RECORD OF WATER PRESSURE TEST

PLTU BANTAENG, SULAWESI SELATAN


Hole
Depth

: BH-1
: 0.00 - 5.00 m

P (kg/cm2)

Q (l/min)

0.20
0.40
0.60
Average

4.50
5.09
6.35
5.31

Hole
Depth

Q (l/min)

0.20
0.40
0.60
Average

4.83
5.55
6.42
5.60

Q (l/min)

0.20
0.40
0.60
Average

4.75
5.16
5.64
5.18

Hg
(cm)

D
(cm)

Calculating
Const.

500
500
500

700
700
700

20
20
20

7.3
7.3
7.3

6.80E-04
6.80E-04
6.80E-04
Average

Coef. Perm Lugeon Unit


cm/det
(l/min/m)

2.15E-05
1.32E-05
1.13E-05
1.53E-05

Q (l/min)

0.20
0.40
0.60
Average

4.29
5.58
6.19
5.35

: BH-1

45.00
25.45
21.17
30.54

Type of flow

Representatif of
lugeon unit

Void and Filling

45.00

Operator : Eko
Tanggal : Nopember 2014

L
(cm)

GWL
(cm)

Hg
(cm)

D
(cm)

Calculating
Const.

500
500
500

700
700
700

20
20
20

7.3
7.3
7.3

6.80E-04
6.80E-04
6.80E-04
Average

Coef. Perm Lugeon Unit


cm/det
(l/min/m)

2.01E-05
1.33E-05
1.08E-05
1.48E-05

48.30
27.75
21.40
32.48

Type of flow

Representatif of
lugeon unit

Void and Filling

48.30

Operator : Eko
Tanggal : Nopember 2014

L
(cm)

GWL
(cm)

Hg
(cm)

D
(cm)

Calculating
Const.

500
500
500

700
700
700

20
20
20

7.3
7.3
7.3

6.80E-04
6.80E-04
6.80E-04
Average

Coef. Perm Lugeon Unit


cm/det
(l/min/m)

1.98E-05
1.24E-05
9.52E-06
1.39E-05

: BH-1
: 15.00 - 20.00 m

P (kg/cm2)

Hole

GWL
(cm)

: BH-1
: 10.00 - 15.00 m

P (kg/cm2)

Hole
Depth

L
(cm)

: BH-1
: 5.00 - 10.00 m

P (kg/cm2)

Hole
Depth

Operator : Eko
Tanggal : Nopember 2014

47.50
25.80
18.80
30.70

Type of flow

Representatif of
lugeon unit

Void and Filling

47.50

Operator : Eko
Tanggal : Nopember 2014

L
(cm)

GWL
(cm)

Hg
(cm)

D
(cm)

Calculating
Const.

500
500
500

700
700
700

20
20
20

7.3
7.3
7.3

6.80E-04
6.80E-04
6.80E-04
Average

Coef. Perm Lugeon Unit


cm/det
(l/min/m)

1.79E-05
1.34E-05
1.04E-05
1.39E-05

42.90
27.90
20.63
30.48

Type of flow

Representatif of
lugeon unit

Void and Filling

42.90

Operator : Eko

Depth

: 20.00 - 25.00 m

P (kg/cm2)

Q (l/min)

0.20
0.40
0.60
Average

4.62
5.40
5.79
5.27

Tanggal

L
(cm)

GWL
(cm)

Hg
(cm)

D
(cm)

Calculating
Const.

500
500
500

700
700
700

20
20
20

7.3
7.3
7.3

6.80E-04
6.80E-04
6.80E-04
Average

Coef. Perm Lugeon Unit


cm/det
(l/min/m)

1.93E-05
1.30E-05
9.77E-06
1.40E-05

46.20
27.00
19.30
30.83

: Nopember 2014

Type of flow

Representatif of
lugeon unit

Void and Filling

46.20

RECORD OF WATER PRESSURE TEST


PLTU BANTAENG, SULAWESI SELATAN
Hole
Depth

: BH-1
: 25.00 - 30.00 m

P (kg/cm2)

Q (l/min)

0.20
0.40
0.60
Average

5.35
5.81
6.26
5.81

Hole
Depth

L
(cm)

GWL
(cm)

Hg
(cm)

D
(cm)

Calculating
Const.

