You are on page 1of 63

PENGADAAN KHS OSP-FOTS TAHUN 2014-2017

STO.TANJUNG BALAI ASAHAN SUMUT

HARGA SATUAN
NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

VOLUME
MATERIAL

JASA

Kabel, Penyambungan dan Pekerjaan Sipil

DC-OF-SM-12D

Pengadaan dan pemasangan Kabel Duct Fiber


Optik Single Mode 12 core G 652 D

meter

8,677

3,003

DC-OF-SM-24D

Idem 24 core

meter

11,107

3,003

2,060

DC-OF-SM-48D

Idem 48 core

meter

15,949

3,003

4,133

4
5
6
7
8
9

DC-OF-SM-96D
DC-OF-SM-144D
DC-OF-SM-264D
DC-OF-SM-288D
DC-OF-SM-432D
DC-OF-SM-960D

Idem
Idem
Idem
Idem
Idem
Idem

meter
meter
meter
meter
meter
meter

26,956
38,573
66,505
71,216
187,189
336,947

3,003
3,653
3,653
3,647
4,054
4,054

4,008
9,062
-

10

AC-OF-SM-12D

Pengadaan dan pemasangan Kabel Udara Fiber


Optik Single Mode 12 core G 652 D

meter

11,742

4,183

11
12
13

AC-OF-SM-24D
AC-OF-SM-48D
AC-OF-SM-96D

Idem 24 core
Idem 48 core
Idem 96 core

meter
meter
meter

13,950
20,137
30,178

4,152
4,152
4,152

14

DC-OF-SM-12C

Pengadaan dan pemasangan Kabel Duct Fiber


Optik Single Mode 12 core G 655 C

meter

11,681

3,003

15
16
17

DC-OF-SM-24C
DC-OF-SM-48C
DC-OF-SM-96C

Idem 24 core
Idem 48 core
Idem 96 core

meter
meter
meter

16,460
26,648
49,491

3,003
3,003
3,003

18

AC-OF-SM-12C

Pengadaan dan pemasangan Kabel Udara Fiber


Optik Single Mode 12 core G 655 C

meter

15,153

4,152

19
20

AC-OF-SM-24C
AC-OF-SM-48C

Idem 24 core
Idem 48 core

meter
meter

20,534
31,993

4,152
4,152

96 core
144 core
264 core
288 core
432 core
960 core

PENGADAAN KHS OSP-FOTS TAHUN 2014-2017


STO.TANJUNG BALAI ASAHAN SUMUT

HARGA SATUAN
NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

VOLUME
MATERIAL

JASA

meter

55,863

4,152

A
21

Kabel, Penyambungan dan Pekerjaan Sipil


AC-OF-SM-96C
Idem 96 core

22

DC-OF-SM-8-SC

Pengadaan dan pemasangan Kabel Duct Fiber


Optik Single Mode 8 core G 652 D, "Easy to split"

meter

11,232

3,003

23
24

DC-OF-SM-12-SC
DC-OF-SM-24-SC

Idem 12 Core
Idem 24 Core

meter
meter

13,927
18,757

3,003
3,003

25

AC-OF-SM-8-SC

Pengadaan dan pemasangan Kabel Udara Fiber


Optik Single Mode 8 core G 652 D, "Easy to split"

meter

13,478

4,152

26
27

AC-OF-SM-12-SC
AC-OF-SM-24-SC

Idem 12 Core
Idem 24 Core

meter
meter

17,018
21,224

4,152
4,152

28

SC-OF-SM-24

Pengadaan dan pemasangan alat sambung


(cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24
core

pcs

822,513

34,167

29
30
31
32

SC-OF-SM-48
SC-OF-SM-96
SC-OF-SM-144
SC-OF-SM-288

Idem
Idem
Idem
Idem

pcs
pcs
pcs
pcs

929,217
1,060,758
1,474,850
2,609,350

34,167
34,167
34,167
34,167

2
4
14

Penyambungan Kabel Optik Single Mode kap 1


core dengan cara fusion splice

core

58,753

2,544

288 OS-SM-1

12
12
12
12

48 core
96 core
144 core
288 core

34

AB-OF-SM-2D

Pengadaan dan pemasangan Air Blown Cable


Optik, Single Mode 2 core, G 652 D

meter

2,165

2,412

35
36
37
38

AB-OF-SM-4D
AB-OF-SM-8D
AB-OF-SM-12D
AB-OF-SM-24D

Idem
Idem
Idem
Idem

meter
meter
meter
meter

3,029
5,626
7,791
11,097

2,412
2,412
2,412
3,417

4 core
8 core
12 core
24 core

PENGADAAN KHS OSP-FOTS TAHUN 2014-2017


STO.TANJUNG BALAI ASAHAN SUMUT

HARGA SATUAN
NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

VOLUME
MATERIAL

JASA

meter
meter
meter
meter
meter

17,528
28,132
33,109
51,071
97,380

3,417
3,417
3,377
3,859
4,824

A
39
40
41
42
43

Kabel, Penyambungan dan Pekerjaan Sipil


AB-OF-SM-48D
Idem 48 core
AB-OF-SM-72D
Idem 72 core
AB-OF-SM-96D
Idem 96 core
AB-OF-SM-144D
Idem 144 core
AB-OF-SM-288D
Idem 288 core

44

DC-OF-SM-1A

Pengadaan dan pemasangan Kabel Serat Optic


Penanggal Single Mode 1 core dgn pelindung pipa
G 657 A (indoor)

meter

5,173

3,003

45

DC-OF-SM-2A

idem 2 core

meter

5,446

3,003

46

DC-OF-SM-1B

Pengadaan dan pemasangan Kabel Serat Optic


Penanggal Single Mode 1 core dgn pelindung pipa
G 657 B (outdoor)

meter

5,442

3,003

47

DC-OF-SM-2B

idem 2 core

meter

5,446

3,036

48

AC-OF-SM-1B

Pengadaan dan pemasangan Kabel Serat Optic


Penanggal Single Mode 1 core dgn kawat
penggantung G.657 B (outdoor)

meter

5,446

4,152

49

AC-OF-SM-2B

idem 2 core

meter

5,707

4,152

50

PC-APC-657-2

Pengadaan dan pemasangan Patch cord 2 meter,


(FC/LC/SC-APC To FC/LC/SC-APC), G.657

pcs

82,478

3,036

51

PC-APC-657-A1

additional per 1 meter

pcs

5,173

1,503

52

PC-UPC-657-2

Pengadaan dan pemasangan Patch cord 2 meter,


(FC/LC/SC-UPC To FC/LC/SC-UPC), G.657

pcs

68,268

3,036

53

PC-UPC-657-A1

additional per 1 meter

pcs

5,173

1,503

PENGADAAN KHS OSP-FOTS TAHUN 2014-2017


STO.TANJUNG BALAI ASAHAN SUMUT

HARGA SATUAN
NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

VOLUME
MATERIAL

JASA

Kabel, Penyambungan dan Pekerjaan Sipil

54

PC-APC-655-2

Pengadaan dan pemasangan Patch cord 2 meter,


(FC/LC/SC-APC To FC/LC/SC-APC), G.655C

pcs

79,415

3,036

55

PC-APC-655-A1

additional per 1 meter

pcs

5,173

1,503

56

PC-UPC-655-2

Pengadaan dan pemasangan Patch cord 2 meter,


(FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C

pcs

61,972

3,036

57

PC-UPC-655-A1

additional per 1 meter

pcs

5,173

1,503

58

PC-APC-652-2

Pengadaan dan pemasangan Patch cord 2 meter,


(FC/LC/SC-APC To FC/LC/SC-APC), G.652 D

pcs

77,146

3,036

59

PC-APC-652-A1

additional per 1 meter

pcs

5,173

1,503

60

PC-UPC-652-2

Pengadaan dan pemasangan Patch cord 2 meter,


(FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D

pcs

59,300

3,036

61

PC-UPC-652-A1

additional per 1 meter

pcs

5,173

1,503

62

ODC-C-48

Pengadaan dan pemasangan ODC-Pole (Outdoor)


