PP10

Master Data

Created by: Veronika Obstov

www.itica.cz http://www.itica.cz
skoleni@itica.cz

PP10

Master data Material

Material

http://www.itica.cz

SAP PP Master Data


Master Data Overview

Master Data consists of three parts


1) Product structure (BOM)
2) Product processes (Routing)
3) Available capacities (Work Center)
BOM and Routing can be combined into production versions.

http://www.itica.cz

Material Master
MM02 transaction

MM01/MM02

Central element of basic data within production

When you create in MM01 the new material:


Industry sector needs to be filled
Industry sector influences the
A) screen sequence
B) field selection
Which follow in the creation of material master
Material Type is also neccessary to select.
It influences:
Internal or external number assignment
Which views are available and in which sequence
Whether the material can be configured
Controls Inventory management requirements
Accounts for goods movements

http://www.itica.cz

Customize material type


SPRO

SPRO setting
You can set in SPRO several material types or use the existing ones

http://www.itica.cz

MRP profile

Create material with MRP profile

MMD1 / MMD2
When you are creating material master you can use MRP profile to make
easier the data management of all materials.

http://www.itica.cz

Reduce maintenance time


Save views and orgainizational data

MM01
You can save your usually used views and your organizational data.

http://www.itica.cz

PP10

Bill of Material

BOM

http://www.itica.cz

SAP BOM Master data


BOM Overview

4 types of BOMs
1)
2)
3)
4)

Single-level BOM
Multilevel BOM
Summarized BOM
Variant BOM

http://www.itica.cz

Create BOM
Create Bill of Material

CS01
The BOM can be used in several types of usage.

http://www.itica.cz

Change BOM
CS02 transaction

Customize in OS13

CS02
Change BOM

http://www.itica.cz

BOM Header
CS02 transaction

CS02
BOM Header
Customize in OS23

http://www.itica.cz

BOM Item
CS02 transaction

CS02
BOM Header
Phantom item
iden5ca5on

http://www.itica.cz

SAP BOM Transactions


BOM Overview

Transaction to manage BOMs


1) CS11 Multilevel BOM
2) CS15 Where used BOM
3) CS14 BOM comparison

http://www.itica.cz

PP10

Work center master data

Work center

http://www.itica.cz

Work centers overview


Master data

Main characteristics
Work center represents the central capacity quantity within production planning.
It can represent:
Machine
Group of machines
Person
Group of persons

http://www.itica.cz

Create Work center


Create the master data

CR01
By CR01 you create the work center. By CR02 you can change the work
center.

Can be customized in
OP40

http://www.itica.cz

Create Pooled capacity


Create the master data

CR11
Capacity can be shared with several work centers.

Can be customized in
OP40

http://www.itica.cz

Work center hiearchy


Create the master data

CR21
You can subordinate one work center to another work center.

You can select which


workcenters are
under this hiearchy.

http://www.itica.cz

PP10

Routings master data

Routings

http://www.itica.cz

Routings overview
Master data

Main characteristics
3 types of time are used within routings:
1) Queque time
This is the period of time in which the material is located at the production center until the execution of operation begins.
2) Move time
Time to move from one production center to subsequent production center.
3) Wait time
After the operation is done the material wait to be moved to another production center.

http://www.itica.cz

Create Routing
Create the master data

CA01
By CA01 you create the routing. By CA02 you can change the Routing.

http://www.itica.cz