Professional Documents
Culture Documents
Pro Report
To:
From:
Copy to:
Date:
28/04/2013
Ref:
ca/ 275388817
Job Information
Engineer
Name:
Date:
Checked
Approved
28-Apr-13
Structure Type
SPACE FRAME
Number of Nodes
Number of Elements
4
3
Highest Node
Highest Beam
4
3
2
1
L/C
Primary
Primary
Combination
1
2
3
Name
beban mati
beban hidup
kombinasi
Nodes
Node
1
2
3
4
X
(m)
0.000
4.000
8.000
12.000
Y
(m)
0.000
0.000
0.000
0.000
Z
(m)
0.000
0.000
0.000
0.000
Beams
Beam
Node A
Node B
1
2
3
1
2
3
2
3
4
Materials
04/07/2015
Length
(m)
4.000
4.000
4.000
Property
1
1
1
(degrees)
0
0
0
Mat
3
4
5
E
(kip/in2)
29E 3
10E 3
3.15E 3
Name
STEEL
ALUMINUM
CONCRETE
0.300
0.330
0.170
Density
(kip/in3)
0.000
0.000
0.000
(1/K)
3.61E -6
7.11E -6
3.06E -6
Supports
X
(kN/m)
Fixed
Fixed
Fixed
Fixed
Node
1
2
3
4
Y
(kN/m)
Fixed
Fixed
Fixed
Fixed
Z
(kN/m)
Fixed
Fixed
Fixed
Fixed
Max: kg-m
1696
1696 kg-m
1316 kg-m
1
-720.112 kg-m
Y
Z X
momen
04/07/2015
3
-653.884 kg-m
-1045.9 kg-m
Load 3 : Bending Z
Moment - kg-m
rX
(kN-m/deg)
Fixed
Fixed
rY
(kN-m/deg)
Fixed
Fixed
rZ
(kN-m/deg)
Fixed
Fixed