with space for passive spliter, adaptor SC kap 48
core, berikut pelabelan

pcs

5,632,864

4,175,600

ODC-C-144

Pengadaan dan pemasangan kabinet ODC


(Outdoor) kap 144 core dengan space untuk spliter
modular termasuk material adaptor SC, pigtail,
pondasi berlapis keramik, lantai kerja keramik,
patok pengaman (5 buah), berikut pelabelan

pcs

14,070,069

5,642,327

63

PENGADAAN KHS OSP-FOTS TAHUN 2014-2017


STO.TANJUNG BALAI ASAHAN SUMUT

HARGA SATUAN
NO
A

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

VOLUME
MATERIAL

JASA

Kabel, Penyambungan dan Pekerjaan Sipil

ODC-C-288

Pengadaan dan pemasangan kabinet ODC


(Outdoor) kap 288 core dengan space untuk spliter
modular termasuk material adaptor SC, pigtail,
pondasi berlapis keramik, lantai kerja keramik,
patok pengaman (5 buah), berikut pelabelan

pcs

25,226,742

5,684,905

12

65

ODC-C-576

Pengadaan dan pemasangan kabinet ODC


(Outdoor) kap 576 core dengan space untuk spliter
modular termasuk material adaptor SC, pigtail,
pondasi berlapis keramik, lantai kerja keramik,
patok pengaman (5 buah), berikut pelabelan

pcs

66,630,248

5,640,333

66

ODP-CA-8

Pengadaan dan pemasangan ODP type Closure


Aerial Kap 8 core berikut space pasive spliter (1:8),
adapter SC,berikut pelabelan

pcs

1,327,365

136,669

67

ODP-CA-16

Pengadaan dan pemasangan ODP type Closure


Aerial Kap 16 core berikut space 2 pasive spliter
(1:8), adapter SC,berikut pelabelan

pcs

1,588,300

136,669

68

ODP-A-8

Pengadaan dan pemasangan ODP type Indoor/wall


Kap 8 core berikut space pasive spliter (1:8),
adapter SC,berikut pelabelan

pcs

1,054,574

136,669

64

PENGADAAN KHS OSP-FOTS TAHUN 2014-2017


STO.TANJUNG BALAI ASAHAN SUMUT

HARGA SATUAN
NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

VOLUME
MATERIAL

JASA

Kabel, Penyambungan dan Pekerjaan Sipil

69

ODP-A-16

Pengadaan dan pemasangan ODP type Indoor/wall


Kap 16 core berikut space 2 pasive spliter (1:8),
adapter SC,berikut pelabelan

pcs

1,361,400

136,669

70

ODP-PB-8

Pengadaan dan pemasangan ODP type


outdoor/wall dan Pole Kap 8 core berikut space
pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,021,050

136,427

71

ODP-PB-16

Pengadaan dan pemasangan ODP type


outdoor/wall dan Pole Kap 16 core berikut space 2
pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,284,382

136,669

72

ODP-PL-8

Pengadaan dan pemasangan ODP ( Pilar ) kap 8


core termasuk pigtail, berikut space 1 splitter
(1:8), pelabelan.

pcs

2,376,514

136,669

73

ODP-PL-16

Pengadaan dan pemasangan ODP ( Pilar ) kap 16


core termasuk pigtail, berikut space 2 splitter
(1:8), pelabelan.

pcs

2,940,034

136,669

74

TC-SM-12

Pengadaan dan Pemasangan OTB termasuk


terminasi dan penyambungan kabel optik Single
mode kap 12 core serta Adapter (SC Connector),
pigtail dan protection sleeve pada cassette/box

pcs

1,162,802

742,144

75
76
77

TC-SM-24
TC-SM-48
TC-SM-96

Idem 24 core
1
Idem 96 core

pcs
pcs
pcs

1,634,750
3,156,746
5,442,197

1,484,288
2,968,577
5,937,154

9
6

PENGADAAN KHS OSP-FOTS TAHUN 2014-2017


STO.TANJUNG BALAI ASAHAN SUMUT

HARGA SATUAN
NO
A

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

VOLUME
MATERIAL

JASA

Kabel, Penyambungan dan Pekerjaan Sipil

78

FTB-SM-144SA

Pengadaan dan Pemasangan ODF High Capacity


tidak termasuk terminasi dengan kapasitas 144
core, Adapter (SC Connector), pigtail dan
protection sleeve pada cassette/box dan
manajemen core

