PICTON WATER TREATMENT PLANT

PROCESS FLOW DIAGRAM


Low Lift
Transfer Pumps
(2)

PAC
Cl2 &
Fluoride
Quinte Bay
Intake Crib

Alum

Flow
Meter

Flocculation
Tanks
(4)

Raw Water
Well & Screens

Cl2

Settling
Tanks
(4)
Backwash
Pump

High Level
Reservoir

Low Level
Reservoir

Town of
Picton

Filters
(4)

Clear Well/
Contact Tank
Transfer
Pump

Cast Iron Pipe

High Lift
Pump

Cl2
Suction
Well

Flow
Meter

Backwash Water
To Quinte Bay

Bloomfield
Tower

Plastic Pipe
Pinecrest
School

Flow
Meter

(*) Cl2 is injected either at


the Intake Crib or in
the Raw Water Well

FIGURE 2
PICTON WATER TREATMENT PLANT
SAMPLING POINTS & CHLORINE ANALYZERS

Low Lift
Transfer Pumps
(2)

PAC
Cl2 &
Fluoride

Quinte Bay
Intake Crib

Alum

Flow
Meter

Flocculation
Tanks
(4)

1 2

Raw Water
Well & Screens

Cl2

Settling
Tanks
(4)
Backwash
Pump

High Level
Reservoir

Low Level
Reservoir

Filters
(4)

Cl2

Cast Iron Pipe

Clear Well/
Contact Tank
Transfer
Pump

Town of
Picton

High Lift
Pump

Suction
Well

Flow
Meter

Backwash Water
To Quinte Bay

Bloomfield
Tower

Plastic Pipe
Pinecrest
School

Flow
Meter

Sampling Point
Cl2 Analyzer

(*) Cl2 is injected either at


the Intake Crib or in
the Raw Water Well