KODE
1
KOEF
SAT.
URAIAN PAKERJAAN
J.6
1.0100
0.3500
m'
0.0360
0.0600
0.0060
OH
OH
OH
Pekerja
Tukang Ledeng
Kepala Tukang
1.0100
0.3500
m'
0.0396
0.0660
0.0066
OH
OH
OH
1.0100
0.3500
HARGA SAT.
Rp
6
JUMLAH
Rp
8=(4X7)
4,500.00
4,500.00
10,605.00
4,545.00
1,575.00
34,500.00
48,875.00
51,750.00
1,242.00
2,932.50
310.50
7,100.00
7,100.00
14,589.50
7,171.00
2,485.00
Pekerja
Tukang Ledeng
Kepala Tukang
34,500.00
48,875.00
51,750.00
1,366.20
3,225.75
341.55
m'
11,275.00
11,275.00
20,716.00
11,387.75
3,946.25
0.0432
0.0720
0.0072
OH
OH
OH
Pekerja
Tukang Ledeng
Kepala Tukang
34,500.00
48,875.00
51,750.00
1,490.40
3,519.00
372.60
1.0100
0.3500
m'
14,600.00
14,600.00
25,686.50
14,746.00
5,110.00
0.0468
0.0780
0.0078
OH
OH
OH
Pekerja
Tukang Ledeng
Kepala Tukang
34,500.00
48,875.00
51,750.00
1,614.60
3,812.25
403.65
1.0100
0.3500
m'
22,800.00
22,800.00
37,287.00
23,028.00
7,980.00
0.0504
0.0840
0.0084
OH
OH
OH
Pekerja
Tukang Ledeng
Kepala Tukang
34,500.00
48,875.00
51,750.00
1,738.80
4,105.50
434.70
1.0100
0.3500
m'
34,100.00
34,100.00
53,103.50
34,441.00
11,935.00
0.0540
0.0900
0.0090
OH
OH
OH
Pekerja
Tukang Ledeng
Kepala Tukang
34,500.00
48,875.00
51,750.00
1,863.00
4,398.75
465.75
1.0100
0.3500
m'
49,700.00
49,700.00
76,003.96
50,197.00
17,395.00
0.0675
0.1125
0.0113
OH
OH
OH
Pekerja
Tukang Ledeng
Kepala Tukang
34,500.00
48,875.00
51,750.00
2,328.75
5,498.44
584.78
1.0100
0.3500
m'
72,600.00
72,600.00
108,827.25
73,326.00
25,410.00
0.0810
0.1350
0.0135
OH
OH
OH
Pekerja
Tukang Ledeng
Kepala Tukang
34,500.00
48,875.00
51,750.00
2,794.50
6,598.13
698.63
0.5600
0.1370
0.3150
m3
m3
m3
0.1350
0.0130
0.4000
0.0750
OH
OH
OH
lot
Tukang Pipa
Kepala Tukang
Pekerja
Alat Bantu
J.7
J.8
J.9
J.10
J.11
J.12
J.13
J.14
13,800.00
84,690.00
10,350.00
48,875.00
51,750.00
34,500.00
13,750.00
23
44,692.91
7,728.00
11,602.53
3,260.25
6,598.13
672.75
13,800.00
1,031.25