79

TR-FTM-HIGH CAP

Pengadaan dan Pemasangan Close Rack FTM High


Capacity

pcs

16,393,570

525,686

80

RS-IN-SC-1P

Pemasangan dan terminasi Roset/Indoor Optical


Outlet with SC Adaptor - kap 1 port berikut pigtail

pcs

72,608

61,846

81

RS-IN-SC-2P

idem 2 port

pcs

106,643

125,053

82

PS-1-2-ODC

Pengadaan dan pemasangan Passive Splitter 1:2,


type modular SC/UPC, for ODC, termasuk pigtail

pcs

299,006

34,000

83
84
85

PS-1-4-ODC
PS-1-8-ODP
PS-1-16-ODP

Idem, 1 : 4
Idem, 1 : 8
Idem, 1 : 16

pcs
pcs
pcs

396,508
631,826
975,670

34,000
34,000
34,000

86

PS-2-2-ODC

Pengadaan dan pemasangan Passive Splitter 2:2,


type modular SC/UPC, for ODC, termasuk pigtail

pcs

692,045

34,247

87
88

PS-2-4-ODC
SITAC

Idem, 2 : 4
Akuisisi Lahan SITAC ODC

pcs
Node

816,840
-

34,247
7,421,442

89

PU-S7.0-140

Pengadaan dan Pemasangan Tiang Besi 7 meter,


berikut cat & cor pondasi dan assesories dengan
kekuatan tarik 140 kg

pcs

1,166,334

192,875

pcs

11,912,250

525,686

12
-

PENGADAAN KHS OSP-FOTS TAHUN 2014-2017


STO.TANJUNG BALAI ASAHAN SUMUT

HARGA SATUAN
NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

VOLUME
MATERIAL

JASA

Kabel, Penyambungan dan Pekerjaan Sipil

90

PU-S9.0-140

Pengadaan dan Pemasangan Tiang Besi 9 meter,


berikut cat & cor dan assesories dengan kekuatan
tarik 140 kg

pcs

1,928,650

195,161

91

PU-C7.0-250

Pengadaan dan Pemasangan Tiang Beton 7 meter,


berikut assesories dengan kekuatan tarik 250 kg

pcs

2,836,250

201,285

92

PU-C9.0-300

Pengadaan dan Pemasangan Tiang Beton 9 meter,


berikut assesories dengan kekuatan tarik 300 kg

pcs

3,392,155

198,867

93

GU-G

Pengadaan dan Pemasangan Temberang Tarik

pcs

526,175

60,713

94

PU-AS

Pengadaan dan Pemasangan Asesoris tiang


eksisting

set

33,134

40,413

95

GB-G1

Pengadaan dan Pemasangan Grounding 1 titik rod


pada ODP /kotak pembagi dengan tahanan maks 3
ohm

pcs

903,909

408,081

96

GB-G3

Pengadaan dan Pemasangan Grounding 3 titik rod


pada ODC dengan tahanan maks 1 ohm

pcs

2,722,800

473,085

12

97

GB-G-INTG

Pengadaan dan Pemasangan material Grounding di


lokasi gedung eksisting dengan cara integrasi

pcs

273,437

164,419

98

TC-02-ODC

Pengadaan dan Pemasangan Riser Pipe untuk


pengaman kabel optik ke ODC Pole / titik naik KU
diamater 2 inch panjang 3 meter

pcs

246,029

60,975

PENGADAAN KHS OSP-FOTS TAHUN 2014-2017


STO.TANJUNG BALAI ASAHAN SUMUT

HARGA SATUAN
NO
A

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

VOLUME
MATERIAL

JASA

Kabel, Penyambungan dan Pekerjaan Sipil


PP-OF-IN

Pengadaan dan Pemasangan Pipe Protector


Indoor Cable (PVC White) High Impact Conduit 20
mm

meter

27,001

4,041

PP-OF-OUT

Pengadaan dan Pemasangan Pipe Protector


Outdoor Cable ( PVC Black) High Impact Conduit
20 mm

meter

26,680

4,041

101 DD-S3-1

Pengadaan dan pemasangan Pipa Besi Diameter


100 mm dan ketebalan pipa 3,65 mm untuk
crossing 1 pipa bentang 6 meter

meter

340,364

60,620

102 DD-S3-2
103 DD-S3-3

idem, 2 pipa
idem, 3 pipa

meter
meter

680,728
1,021,092

80,827
121,240

104 DD-V4-1

Pengadan dan Pemasangan Pipa Duct PVC


diameter dalam 100 mm, ketebalan 4 mm, 1 pipa
termasuk pengecoran

meter

64,761

60,620

105 DD-V4-2

Idem, 2 pipa

meter

129,520

80,950

106 DD-V5-1

Pemasangan Pipa Duct dengan selubung pasir dia


100 mm dengan ketebalan 5,5 mm, 1 pipa
( crossing )

meter

62,619

60,620

107 DD-V5-2

Idem, 2 pipa

meter

125,930

80,827

108 DD-DA-S1

Pengadaan dan pemasangan pipa Duct menempel


pada jembatan existing menggunakan Pipa
Galvanis diamenter 100 mm, tebal 3,65 mm, 1
pipa

meter

340,364

242,481

558

109 DD-DA-S2
110 DD-DA-S4

idem, 2 pipa
idem, 4 pipa

meter
meter

680,728
1,361,457

484,962
969,923

99

100

26

PENGADAAN KHS OSP-FOTS TAHUN 2014-2017


STO.TANJUNG BALAI ASAHAN SUMUT

HARGA SATUAN
NO
A

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

VOLUME
MATERIAL

JASA

Kabel, Penyambungan dan Pekerjaan Sipil

111 DD-BSS-S1

Pengadaan dan pemasangan pipa Duct pada


jembatan dengan self support berpenguatan
menggunakan Pipa besi Galv 1 pipa, bentang 6 12 meter

meter

438,484

242,481

112 DD-BSS-S2

Idem, 2 pipa

meter

876,889

484,962

113 DD-BTS-S1

Pengadaan dan pemasangan pipa Duct pada


jembatan menggunakan Pipa besi Galv 1 pipa,
bentang 6 - 12 meter

meter

436,783

242,481

114 DD-BTS-S2
115 DD-BTS-S4

idem, 2 pipa
idem, 4 pipa

meter
meter

873,565
1,736,900

484,962
735,171

116 HB-PS-1

Pengadaan dan pemasangan Pipa Duct dengan


system gantung 1 tiang besi, bentang s/d 40
meter

meter

152,793

38,653

117 HB-PS-2

Pengadaan dan pemasangan Pipa Duct dengan


system gantung 2 tiang besi, bentang s/d 100
meter

meter

314,514

46,384

118 HB-PS-4

Pengadaan dan pemasangan Pipa Duct dengan


system gantung 4 tiang besi, bentang 100
meter

meter

608,773

54,115

119 HB-PC-2

Pengadaan dan pemasangan Pipa Duct dengan


system gantung 2 tiang beton, bentang s/d 100
meter

meter

517,332

46,384

120 HB-PC-4

Pengadaan dan pemasangan Pipa Duct dengan


system gantung 4 tiang beton, bentang 100
meter

meter

1,013,774

54,115

PENGADAAN KHS OSP-FOTS TAHUN 2014-2017


STO.TANJUNG BALAI ASAHAN SUMUT

HARGA SATUAN
NO
A

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

VOLUME
MATERIAL

JASA

Kabel, Penyambungan dan Pekerjaan Sipil

121 DD-BMR-1

Pengadaan dan Pemasangan Boring pada Lintasan


Kereta Api menggunakan 1 pipa Galvanis diameter
100 mm tebal 3,65 mm

track

1,021,092

22,264,326

122 DD-BMR-2
123 DD-BMR-4

idem, 2 pipa
idem, 4 pipa

track
track

2,042,185
4,084,369

33,396,489
44,528,653

1
-

124 DC-SD-28-1

Pengadaan dan Pemasangan 1 Subduct 28/32 mm


pada polongan route Duct

meter

9,785

1,643

125 DC-SD-28-3

idem, 3 pipa

meter

29,355

2,145

126 DC-SD-33-1

Pengadaan dan Pemasangan 1 Subduct 40/33


pada polongan route Duct

meter

10,517

1,643

127 DC-SD-33-2

idem, 2 pipa

meter

21,334

2,136

128 DC-SD-43-1

Pengadaan dan Pemasangan 1 Subduct 50/42


pada polongan route Duct

meter

23,257

1,643

129 DC-SD-43-2

idem, 2 pipa

meter

46,515

2,136

130 DCD-PVC-1

Pengadaan dan Pemasangan Duct Cable


Penanggal diameter pipa PVC 2 inch (Class AW) 1
pipa

meter

14,358

1,623

131 DD-BM-100-1

Pengadaan dan Pemasangan Pipa galvanis dengan


ukuran diameter 100 mm dan ketebalan 3,65 mm
dengan cara boring manual /mesin 1 pipa dengan
kedalaman minimal 150 cm

