Professional Documents
Culture Documents
LEVEL-1
POWER BLOCK
PB
LEVEL-2
GAS TURBINE BUILDING UNIT 1 PB-2
LEVEL-3
C4 , CA
LEVEL-4 (System) GT 3-1 Control Oil Unit
BQ
Weight
CODE
CODE
Ton
%
CODE
CODE
P-23
Area Code
13100
1.
1
2
3
4
5
6
7
PB
PB
PB
PB
PB
PB
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
C4
C4
C4
C4
C4
C4
9
10
11
12
13
14
15
16
17
18
19
PB
PB
PB
PB-2
PB-2
PB-2
C4
C4
C4
C4
C4
C4
PB
PB
PB
PB
PB
PB
PB
PB
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
22
23
24
PB
PB
PB
PB
PB-2
PB-2
PB-2
PB-2
CA
CA
CA
CA
CA
CA
CA
CA
Equipment on position
Install found. bolt & nut hanging at the base plate of Equip.
Check centerline & elevation of equipment
Alignment inspection of equipment
Install formwork
Grouting Foundation
Curing time
Remove formwork
Check alignment (centerline & elevation) after grouting
Tightening anchor bolt
Inspection equipment after grouting
13100
C4 X04
13100
C4 X04
13100
C4 X04
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
CA X02
13100
CA X02
13100
CA X02
13100
CA X02
Elev. : 2mm
Location : 2mm
Grout Mixer
Spanner
Y-level, Water level,
Elev. : 2mm
Location : 2mm
MNS
FINISH
START
FINISH
NUM.
DUR.
ACTUAL
NUM.
DUR.
RESOURCE
Mechanical
Manpower
Insulation
Manpower
painting
Manpower
Progress (%)
Plan
(Mandays)
Plan
Act
(Mandays)
Plan
Act
(Mandays)
Plan
Act
C4 X04
1
-
Weight
Actual
%
Weight
96
-
Painting
6.1.
6.2.
6.3.
6.4.
Preparation
Cleaning surface
Painting Work
Painting Inspection
TOTAL
Drawing No.
START
PLANNING
Installation
2.1.
2.2.
2.3.
2.4.
2.5.
2.6.
2.7.
2.8.
2.9.
2.10.
2.11.
6.
20
21
1.1.
1.2.
1.3.
1.4.
1.5.
1.6.
2.
Remarks
ACTUAL
Preparation
C4
C4
C4
C4
C4
C4
Equipment/ Tools
F-WBS
WBS Code
LEVEL-6
(Activity)
LEVEL-5
PC-WBS
Activity No.
LEVEL-3
S4-79089
- 1/1 -
[07/28/2015]