500
500
500

700
700
700

20
20
20

7.3
7.3
7.3

6.80E-04
6.80E-04
6.80E-04
Average

Coef. Perm Lugeon Unit


cm/det
(l/min/m)

2.23E-05
1.40E-05
1.06E-05
1.56E-05

: B-2
: 30 - 35 m

P (kg/cm2)

Q (l/min)

0.20
0.40
0.60
Average

5.22
5.75
6.30
5.76

Hole
Depth

Operator : Eko
Tanggal : Nopember 2014

Q (l/min)

0.20
0.40
0.60
Average

5.88
6.03
6.20
6.04

Representatif of
lugeon unit

Void and Filling

53.50

Operator : Eko
Tanggal : Nopember 2014
L
(cm)

GWL
(cm)

Hg
(cm)

D
(cm)

Calculating
Const.

500
500
500

700
700
700

20
20
20

7.3
7.3
7.3

6.80E-04
6.80E-04
6.80E-04
Average

Coef. Perm Lugeon Unit


cm/det
(l/min/m)

2.18E-05
1.38E-05
1.06E-05
1.54E-05

: B-2
: 35 - 40 m

P (kg/cm2)

53.50
29.05
20.87
34.47

Type of flow

52.20
28.75
21.00
33.98

Type of flow

Representatif of
lugeon unit

Void and Filling

52.20

Operator : Eko
Tanggal : Nopember 2014
L
(cm)

GWL
(cm)

Hg
(cm)

D
(cm)

Calculating
Const.

500
500
500

700
700
700

20
20
20

7.3
7.3
7.3

6.80E-04
6.80E-04
6.80E-04
Average

Coef. Perm Lugeon Unit


cm/det
(l/min/m)

2.45E-05
1.45E-05
1.05E-05
1.65E-05

58.80
30.15
20.67
36.54

Type of flow

Representatif of
lugeon unit

Void and Filling

58.80

DATA WPT PLTU BANTAENG [BH-1]


BH-1 (Kedalaman 0 - 5 meter)
Penurunan
(Menit)
0
1
2
3
4
5
6
7
8
9
10

Tekanan
0.2
1.5
2.7
12.1
16.4
22.6
23.9
29.2
33.4
37.7
42.5
46.5

1.2
9.4
4.3
6.2
1.3
5.3
4.2
4.3
4.8
4.0
4.5

0.4
8.7
10.3
15.7
21.2
26.8
32.2
37.8
45.3
46.7
49.1
59.6

1.6
5.4
5.5
5.6
5.4
5.6
7.5
1.4
2.4
10.5
5.09

0.6
6.1
12.4
18.8
25.1
32.5
37.8
44.2
50.5
56.9
63.2
69.6

6.3
6.4
6.3
7.4
5.3
6.4
6.3
6.4
6.3
6.4
6.35

BH-1 (Kedalaman 5 - 10 meter)


Penurunan
(Menit)
0
1
2
3
4
5
6
7
8
9
10

Tekanan
0.2
5.3
10.2
15.1
19.9
24.7
29.5
34.4
39.2
43.5
47.8
53.6

4.9
4.9
4.8
4.8
4.8
4.9
4.8
4.3
4.3
5.8
4.83

0.4
4.7
10.3
14.8
20.3
26.9
32.4
37.9
43.5
49.1
54.7
60.2

5.6
4.5
5.5
6.6
5.5
5.5
5.6
5.6
5.6
5.5
5.55

0.6
2.4
8.1
15.1
21.5
27.9
34.3
40.7
47.2
53.8
60.4
66.6

5.7
7.0
6.4
6.4
6.4
6.4
6.5
6.6
6.6
6.2
6.42

BH-1 (Kedalaman 10 - 15 meter)


Penurunan
(Menit)
0
1
2

Tekanan
0.2
4.8
9.4
14.3

4.6
4.9

0.4
5.2
8.5
13.8

3.3
5.3

0.6
6.1
11.2
17.0

5.1
5.8

3
4
5
6
7
8
9
10

19.1
23.9
28.7
33.4
38.2
42.9
47.6
52.3

19.1
24.5
29.9
35.3
40.7
46.1
51.5
56.8

4.8
4.8
4.8
4.7
4.8
4.7
4.7
4.7
4.75

5.3
5.4
5.4
5.4
5.4
5.4
5.4
5.3
5.16

22.8
28.6
34.4
40.3
46.7
51.9
57.7
62.5

5.8
5.8
5.8
5.9
6.4
5.2
5.8
4.8
5.64

BH-1 (Kedalaman 15 - 20 meter)