meter

340,364

72,159

279

132 DD-BM-100-2

Idem, 2 pipa

meter

680,728

74,837

PENGADAAN KHS OSP-FOTS TAHUN 2014-2017


STO.TANJUNG BALAI ASAHAN SUMUT

HARGA SATUAN
NO
A

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

VOLUME
MATERIAL

JASA

Kabel, Penyambungan dan Pekerjaan Sipil

133 DD-BM-50-1

Pengadaan dan Pemasangan Pipa galvanis dengan


ukuran diameter 50 mm dan ketebalan 2,7 mm
cara boring manual /mesin 1 pipa dengan
kedalaman minimal 150 cm

meter

198,538

37,385

134 DD-BM-50-2

Idem, 2 pipa

meter

394,500

37,385

135 DD-BM-HDPE-40-1

Pekerjaan Boring manual (rojok) HDPE 40/33 mm


1 pipa dengan kedalaman 1,5 meter

meter

37,516

16,326

136 DD-BM-HDPE-40-2

Idem, 2 pipa

meter

37,411

137 DD-BM-HDPE-50-1

Pekerjaan Boring manual (rojok) HDPE 50/42 mm


1 pipa dengan kedalaman 1,5 meter

meter

37,516

138 DD-BM-HDPE-50-2

Idem, 2 pipa

meter

37,385

139 DD-HDPE-40-1

Pengadaan dan pemasangan pipa HDPE 40/33


mm 1 pipa dengan kedalaman 1,5 meter

meter

13,219

1,564

17,189

140 DD-HDPE-40-2

Idem 2 pipa

meter

26,440

1,892

141 DD-HDPE-50-1

Pengadaan dan pemasangan pipa HDPE 50/42


mm 1 pipa dengan kedalaman 1,5 meter

meter

22,463

1,564

142 DD-HDPE-50-2

Idem 2 pipa

meter

44,926

1,892

143 DD-HDPE-40-1C

Pengadaan dan pemasangan pipa HDPE 40/33 mm


1 pipa dengan kedalaman 1,5 meter sudah
termasuk connector HDPE tipe compression fitting

meter

13,756

1,564

144 DD-HDPE-40-2C

idem, 2 pipa

meter

27,322

1,892

PENGADAAN KHS OSP-FOTS TAHUN 2014-2017


STO.TANJUNG BALAI ASAHAN SUMUT

HARGA SATUAN
NO
A

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

VOLUME
MATERIAL

JASA

Kabel, Penyambungan dan Pekerjaan Sipil

145 DD-ROD

Pekerjaan Pembersihan pada route Duct yang


kosong / Rodding Duct Existing.

meter

2,021

146 DD-RV-1

Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa.

meter

39,762

80,827

147 DD-RV-CONCRETE

Pekerjaan bobok dinding MH / HH termasuk


perbaikan kembali

m3

1,165,313

727,443

148 DD-DS-S1

Pengadaan dan pemasangan duct baru dengan


cara melakukan boring dibawah dasar parit/sungai
dengan kedalaman 1,5 M dengan menggunakan
PVC diamater 100 mm dan ketebalan 5,5 mm 1
pipa

meter

282,253

169,737

149 DD-DS-COD1-M

Pengadaan dan pemasangan duct baru type COD,


dengan mesin pengeboran (borring) dibawah parit,
pada kedalaman 1,50 m di bawah dasar selokan,
tanpa perlindungan PVC, 1 pipa

meter

27,170

475,966

150 BC-TR-0.4

Pekerjaan Galian, Pengurugan kembali dan


perbaikan kembali, pengisian pasir, warning tape
dan tanda rute kabel serta tempat sambung
kedalaman 0.4 meter

meter

13,862

151
152
153
154
155

idem,
idem,
idem,
idem,
idem,

meter
meter
meter
meter
meter

17,594
26,390
31,012
32,987
35,329

BC-TR-0.6
BC-TR-1
BC-TR-2
BC-TR-3
BC-TR-4

kedalaman
kedalaman
kedalaman
kedalaman
kedalaman

0,6 meter
1 meter
1,2 meter
1,3 meter
1,4 meter

PENGADAAN KHS OSP-FOTS TAHUN 2014-2017


STO.TANJUNG BALAI ASAHAN SUMUT

HARGA SATUAN
NO
A

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

VOLUME
MATERIAL

JASA

Kabel, Penyambungan dan Pekerjaan Sipil

156 BC-TR-5

Pekerjaan Galian, Pengurugan kembali dan


perbaikan kembali, pengisian pasir, warning tape
dan tanda rute kabel serta tempat sambung
kedalaman 1,5 meter

meter

37,516

157 BCTR-ROCK

Pengadaan galian batu masif kedalaman 1,5


meter, panjang minimum 5 m, termasuk
pengadaan marking post

meter

214,660

158 BD-SK

Pekerjaan bobokan dan perbaikan Dinding


Chamber / BTS / STO untuk lubang Sparing Kabel

Titik

58,266

80,827

159 SMD-ABS-2A

Pengadaan dan pemasangan Alat Sambung Micro


Duct cabang / lurus 2 cabang,termasuk gas block
(seal).

pcs

275,317

158,292

160 SMD-ABS-3A
161 SMD-ABS-4A
162 SMD-ABS-6A

idem 3 cabang
idem 4 cabang
idem 6 cabang

pcs
pcs
pcs

300,687
839,426
702,775

170,987
188,089
206,898

163 DD-MDSC-5/3.5

Pengadaan dan Pemasangan Straight Connector


5/3,5 mm

pcs

24,728

520

164 DD-MDSC-10/8

Pengadaan dan Pemasangan Straight Connector


10/8 mm

pcs

26,029

520

165 DD-MDSC-12/10

Pengadaan dan Pemasangan Straight Connector


12/10 mm

pcs

27,461

520

166 DD-MDDI-1A

Pengadaan dan Pemasangan Micro Duct 5/3.5mm,


Direct Install, 1 way, untuk Air / Water Blowing
kabel FO termasuk connector

meter

5,928

1,861

167 DD-MDDI-2A

Idem 2 way

meter

8,062

2,450

PENGADAAN KHS OSP-FOTS TAHUN 2014-2017


STO.TANJUNG BALAI ASAHAN SUMUT

HARGA SATUAN
NO
A
168
169
170
171
172

DESIGNATOR

URAIAN PEKERJAAN

Kabel, Penyambungan dan Pekerjaan Sipil


DD-MDDI-4A
Idem 4 way
DD-MDDI-7A
Idem 7 way
DD-MDDI-12A
Idem 12 way
DD-MDDI-19A
Idem 19 way
DD-MDDI-24A
Idem 24 way

