You are on page 1of 28
KERAJAAN MALAYSIA JABATAN KERJA RAYA MALAYSIA STANDARD SPECIFICATION FOR ROAD WORKS Section 2: Earthworks KETUA PENGARAH KERJA RAYA HER | apa tan keRiA RAYA MALAYSIA JALAN SULTAN SALAHUDDIN, 80882 KUALA LUMPUR Perunding SSE wors0:.% oe ‘0 aa, anor Oo Ean FOREWORD Seeenarsison ar Fao58T33600 ’As practices in road construstion change over time, it is imperative for Jabatan Karja Raya (UR) to continuously update and improve thelr standard specications. These now specications are not only aimed at keeping abreast with current technologies but aso helping in improving the quaty of constructed product. In unison, these new specifications. have @ signiicant postive impact on the construction industry especialy with the incorporation of now products and technologies. Standard Specification for Road Woiks Is an essontlal component in the road Infastucture construction industry. This speciation provides an improved guidance In the material selection and the production of good quality workmanship and products bbased on current best practices. The purpose ofthis standard specication isto establish Lnitormiy in road works to be used by road designers, road autho, manufacturers ‘and suppliers of read related products ‘This document “Standard Specification for Road Works - Section 2: Eartworks” sa part ofa sores of improved specifications in the Standard Specticaton for Road Works. The Ccamplation ofthis dacument was carried out through many discussions by the technical Committee members. Additonal thas been presented ata technical workshop held on March 2011. Feedbacks and comments received were carefully considered and Incorporated in the specifeation where appropiate This Specification had slso been presented in the Mesyuarat Jawatankuasa Spesitkasi Plawal JKR bag) Korja-kera Jalan Bl, 22012 on 12" April 2012 and finally approved in the Mesyvarat Jawatankvasa Pemandu Pengurusan Bil 04/2013 en 19" February 2013, “This document will bo reviewed and updated from time to ime to cater for any changes on policies and current requirements. inthis respect, any comments and feeaback regarding to this specication should be forwarded to Unit Standard & Spesifkasi, Cawangan ejuutecan Jalan & Geoteknik Published by: Cawangan Kejurutoraan Jalan & Geoteknik bu Pejabat Jabatan Kerja Raya Tingkat 26, Menara PD, No. 80, dalan Tun Razak, ‘50400 Kuala Lumpu. malt: ussi@ikaov.my June 2013 sa ACKNOWLEDGEMENT ‘This Standard Specification for Road Works - Section 2: Earthworks has been prepared ‘bya technical committee comprised of the folowing members: ‘Committee Members ier Mohamad Noe bin Omar (Chairman) Caw. Ko). Jaan & Geoteknik Ie Rami bin Othman Caw, Ke. Jalan & Gootehnik Ir Abdul Had bin Abdul Ae Caw. Ke) Jalan & Geotokrik ie Edayy bt Salloh @ Aman Cavs. Ko} Jalan & Gootoknik Pa, Noshazamawat bt Md Desa Caw. Ke. Jalan & Geotekrk Ir. Som Pong at Pchan ‘Caw. Ke} Jalan & Geotekrik Ck Zaton bt Zeina Bae (Caw. Ke, Jalan & Gootehnik ‘A special thanks to the Committee that prepared the "Research Report Guidelines and Improvement of JKR Specication for Earth Works” who chaired by Ir. N. Selvanayagam, ‘ormer Deputy Dicector General Public Works Department for their valuable findings and studies used inthis document, Filly, the publisher would ike to express its gratitude fo the above committee members for thalr substantial contributions towards the successful completion ofthis document. rousey201250) SECTION 2~ EARTHWORKS 2. CLEARING, GRUBBING AND STRIPPING TOPSOIL 241 Description Site Clearing Grabbing Stripping Topsoi Dumping a. a4 a4 a4 24.2 Constttion Methods 2121 Areas tobe Cleared 2122 Areas tobe Cleared, Grubbed and Stipped of Topsoil 2123 Topsoil 2424 Timber 2128 Structures 21.26 Disposal of Material 2 EARTHWORKS 221 Definitions 2.22 General Requirements 223 Roadway Excavation 223.1 Dimensional Tolerances 22.32 — Soparation and Stockpling of Suitable Material 2233 Removal of Excavated Material from Ste 22.34 Removal of Unsuitable Material 22:38 Replacement of Excavated Material Under Standing Water 2236 Widening Cuts 2237 Excavation of Rock 22.38 Storage and Handing of Explosives 2239 Blasting 22310 Safely Measures 223.11 insecure Materia 2.24 Earth Embankment 2241 Material 2242 Borrow Pits 22.43 Placement of Fil Materials 22.44 Compaction 2245 Frequency of Contol Tests 22.5 Rock Fill Embankment 22.6 Embankment Over Soft Ground 2261 Foundation Treatment sou PAGE 10 10 " " " "1 2 4 “ 6 16 (xrsPu2018.82) 226.2 — Surcharge and Staged Construction 18 2263 — Geotechnical Instamentations 5 2264 — Monitoring Records 16 22.7 Subgrede 6 22.8 Protective Vegetation fr Erosion Control 7 2281 Topsoil 7 2282 Turing v 2283 Hydroseeding 8 2284 Crespers 19 22.85 Temporary Stopo Protection 20 228.6 — Falureto Comply 0 Spectication 20 SECTION 2: EARTHWORKS 2a (oxuseaz0n3s2 SECTION 2 - EARTHWORKS CLEARING, GRUBBING AND STRIPPING TOPSOIL aaa Description This work shall consist of clearing, grubbing and stripping topsol in the ‘areas within the limits of Works designated hereunder andlor shown onthe Drawings andlor directed by the S.0,, and of clearing only in other areas \dosignated hereunder andior shown on the Drawings andior directed by the $.0,, all as specified herein and as required by the S.0. The work shall ‘also include the demoliton and disposal of stuctures in the said reas, ‘except where otherwise provided for in the Contract, as spectied herein and as required by the S.0. 