0"
IPAL Komunal+
Perpipaan

a
10

Kab. Pemalang

400.0

9-Apr

29-Apr

10-May

17-May

Dusun Kuta Lor, Desa Kuta, Kec. Belik

E. 10922'03,6"

Kombinasi

a
a

S. 0710'49,6"

400.0

9-Apr

28-Apr

6-May

Dusun Bungkus RT 01 & 02 RW 05, Desa Majalangu, Kec.


Watukumpul

E. 109 26' 29,1"

Kombinasi

S. 7 9' 0,78"

400.0
a

9-Apr

6-May

17-May

17-May

RT.03,06 RW 01, Desa Karangasem, Kec. Petarukan

E. 10928'26,4"

S. 655'21,76"

MCK ++

400.0

9-Apr

27-Apr

4-May

4-May
E. 10858'916"

11

Kab. Brebes

Desa Banjaratma, RT/RW 6/7, Kec. Bulakamba

Kombinasi

S. 0654'000"

400.0
5

DI YOGYAKARTA

Kab. Gunung Kidul

4-Apr

23-Apr

6-May

2-May

Padukuhan Besari RT/RW 02/04, Desa Siraman, Kecamatan Wonosari

E:110 3511,9

S: 07 5824,1
IPAL Komunal+
Perpipaan

400.0

1-Apr

19-Apr

15-Aug

Padukuhan Karangrejek RT/RW 7/3, Desa Karangrejek, Kecamatan


Wonosari

E: 110 3546,9

S:07 5847,8
IPAL Komunal+
Perpipaan

400.0

1-Apr

12-Apr

19-Apr

15-Aug

Dusun Logandeng RT/RW 20/05, Desa Logandeng, Kecamatan


Playen

E:1100 3438,6

S: 070 5603,4
IPAL Komunal+
Perpipaan

a
2

Kab. Kulon Progo

400.0

1-Apr

19-Apr

25-Apr

15-Aug

Padukuhan Cekelan RT/RW 12/5, Desa Karangsari, Kecamatan


Pengasih

E: 110 828,9

S: 7 5144,2
IPAL Komunal+
Perpipaan

400.0

27-Mar

2-Jun

4-Jun

15-Aug

Padukuhan Sideman RT/RW 40/18, Desa Giripeni, Kecamatan Wates

E: 110 96,5

S: 7 5215,0
IPAL Komunal+
Perpipaan

400.0

27-Mar

17-Apr

1-May

15-Aug

Padukuhan Sanggrahan RT/RW 18/8, Desa Bendungan, Kecamatan


Wates

E: 110 831,1

S: 7 5313,8
IPAL Komunal+
Perpipaan

a
6

JAWA TIMUR

Kab. Pasuruan

400.0

27-Mar

18-Apr

23-Jun

15-Aug

Dusun Kampung Baru Barat RT/RW 2/9, Desa Tambak Lekok, Kec.
Lekok

1120 58 58,8

MCK+

400.0

1-Apr

17-Apr

22-Apr

24-Jul

2-May

21-Aug

70 39 39,1

0%

50%

100%

Status : 20/September/2013

64,200.0

131.00

134.00

142.00

47.00

70.00

54.00

Dusun Krajan RT/RW 1/3, Desa Kapasan, Kec. Nguling

1130 4 19,2

MCK+

a
2

FOTO
LONGTITUDE
(E)

TITIK KOORDINAT

LATITUDE
(N/S)

FISIK

KEUANGAN

B 12

KOMULATIF (%)

B 11

B 10

B 09

B 08

B 07

(X1.000.000,-)

UJI COBA

KEC/KEL/LINGKUNGAN

163

PROGRES
FISIK

KAB/KOTA

KONTRAK
KERJA

(X1.000.000,-)

PILIHAN
SISTEM

Kab. Pasuruan

CAPAIAN FISIK (%)


PEMBENTUKA
N PENGELOLA

58

PENYUSUNAN
RKM

KEGIATAN
PEMBENTUKA
N KSM

JAWAPROVINSI
TIMUR

NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI

NILAI PAGU (RP.)