SATUAN

VOLUME
MATERIAL

JASA

meter
meter
meter
meter
meter

12,742
18,073
27,174
37,870
46,271

2,805
2,828
3,251
3,785
4,320

173 DD-MDDI-1B

Pengadaan dan Pemasangan Micro Duct 10/8mm,


Direct Install, 1 way, untuk Air / Water Blowing
kabel FO termasuk connector

meter

12,014

2,404

174 DD-MDDI-2B
175 DD-MDDI-4B
176 DD-MDDI-7B

Idem 2 way
Idem 4 way
Idem 7 way

meter
meter
meter

17,163
30,554
44,728

2,805
3,206
3,696

177 DD-MDDI-1C

Pengadaan dan Pemasangan Micro Duct 12/10mm,


Direct Install, 1 way, untuk Air / Water Blowing
kabel FO termasuk connector

meter

14,198

3,028

178 DD-MDDI-2C
179 DD-MDDI-4C
180 DD-MDDI-7C

Idem 2 way
Idem 4 way
Idem 7 way

meter
meter
meter

20,461
36,666
53,959

3,473
4,321
4,631

181 DD-MDDB-1A

Pengadaan dan Pemasangan Micro Duct 5/3.5mm,


Direct Buried, 1 way, untuk Air / Water Blowing
kabel FO termasuk connector

meter

14,781

2,703

182
183
184
185
186

Idem
Idem
Idem
Idem
Idem

meter
meter
meter
meter
meter

17,475
24,964
32,328
48,056
61,830

3,592
4,115
4,147
4,768
5,551

DD-MDDB-2A
DD-MDDB-4A
DD-MDDB-7A
DD-MDDB-12A
DD-MDDB-19A

2 way
4 way
7 way
12 way
19 way

PENGADAAN KHS OSP-FOTS TAHUN 2014-2017


STO.TANJUNG BALAI ASAHAN SUMUT

HARGA SATUAN
NO

DESIGNATOR

URAIAN PEKERJAAN

A Kabel, Penyambungan dan Pekerjaan Sipil


187 DD-MDDB-24A
Idem 24 way

SATUAN

VOLUME
MATERIAL

JASA

meter

73,644

6,335

188 DD-MDDB-1B

Pengadaan dan Pemasangan Micro Duct 10/8mm,


Direct Buried, 1 way, untuk Air / Water Blowing
kabel FO termasuk connector

meter

24,959

3,527

189 DD-MDDB-2B
190 DD-MDDB-4B
191 DD-MDDB-7B

Idem 2 way
Idem 4 way
Idem 7 way

meter
meter
meter

32,328
57,292
76,288

4,115
4,702
5,421

192 DD-MDDB-1C

Pengadaan dan Pemasangan Micro Duct 12/10mm,


Direct Buried, 1 way, untuk Air / Water Blowing
kabel FO termasuk connector

meter

29,109

4,441

193 DD-MDDB-2C
194 DD-MDDB-4C
195 DD-MDDB-7C

Idem 2 way
Idem 4 way
Idem 7 way

meter
meter
meter

38,069
67,777
90,867

5,095
6,287
6,792

196 DD-MDEC-5/3.5

Pengadaan dan Pemasangan End Cap 5/3,5 mm

pcs

14,316

520

197 DD-MDEC-10/8

Pengadaan dan Pemasangan End Cap 10/8 mm

pcs

14,316

520

198 DD-MDEC-12/10

Pengadaan dan Pemasangan End Cap 12/10 mm

pcs

14,316

520

Manhole, Perbaikan dan Modifikasi

199 MH-HH1

Pekerjaan Pembuatan Handhole Type HH1 ukuran


dimensi dalam (P X L X T = 170x150x165) cor
beton 1 : 2 : 3

pcs

6,580,100

2,714,357

200 MH-HH2

Pekerjaan Pembuatan Handhole Type HH2 ukuran


dimensi dalam (P X L X T = 120x130x165) cor
beton 1 : 2 : 3

pcs

4,603,674

2,066,404

29

PENGADAAN KHS OSP-FOTS TAHUN 2014-2017


STO.TANJUNG BALAI ASAHAN SUMUT

HARGA SATUAN
NO
A

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

VOLUME
MATERIAL

JASA

Kabel, Penyambungan dan Pekerjaan Sipil

201 HH-PIT-P-HA

Pekerjaan Pembuatan HH Pit Portable Home Access


beserta aksesorisnya

pcs

867,461

183,294

202 HH-PIT-P-ODP

Pekerjaan Pembuatan HH Pit Portable ODP beserta


aksesorisnya

pcs

2,836,250

273,403

203 HH-PIT-P-ODC

Pekerjaan Pembuatan HH Pit Portable ODC beserta


aksesorisnya

pcs

10,755,060

515,884

204 MH-CA

Pekerjaan Peninggian Tutup Manhole/Handhole

pcs

920,846

714,884

205 CO-OF

Pekerjaan Cut Over Kabel Serat Optik

core

59,409
JUMLAH MATERIAL
JUMLAH JASA

TOTAL HARGA

1,924,093,733.00
1,315,473,285.00
3,239,567,018.00

STO.TJ.BALAI-PULAU
SIMARDAN

PULAU SIMARDANSELAT LANCANG

SELAT LANCANGTJ.BALAI-5

TJ.BALAI-5 - BSC
ASAHAN

TJ.BALAI-5 TJ.BALAI-6

TJ.BALAI-6 - SEI
TUALANG RASO

###

###

94

129

117

222

523

763

803

55

1,630

55

305

1,805
-

###
###

850
1,399
-

1,135
-

###
###
###
###
###

2,351
-

###

###

###
###
###

###
###
###

###

###

###
###
###

###
###
###

###

###

###
###

###
###

1,027

###
###
1,485

STO.TJ.BALAI-PULAU
SIMARDAN

PULAU SIMARDANSELAT LANCANG

SELAT LANCANGTJ.BALAI-5

TJ.BALAI-5 - BSC
ASAHAN

TJ.BALAI-5 TJ.BALAI-6

TJ.BALAI-6 - SEI
TUALANG RASO

###

###

###

###

###
###

###
###

###

###

###
###

###
###

###

###

3
3

###

1
1
1

24

360

312

###

120

336

408

###

###

###

###
###
###
###

###
###
###
###

STO.TJ.BALAI-PULAU
SIMARDAN

PULAU SIMARDANSELAT LANCANG

SELAT LANCANGTJ.BALAI-5

TJ.BALAI-5 - BSC
ASAHAN

TJ.BALAI-5 TJ.BALAI-6

TJ.BALAI-6 - SEI
TUALANG RASO

###
###
###
###
###

###
###
###
###
###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

STO.TJ.BALAI-PULAU
SIMARDAN

PULAU SIMARDANSELAT LANCANG

SELAT LANCANGTJ.BALAI-5

TJ.BALAI-5 - BSC
ASAHAN

TJ.BALAI-5 TJ.BALAI-6

TJ.BALAI-6 - SEI
TUALANG RASO

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

STO.TJ.BALAI-PULAU
SIMARDAN

PULAU SIMARDANSELAT LANCANG

SELAT LANCANGTJ.BALAI-5

TJ.BALAI-5 - BSC
ASAHAN

TJ.BALAI-5 TJ.BALAI-6

TJ.BALAI-6 - SEI
TUALANG RASO

###

###

###

###

###

###

###

###

STO.TJ.BALAI-PULAU
SIMARDAN

PULAU SIMARDANSELAT LANCANG

SELAT LANCANGTJ.BALAI-5

TJ.BALAI-5 - BSC
ASAHAN

TJ.BALAI-5 TJ.BALAI-6

TJ.BALAI-6 - SEI
