Master Data
www.itica.cz http://www.itica.cz
skoleni@itica.cz
PP10
Material
http://www.itica.cz
http://www.itica.cz
Material Master
MM02 transaction
MM01/MM02
http://www.itica.cz
SPRO setting
You can set in SPRO several material types or use the existing ones
http://www.itica.cz
MRP profile
MMD1 / MMD2
When you are creating material master you can use MRP profile to make
easier the data management of all materials.
http://www.itica.cz
MM01
You can save your usually used views and your organizational data.
http://www.itica.cz
PP10
Bill of Material
BOM
http://www.itica.cz
4 types of BOMs
1)
2)
3)
4)
Single-level BOM
Multilevel BOM
Summarized BOM
Variant BOM
http://www.itica.cz
Create BOM
Create Bill of Material
CS01
The BOM can be used in several types of usage.
http://www.itica.cz
Change BOM
CS02 transaction
Customize in OS13
CS02
Change BOM
http://www.itica.cz
BOM Header
CS02 transaction
CS02
BOM Header
Customize
in
OS23
http://www.itica.cz
BOM Item
CS02 transaction
CS02
BOM Header
Phantom
item
iden5ca5on
http://www.itica.cz
http://www.itica.cz
PP10
Work center
http://www.itica.cz
Main characteristics
Work center represents the central capacity quantity within production planning.
It can represent:
Machine
Group of machines
Person
Group of persons
http://www.itica.cz
CR01
By CR01 you create the work center. By CR02 you can change the work
center.
Can
be
customized
in
OP40
http://www.itica.cz
CR11
Capacity can be shared with several work centers.
Can
be
customized
in
OP40
http://www.itica.cz
CR21
You can subordinate one work center to another work center.
http://www.itica.cz
PP10
Routings
http://www.itica.cz
Routings overview
Master data
Main characteristics
3 types of time are used within routings:
1) Queque time
This is the period of time in which the material is located at the production center until the execution of operation begins.
2) Move time
Time to move from one production center to subsequent production center.
3) Wait time
After the operation is done the material wait to be moved to another production center.
http://www.itica.cz
Create Routing
Create the master data
CA01
By CA01 you create the routing. By CA02 you can change the Routing.
http://www.itica.cz