PLN Tanjung Priok GFPPEP

LEVEL-1
POWER BLOCK
PB
LEVEL-2
GAS TURBINE BUILDING UNIT 1 PB-2
LEVEL-3
C4 , CA
LEVEL-4 (System) GT 3-1 Fuel Oil Flow Divider Inlet Filter Unit

BQ
Weight
Sheet No.

CODE
CODE
CODE
CODE

P-1

Area Code

- Ton
- %
PPSS-GT1-MECH-23

13100

GT 3-1 Fuel Oil Flow Divider Inlet Filter Unit

1.

1
2
3
4
5
6
7
8
9
10

PB
PB
PB
PB
PB
PB
PB
PB
PB

PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2

C4
C4
C4
C4
C4
C4
C4
C4
C4

2.

12
13
14
15

PB
PB
PB
PB

PB-2
PB-2
PB-2
PB-2

C4
C4
C4
C4

3.

17
18
19
20

PB
PB
PB
PB

PB-2
PB-2
PB-2
PB-2

CA
CA
CA
CA

CA
CA
CA
CA

MNS

PLANNING

ACTUAL

RESOURCE
Mechanical
Manpower

START

FINISH

START

FINISH

NUM.

DUR.

NUM.

DUR.

Insulation
Manpower

painting

Progress (%)

Manpower
Plan

(Mandays)

(Mandays)

(Mandays)

Plan

Act

Plan

Plan

Act

Act

Weight

Actual
%

Weight

1.1.
1.2.
1.3.
1.4.
1.5.
1.6.
1.7.
1.8.
1.9.

Handing over Foundation from Civil


Marking centerline of Foundation Floor
Inspection of centerline of foundation floor
Installation of Embedded Plate
Installation of setting for embedded plate
Grouting & Curing
Embedded Plate Cleaning
Cleaning of Foundation
Transporting of Equipment

Theodolite, Y-level,Measurer tape, ElectricDrill, Hammer

2.1.
2.2.
2.4.
2.7.

Placement of equipment
Adjusting centerline, Level & elevation of equipment
Welding Shim Pack plate to embedded Plate
Placement Inspection

OHTC, Chain lock, sling


Y-level, Water level,
Spanner, Measuring Tape
Hydraulic Jack
Welding Machine

3.1.
3.2.
3.3.
3.4.

Preparation
Cleaning surface
Painting Work
Painting Inspection

X, Y : 2mm
Elevation : -3mm ~ 0
Location : 3mm

Unic Crane

13100

C4 X01

13100

C4 X01

13100

C4 X01

13100

C4 X01

13100

C4 X01

13100

C4 X01

13100

C4 X01

13100

C4 X01

13100

C4 X01

13100

C4 X01

13100

C4 X01

13100

C4 X01

13100

C4 X01

13100

CA X01

13100

CA X01

13100

CA X01

13100

CA X01

Installation

C4
C4
C4
C4

16

Remarks

ACTUAL

Preparation

C4
C4
C4
C4
C4
C4
C4
C4
C4

11

Equipment/ Tools

F-WBS

WBS Code

LEVEL-6
(Activity)

LEVEL-5

PC-WBS

Activity No.

LEVEL-3

PLANNING

Painting

Elevation : 2mm
Location : 2mm

TOTAL

Drawing No.

G1-84886

- 1/1 -