TUALANG RASO

###

###

###

###

###

###

###

###

###

###

###

###

1
3

###
###

1
-

1
-

###
###
###

1
-

STO.TJ.BALAI-PULAU
SIMARDAN

PULAU SIMARDANSELAT LANCANG

SELAT LANCANGTJ.BALAI-5

TJ.BALAI-5 - BSC
ASAHAN

TJ.BALAI-5 TJ.BALAI-6

TJ.BALAI-6 - SEI
TUALANG RASO

###

###

###

###

###

###

###

###

###

###

###
###
###

###
###
###

###

###

###

###

###

###

3
-

STO.TJ.BALAI-PULAU
SIMARDAN

PULAU SIMARDANSELAT LANCANG

SELAT LANCANGTJ.BALAI-5

TJ.BALAI-5 - BSC
ASAHAN

TJ.BALAI-5 TJ.BALAI-6

TJ.BALAI-6 - SEI
TUALANG RASO

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

STO.TJ.BALAI-PULAU
SIMARDAN

PULAU SIMARDANSELAT LANCANG

SELAT LANCANGTJ.BALAI-5

TJ.BALAI-5 - BSC
ASAHAN

TJ.BALAI-5 TJ.BALAI-6

TJ.BALAI-6 - SEI
TUALANG RASO

###

###

###

###

18

###
###

###
###

###

###

###

###

###

###

###

###

27

###

198

###
###

80

40

###
###

STO.TJ.BALAI-PULAU
SIMARDAN

PULAU SIMARDANSELAT LANCANG

SELAT LANCANGTJ.BALAI-5

TJ.BALAI-5 - BSC
ASAHAN

TJ.BALAI-5 TJ.BALAI-6

TJ.BALAI-6 - SEI
TUALANG RASO

###

###

###

###

###

###
###

###
###

###

###

###

###

###

###

###

###

###

###

STO.TJ.BALAI-PULAU
SIMARDAN

PULAU SIMARDANSELAT LANCANG

SELAT LANCANGTJ.BALAI-5

TJ.BALAI-5 - BSC
ASAHAN

TJ.BALAI-5 TJ.BALAI-6

TJ.BALAI-6 - SEI
TUALANG RASO

###

###

###
###

###
###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

67

37

33

###

###

66

STO.TJ.BALAI-PULAU
SIMARDAN

PULAU SIMARDANSELAT LANCANG

SELAT LANCANGTJ.BALAI-5

TJ.BALAI-5 - BSC
ASAHAN

TJ.BALAI-5 TJ.BALAI-6

TJ.BALAI-6 - SEI
TUALANG RASO

###

###

###

###

2,179

3,345

1,559

1,003

1,879

2,789

###

###

###

###

###

###

2,273

3,382

1,061

1,672

1,883

3,053

###

###

###

###

###

###

###

###

###

###

STO.TJ.BALAI-PULAU
SIMARDAN

PULAU SIMARDANSELAT LANCANG

SELAT LANCANGTJ.BALAI-5

TJ.BALAI-5 - BSC
ASAHAN

TJ.BALAI-5 TJ.BALAI-6

TJ.BALAI-6 - SEI
TUALANG RASO

###

###

###

###

###

###

###

###

###

###

###

###

###
###
###
###
###

###
###
###
###
###

STO.TJ.BALAI-PULAU
SIMARDAN

PULAU SIMARDANSELAT LANCANG

SELAT LANCANGTJ.BALAI-5

TJ.BALAI-5 - BSC
ASAHAN

TJ.BALAI-5 TJ.BALAI-6

TJ.BALAI-6 - SEI
TUALANG RASO

###

###

###

###

###

###

###

###

###
###
###

###
###
###

###

###

###

###

###

###

###

###

###

###

STO.TJ.BALAI-PULAU
SIMARDAN

PULAU SIMARDANSELAT LANCANG

SELAT LANCANGTJ.BALAI-5

TJ.BALAI-5 - BSC
ASAHAN

TJ.BALAI-5 TJ.BALAI-6

TJ.BALAI-6 - SEI
TUALANG RASO

###
###
###
###
###

###
###
###
###
###

###

###

###
###
###

###
###
###

###

###

###
###
###

###
###
###

###

###

###
###
###
###
###

###
###
###
###
###

STO.TJ.BALAI-PULAU
SIMARDAN

PULAU SIMARDANSELAT LANCANG

SELAT LANCANGTJ.BALAI-5

TJ.BALAI-5 - BSC
ASAHAN

TJ.BALAI-5 TJ.BALAI-6

TJ.BALAI-6 - SEI
TUALANG RASO

###

###

###

###

###
###
###

###
###
###

###

###

###
###
###

###
###
###

###

###

###

###

###

###

###

###

###

###

STO.TJ.BALAI-PULAU
SIMARDAN

PULAU SIMARDANSELAT LANCANG

SELAT LANCANGTJ.BALAI-5

TJ.BALAI-5 - BSC
ASAHAN

TJ.BALAI-5 TJ.BALAI-6

TJ.BALAI-6 - SEI
TUALANG RASO

###

###

###

###

###

###

###

###

284,864,221.00
150,323,339.00
435,187,560.00

214,966,185.00
199,774,527.00
414,740,712.00

267,737,358.00
155,823,615.00
423,560,973.00

###
117,185,880.00
59,206,139.00
176,392,019.00

###
182,705,089.00
119,837,455.00
302,542,544.00

375,213,345.00
247,570,413.00
622,783,758.00

SEI TUALANG RASO TJ.BALAI-3

TJ.BALAI-3 SINGOSARI

SINGOSARI - STO
TJ.BALAI

###

101

111

1,045

240

1,353

374

###

1,112
-

###

###
###
###

###

###
###
###

###

###
###

###
###
179
-

###

SEI TUALANG RASO TJ.BALAI-3

TJ.BALAI-3 SINGOSARI

SINGOSARI - STO
TJ.BALAI

###

###

###
###

###

###
###

###

216

360

1
###
###
1

###

408

###
###
###
###

###

SEI TUALANG RASO TJ.BALAI-3

TJ.BALAI-3 SINGOSARI

SINGOSARI - STO
TJ.BALAI

###

###
###
###
###

###

###

###

###

###

###

###

###

###

###

SEI TUALANG RASO TJ.BALAI-3

TJ.BALAI-3 SINGOSARI

SINGOSARI - STO
TJ.BALAI

###

###

###

###

###

###

###

###

###

###

SEI TUALANG RASO TJ.BALAI-3

TJ.BALAI-3 SINGOSARI

SINGOSARI - STO
TJ.BALAI

###

###

###

###

SEI TUALANG RASO TJ.BALAI-3

TJ.BALAI-3 SINGOSARI

SINGOSARI - STO
TJ.BALAI

###

###

###

###

###

###

1
3

1
###

###
###

SEI TUALANG RASO TJ.BALAI-3

TJ.BALAI-3 SINGOSARI

SINGOSARI - STO
TJ.BALAI

###

###

###

###

###

###
###
###

###

###
2
-

###

SEI TUALANG RASO TJ.BALAI-3

TJ.BALAI-3 SINGOSARI

SINGOSARI - STO
TJ.BALAI

###

###

###

###

###

###

###

###

SEI TUALANG RASO TJ.BALAI-3

TJ.BALAI-3 SINGOSARI

SINGOSARI - STO
TJ.BALAI

###

###

###
###

###

###

###

###

153

60

###

###

SEI TUALANG RASO TJ.BALAI-3

TJ.BALAI-3 SINGOSARI

SINGOSARI - STO
TJ.BALAI

###

###

###

###
###

###

###

###

###

###

SEI TUALANG RASO TJ.BALAI-3

TJ.BALAI-3 SINGOSARI

SINGOSARI - STO
TJ.BALAI

###

###

###

###

###

###

###

###

###

66