24.4.1 Site Clearing Clearing shall consist of cuting andor taking down, removal and dlsposal fof everthing above ground lave, including objects overnanging the areas to be cleared such as trea branches, except such trees, vegetation, Structures or pars of structures, and other things which are designate in the Contract to remain, or be removed by other, of which the §.0. directs ‘are to be left uncsturbed. The material fo be cleared shall include but not, recessarly be limited to trees, stumps (parts above ground), logs, brushwood, undergrowth, long grasses, cops, loose vegetable matter and structures (except those structures whose removal of clearance Is otherwise provided for inthe Contract). Clearing shall also include leveling of obsolte dikes, terraces, ditches, ec, unless otherwise dicted by the 80. 2..4.2Grubbing rubbing shall consist of removal and disposal of surface vegetation bases of stumps, roots, underground pars of structures, and other ‘structions to a depth of at least 0.50 m below ground level, with the agreement of the $0. 2.4.4.8 Stdpping Topsot ‘Stripping topsoil shall consist of the removal of topsoil to an average depth of at least 100 mm below ground loval, and is stockpiling for use in the Works, andlor is disposal, as directed bythe S.0. 2.1.14 Dumping ‘All materials resited from ste clearing shal be dumped tothe Contractor's dump site 2s approved by the S.O. Method statement on dumping wth Paricular emphasis on prevention of environmental polluton shall be submited othe $.0. for approval se (oxrispu013-s2) 24.2 Construction Methods 2.12.1 Areas to be Cleared ‘The areas where the Works are to be carried out shal! be cleared as described in Sub-Section 2.1.1, uniess otherwise shown on the Drawings andlor directed bythe 80. tearing shall be carried out to the extents deemed necessary and approved or directed by the 5.0. in areas outside the road reserve where ‘channel excavation or other works required, In areas which are to be cleared only, and in which grubbing and sipping topsoil are not required, the methods of work shall be such as wil not unduly damage the surface vegetation and tops, and care shal be taken Not to isturb the topsoil and the root systems of grasses and other surface vegetation. No topsoil! shall be removed from such areas, except as icected by the S.0,, and any topsol grasses and other surface vegetation otherwise removed or disturbed shall be replaced and made good at the Contractors own expense, with the agreement ofthe S.0. 2.1.2.2 Areas to be Gleared, Grubbed and Stipped of Topsoil, Uniess otherwise shown on the Drawings andlor dicted by the 8.0, clearing, gubbing and stripping topsoil shall be carried aut in all reas of roadway excavation and in all areas where embankment is 10 be constructed, excep hat grubbing and sipping topsoil shall not be catied ‘ut in those areas were embankment is to be constricted on ground Identiied as swamp o soft ground, Cearing, rubbing and stipping topsol shall be caried out tothe extents doemed necessary and approved or directed by the S.O. in areas both Inside and outside the road reserve where channel excavation or other work is requires Except where further excavation is required, holes and caves in the ground surface afr clearing, grubbing and stipping topsoll shall be filed with materiis similar to the adjacent ground, and such fil shal be ‘compacted 10 a dry density similar to that ofthe surtounding material, with {the agreement ofthe 8.0. ‘This work shall be considered incidental to the work of clearing, grabbing and stripping topso, and shall not be measured for payment. 2.1.2.3 Topso Topsail tobe stockpiled for the Works shall be sufficiently fertile to promote and support the growth of vegetation, and shal be taken from such reas Where clearing, qrubbing and stpping topsoil required as approved or directed by the S.0. Before stockpling, topsoil shal be separated from wz (oxrusPuz01s.s2) objectionable materials as defined in Sub-Section 2.1.2.6, with the ‘2greement of the $.0. The Contractor shall arange for stockpile sites cither within or outside the road reserve, at his own expense, and with the ‘29reement of the 5.0. or as required by the relevant laws and regulations. ‘Otherwise, topsoil removed during grubbing and stripping operations shall bbe separated from objectionable matrils and spread within the road reserve or borrow areas, or ethorwise disposed of, as approved ox drocted bythe SO, 21.24 Tambor ‘The ownership of tors vested inthe Government Saleable timber shall be Wimmed and stacked in accordance with the requirements ofthe appropiate Government agency, In accessible places within the oad reserve 8s approved or directed by the S.0, ‘The Contractor shall have the right to uso unsaleabie timber (or saleable limber when permission Is granted in wring by the appropriate Government agency or authority) for his own purposes in connection with the Contac, always provided that he shall comply with the requirements of the S.0 21.25 Suctures Major stuctures are those which cannot practicably be cleared by bulldozer andlor hyraulc excavator, whose demolition requires pneumatic tools, explosives andlor other specialised equipment. A brief descriton of teach major structure ( ary) and depth to which extent it shall be ‘demolished is given inthe Bil of Quantities. All fences, buildings, structures, and encumbrances of any character within the limits ofthe road reserve, except those to be removed by others or

You might also like