Professional Documents
Culture Documents
Section 5160 - Steel Space Frame Structure: General
Section 5160 - Steel Space Frame Structure: General
Part 1
General
1.1 Summary
A. ScopeofWork:Theworkunderthissectionofthespecificationsincludesall
labor,materials,equipmentandservicesnecessarytodeliverthespaceframe
structure,asshownonthedrawingsandhereinspecified,inaccordancewith
thecontractdocuments.
B. WorkofOtherSections:
(1)
Spaceframedeck
(2)
Spaceframeinsulationandwaterproofing
(3)
Spaceframeskylights
(4)
Supportingstructureoredgebeam
1.2 Submittals
A. Drawings:SubmittwopapercopiesandonesetofPDForAutoCADfiles
forArchitectsreviewpriortofabrication.Drawingsmustdescribethespace
frameinfullinrelationtoalladjacentworkandshowallinterfacedetails
withmaterialseithersupportedbythespaceframeorsupportingthespace
frame.DrawingsmustbesignedandsealedbyaRegisteredProfessional
Engineer.
B. DesignReport:SubmittwopapercopiesandonesetofPDForMSWord
filesofadesignreportdescribingthestructuralengineeringcalculationsused
todesignthespaceframe.Designreportmustincludeallactionson
supportingstructureforreviewbyprojectsengineer.DesignReportmustbe
signedandsealedbyaRegisteredProfessionalEngineer.
C. Samples:Submitsampleofatypicaltubeendandhubwithspecifiedfinish.
1.3 QualityAssurance
A. Qualifications:
(1)
Manufacturer:Thespaceframemustbemanufacturedbyafirm
havingaminimumoftenyearsofexperienceinthedesign,
engineering,fabricationandconstructionofmetalspaceframesthatare
ofsimilarsizeandcomplexitytotheoneforthisproject.
(2)
Installer:Theinstallerofthespaceframemustbetrainedbythe
manufacturer.Allinstallationworkmustproceedinaccordanceto
manufacturerswritteninstructionsandfollowingrecommendationsof
manufacturersqualifiedsiteconsultant.
B. DesignRequirements:
(1)
Thestructureshallbedesignedtomeettherequirementsofthe
followingbuildingcode:___________________________
(2)
Inadditiontotheloadsspecifiedinthecode,thespaceframeshallbe
designedtoresisttheloadsofallmaterialsandequipmentsupportedby
thespaceframe,asshownonthedrawings,aswellasthefollowing
loads:
_________________________________________________________
_________________________________________________________
_________________________________________________________
1.4 Delivery,StorageandHandling
A. Wrapping:Allpaintedstructurecomponentsshallbeindividuallywrappedat
sourceinamannerthatprotectsthepaintfinishduringtransportation,storage
andhandling.
B. Packaging:Allcomponentsshallbepackagedinmetalcrates,eachweighing
nomorethan3tonsfullyloaded.Eachindividualcrateshallcontainonly
componentsimmediatelyadjacenttoeachotherinthefinishedstructure.
Cratesshallbenumberedtomatchinstallationsequenceandinstructions.
Packinglistsshallbeaffixedtoallcrates.
C. Storageatsite:Materialsshallbestoredofftheground,protectedfrom
weather,protectedfromallsourcesofwater,andsecurefromleaningor
toppling.
1.5 Warranty
A. Themanufacturershallissuetheownerawrittenguarantee,validforaperiod
ofoneyearafterinspectionandacceptanceofthework,thatthestructureis
freeofdefectsinmaterialsormanufacture,andfurther,thatanysuchdefects
thatmayariseduringthisperiodwillberepairedorreplacedatnocosttothe
owner.
Part 2
Products
2.1 Manufacturers
A. Manufacturer:StructurewillbemanufacturedbyGeometrica,Inc.,Houston,
TX,(713)7227555,http://geometrica.com.
2.2 Materials
A. TubecomponentsshallbeERWsteeltubingmeetingorexceedingthe
mechanicalpropertiesofASTMA500GRBorequivalent.Tubesshallbe
sizedbydesignloadsfromstructuralanalysis.
B. PurlinmembersshallbeERWformedsteeltubingconformingtoASTM
A569orequivalent.Purlinsshallbeeitherfastenedtoorintegraltotop
chordmembers.Nosecondarycladdingsupportstructureshallbepermitted.
C. HubsshallbealuminumalloyAA6061T6solidextrusionswithserrated
connectionslotsfortherequiredtubewallthickness.Hubsultimateload
undertensionshallbeatleast120%ofthenominalyieldstrengthofthetubes
beingjoinedasdemonstratedbytestsandanalysis.
D. ThreadedhardwareshallmeettherequirementsofeitherASTMA307orA
449asrequiredbystructuralanalysisanddesign.
E. Othersteelcomponents:SeatFittings,washersandmiscellaneoussteel
membersshallbefabricatedfromhotrolledsteelperASTMA36.
2.3 FinishRequirements
A. Galvanizing:
(1)
Tubeandpurlincomponentsshallbemillgalvanizedonbothinterior
andexteriorsurfacestoASTMA653,G90.
(2)
Bolts,washersandothersteelhardware,miscellaneoussteelfittings
andedgeframingmaterialshallbehotdipgalvanized.
B. PowdercoatPaint:Tubes,purlins,seatfittingsandwashersshallbefinished
withabakedonpolyesterpowdercoatsystemovertheexternalgalvanizing.
Colorasselectedbyarchitectfrommanufacturersstandardcolors.
Part 3
Execution
3.1 Examination
A. Theinstallershallexaminethespaceframesupports,workareasand
conditionsunderwhichthespaceframeistobeinstalledpriortoassembly
anderection.Ifthesupportsareaorconditionsareunsatisfactory,erection
shallnotproceeduntilsatisfactorycorrectionshavebeenmade.
3.2 Installation
A. Manufacturershallprovideaqualifiedconsultantatsiteduringinstallation.
Thesiteconsultantwillbeavailableatalltimestoanswerquestionsaboutthe
installationprocedures.
B. Erectionofthemetalspaceframeandrelatedaccessoriesshallbeincomplete
accordancewiththemanufacturer'sinstallationinstructionsandfollowing
recommendationsofmanufacturersqualifiedsiteconsultant.
C. Adequatecareshallbetakenduringtheerectionsequencestoinsure
membersarenotpositionedbyundueforceorerectedinanymannerthat
causesecondarystresses.
D. Adequatetemporarybracingandsupportsshallbeprovidedtoinsurethe
spaceframestabilityduringerection.
E. Protectivewrapshallremainonthetubesthroughtheerectionprocess.
3.3 CleanUp
A. Uponcompletionofthissectionofwork,removeallprotectivewraps,leave
allworkandworkareascleanandinsatisfactorycondition.
B. Immediatelyafterassembly,applyairdrytouchuppainttomemberswhose
finishwasdamagedduringmaterialhandlingorassembly.
C. Uponcompletionandinspection(3.4)ofspaceframework,itshallbethe
responsibilityofthegeneralcontractortoprotectthespaceframefrom
damageduringtheremainderofconstructionontheprojectanduntilowner
acceptance.
3.4 Inspection
A. ThecompletedSpaceframestructureshallundergoafullandcompletefinal
inspectionbymanufacturer'ssiteconsultantandshallbecertifiedinwriting
bythemanufacturerthatthefinishedproducthasbeenerectedinaccordance
withitsapproveddrawingsandthesecontractdocuments.