10

###

SEI TUALANG RASO TJ.BALAI-3

TJ.BALAI-3 SINGOSARI

SINGOSARI - STO
TJ.BALAI

###

###
2,259
-

390

923

###

###

###

390

1,142

2,333
-

###

###

###

###

###

SEI TUALANG RASO TJ.BALAI-3

TJ.BALAI-3 SINGOSARI

SINGOSARI - STO
TJ.BALAI

###

###

###

###

###

###

###
###
###
###
###

SEI TUALANG RASO TJ.BALAI-3

TJ.BALAI-3 SINGOSARI

SINGOSARI - STO
TJ.BALAI

###

###

###

###

###
###
###

###

###

###

###

###

SEI TUALANG RASO TJ.BALAI-3

TJ.BALAI-3 SINGOSARI

SINGOSARI - STO
TJ.BALAI

###

###
###
###
###

###

###
###
###

###

###
###
###

###

###
###
###
###
###

SEI TUALANG RASO TJ.BALAI-3

TJ.BALAI-3 SINGOSARI

SINGOSARI - STO
TJ.BALAI

###

###

###
###
###

###

###
###
###

###

###

###

###

###

SEI TUALANG RASO TJ.BALAI-3

TJ.BALAI-3 SINGOSARI

SINGOSARI - STO
TJ.BALAI

###

###

###

###

41,870,845.00
33,214,018.00
75,084,863.00

230,383,347.00
141,244,864.00
371,628,211.00

###
209,167,463.00
208,478,915.00
417,646,378.00

TOS FOTS-Tj.BALAI SUMUT


NO

ID PROJECTID STARCLICK

WITEL

SITE ID

SITE NAME

NO

ID PROJECTID STARCLICK

WITEL

SITE ID

SITE NAME

Latitude
Latitude

SUMATERA TITJB778

BSC Asahan

2.9456389

SUMATERA TITJB269

Tanjung Bala

2.9526944

SUMATERA TITJB149

Tanjung Bala

2.9816667

SUMATERA TITJB046

Sto Tanjung

2.9637222

SUMATERA TITJB603

Pulau Simar

2.9580000

SUMATERA TITJB845

Selat Lanca

2.9548300

SUMATERA TITJB269

Tanjung Bala

2.9526944

SUMATERA TITJB578

Tanjung Bala

2.9626000

SUMATERA TITJB501

Sei Tualang

2.9816667

10

SUMATERA TITJB149

Tanjung Bala

2.9816667

11

SUMATERA TITJB049

Singosari

2.9701600

Longitude
Longitude

STO

FEEDER 1

NAMA STO

LAT

LONG

NAMA STO

LAT

LONG

99.7607500 Sto Tanjung Balai

2.9637222

KAP

LENGTH

99.8055556

96

3,603

48

4,588

99.7894444 Sto Tanjung Balai

2.9637222

99.8055556

99.8007500 Sto Tanjung Balai

2.9637222

99.8055556

99.8055556 Sto Tanjung Balai

2.9637222

99.8055556

99.8075600 Sto Tanjung Balai

2.9637222

99.8055556

96

1,218

99.8024700 Sto Tanjung Balai

2.9637222

99.8055556

144

2,474

99.7894444 Sto Tanjung Balai

2.9637222

99.8055556

96

2,056

99.7959300 Sto Tanjung Balai

2.9637222

99.8055556

96

2,100

99.8007500 Sto Tanjung Balai

2.9637222

99.8055556

96

3,419

99.8055556

96

2,119

99.8007500 Sto Tanjung Balai


99.8013200 Sto Tanjung Balai

2.9637222
2.9637222

99.8055556

96
96

96

3,074
1,264

1,189

DISTRIBUSI KT 1
KAP

DISTRIBUSI KT 1
LENGTH

DISTRIBUSI KT 2

NODE CATUAN

KAP

LENGTH

JENIS

NAMA

LAT

KAP

LENGTH

JENIS

NAMA

LAT

BSC

BSC Asahan

2.9456389

BTS

Tanjung Balai 5

2.9526944

BTS

Tanjung Balai Asahan 3

2.9816667

STO

Sto Tanjung Balai

2.9637222

BTS

Pulau Simardan

2.9580000

BTS

Selat Lancang

2.9548300

BTS

Tanjung Balai 5

2.9526944

BTS

Tanjung Balai 6

2.9626000

BTS

Sei Tualang Raso

2.9816667

BTS

Tanjung Balai Asahan 3

2.9816667

ROOFTOP

Singosari

2.9701600

JARAK KE
NODE B

LONG
LONG

JARAK KE
STO

JARAK KE NODE
JARAK
B
KE STO

JUMLAH
HOME
PASS

RAB SURVEY
RAB SURVEY

99.7607500

387,640,105.00

99.7894444

601,664,366.00

99.8007500

501,147,916.00

99.8055556

227,692,974.00

99.8075600

196,253,040.00

99.8024700

396,518,610.00

99.7894444

162,816,075.00

99.7959300

389,440,711.00

99.8007500

324,392,407.00

99.8007500

181,419,738.00

99.8013200

236,617,782.00
3,605,603,724.00

KETERANG KATEGORI
AN

APPROVE

KEBUTUHAN MATERIAL
PENGADAAN DAN PEMASANGAN OUT SIDE PLANT FIBER OPTIK (OSP-FO) FO TELKOMSEL SIN
LOKASI : STO.TANJUNG BALAI ASAHAN SUMUT
NO
1
2
3
4
5
6
7
8
9

DESIGNATOR
DC-OF-SM-24D
DC-OF-SM-48D
DC-OF-SM-96D
DC-OF-SM-288D
DC-OF-SM-288D
DC-OF-SM-288D
SC-OF-SM-48
SC-OF-SM-96
SC-OF-SM-288

URAIAN
Kabel Duct Fiber Optik Single
Kabel Duct Fiber Optik Single
Kabel Duct Fiber Optik Single
Kabel Duct Fiber Optik Single
Kabel Duct Fiber Optik Single
Kabel Duct Fiber Optik Single
Closure Fiber Optik kapasitas
Closure Fiber Optik kapasitas
Closure Fiber Optik kapasitas

Mode 24 core G 652 D


Mode 96 core G 652 D
Mode 96 core G 652 D
Mode 288 core G 652 D
Mode 288 core G 652 D
Mode 288 core G 652 D
12 - 48 core
12 - 96 core
12 - 288 core

10

ODC-C-288

ODC (Outdoor) kap 288 core dengan space untuk spliter modular
termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai
kerja keramik, patok pengaman (5 buah), berikut pelabelan

11

TC-SM-24

OTB termasuk terminasi dan penyambungan kabel optik Single mode kap
24 core serta Adapter (SC Connector), pigtail dan protection sleeve pada
cassette/box

12

TC-SM-96

OTB termasuk terminasi dan penyambungan kabel optik Single mode kap
96 core serta Adapter (SC Connector), pigtail dan protection sleeve pada
cassette/box

13

GB-G3

14

BC-16

15

DD-S3-1

Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan


ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang 6 meter

16

DD-DA-S1

Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa (Jembatan)

