110 e6ed,
Fass
& Alb vet] may °2
cs - srnpene Aman Mes esrb %
aval)
aig spare abrod Bip apinarcl
-a{dmys pourebfo aa sve yoube auf Jo Hove Jol Wem oe
ae = 1 sytem? .
if Poupalpo vat we pony
7euuo} Ys prepUEYS oe Fea
-=qaudiers poyjaujia payoene-sysp-penorddy ursishieuy Ayes aor panaidde ypeny | zeuenno oy | WeuXoenwol uoHoes 6£00'0-L-¥SIHSN
j
SECT Bp ka (GerBojouuua) sued =
pl FRoojoanyot 3yé5 | poyeoipul wm Buipjoyeos jo uogensniy apivcig | zavoNnO OY ee) 6£00-0-L1S/IHSN
‘SoURUBIUIEW pul aBei0Ig, 10) appa uonnes _SOURUBTUIEW! PUE EBRIO}S, 10} uoNIes ppy | zawaNNO OW jer8uap 6E00-O-L-HSIHSN
oi8hg uonparoig ie, 44 pepPRLONOS uayshg vopoarosg lfe4, 40} voNseS Ppy | ZaLOIND OV reseuen {6£00-0-1-¥SIHSN
Burpee pue uoroadsul Jo} appe|uonses .BulBBe] pue uoyoadsu, 304 uoHoes ppy | zaN0NNS OY reseuap {6£00-0-LYS/HSN
(G0C0-L-yS-VS)MeIN|s AuedWod paYyoeye oe
‘04 Ul SUOUIWO9 alqealidde jIe poyescdioou} zauenn| OV leeue9, 6£00-0-L¥SHSN
Aidoy s.1o,9e.nu0sqns siuewWwos s,10yenUED Agquowwicg | Burmeigruonsogiobeq | ‘oN wuewnsog cousiajoy | “
aia ‘SL02-60°60 7 ava 6£00-O-L-4S/HSN "ON 0UBI3}ey
196200099 “ON BUCS
(6 Od3)
aloig jeuluuel pue Neuyey ueZer
TERIUISURI] 10}9e.QUODGNS 0} SJUBUIUIOD S,10}9EHUODNSH
AL-Hajs Compration
METHOD OF STATEMENT FOR GENERAL as
SCAFFOLDING WORKS
Contractor Job Ne.i12172DqK)
JAZAN REFINERY & TERMINAL PROJECT | Dotunes! No. :NSH-SKIRTP-WMS-Ci0006
Rev. No: A | Rev. Date:
9.14 Scaffolding requirements and acceptance j
Provide ledgers/runners tightly connected into vertical post (standard) at every
maximum of 2.0m lift. Every scaffold platform shall be diagonally braced at all sides
started at every 6.0m high. Transom pipes should be connected by means of single
coupler on ledgers /runners.
9.5 Box tie and out rigger support - When scaffold reach the height more than 4 times of
base width, the scaffold must be tied up into any structural members or have to install
out-rigger to prevent scaffold for turning down.
9.6 Installation of scaffold planks - scaffold wood plank should be placed supported
perpendicular into transom pipe. Loose Planks must be properly secured from falling by
using board clamp or wire by lashing.
9.7 Install guarding system - Top-rail, mid-rail and toe board must be placed at all open
sides of scaffold and tightly connected into post (standard). The top rail shall be place
38mm to 45mm from top of platform and mid rail shall be placed in the middle between
top rail and toe board.
9.8 Provide proper access - Proper access shall be installed by means of straight ladder
placed at narrowest side of scaffolds. Straight ladders should be place vertically inclined
and tightly connected into ledgers by means of single clamps or ladder clamps.
9.9. Inspection for scaffold tagging system - inspection shall be conducted either _ by
Authorized Scaffold Inspector or Scaffold Supervisor or both depending upon the job
responsibilities assigned to them.
9.10 Only complete scaffold shall be green tag for safe use. Scaffolding tags shall be placed
visually at every entry access points of scaffold platforms.
9.11 Re-inspection must be repeated and sign at every 14 days from previous inspection,
alterations and at times of adverse weather conditions.
9.12 Propping support for columns formworks - when scaffold are used to support propping of
formworks, scaffold must be reinforced by providing additional extra braces and tightly
connected into ground support or by providing additional extra span or bay-length of
scaffolds to counter the lateral forces.
9.13 Where ever fall protection is required proper life line to be installed as per the
requirement mentioned in Saudi Aramco CSI Fall Protection
iveh in the table below.axgonupsoseu! METHOD OF STATEMENT FOR GENERAL neal eal
SCAFFOLDING WORKS Contractor Job No.:12172D(IK)
dy JAZAN REFINERY & TERMINAL PROJECT || Doses No.: NSHPSKIRTP-WMS-C-0008
SK ej fi ReuNoia | Rev Dat
Scaffold SP to Be ‘SP tobe | Scaffoldto | Scaffold | Scaffold
Scaffold | Plan(SP)| Reviewed By | reviewed | beerected | field Tags
Height | Required | proponentand | by CSD? By: Inspection | Signed
2 LP Area office checklist By:
? completed
a By:
0-6m No No No Qualified |~ Scaffold | Scaffold
(0-208t) scaffold | supervisor | supervisor
Erector only” only”
642.2 No No No Qualified |~ Scaffold | Scaffold
(20-40) scaffold | supervisor | supervisor
Erector_| & Inspector | __ onl
42.2-38m| Yes Yes No | Specialized | Scaffold | Scaffold
(40-125ft) scaffolding | supervisor | supervisor
contractor | & Inspector | __ onl
Special Specialized | Scaffold | Scaffold
Scaffold” Yes Yes Yes scaffolding | supervisor | supervisor
including>38 contractor | & Inspector | only
m (1281)
* Note: Special scaffolds also include those cantilevered by more than 3m(10ft) and those with a
total platform area of more than 30sq.meters (320 sq.ft) that are supported by or hung from
an existing structure or are within 3 meters(10ft) of any other scaffold by or hung from the
same structure.
* Unless scaffold is below 1.8m (6ft) tall and tagging isnot required.
9.15 Scaffolding Process and Inspection flow chart &. jwn below