CFRP Strengthening
During a Real Fire
Tim Stratford
Jian-fei Chen
Martin Gillie
The University of Edinburgh
Background
Carbon fibre reinforced polymer
(CFRP) strengthening
Background
Example applications of Carbon Fibre Reinforced
Polymer (CFRP) strengthening systems
Background
Finish (coating resin etc)
Carbon fibre
(preformed plate or wet lay-up)
Bonding adhesive
Tg = 65 - 100C
Concrete substrate
The Performance of CFRP Strengthening During a Real Fire
Background
Bonding adhesive
Tg 65 to 100C (?)
Background
Concrete Society Technical Report 55:
Unless a rigorous analysis is undertaken it is
sensible to neglect the strengthening from FRP
in fire situations.
Fire protection.
Regulations may require the application of an
over-coat layer, which has been tested on the
fully-cured composite system
Background
Background
Structural alterations
FRP carrying permanent load, and must carry load during fire
Fire protection?
Background
Dalmarnock compartment fire tests
Installation of
Strengthening
Installation
WINDOW
x
FRP plate 1
Intumescent
FRP plate 2
Unprotected
FRP plate 3
Gypsum Board
1180
1360
1560
FRP NSM
Intumescent
FRP NSM 2
Unprotected
FRP NSM 3
Gypsum Board
1940
2190
2420
PLATES
NSM
Gyproc
Unprotected
Intumescent
Gyproc
Unprotected
Intumescent
Installation
Gypsum board
2 layers of 12mm board
+ intumescent sealer
(Designed system)
Experimental Setup
Strain gauges, Thermocouples
WINDOW
Experimental Setup
x
7Pt
7Nt
7Mt
1180
6Pt
1360
5Pt*
6Nt*
5Nt
6Mt
5Mt
1560
4Pt
1940
4Rt
4Qt*
4Nt
4Mt
3Pt
3Nt
3Mt
2Pt
2Nt
2Mt
2190
2420
FRP plate 1
FRP plate 2
FRP plate 3
FRP NSM 1
FRP NSM 2
FRP NSM 3
Thermocouples
in FRP bondline
WINDOW
Experimental Setup
x
1180
1360
1560
1940
2190
7N
7P
6P
(Dead Gauge)
7M
FRP plate 1
6M
FRP plate 2
5P
5N
5M
FRP plate 3
4P
4N
4M
FRP NSM 1
3P
3N
3M
FRP NSM 2
2P
2N
2M
FRP NSM 3
2420
750
750
Other instrumentation:
-gauges on top of slab
-gauges on top of slab
-gauges against
adjoining wall
Thermocouples through
slab depth
Thermocouples within
compartment (gas phase)
The Performance of CFRP Strengthening During a Real Fire
Results
Results
Results
Gas-phase temperatures
1000
WINDOW
900
FRP plate 1
800
FRP plate 2
FRP plate 3
700
FRP NSM 2
FRP NSM 3
Temperature (C)
FRP NSM
600
500
400
300
200
TC-12-2
TC-14-2
100
TC-17-2
0
0
10
15
20
Time (mins)
Results
Results
Fibres on floor (resin burnt off)
WINDOW
FRP plate 1
FRP plate 2
FRP plate 3
FRP NSM
FRP NSM 2
FRP NSM 3
Results
Mostly debonded.
Resin mostly burnt off.
WINDOW
FRP plate 1
FRP plate 2
FRP plate 3
FRP NSM
FRP NSM 2
FRP NSM 3
Results
Gypsum board intact.
Plate and adhesive visually sound.
WINDOW
FRP plate 1
FRP plate 2
FRP plate 3
FRP NSM
FRP NSM 2
FRP NSM 3
Results
Bonding adhesive burnt away
from beneath and to sides,
leaving fibre in FRP exposed.
WINDOW
FRP plate 1
FRP plate 2
FRP plate 3
FRP NSM
FRP NSM 2
FRP NSM 3
Results
Intumescent layer intact;
FRP and adhesive in place.
WINDOW
FRP plate 1
FRP plate 2
FRP plate 3
FRP NSM
FRP NSM 2
FRP NSM 3
Results
Gypsum board sound.
FRP and adhesive visually sound.
WINDOW
FRP plate 1
FRP plate 2
FRP plate 3
FRP NSM
FRP NSM 2
FRP NSM 3
Results
FRP Plates Bondline Temperatures
450
WINDOW
Unprotected
400
Intumescent
Gypsum Board
FRP plate 1
350
FRP plate 2
FRP plate 3
300
FRP NSM 2
FRP NSM 3
Temperature (C)
FRP NSM
250
200
150
100
50
0
0
10
20
30
40
50
60
Time (mins)
Results
NSM FRP Bondline Temperatures
350
Unprotected
WINDOW
Intumescent
300
Gypsum Board
FRP plate 1
FRP plate 2
250
FRP plate 3
FRP NSM 2
FRP NSM 3
Temperature (C)
FRP NSM
200
150
100
50
0
0
10
20
30
40
50
60
Time (mins)
Results
FRP Plates Bondline Temperatures
NSM FRP Bondline Temperatures
450
350
Unprotected
400
Intumescent
Unprotected
Gypsum Board
350
Intumescent
300
Gypsum Board
300
Temperature (C)
Temperature (C)
250
200
150
250
200
150
100
100
50
50
0
0
0
0
10
20
30
40
50
60
10
20
30
40
50
60
Time (mins)
Time (mins)
Results
5000
Unprotected
Intumescent
Gypsum Board
FRP plate 1
4500
FRP plate 2
FRP plate 3
4000
FRP NSM
3500
FRP NSM 3
Strain ( strain)
FRP NSM 2
3000
2500
2000
1500
1000
500
0
0
10
20
30
40
50
60
Time (min)
The Performance of CFRP Strengthening During a Real Fire
Results
5000
Unprotected
4500
FRP plate 1
Intumescent
FRP plate 2
4000
FRP plate 3
Gypsum Board
FRP NSM
3500
FRP NSM 3
Strain (strain)
FRP NSM 2
3000
2500
2000
1500
1000
500
0
0
10
20
30
40
50
60
Time (min)
The Performance of CFRP Strengthening During a Real Fire
Results
3500
Unprotected
Intumescent
Gypsum Board
FRP plate 1
3000
FRP plate 2
FRP plate 3
FRP NSM
2500
FRP NSM 2
Strain (strain)
FRP NSM 3
2000
1500
1000
500
0
0
10
20
30
40
50
60
-500
Time (min)
The Performance of CFRP Strengthening During a Real Fire
Results
NSM Plates - Central Strain Gauge Readings
5000
3500
Unprotected
Intumescent
4500
4000
Gypsum Board
2500
3500
3000
Strain (strain)
Strain (strain)
Unprotected
Intumescent
Gypsum Board
3000
2500
2000
1500
1000
2000
1500
1000
500
500
0
0
0
0
10
20
30
Time (min)
40
50
60
10
20
30
40
50
60
-500
Time (min)
Ongoing Work
Conclusions
Acknowledgements
BASF Construction