ing 25 kw Jajce, 01.01.2010.
0. Load Pellets TimeOut 18
1. Fire-On TimeOut Z
2._Pellets Type o
3. Feeder Fast Load Off Time 5
4,_Feeder Fast Load On Time 70
5. Feeder Load Off Time 65
6 _Feeder Load On Time 5
7, Feeder Fire-On Off Time 65
8._Feeder Fire -On On Time 5
9. Pwrl Feeder Off Time 60
10. Pwr-1 Feeder On Time 3
11. Pwr-2 Feeder Off Time 60
12._Pwr-2 Feeder ON Time 4
13. Pwr-3 Feeder Off Time 60
14. Pwr-3 Feeder On Time 8
15. Pwr Feeder Off Time 60
16. Pwr-4 Feeder On Time 20
17. Pwr Feeder Off Time 60
18. Pwr-5 Feeder On Time 40
19. Fan Speed in Load Pellets 36
20. Fan Speed in Fire-On 36
21, Pwr-i Fan Speed 25
22, Pwrd Fan Speed 5
23, Pwr3 Fan Speed 28
24, Pwr Fan Speed 30
25, Pwr Fan Speed 30
26. Pwr Fan Speed Fan 2 0
27. Pwr-2 Fan Speed Fan 2 0
28, Pwr-3 Fan Speed Fan 2 0
29, Pwr-4 Fan Speed Fan 2 0
30, Pwr-5 Fan Speed Fan 2 0
31. Turn On Hysteresis é
32, Desired Water Temp. 65
33, Water Modulation Start Temp. 5
‘34, Fire-On Start Gasses Temp. 50
335, Gasses Modulation Start Temp. 20
36, Fan Turn Off Temp. a5
37, Maximum Gasses Temp. 250
38. CLEANING period 60
39, CLEANING time 20
"40, COOL GASSES/CLEANING FAN speed 60“AL, Second Feeder Relative dose 0
42, Flame Chamber ASH cleaning rotation time 0
3, ASH transporting belt activation 0
“44, Time between two Ash Cleanings 0
“45, Water Pump Turn on Temp. 30
“46, Water Pump Turn Off Temp. 45
“47, Back Water Pump Turn Off Temp. o
“48, Fast Loading Phase Time o
49, Temperature Gradient mesuring Time window 30
50, Temperature gradient in PAR 49 Time Frame. 5
‘SI, Number of Load Pellets Temperature Samples 6
'52, Temperature difference during Load Pellets sequence 2
53, Feeder 1 pause factor when pellets type 1 is selected 100
‘54, Feeder 1 pause factor when pellets type 2 is selected 700
55, Feeder 1 pause factor when pellets type 3 is selected 100