You are on page 1of 78

RENCANA ANGGARAN BIAYA

TOWER AIR DAN PAGAR

NO

U R A I A N

VOLUME

SAT.

HARGA
SATUAN
(Rp.)

JUMLAH
(Rp.)

1
I

TOWER AIR TINGGI 2 M


1 Pancang Cerucuk dia 10cm - 200 cm

50.00

Btg

4,500.00

225,000.00

2 Urugan Pasir di bawah Pondasi t. 10 cm

0.20

61,874.40

12,127.38

3 Lantai Kerja Beton Tumbuk t. 5 cm camp 1:2:3

0.10

319,698.04

31,330.41

4 Pelat pondasi Beton Betulang camp 1:2:3

0.39

3,500,000.00

1,372,000.00

5 Kolom Pondasi uk. 15x15 cm T = 50cm Beton Bertulang camp 1:2:3

0.05

6,000,000.00

270,000.00

6 Sloof Pondasi uk. 10x15 cm Beton Bertulang camp 1:2:3

0.11

4,500,000.00

476,280.00

7 Kolom Tower uk. 15x15 cm T = 1.94 m Beton Bertulang camp 1:2:3

0.17

6,000,000.00

1,047,600.00

8 Balok Plat 1 & 2 uk 10x15 cm Beton Bertulang camp 1:2:3

0.12

M3

4,500,000.00

553,500.00

9 Plat Lantai 1 tebal 8cm

0.17

3,200,000.00

553,190.40

10 Plat Lantai 2 tebal 10 cm

0.20

3,500,000.00

686,000.00

11 Tangga Plat besi siku

1.00

LS

400,000.00

400,000.00

13 Plesteran 3 sisi dinding tower

4.50

M2

20,000.00

90,000.00

14 Pipa PVC uk 1/2"

10.00

btg

16,000.00

160,000.00

15 Pipa PVC uk 1.5"

2.00

btg

32,000.00

64,000.00

SUB TOTAL
II

5,941,028.19

PEKERJAAN PAGAR
1 Batako

500.00

bh

700.00

350,000.00

2 Plester

38.52

m2

20,000.00

770,400.00

0.11

M3

4,000,000.00

428,000.00

3 Balok Pagar uk 10x10


SUB TOTAL

1,548,400.00

TOTAL

7,489,428.19

ANALISA SATUAN HARGA UPAH DAN BAHAN


1

1 m Pengukuran dan Pemasangan Bouwplank (P.Ps. 02)


HARGA
No.
URAIAN PEKERJAAN
SATUAN
SATUAN
( Rp. )
1

A
1
2
3
4
B

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

Jumlah
BAHAN
1 Kayu Pancang (Dolken) d = 6-8 cm, p = 4m
2 Paku
3 Papan Kayu Kelas III

KUANTITAS

BIAYA
SATUAN
( Rp. )

OH
OH
OH
OH

0.00
0.00
0.00
0.00

0.100
0.100
0.010
0.005

0.00
0.00
0.00
0.00

Btg
Kg

78,000.00
24,375.00
2,482,593.75

1.000
0.020
0.007

78,000.00
487.50
17,378.16

0.00

95,865.66

Jumlah
C

Jumlah A + B

Harga Satuan

95,865.66

95,865.66

Acuan : ABK Bangunan Gedung dan Perumahan - 6.4

1m2 Membersihkan Lapangan dan Perataan (P.Ps. 03)


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS

BIAYA
SATUAN
( Rp. )

TENAGA
1 Pekerja
2 Mandor

OH
OH

BAHAN

C
D

Jumlah A + B
Harga Satuan

0.00
0.00

0.100
0.050

0.00
0.00

Jumlah

0.00

Jumlah

0.00
0.00

0.00

Acuan : ABK Bangunan Gedung dan Perumahan - 6.8

1m2 Pembuatan Direksi Keet / Gudang Bahan Bangunan dan Alat / Bedeng Pekerja (P.Ps. 04)
HARGA
BIAYA
No.
URAIAN PEKERJAAN
SATUAN
KUANTITAS
SATUAN
SATUAN
( Rp. )
( Rp. )
1