Penurunan
(Menit)
0
1
2
3
4
5
6
7
8
9
10

Tekanan
0.2
8.4
9.3
13.1
17.2
22.0
26.8
31.7
36.5
41.3
46.1
51.3

0.9
3.8
4.1
4.8
4.8
4.9
4.8
4.8
4.8
5.2
4.29

0.4
5.6
11.2
16.8
22.4
27.9
33.5
39.1
44.7
50.3
55.9
61.4

5.6
5.6
5.6
5.5
5.6
5.6
5.6
5.6
5.6
5.5
5.58

0.6
3.4
9.5
15.7
21.9
28.2
34.3
40.5
46.6
52.9
59.1
65.3

6.1
6.2
6.2
6.3
6.1
6.2
6.1
6.3
6.2
6.2
6.19

BH-1 (Kedalaman 20 - 25 meter)


Penurunan
(Menit)
0
1
2
3
4
5
6
7
8
9
10

Tekanan
0.2
6.7
10.9
15.4
19.9
24.5
29.2
33.9
38.6
43.4
48.2
52.9

4.2
4.5
4.5
4.6
4.7
4.7
4.7
4.8
4.8
4.7
4.62

0.4
4.3
9.7
15.1
20.5
25.9
31.3
36.7
42.1
47.6
53.2
58.3

5.4
5.4
5.4
5.4
5.4
5.4
5.4
5.5
5.6
5.1
5.4

0.6
4.4
10.3
16.1
21.9
27.7
33.5
39.1
45.2
51.1
56.8
62.3

5.9
5.8
5.8
5.8
5.8
5.6
6.1
5.9
5.7
5.5
5.79

DATA WPT PLTU BANTAENG [BH-1]


BH-1 (Kedalaman 25 - 30 meter)
Penurunan
(Menit)
0.2
0
5.2
5.3
1
10.5
5.3
2
15.8
5.3
3
21.1
5.3
4
26.4
5.3
5
31.7
5.4
6
37.1
5.4
7
42.5
5.4
8
47.9
5.4
9
53.3
5.4
10
58.7

Tekanan
0.4
3.3
9.1
14.9
20.7
26.5
32.3
38.2
44.1
49.8
55.6
61.4

5.35

BH-1 (Kedalaman 30 - 35 meter)


Penurunan
(Menit)
0.2
0
3.6
5.1
1
8.7
5.2
2
13.9
5.3
3
19.2
5.2
4
24.4
5.3
5
29.7
5.1
6
34.8
5.3
7
40.1
5.2
8
45.3
5.2
9
50.5
5.3
10
55.8

Tekanan
0.4
2.7
8.5
14.3
20.1
25.9
31.8
37.7
43.1
48.8
54.5
60.2

5.22

BH-1 (Kedalaman 35 - 40 meter)


Penurunan
(Menit)
0.2
0
2.7
6.4
1
9.1
6.4
2
15.5
6.4
3
21.9
6.4
4
28.3
5.8
5
34.1
5.8
6
39.9

Tekanan
0.4
5.4
11.6
17.7
23.9
29.9
35.9
42.1

5.8
5.8
5.8
5.8
5.8
5.9
5.9
5.7
5.8
5.8
5.81

5.8
5.8
5.8
5.8
5.9
5.9
5.4
5.7
5.7
5.7
5.75

6.2
6.1
6.2
6.0
6.0
6.2

0.6
4.5
10.7
16.9
23.1
29.4
35.6
41.9
48.2
54.4
60.7
67.1

0.6
4.3
11.1
17.4
23.6
29.9
36.1
42.3
48.6
54.8
61.2
67.3

0.6
3.8
10.2
16.6
22.9
29.1
35.1
41.1

6.2
6.2
6.2
6.3
6.2
6.3
6.3
6.2
6.3
6.4
6.26

6.8
6.3
6.2
6.3
6.2
6.2
6.3
6.2
6.4
6.1
6.3

6.4
6.4
6.3
6.2
6.0
6.0

7
8
9
10

45.5
50.9
56.3
61.5

5.6
5.4
5.4
5.2
5.88

48.5
54.8
60.7
65.7

6.4
6.3
5.9
5.0
6.03

47.5
53.9
60.4
65.8

6.4
6.4
6.5
5.4
6.2