SOSIALISASI

LOKASI

400.0

1-Apr

23-Apr

24-Apr

19-Jul

14-May

21-Aug

70 40 56,32

Kab. Sidoarjo

1120 29 33,03

Jl. Kedung Bacok No.1, Dsn Kedung Klinter,Ds Kedung Bacok, Kec
Tarik

MCK+

400.0

20-Apr

24-Apr

29-Apr

19-Jul

24-Jun

21-Aug

70 27 12,26

Kab. Pacitan

Jl. Desa Jedongcangkring, Ds. Jedong, Kec. Prambon

MCK+

400.0

22-Jul

29-Jul

5-Aug

19-Aug

6-Aug

21-Aug

RT1 /RW 1, Dsn Krajan, Ds Glinggangan, Kec Pringkuku

111o 04 15

MCK+

400.0

12-Mar

24-Apr

25-Apr

19-Jul

25-Apr

21-Aug

8o 09 15,1

a
Ponpes Al Falah, RT 2/RW 5, Dusun Trobakal, Desa Karangrejo,
Kecamatan Arjosari

111o 8 7,35

Kombinasi

400.0

12-Mar

23-Apr

25-Apr

19-Jul

25-Apr

21-Aug

8o 05 15,8

a
4

Kab. Trenggalek

RT 6 / RW 2, Dusun Ngrejo, Desa Mulungkulon, Kecamatan


Munjungan

111o 30 30

MCK+

400.0

30-Apr

30-Apr

7-May

25-Jul

7-May

21-Aug

8o 18 33,9

a
RT 9 / RW 2, Dsn Ketawang, Desa Tasikmadu, Kecamatan Watulimo,

111o 43 36

Kombinasi

400.0

30-Apr

6-May

3-Jun

19-Jul

6-Jun

21-Aug

8o 17 6,4

a
5

Kab. Lumajang

RW 5, Kel. Rogotrunan, kecamatan Lumajang

1130 13 44,4

Kombinasi

400.0

28-Mar

20-May

7-Jun

24-Jul

10-Jun

21-Aug

80 7 29,42

a
Dsn Krajan RT/RW 3/1, Desa Wonorejo, Kecamatan Kedungjajang

1130 14 16,8

IPAL Komunal+
Perpipaan

400.0

28-Mar

20-May

11-Jun

24-Jul

13-Jun

21-Aug

80 4 31,51
6

Kab. Jember

Jl Badean RT/RW 3/16 Dsn Krajan A Ds. Badean Kec Bangsalsari

1130 35' 24,7''

MCK+

400.0

28-May

23-Apr

14-May

29-Jul

14-May

21-Aug

80 8' 28,7''
Ponpes Addimyati Jl. A Yani 164, Dsn Pondok lalang, Ds Wonojati,
Kec Jenggawah

1130 38' 3,7''

MCK+

400.0

28-May

23-Apr

10-May

29-Jul

10-May

21-Aug

80 17' 2,9''
7

Kab. Banyuwangi

Desa Karetan, Kec. Purwoharjo

1140 13 22,8

MCK+

400.0

11-Mar

17-May

29-May

23-Jul

29-May

21-Aug

80 30 48,06

a
Desa Grogol Kec. Giri

MCK+

400.0

11-Mar

17-May

16-Jun

23-Jul

16-Jun

21-Aug

a
8

Kab. Nganjuk

RT 3 - RW 10 Dusun Kuniran, Desa Jekek, Kecamatan Baron

E 112 02 35

MCK+

400.0

28-Mar

10-Apr

20-May

26-Jul

27-May

21-Aug

S 7 35 8,0

0%

50%

100%

Status : 20/September/2013

64,200.0

131.00

134.00

142.00

47.00

70.00

54.00

RT 8 RW 16 Dusun Kedunglo, Desa Cengkok, Kec Ngronggot

E 112 02 57

MCK+

Kab. Lamongan

a
a

10

Kab Situbondo

400.0

28-Mar

20-Apr

20-May

26-Jul

27-May

21-Aug

S 7 41 36

Lingkungan Tresno Mulyo, RT 03, RW 06, Kelurahan Sidoharjo,


Kecamatan Lamongan

1120 24 34,72

MCK+

400.0

19-Mar

22-Mar

1-May

27-Jul

16-May

21-Aug

MCK+

400.0

19-Mar

22-Mar

1-May

18-Jul

6-May

21-Aug

70 7 57,85

Desa Ngasem Lemahbang, Dusun Lemahbang, Kecamatan


Ngimbang

Ponpes Walisongo Jl. Basuki Rahmat no.7 Kel. Mimbaan, Kec. Panji

114 01' 9,4"