A
1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

OH
OH
OH
OH

Jumlah
BAHAN
Kayu Pancang (Dolken) d = 10cm, p = 4m
Kayu Kelas III
Paku
Seng Gelombang BJLS 0.20
Triplek 4mm
Jumlah
Jumlah A + B

Harga Satuan

B
1
2
3
4
5

59,062.00
54,468.75
78,750.00
94,500.00

6
2.000
1.000
0.200
0.050

193,067.75
Btg
3

M
Kg
Lbr
Lbr

78,000.00
2,507,700.00
24,375.00
53,700.00
53,800.00

1.250
0.186
0.300
1.500
1.3500

917,492.45

917,492.45

1m3 Galian Tanah Biasa sedalam 1 meter (P.T. 01)


URAIAN PEKERJAAN

TENAGA
1 Pekerja
2 Mandor

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS

BIAYA
SATUAN
( Rp. )

OH
OH

BAHAN

Jumlah A + B

Harga Satuan

97,500.00
466,432.20
7,312.50
80,550.00
72,630.00

724,424.70

Acuan : ABK Bangunan Gedung dan Perumahan - 6.9

No.

118,124.00
54,468.75
15,750.00
4,725.00

0.00
0.00

0.400
0.040

0.00
0.00

Jumlah

0.00

Jumlah

0.00
0.00

0.00

Acuan : ABK Bangunan Gedung dan Perumahan - 6.1

1m3 Urugan Kembali (P.T. 06)


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS

BIAYA
SATUAN
( Rp. )

TENAGA
1 Pekerja
2 Mandor

BAHAN

C
D

Jumlah A + B
Harga Satuan

OH
OH

0.00
0.00

0.192
0.019

0.00
0.00

Jumlah

0.00

Jumlah

0.00

Acuan : ABK Bangunan Gedung dan Perumahan - 6.9

0.00

0.00

1m Urugan Pasir Alas (P.T. 11)


No.

URAIAN PEKERJAAN

TENAGA
1 Pekerja
2 Mandor

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS

BIAYA
SATUAN
( Rp. )

OH
OH

0.00
0.00

0.300
0.010

0.00
0.00

0.00

Jumlah
B

BAHAN
1 Pasir Urug

117,812.50

1.250

C
D

147,265.63

147,265.63

Jumlah
Jumlah A + B
Harga Satuan

147,265.63

147,265.63

Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - W. 1

1m Pasang Pondasi Batu Belah 1Pc : 3Ps (P.PB. 01)


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS

BIAYA
SATUAN
( Rp. )

1
A
1
2
3
4

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

OH
OH
OH
OH

54,468.75
59,062.00
78,750.00
94,500.00

1.500
0.600
0.060
0.075

128,952.83

Jumlah
B

BAHAN
1 Batu Belah 10-15 cm
2 Semen Portland
3 Pasir

Jumlah
C
D

M
Kg
3
M

349,375.00
2,437.50
117,812.50

1.100
202.000
0.485

1,062,779.39

1,062,779.39

Acuan : ABK Bangunan Gedung dan Perumahan - 6.4

1m3 Pasang Pondasi Batu Belah 1Pc : 4Ps (P.PB. 02)


URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS

BIAYA
SATUAN
( Rp. )

1
A
1
2
3
4

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

OH
OH
OH
OH

54,468.75
59,062.00
78,750.00
94,500.00

1.500
0.600
0.060
0.075

BAHAN
1 Batu Belah 10-15 cm
2 Semen Portland
3 Pasir

M
Kg

Jumlah
C
D

349,375.00
2,437.50
117,812.50

1.100
163.000
0.520

971,840.33

971,840.33

Acuan : ABK Bangunan Gedung dan Perumahan - 6.5

1m3 Membuat Beton Tumbuk 1Pc : 3Ps : 5Kr (P.BB. 01)


HARGA
No.
URAIAN PEKERJAAN
SATUAN
SATUAN
( Rp. )
2

A
1
2
3
4

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

3
OH
OH
OH
OH

KUANTITAS

BIAYA
SATUAN
( Rp. )

