Professional Documents
Culture Documents
Cleaning of HEMM Workshop
Cleaning of HEMM Workshop
Estimate No. - 1
Date: 19-03-2015
(A Subsidiary of Coal India Ltd.)
ECL (Civil) 102
Colliery:
Khottadih
OCP
ABSTRACT
OF
COST
FOR
ORIGINAL
ESTIMATE
Name of Work: Cleaning of garbage, industrial wastes and mud within HEMM workshop under Khottadih OCP.
Item
No.
1
Quantity
Unit
8096.25
Cum.
Reference in SOR
PWD- 2012,P-516,I-49
Updated
Amount in
Rate
Rs.
57.88
468610.95
468610.95
26242.21
494853.16
Cleaning of garbage, industrial wastes and mud within HEMM workshop under Khottadih OCP.
(1 April '2015 to 15th Aug' 2015) 30+31+30+31+31+30+15=198 days.
Sl.
No.
1
Description of Items.
No.
Length.
Breadth.
Height.
(M)
(M)
(M)
Factor.
Quantity.
Unit
Cleaning & removing conservancy garbege mixed with rubbish and other fifthy materials from road side drain & compound including loading unloading by
mathor labour and removing the same to any distance
Days up to 15 Aug '2015'
15
100.000
85.000
0.050
6375.00
Cum.
15
60.000
25.500
0.075
1721.25
Cum.
8096.25
Cum.
Total:-
Total days
198.00
Nos. of head
1st June'2014 to 31st March' 2015 total days
10.00
1980.00
222.00
439560.00
12%
52747.20
492307.20
2.2.1
UP DATE ANALYSIS
Labour weightage from CPWD 2007
Clearing of coal from Railway Track sides and side drain macking (not exceeding 1.5m in
width or 10 sqm on plan) including dressing of sides and lift up to 1.5m, including getting out
the coal and disposal of surplus excavated coal as directed with in a lead 50m.
All kinds of Coal (Loose)
Code
Description
2.2 :
Unit
Quantity
5.9
3.6
0.4
9.9
4.95
Rate
Amount
165
816.75
8.17
824.92
82.49
907.41
90.74
90.00
-9.00