You are on page 1of 1

THERMAX LIMITED

F-CEC-9.06

Page 1 of 1
PROTOCOL FOR FOUNDATION CHECKING

SITE

:M/s.RAICHUR BIO-ENERGIES PVT

LTD
JOB NO. :PD0581
1.
2.

REPORT NO. :

01

DATE

19.05.2014

DRAWING NO
: D22-0PD-016262,Rev.3
FOUNDATION FOR : STRUCTURAL COLUMNS & BOILER PRESSURE PARTS

CHARACTERISTIC CHECK

AS PER DRG

OBSERVED

REMARKS

DISTANCES FROM EQUIPT.AXIS


DISTANCE FROM DRUM CENTER
LINE OR REF.AXIS
POCKET CENTER-LINE W.R.T
FOUNDATION
POCKET DEPTH & SIZE
DIAGONAL OF POCKET

DETAILED ANNEXURES ATTACHED

ELEVATION
VISUAL INSPECTION (FOR
ROUGHNESS & CRACKS)
GROUTING MARGIN

--------------------------------------------------------------------------------------------------RESULT
ACCEPTED / NOT ACCEPTED
------------------------------------------------------------------------------------------------------------------------------------

M/s. KAMAL
CONSTRUCTIONS
SIGN
NAME
DATE

M/s.THERMAX LTD

CONSULTANT

M/s.RBPL

You might also like