7) Explain what is “work centre” in SAP PP and what is the use of Data in
Work Centres?
“Work Centres” are business objects in SAP-PP that is used in task list
operations (routings, maintenance task lists, inspection plans) and work orders.
This role contains a function for evaluating the MRP result. This function can be
used to find information about the availability of material and to identify any
material shortage situation.
It can be integrated with various SAP applications like SAP-SD, PP, PP-SOP, PP-
LTP, PP-SFC, etc.
10) Explain how can you create production order without routing and BOM?
Without BOM and routing you can create a production order by changing the
config in OPL8 (order type dependent parameters) as routing optional. When we
try to create an order using C001 it may ask for a sales order.
11) Explain what happens to planned after it has been converted into
production order?
When planned order is converted to the production order, the planned order is
offset by production order. The planned order reference can be seen in the
production order.
12) Mention what is the difference between stock transport order and stock
transfer order?
Stock transfer order: It is referred to the transfer of stock for the usage in
the same company
Stock transport order: It is referred to the change of title of stock in the
name of the buyer
13) Explain what is PRT (Production Resource Tools) in SAP PP?
Engineering drawings
Jigs
Fixtures
Measurement Instruments
To create PRT master records you have to follow the following steps
15) Mention what is the t-code for changing production order and to display
production order?
It is a collection of solutions with which you digitally create, maintain and make
product information, available in the whole company and for the entire life
cycle of the product.
PLM provides you the function with which you do following things
The workplace is an open portal in the world wide web and allows you to
access all application and information that you need to work with all
external and internal business partners
It can link with other internet applications like program management,
change and configuration management and engineering collaboration.
18) In cost controlling information system mention the fields that are listed
in the list screen of the report?
Key Figures
Costing/MM
%Costing/MM
Revaluation
VarCstRuns
%VarCstRuns
Basic data
Valuation
Cost component group 1/ Cost component group 2
CostCompGr(fix)1 / CostCompGr( fix)2
19) Explain what is the use of SAP Material View and list out other
parameters where SAP Material View is applicable?
SAP Material View is an SAP object that not only hold name of the material, but
various other information related to material like
20) Mention what are the types of Master Views for Production and
Planning?
21) Mention how MRP (Material Requirement Planning) types are classified?
22) Mention what are the key fields found in MRP View 1?
General Data
MRP Procedure
Lot size data
23) List out the basic procedure for dispatching operations in capacity
levelling ?
24) Explain what is the need of MRP list if the stock requirement list is
already given?
MRP list displays the result of the last planning run, changes that occurred
between planning runs are ignored in the MRP list. While contrary to this, in the
stock or requirement list all changes that occurred in the stock, issues and
receipts are displayed by the system.
25) Mention what are the t-codes for creating, changing and summarizing
BOM?