54,468.75
59,062.00
78,750.00
94,500.00

1.650
0.250
0.025
0.080

BAHAN
1 Semen Portland
2 Pasir

Kg
3

3 Batu Belah 0,5 - 1 (Kerikil)

2,437.50
117,812.50

218.000
0.520

1,137,500.00

0.870

Jumlah A + B
Harga Satuan

1,696,430.19

1m3 Pekerjaan Beton Bertulang, camp. 1 PC : 2 Ps : 3 Kr (P.BB. 02)


HARGA
No.
URAIAN PEKERJAAN
SATUAN
KUANTITAS
SATUAN
( Rp. )
2

A
1
2
3
4

989,625.00

1,696,430.19

Acuan : ABK Bangunan Gedung dan Perumahan - 6.1

531,375.00
61,262.50

1,582,262.50

Jumlah
C
D

89,873.44
14,765.50
1,968.75
7,560.00

114,167.69

Jumlah
B

384,312.50
397,312.50
61,262.50

842,887.50

Jumlah A + B
Harga Satuan

81,703.13
35,437.20
4,725.00
7,087.50

128,952.83

Jumlah
B

384,312.50
492,375.00
57,139.06

933,826.56

Jumlah A + B
Harga Satuan

No.

81,703.13
35,437.20
4,725.00
7,087.50

TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor

Jumlah
BAHAN
1 Semen Portland
2 Pasir
3 Batu Belah 0,5 - 1 (Kerikil)
Jumlah
C
Jumlah A + B
D
Harga Satuan

3
OH
OH
OH
OH

4
54,468.75
59,062.00
78,750.00
94,500.00

BIAYA
SATUAN
( Rp. )
6

2.000
0.350
0.035
1.000

108,937.50
20,671.70
2,756.25
94,500.00

226,865.45

Acuan : ABK Bangunan Gedung dan Perumahan - 6.13

Kg

M
3
M

2,437.50
117,812.50
1,137,500.00

336.000
0.540
0.810

819,000.00
63,618.75
921,375.00

1,803,993.75
2,030,859.20

2,030,859.20

1Kg Pembesian dengan Besi Polos atau Ulir (P.BB. 03)


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS

BIAYA
SATUAN
( Rp. )

1
A
1
2
3
4

TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor

OH
OH
OH
OH

Jumlah
BAHAN
1 Besi Beton (polos/ulir)
2 Kawat Ikat Beton (bendrat)
Jumlah
C
Jumlah A + B

54,468.75
59,062.00
78,750.00
94,500.00

0.007
0.007
0.0007
0.0003

381.28
413.43
55.13
28.35

878.19

Kg
Kg

21,125.00
23,400.00

1.050
0.015

22,181.25
351.00

22,532.25
23,410.44

23,410.44

Harga Satuan

Acuan : ABK Bangunan Gedung dan Perumahan - 6.25


2

1m Pasang Bekesting untuk Pondasi (P.BB. 04)


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS

BIAYA
SATUAN
( Rp. )

1
A
1
2
3
4

TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

OH
OH
OH
OH

Jumlah
BAHAN
1 Papan Mal (Kayu Kelas III)
2 Paku 2" - 5"
3 Minyak Bekesting
Jumlah
C
Jumlah A + B

54,468.75
59,062.00
78,750.00
94,500.00

0.300
0.260
0.026
0.005

16,340.63
15,356.12
2,047.50
472.50

34,216.75

M
Kg
Lt

2,482,593.75
24,375.00
17,296.50

0.040
0.300
0.100

108,345.90
142,562.65

142,562.65

Harga Satuan

Acuan : ABK Bangunan Gedung dan Perumahan - 6.28

1m2 Pasang Bekesting untuk Sloof (P.BB. 05)


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS

BIAYA
SATUAN
( Rp. )

1
A
1
2
3
4

99,303.75
7,312.50
1,729.65

TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

OH
OH
OH
OH

Jumlah
BAHAN
1 Papan Mal (Kayu Kelas III)
2 Paku 2" - 5"
3 Minyak Bekesting
Jumlah
C
Jumlah A + B

54,468.75
59,062.00
78,750.00
94,500.00

0.300
0.260
0.026
0.005

16,340.63
15,356.12
2,047.50
472.50

34,216.75

M3
Kg
Lt

2,482,593.75
24,375.00
17,296.50

0.045
0.300
0.100

120,758.87
154,975.61

154,975.61

Harga Satuan

Acuan : ABK Bangunan Gedung dan Perumahan - 6.29

1m2 Pasang Bekesting untuk Kolom (P.BB. 06.a)


No.