MCK+

400.0

9-Apr

2-Apr

22-Apr

18-Jun

23-Apr

21-Aug

7 41' 58,4"

Dsn Timur Curah RT/RW 2/2 Ds Kedungdowo Kec Arjasa

114 09' 14,3"

MCK+

a
11

FOTO
LONGTITUDE
(E)

TITIK KOORDINAT

LATITUDE
(N/S)

FISIK

KEUANGAN

B 12

KOMULATIF (%)

B 11

B 10

B 09

B 08

B 07

(X1.000.000,-)

UJI COBA

KEC/KEL/LINGKUNGAN

PROGRES
FISIK

163

KONTRAK
KERJA

KAB/KOTA

CAPAIAN FISIK (%)


PEMBENTUKA
N PENGELOLA

(X1.000.000,-)

PILIHAN
SISTEM

Kab. Nganjuk

PENYUSUNAN
RKM

58

KEGIATAN
PEMBENTUKA
N KSM

NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI

PROVINSI

NILAI PAGU (RP.)

SOSIALISASI

LOKASI

400.0

9-Apr

15-May

20-May

18-Jun

20-May

21-Aug

7 45' 15,9"

Kab Bangkalan

11258'39,50"

Masjid dan Madrasyah Al-Hidayah Dusun Kemeden Desa Banyur


Kec. Sepulu

400.0

5-Apr

10-Apr

21-May

12-Jul

23-May

21-Aug

MCK+

653'55,19"
112046'13,45"

Pondok Pesantren Putri Raudhotul Mutha'alimin Al-Azizah. Sebaneh


Jl. Raya Banjaran Kel. Banjaran Kec. Bangkalan

400.0

5-Apr

10-Apr

8-May

12-Jul

9-May

21-Aug

MCK+
12

700'11,94"

Kab Probolinggo

1130 23 38,4

Dusun Lesan RT/RW 02/04, Desa Rondokuning, Kec. Kraksaan

MCK+

400.0

10-Apr

26-Apr

16-May

26-Jun

17-May

21-Aug

70 46 4,94
1130 25 37,2

Blok Pasar sore RT/RW 04/04, Kel. Kraksaan Wetan, Kec. Kraksaan

MCK+

400.0

10-Apr

29-Apr

20-May

26-Jun

21-May

21-Aug

70 45 24,08
13

Kab Sumenep

1130 38 8,01

Dusun Nongbunter, Kecamatan Pragaan

MCK+

400.0

10-Apr

10-Apr

16-May

10-Jul

17-May

21-Aug

70 4 40,49
1140 5 35,06

Dusun Dungkek laok, Kecamatan Dungkek

MCK+

400.0

10-Apr

10-Apr

17-May

10-Jul

18-May

21-Aug

60 38 47,35
14

Kab Kediri

1120 8 53,99

Dusun Kalasan, Desa Jarak RT. 02,03 dan 04, Kecamatan Plosoklaten

400.0

11-Apr

23-Apr

3-May

24-Jul

8-May

21-Aug

70 52 59,30
1120 3 59,64

Pasar Sumberrejo RT 08, RW 02, Dusun Joho, Desa Sumberrejo,


Kecamatan Ngasem

400.0

16-Apr

23-Apr

6-May

24-Jul

6-May

21-Aug

70 48 30,48
15

Kab Pamekasan

1130 27 14,44

Dsn Gubug, Kel. Teja Barat, Kec. Pamekasan

MCK=

400.0

19-Mar

1-Apr

20-Apr

19-Jul

20-Apr

21-Aug

70 10 10,70

0%

50%

100%

Status : 20/September/2013

64,200.0

131.00

134.00

142.00

47.00

70.00

FOTO
LONGTITUDE
(E)

