Project Profile For Manufacture Of: Agricultural Implements
Project Profile For Manufacture Of: Agricultural Implements
AGRICULTURAL IMPLEMENTS
Agricultural Implements
NAME OF PRODUCT
REVISED
NIC Code(2004)
29212
Product Code(ASICC-2000)
76101
PRODUCTION
CAPACITY
1250 NOS
MONTH
&
YEAR
Rs.248 LACS
OF
DECEMBER,2010
PREPARATION
MSMEDI, Digiana Industrial
PREPARED BY
Estate, JAMMU
Ph-0191-2431077,2435425
Section I
PROJECT & ITS
INTRODUCTION
The proposed pro ject is for establishment of an industrial unit
for
manufacture
of
Tractor
drawn
Agricultural
Implements
like
Tillers/cultivators & Disc harrows etc. These implements are mainly employed
for the preparation of soil bed for sowing & burial of organic substa nces as well
as loosening & aerati ng the soil in the agri cultural fields
MARKET POTENTIAL
The proposed products Tillers & Disc harrows are primarily the tractors
drawn agricultural implements that are mainly employed for preparation of soil
bed for sowing & buri al of organic substances as well as looseni ng & aerating
the soil in the agricultural fields. These are heavy duty & economical
implements employed by the farmers all over the world for soil bed preparation.
Since India is high i n the Agriculture base there is a big demand of these
implements in the entire country including Jammu & Kashmir particularly in the
plain areas like districts Kathua, Jammu & Samba.
Presentl y there is no
Section II
MANUFACTURING PROCESS, TECHNICAL ASPECTS & BASIS
The manufacturing of proposed products involve various manufacturing
processes like cutting of steel sections, fabrication, welding, dril ling, turning making
sub
assemblies,
fitting
&
final
assembly
etc
where
steel
sections
&
other
parts/components like tynes, springs & fast eners be out sourced & purchased as per
own design & specifications.
. The manufacturing also involves inspections at various stages till they are
finally assembled & packed as per thei r Quality assurance standards/plans.The
following are the presumptions made while preparing this project report.
The establishment of unit involves an electrical connection of 60 KW
The viability calculations in the project are based on the 100 % capacity
utilization of the project.
Na m e o f I tem
Qty .
No s
in
Avg Ra te
(R s i n tho u sa nd s )
Sp ri n g T yp e T il ler s - 9 T yn es
100
10
10
Sp ri n g T yp e T il ler s - 1 1 T yn e s
150
12
18
Ri g id T yp e T il ler s 9 T yn e s
150
12
Ri g id T yp e T il ler s 1 1 T yn es
100
Di sc Har r o ws P la n e 1 2 Di sc s
100
24
24
Di sc H ar r o ws P la n e 1 4 Di sc s
100
26
26
Di sc Har r o ws P la n e 1 6 Di sc s
100
28
28
Di sc Har r o ws T r ail ed o f f se t 1 2 Di sc s
100
25
25
Di sc Har r o ws T r ail ed o f f se t 1 4 Di sc s
100
27
27
10
Di sc Har r o ws T r ail ed o f f se t 1 6 Di sc s
50
28
14
11
Mo u n ted O f f se t D i sc ha r r o w -1 2 Di sc s
100
26
26
12
Mo u n ted O f f se t D i sc ha r r o w -1 4 Di sc s
50
28
14
13
Mo u n ted O f f se t D i sc ha r r o w -1 6 Di sc s
50
30
15
To ta l
Am o un t
(R s. in La c s)
2 4 8 La c s
Section III
LAND, BUILDING & PROPOSED SECTIONS
Land
Plot of 1500 Sq.Yd.( in any industrial Estate at its prevailing average
price) of Rs. 1558 per Sq.Yds. = Rs 23.37 Lacs
Building
Plot area to be covered for construction = 60% = 607 Sq. Mts.
Area
(Sq. Mts.)
Work Involved
RCC
Construction
with
Elect/ Water/Sanitary fittings
Sheds with asbestos/ other sheets
roof
Boundary Wall, Gates & lighting
etc.
Rate per
Sq. Mts.
(in Rs.)
150
4500.00
6.75
455.5
1800.00
8.20
Total
Amount
(Rs. in
Lacs)
1.00
Rs
15.95
Section IV
MACHINERY, EQUIPMENTS & INFRASTRUCTURES
S.
No.
Quantity
(in Nos.)