URAIAN PEKERJAAN

A
1
2
3
4
B
1
2
3
4
C
D

TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
BAHAN
Paku 2" - 5"
Minyak Bekesting
Papan Mal
Cerucuk 6 - 8cm / 4m
Jumlah
Jumlah A + B
Harga Satuan

SATUAN
3

HARGA
SATUAN
( Rp. )

KUANTITAS

BIAYA
SATUAN
( Rp. )

OH
OH
OH
OH

54,468.75
59,062.00
78,750.00
94,500.00

0.300
0.330
0.033
0.006

Kg
Lt
M3
Btg

24,375.00
17,296.50
2,482,593.75
16,900.00

0.200
0.200
0.040
2.000

A
1
2
3
4
B
1
2
3
4
5
C
D

TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
BAHAN
Paku 2" - 5"
Minyak Bekesting
Balok Kayu Kelas III
Papan Mal
Cerucuk 6 - 8cm / 4m
Jumlah
Jumlah A + B
Harga Satuan

Acuan : ABK Bangunan Gedung dan Perumahan - 6.31

4,875.00
3,459.30
99,303.75
33,800.00

141,438.05
180,434.89

180,434.89

1m2 Pasang Bekesting untuk Balok (P.BB. 07.a)


URAIAN PEKERJAAN

16,340.63
19,490.46
2,598.75
567.00

38,996.84

Acuan : ABK Bangunan Gedung dan Perumahan - 6.30

No.

111,716.72
7,312.50
1,729.65

SATUAN
3

HARGA
SATUAN
( Rp. )

KUANTITAS

BIAYA
SATUAN
( Rp. )

OH
OH
OH
OH

54,468.75
59,062.00
78,750.00
94,500.00

0.320
0.330
0.033
0.006

Kg
Lt
M3
M3
Btg

24,375.00
17,296.50
2,507,700.00
2,482,593.75
16,900.00

0.200
0.200
0.018
0.040
2.000

17,430.00
19,490.46
2,598.75
567.00

40,086.21
4,875.00
3,459.30
45,138.60
99,303.75
33,800.00

186,576.65
226,662.86

226,662.86

1m Pasang Bekesting untuk Lantai (P.BB. 08.a)


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS

BIAYA
SATUAN
( Rp. )

1
A
1
2
3
4
B
1
2
3
4
5
C
D

TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

OH
OH
OH
OH

Jumlah
BAHAN
Paku 2" - 5"
Minyak Bekesting
Balok Kayu Kelas III uk. 4/6
Papan Mal
Cerucuk 6 - 8cm / 4m
Jumlah
Jumlah A + B
Harga Satuan

54,468.75
59,062.00
78,750.00
94,500.00

0.320
0.330
0.033
0.006

40,086.21
Kg
Lt
M3
M3
Btg

24,375.00
17,296.50
2,507,700.00
2,482,593.75
16,900.00

0.400
0.200
0.015
0.040
6.000

291,614.76

291,614.76

1m2 Pasang Batako uk. 15/30/7(P.Dnd. 01)


URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS

BIAYA
SATUAN
( Rp. )

1
A
1
2
3
4

9,750.00
3,459.30
37,615.50
99,303.75
101,400.00

251,528.55

Acuan : ABK Bangunan Gedung dan Perumahan - 6.32

No.

17,430.00
19,490.46
2,598.75
567.00

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

OH
OH
OH
OH

Jumlah
BAHAN
1 Batako 15/30/7 (cetak mesin)
2 Semen Portland
3 Pasir Beton / Pasang
Jumlah
C
Jumlah A + B

54,468.75
59,062.00
78,750.00
94,500.00

0.32
0.10
0.01
0.015

17,430.00
5,906.20
787.50
1,417.50

25,541.20

Bh
Kg
3
M

1,950.00
2,437.50
117,812.50

22.000
7.500
0.027

64,362.19
89,903.39

89,903.39

Harga Satuan

Acuan : ABK Bangunan Gedung dan Perumahan - 6.20

1m2 Plasteran 1Pc : 3Ps tebal 1,5cm (P.Pls. 02)


No.