17

DD-BM-100-1

Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm


dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal
150 cm

18

DD-BMR-2

Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa
Galvanis diameter 100 mm tebal 3,65 mm

19

DD-HDPE-40-1

20

MH-HH2

21
22
23

Note

Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan


tahanan maks 1 ohm
Kabel Grounding

Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan


kedalaman 1,5 meter
Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X
T = 120x130x165) cor beton 1 : 2 : 3
Handle
Hanger
Belmouth

: Data Material sesuai dengan BOQ

IBER OPTIK (OSP-FO) FO TELKOMSEL SINERGY

VOLUME

KETERANGAN

2,060
4,133
4,008
2,162
3,836
3,064
2
4
14

Drum
Drum
Drum
Drum
Drum
Drum
Unit
Unit
Unit

001
002
003
004
005
006

12 Unit

9 Unit

6 Unit
12 Stick Grounding: 36 Batang
96 Meter

4 Batang
93 Batang
47 Batang

2 Batang
86 Roll
29 Frame dan tutup 29 set
116 Pcs
58 Pcs
58 Pcs

PENGADAAN DAN PEMASANGAN KHS OSP-FOTS TAHUN 2014-2017


LOKASI : STO TANJUNG BALAI ASAHAN SUMUT
NO

RING
1 STO.TJ.BALAI-PULAU SIMARDAN
2 PULAU SIMARDAN-SELAT LANCANG
3 SELAT LANCANG-TJ.BALAI-5
4 TJ.BALAI-5 - BSC ASAHAN
5 TJ.BALAI-5 - TJ.BALAI-6
6 TJ.BALAI-6 - SEI TUALANG RASO
7 SEI TUALANG RASO - TJ.BALAI-3
8 TJ.BALAI-3 - SINGOSARI
9 SINGOSARI - STO TJ.BALAI
TOTAL

6.0
1.0
4.0
4.0
2.0
4.0
5.0
1.0
2.0

2.0
1.0
2.0
1.0
3.0
2.0
1.0

21.0
3.5
14.0
14.0
7.0
14.0
17.5
3.5
7.0

144.0
22.0
94.0
100.0
50.0
106.0
122.0
22.0
50.0

68.0
10.0
44.0
48.0
24.0
52.0
58.0
10.0
24.0

7.0
1.0
4.5
5.0
2.5
5.5
6.0
1.0
2.5

7.0
1.0
4.5
5.0
2.5
5.5
6.0
1.0
2.5

12.0
2.0
8.0
8.0
4.0
8.0
10.0
2.0
4.0

12.0
2.0
8.0
8.0
4.0
8.0
10.0
2.0
4.0

6.0
3.0
6.0
3.0
9.0
6.0
3.0

16.0
8.0
16.0
8.0
24.0
16.0
8.0

8.4
5.3
11.4
16.9
9.4
15.3
11.7
2.0
5.7

GSP
100mm
(3.65mm)
Jembatan
13.3
9.7
4.5
0.7
33.0
10.7
25.5

29.0

12.0

101.5

710.0

338.0

35.0

35.0

58.0

58.0

36.0

96.0

85.9

97.3

BESI SIKU
BESI
MH-HH2 ODC 288 5x5x50
BETON
(Batang) 10mm

SEMEN
60 Kg

SPLIT
(Kerikil)

PASIR
HANGER BELMOUTH
COR

STICK
GROUNDING

KABEL
BC 16

DD-HDPE40-1

17,189.00

GSP
100mm
TC-SM-24
(3.65mm)
Boring
5.5
1.0
1.0
11.2
1.0
6.2
1.0
1.0
11.0
1.0
1.7
1.0
1.0
11.0
1.0
46.5

9.0

TC-SM-96

SC-OF-SM-48 SC-OF-SM-96

SC-OF-SM-288

3.0
3.0

1.0
1.0
-

3.0
1.0
-

3.0
1.0
2.0
1.0
2.0
2.0
1.0
1.0
1.0

6.0

2.0

4.0

14.0

GB-G3
2.0
1.0
2.0
1.0
3.0
2.0
###
12

PROYEK PENGADAAN DAN PEMAS

No.

ITEM

VOLUME

I
STO.TANJUNG BALAI ASAHAN
1
Pekerjaan Persiapan
1.1 a. Survey Pelaksanaan

1.2 b. Perijinan
1.3 c. Direksi Kit

86 Roll
19.263 Meter
863 Meter
12 Unit
20 Pcs
10 Roll
29 Set

MAN POWER
Mobilisasi
Pekerjaan Sipil
3.1 Boring Rojok / Trenching
3.2 Jembatan
3.3 Boring
3.4 HHPit and HH
3.5 Pondasi ODC & Proteksi

5
6
7
8

4 Hari
28 Hari
10 hari

BULAN - I
Minggu 1
1

Minggu 2
5

10

11

Minggu 3
12

13

10

10

14

15

16

17

18

19

Minggu 4
20

21

22

23

24

25

26

27

28

29

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

10

11

12

13

14

15

16

17

18

19

20

21

22

10

11

12

13

14

15

16

17

18

19

20

21

22

10

11

12

13

14

15

16

17

18

19

20

21

22

10

11

12

13

14

15

16

17

18

19

20

21

22

10

11

12

13

14

15

16

17

18

19

20

21

22

10

11

12

13

14

15

16

17

18

19

20

21

22

10

11

12

13

14

15

16

17

18

19

20

21

22

Pengadaan Material
2.1 HDPE Subduct
2.2 Fiber Optik Cable
2.3 Galvanized Pipe 4 inchi
2.4 ODC
2.6 Joint Closure
2.7 Warning Tape
2.8 Frame & Tutup Handhole

DURASI

MAN
POWER

Penarikan Kabel
Penyambungan dan Terminasi
Test Commisioning
ATP

24
24
24
24
24
24
24

Hari
Hari
Hari
Hari
Hari
Hari
Hari

3 Hari
16.326 Meter
584Meter
279 Meter
29 Unit
12 Unit
19.263 Meter
39 Titik

33 Hari
33 Hari
31 Hari
29 Hari
24 hari
7 Hari
13 Hari
4 Hari
3 Hari

40
4
2
6
2

TIME SCHEDULE
ASANGAN OUT SIDE PLANT FIBER OPTIK TELKOMSEL SINERGY-TANJUNG BALAI ASAHAN
AREA SUMATERA UTARA (SUMUT-TIMUR)
BULAN - II
Minggu 5
30

31

27

28

23

24

23

24

23

24

23

24

23

24

23

24

23

24

32

Minggu 6
33

34

35

36

37

38

39

Minggu 7
40

41

42

43

44

45

46

Minggu 8
47

48

49

50

51

52

53

Minggu 9
54

55

56

57

58

59

60

Minggu 10
61

62

63

64

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

65

66

67

68

69

70

G BALAI ASAHAN
BULAN - III
Minggu 11
71

72

73

74

Minggu 12
75

76

77

78

79

80

81

83

84

85

86

87

88

10

11

12

89

90

91

500 Mtr/Hari
18 Meter/hari
9 Meter/Hari
1 Unit/Hari
0.5 Unit/Hari
2500Mtr/Hari
3 Titik/Hari

7
4

KET.

Minggu 13
82

13
1

4
1

Jakarta, ..... Juli 2014

PT.HASIAN PRIMA TELINDO