Name of Machine
Cost
(Rs. in Lacs) incl usive
of taxes,
transportation,
electrical motors &
accessories etc.
13
14
15
16
3 sets
17.00 lacs
2 each
2no
0.30 Lacs
Quantity
(in Nos.)
Cost
(Rs. in Lacs)
Other Infrastructures
Pre-Operative Expenses
S.
No.
Name of Machine
5
Manpower/ Professionals
Conveyance &
Communication Expenses
Miscellaneous Expenses
0.50
Activity
Quantity
(in Nos.)
Cost
(Rs. in Lacs)
0.70
Quantity
(in Nos.)
Cost
(Rs. in Lacs)
1.50
Equipments
Office equipments, gadgets,
computers & furniture etc.
Grand Total
- Rs 20.00 Lac
Section V
HUMAN RESOURCE REQUIREMENT
7.0
Designation
Nos.
Manager
Supervisor/ Foreman
Skilled Workers
Am ount/ Salary
per m onth
Rs.1. 20 Lacs
0.15
Total
1.35
Section VI
OTHER RECURRING EXPENSES & WORKING CAPITAL
Item
Amount
(Rs. in Lacs)
Packaging Materials
190.00
Am ount (Rs. in
Lacs)
Item
Electricity expenses
2.30
0.10
Diesel expenses
0.60
Total
3.00
Am ount (Rs. in
Lacs)
Item
Selling Expenses
Insurance
2.00
Total
S.
No.
Particulars
Average
Period
Am ount
(Rs. in Lacs)
1 week
3.96
2 months
2.70
half week
2.58
Work in process
1 week
4.44
2 week
10.35
Total
24.03
Section VII
PROJECT COST & MEANS OF FINANCE
Total Capital Investment
S. No.
Amount
(Rs. in Lacs)
Item
39.32
20.00
24.03
Total
83.35
Means of Finance
S.
No.
Amount
(Rs. in Lacs)
Item
A) Fixed Capital
Term Loan on Land, Building, Machinery,
1
Infrastructures & Pre -Operatives @ 75% from
financial corporations/ bank
2
14.82
Total
59.32
B) Working Capital
Working Capital loan in the shape of working
1
capital limit @ 75% fro m bank
2
44.50
18.00
6.03
24.03
Section VIII
COST OF PRODUCTION & SALES REALIZATION
Cost of Production per annum
S.
No.
Am ount
(Rs. in Lacs)
Item
190.00
1.80
4.45
2.00
0.80
i.e.
salaries,
other
21.20
Total
220.25
Na m e o f I tem
Qty .
No s
in
Avg Ra te
(R s i n tho u sa nd s )
100
10
10
150
12
18
200
16
100
10
10
Di sc Ha rro w s P la n e 1 2 Di sc s
100
24
24
Di sc Ha rro w s P la n e 1 4 Di sc s
100
26
26
Di sc Ha rro w s P la n e 1 6 Di sc s
100
28
28
Di sc Ha rro w s T ra i led o f fs et 1 2 Di s cs
100
25
25
Di sc Ha rro w s T ra i led o f fs et 1 4 Di s cs
100
27
27
10
Di sc Ha rro w s T ra i led o f fs et 1 6 Di s cs
50
28
14
11
Mo u n t ed O ff se t Di sc h a r ro w - 1 2 Di sc s
100
26
26
12
Mo u n t ed O ff se t Di sc h a r ro w - 1 4 Di sc s
50
28
14
13
Mo u n t ed O ff se t Di sc h a r ro w - 1 6 Di sc s
50
30
15
To ta l
14
S c ra p 8 To n s @ R s .2 5 0 0 0 p er To n
R s.
R s.
Am o un t
(R s. in La c s)
2 4 8 La c s
2 .0 0 La c s
Gra nd To ta l R s.
2 5 0 .0 0 La c s
Section IX
PROFITABILITY, FINANCIAL VIABILITY RATIOS & ANALYSIS
Particulars
Sales Realization
Less (Cost of Production)
220.27
Rs.
29.73 Lacs
29.73
x 100
83.35
35.66%
29.73
250.00
x 100
11.89%
Particulars
Fixed Cost per annum
Interests
6.27
Depreciations
2.80
Insurance
0.24
40 % Salaries,
insurance
Other
expenses
&
Total
utilities
except
8.16
17.47
B.E.P - 37.01 %
10