PLN Tanjung Priok GFPPEP

LEVEL-1
POWER BLOCK
PB
LEVEL-2
GAS TURBINE BUILDING UNIT 1 PB-2
LEVEL-3
C4 , CA
LEVEL-4 (System) GT 3-1 Control Oil Unit

BQ
Weight

CODE
CODE

Ton
%

CODE
CODE

P-23

Area Code

13100

1.

1
2
3
4
5
6
7

PB
PB
PB
PB
PB
PB

PB-2
PB-2
PB-2
PB-2
PB-2
PB-2

C4
C4
C4
C4
C4
C4

9
10
11

12
13
14
15
16
17
18
19

PB
PB
PB

PB-2
PB-2
PB-2

C4
C4
C4

C4
C4
C4

PB
PB
PB
PB
PB
PB
PB
PB

PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2

C4
C4
C4
C4
C4
C4
C4
C4

C4
C4
C4
C4
C4
C4
C4
C4

22
23
24

PB
PB
PB
PB

PB-2
PB-2
PB-2
PB-2

CA
CA
CA
CA

CA
CA
CA
CA

Check & marking Centerline of foundation floor


Chipping at foundation floor & box out
Cleaning foundation
Setting packer plate
Curing time
Alignment inspection of packer plate

Theodolite, Y-level,Measurer tape, ElectricDrill, Hammer

Equipment on position
Install found. bolt & nut hanging at the base plate of Equip.
Check centerline & elevation of equipment
Alignment inspection of equipment
Install formwork
Grouting Foundation
Curing time
Remove formwork
Check alignment (centerline & elevation) after grouting
Tightening anchor bolt
Inspection equipment after grouting

Y-level, Water level,


Spanner, Measuring Tape

13100

C4 X04

13100

C4 X04

13100

C4 X04

Elev. : -3mm ~ 0mm 13100


13100
Location : 5mm

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

CA X02

13100

CA X02

13100

CA X02

13100

CA X02

Elev. : 2mm
Location : 2mm
Grout Mixer

Spanner
Y-level, Water level,

Elev. : 2mm
Location : 2mm

MNS

FINISH

START

FINISH

NUM.

DUR.

ACTUAL

NUM.

DUR.

RESOURCE
Mechanical
Manpower

Insulation
Manpower

painting
Manpower

Progress (%)
Plan

(Mandays)
Plan
Act

(Mandays)
Plan
Act

(Mandays)
Plan
Act

C4 X04

1
-

Weight

Actual
%

Weight

96
-

Painting
6.1.
6.2.
6.3.
6.4.

Preparation
Cleaning surface
Painting Work
Painting Inspection

TOTAL

Drawing No.

START

PLANNING

Installation
2.1.
2.2.
2.3.
2.4.
2.5.
2.6.
2.7.
2.8.
2.9.
2.10.
2.11.

6.

20
21

1.1.
1.2.
1.3.
1.4.
1.5.
1.6.
2.

Remarks

ACTUAL

Preparation

C4
C4
C4
C4
C4
C4

Equipment/ Tools

F-WBS

WBS Code

LEVEL-6
(Activity)

LEVEL-5

PC-WBS

Activity No.

LEVEL-3

GT 3-1 Control Oil Unit


PLANNING

S4-79089

- 1/1 -

[07/28/2015]