Construction Schedule
As a minimum, the following elements are contained as per the Indicative Construction Schedule and
schedule should be in sectional completion basis:
Securing of Permits
Delivery schedules for pipeline materials, with all pipeline materials on site within
scheduled time of the contract
Utility relocation
Pipe laying schedule by location (maximum 800 to 1000m segments), with all pipe laying
activities completed three months before the end of the contract period
Reservoir/s construction