TITIK KOORDINAT

LATITUDE
(N/S)

FISIK

KEUANGAN

B 12

KOMULATIF (%)

B 11

B 10

B 09

B 08

B 07

(X1.000.000,-)

UJI COBA

KEC/KEL/LINGKUNGAN

PROGRES
FISIK

163

KONTRAK
KERJA

KAB/KOTA

CAPAIAN FISIK (%)


PEMBENTUKA
N PENGELOLA

(X1.000.000,-)

PILIHAN
SISTEM

Kab Pamekasan

PENYUSUNAN
RKM

58

KEGIATAN
PEMBENTUKA
N KSM

15

NILAI KONTRAK
(Rp.)
PENETAPAN
LOKASI

PROVINSI

NILAI PAGU (RP.)

SOSIALISASI

LOKASI

54.00

1130 28 17,80

Dsn Tengah, Kel. Tlesa, Kec. Tlanakan

Gang 6 RT 02, RW 03, Kelurahan Sukolilo, Kecamatan Tuban

MCK+

400.0

19-Mar

1-Apr

9-Apr

16-Jul

9-Apr

21-Aug

70 13 6,95
16

Kab Tuban

1120 4 42,10

MCK+

17

Kab Ngawi

Kab Sampang

5-May

21-Jun

23-Jul

25-Jun

21-Aug

60 53 42,66

1120 3 33,91

MCK+

400.0

30-Apr

5-May

10-May

23-Jul

16-May

21-Aug

MCK+

400.0

5-Apr

10-Apr

17-May

26-Jul

17-May

21-Aug

60 53 33,97

RT 20 /RW 5, Dsn Sidomakmur, Kel Ketanggi, Kec Ngawi

RT 3 /RW 1 Dusun Ingasrejo, Desa Beran, Kec Ngawi

E 111 25 0,35

400.0

5-Apr

10-Apr

16-May

26-Jul

16-May

21-Aug

S 7 26 15,4

Pondok Pesantren Miftahud Thullab Jl. Raya Gedangan Dusun Bates


Desa Daleman Kec. Kedundung

11316'14,71"

400.0

30-Apr

Kampung Rujak Beting RT 04, RW 03, Kelurahan Sidomulyo,


Kecamatan Tuban

MCK+

18

400.0

17-Apr

17-Apr

25-May

18-Jul

25-May

21-Aug

74'8,10"

Pondok Pesantern Attanwir Jl. Pemuda Baru No. 54 Desa Rong


Tengah Kp. Kaju Kec. Sampang

11314'58,13"

400.0

17-Apr

17-Apr

25-May

18-Jul

25-May

21-Aug

711'56,00"

0%

50%

100%

RAM PRIORITAS NASIONAL

UKTUR SANIMAS TA 2013 (WILAYAH - II, JAWA)

KETERANGAN

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa

idem

idem

idem

idem

idem

idem

idem

idem

idem

idem

idem

idem

KETERANGAN

idem

idem

idem

3 lokasi di Kota Cilegon dibatalkan dan rencananya dipindahkan ke Kota Tangerang Selatan

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa

idem

idem

idem

idem

idem

idem

idem

idem
idem
Lokasi pada awalnya adalah lokasi di Jakarta Utara (Pademangan Utara) Lokasi masih dalam tahap sosialisasi
idem
Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa.
Penetapan lokasi dilakukan tahun 2012

KETERANGAN

idem

idem

idem

idem

idem

idem

idem

idem

idem

idem

idem

idem

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa

idem

KETERANGAN

idem

idem

idem

idem

idem

idem

idem

idem

idem

idem

idem

idem

idem

idem

KETERANGAN

idem

idem

idem

idem

idem

idem

idem

idem

idem

idem

KETERANGAN

idem

idem

idem

idem

idem

idem

Tidak dilakukan sosialisasi kabupaten, lokasi ditentukan berdasarkan surat minat dari kepala desa yang masuk
ke Dinas Tata Ruang Permukiman dan Kebersihan. Sosialisasi yang dilakukan tingkat desa

idem

idem

Tidak dilakukan sosialisasi kabupaten, sosialisasi dilakukan di tingkat desa,lokasi ditentukan berdasarkan
proposal yang masuk ke Dinas Cipta Karya dan Tata Ruang.

