Professional Documents
Culture Documents
LEVEL-1
POWER BLOCK
PB
LEVEL-2
GAS TURBINE BUILDING UNIT 1 PB-2
LEVEL-3
C6 , CA
LEVEL-4 (System) GT 3-1 Generator Seal Oil No.1 GT Supply Unit
BQ
Weight
Sheet No.
CODE
CODE
CODE
CODE
P-26
Area Code
Ton
%
PPSS-MECH-29
13100
3
4
5
6
7
8
PB
PB
PB
PB
PB
PB
PB
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
C6
11
12
13
14
15
16
17
18
19
20
23
24
25
MNS
START
FINISH
START
FINISH
NUM.
DUR.
ACTUAL
NUM.
DUR.
RESOURCE
Mechanical
Manpower
Insulation
Manpower
painting
Manpower
Progress (%)
Plan
(Mandays)
Plan
Act
(Mandays)
Plan
Act
(Mandays)
Plan
Act
Weight
Actual
Weight
1.1.
1.2.
1.3.
1.4.
1.5.
1.6.
1.7.
Theodolite, Y-level
Hammer Drill
Elev. :-3mm ~ 0mm
Location : 5mm
13100
C6 X03
13100
C6 X03
13100
C6 X03
13100
C6 X03
13100
C6 X03
13100
C6 X03
13100
C6 X03
13100
C6 X03
13100
C6 X03
13100
C6 X03
13100
C6 X03
13100
C6 X03
13100
C6 X03
13100
C6 X03
13100
C6 X03
13100
C6 X03
13100
C6 X03
13100
CA X02
13100
CA X02
13100
CA X02
13100
CA X02
2.1.
2.2.
2.3.
2.4.
2.5.
2.6.
2.7.
2.8.
2.9.
1.10.
2.11.
Equipment on Base
Install found. Bolt & Nut hang at the foot plate Equip.
Check CL & Elev. Of the Equipment
Alignment Inspection of Equipment
Install formwork
Grouting Foundation
Curing Time
Remove formwork
Check Alignment (CL & EL) after Grouting
Foundation Bolt Tightening
Inspection of Equipment after Grouting
Y-level, measurer
Elev. : 2mm
Location : 2mm
Carperter Tools
Mixer Grout
Y-level, measurer
Spanner
Y-level, measurer
Elev. : 2mm
Location : 2mm
3. Painting
21
22
Remarks
PLANNING
2. Installation
9
10
Equipment/ Tools
ACTUAL
1. Preparation
1
2
LEVEL-6
(Activity)
LEVEL-5
F-WBS
WBS Code
PC-WBS
Activity No.
LEVEL-3
PB
PB
PB
PB
PB-2
PB-2
PB-2
PB-2
CA
CA
CA
CA
CA
CA
CA
CA
3.1.
3.2.
3.3.
3.4.
Preparation
Cleaning surface
Painting Work
Painting Inspection
TOTAL
Drawing No.
A11E950
- 1/1 -
[07/28/2015]