SECTION AA
TRAFFIC FLOW- 25
CARS/MIN
900MM HIGH
GENERALLY, THERE
COMPOUND
WERE RESIDENCE ON
WALL IN
CONCRETE
BOTH SIDES OF THE
RANDOM
PAVERS
STREET- G+2(55%),
RUBBLE STONE
MASONRY
G+1(40%); HARDLY 5%
WAS COMMERCIAL.
A LUSH GREEN COVER
ON BOTH THE SIDES OF
FOOTPATH GAVE A VERY
PLEASING FEEL WHILE
WALKING.
WHILE, APPROACHING
LODHI GARDEN WE
FOUND THE WALKWAYS
FREE NDMC PARKING- LODHI
MAINTENANCE- A BIG
GARDEN
IN PATHETIC CONDITION
ISSUE
CAPACITY- 60 CARS, 20 TWOBUT ANYWAY, WE WERE
WHEELERS
MOVED BY THE
TOPIC
TEMPTING
GREENERY
PROJECT :-STUDY OF DISTRICT
OF THAT AREA.
SAFDARJUNG
TOMB , LODHI GARDEN , NIZAMMUDIN , HUMAYUNS
TOMB
FOOTPATH- 1.5M
WIDE
PAVED WITH
CONCRETE TILES
SHEET
NO
RASHIKA DHIILON
RISHABH KAKKAR
SUMEDHA GUPTA
SWATI BABBER
SIGNAGE- 3.5M AWAY FROM THE ROAD MAKING IT DIFFICULT TO READ FOR THE PERSON
TRAVELLING BY
TOPIC
SHEET
NO
RASHIKA DHIILON
RISHABH KAKKAR
SUMEDHA GUPTA
SWATI BABBER
STREET LANDSCAPING
TOPIC
SHEET
NO
VARIEGATED
DURANTA
RASHIKA DHIILON
RISHABH KAKKAR
SUMEDHA GUPTA
SWATI BABBER
SIGNAGE
TOPIC
SHEET
NO
RASHIKA DHIILON
RISHABH KAKKAR
SUMEDHA GUPTA
SWATI BABBER
STREET FURNITURE
TOPIC
THE STREETLIGHTS
ALONG THE MEDIAN
WERE ROUGHLY PLACED
18M C/C.(GENERALLY
VARIED FROM 14M TO
21M)
LIGHTING FIXTURESSODIUM LIGHTS (EMITS
YELLOW LIGHT)
PARTIALLY OPENING
FENCING ALONG THE
EDGES ALLOWING
PEOPLE TO SEE
THROUGH.
MATERIALS- STONE
RUBBLE MASONRY
COMPOUND WALL (600
MM HIGH) WITH MILD
STEEL RAILING
SHEET
NO
RASHIKA DHIILON
RISHABH KAKKAR
SUMEDHA GUPTA