Idem

Idem

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa

KETERANGAN

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa

idem

idem

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa.
Penetapan lokasi dilakukan tahun 2012

Idem

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa.
Penetapan lokasi dilakukan tahun 2012

idem

idem

idem

idem

idem

idem

idem

idem

KETERANGAN

idem

idem

idem

idem

idem

Idem

idem

idem

idem

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat
desa.Penentuan lokasi berdasar SSK Kabupaten, RPA diikuti 3 kampung dalam 1 desa yang sama

idem

idem

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat dusun.
Penetapan lokasi dari awal sudah dilakukan

idem

KETERANGAN

idem

idem

idem

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa.

idem

idem

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa.
Lokasi dari daftar SSK

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa.

Idem

Idem

Idem

Idem

Idem

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat
desa.RPA hanya pada lokasi yang telah terpilih

KETERANGAN

Idem

idem

Lokasi Pengganti dari Jl. Desa Simo Ketawang, Dsn Jarakan, Kec Wonoayu. penggantian lokasi berdasarkan
surat DPU CKTR Kab Sidoarjo tgl 29 Juli 2013

Idem

Idem

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat
desa.lokasi berdasarkan lokasi SSK

idem

idem

idem

Tidak ada sosialisasi kota/kabupaten, sosialisasi dilakukan tingkat desa dikarenakan keterlambatan informasi
dari dinas terkait penentuan lokasi diambil dari lokasi DAK. Kriteria berdasarkan data dari BAPPEDA dan
Dinkes Kab Jember

Idem

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat
desa.RPA hanya pada lokasi yang telah terpilih

Baru akan melakukan Tahap Sosialisasi, pada saat kunjungan pertama Lokasi belum bisa ditentukan karena
pergantian kepala desa

Dinas tidak melakukan sosialisasi kota/kabupaten karena keterlambatan pengetahuan program SANIMAS oleh
pihak Cipta Karya, sosialisasi dilakukan di tingkat desa terpilih. Penentuan lokasi berdasar buku putih

KETERANGAN

idem

Penentuan lokasi berdasarkan SSK. TFL sedang menganalisa/merencakan pengembangan sistem kombinasi
dan perpipaan dengan memanfaatkan MCK eksisting dengan lahan calon lokasi sanimas. Lokasi berada di
daerah rawan air, Dinas PU Cipta karya Kab. Lamongan TA. 2013 tengah membangunan fasilitas sumur bor
untuk dapat melayani wilayah sekitar lokasi sanimas.

Penentuan lokasi berdasarkan SSK . Jarak antar rumah berjauhan dan tata letak rumah yang tidak beraturan,
topografi wilayah memiliki kemiringan 5%<i<10%. TFL sedang menganalisa/merencakan pengembangan
sistem kombinasi dan perpipaan.

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat
desa.Penentuan lokasi berdasarkan SSK Kabupaten dengan menunjuk wilayah yang padat penduduknya serta
fasilitas yang dirasa kurang, tanpa melakukan RPA.

idem

lokasi berdasar wilayah/daerah kumuh, PPSP baru berjalan th 2013, sosialisasi dilakukan di 1 kelurahan antar
RT

Idem

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat
desa.RPA hanya pada lokasi yang telah terpilih

idem

idem

Idem

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat desa.
Lokasi dari daftar SSK

idem

Pemilihan lokasi berdasarkan PPSP (SSK), sudah melakukan RPA

KETERANGAN

idem

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat
desa.RPA hanya pada lokasi yang telah terpilih

Idem

Dinas Kota/Kabupaten tidak melakukan sosialisasi tingkat kota/kabupaten, hanya dilakukan di tingkat
desa.RPA hanya pada lokasi yang telah terpilih. Lokasi berdasarkan PPSP

Idem

Sosialisasi dilakukan di 1 kelurahan antar kampung. Lokasi berada di wilayah perkotaan, padat penduduk dan
rawan sanitasi. Direncanakan bangunan sanimas akan dibuat dengan bentuk untuk dapat digunakan oleh
pesantren dan umum.

idem