URAIAN PEKERJAAN

A
1
2
3
4

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

SATUAN
3
OH
OH
OH
OH

HARGA
SATUAN
( Rp. )

KUANTITAS

BIAYA
SATUAN
( Rp. )

54,468.75
59,062.00
78,750.00
94,500.00

0.200
0.150
0.015
0.010

BAHAN
1 Semen Portland
2 Pasir

Kg
M3

2,437.50
117,812.50

6.480
0.019

15,795.00
2,238.44

18,033.44

Jumlah
C
D

10,893.75
8,859.30
1,181.25
945.00

21,879.30

Jumlah
B

42,900.00
18,281.25
3,180.94

Jumlah A + B
Harga Satuan

39,912.74

39,912.74

Acuan : ABK Bangunan Gedung dan Perumahan - 6.3

1m2 Pasang Lantai Keramik 20 x 20cm (P.LD. 01)


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS

BIAYA
SATUAN
( Rp. )

1
A

TENAGA
1 Pekerja

OH

54,468.75

0.620

33,770.63

2 Tukang Batu

OH

59,062.00

0.350

20,671.70

3 Kepala Tukang

OH

78,750.00

0.035

2,756.25

4 Mandor

OH

94,500.00

0.030

2,835.00

60,033.58

Jumlah
BAHAN
1 Ubin Keramik 20 x 20cm Polos

Bh

1,960.00

25.000

49,000.00

2 Semen Portland

Kg

2,437.50

11.380

27,738.75

3 Pasir Pasang

117,812.50

0.042

4,948.13

81,686.88
C

Jumlah A + B

Harga Satuan

141,720.45

141,720.45

Acuan : ABK Bangunan Gedung dan Perumahan - 6.44

1m2 Pasang Lantai Keramik 30 x 30cm Polos (P.LD. 02)


HARGA
No.
URAIAN PEKERJAAN
SATUAN
SATUAN
( Rp. )
1

A
1
2
3
4
B

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Jumlah
BAHAN
1 Ubin Keramik 30 x 30cm Polos
2 Semen Portland
3 Pasir Pasang

3
OH
OH
OH
OH

4
54,468.75
59,062.00
78,750.00
94,500.00

KUANTITAS

BIAYA
SATUAN
( Rp. )

6
0.260
0.125
0.0125
0.013

14,161.88
7,382.75
984.38
1,228.50

23,757.50
Bh
Kg
3

6,594.44
2,437.50
117,812.50

11.870
10.000
0.0215

78,276.00
24,375.00
2,532.97

105,183.97
C
D

Jumlah A + B
Harga Satuan

Acuan : ABK Bangunan Gedung dan Perumahan - 6.2

128,941.47

128,941.47

1m Pasang Dinding Keramik 20 x 20cm (P.LD. 12)


No.

URAIAN PEKERJAAN

A
1
2
3
4

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1
2
3
4

Jumlah
BAHAN
Keramik 20 x 20 cm
Semen
Pasir Pasang
Semen Pengisi Nat Keramik

SATUAN
3
OH
OH
OH
OH

HARGA
SATUAN
( Rp. )

KUANTITAS

BIAYA
SATUAN
( Rp. )

54,468.75
59,062.00
78,750.00
94,500.00

0.600
0.450
0.045
0.030

32,681.25
26,577.90
3,543.75
2,835.00

65,637.90
Bh
Kg
M3
Kg

2,100.00
2,437.50
117,812.50
1,700.00

25.000
9.300
0.018
0.200

52,500.00
22,668.75
2,120.63
340.00

77,629.38
C
D

Jumlah A + B
Harga Satuan

143,267.28

143,267.28

Acuan : ABK Bangunan Gedung dan Perumahan - 6.63


2

1m Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, 2Lapis Cat Penutup) (P.Ct. 04)
HARGA
BIAYA
No.
URAIAN PEKERJAAN
SATUAN
KUANTITAS
SATUAN
SATUAN
( Rp. )
( Rp. )
1

A
1
2
3
4

TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor

1
2
3
4

Jumlah
BAHAN
Cat Meni
Plamur (dempul kayu)
Cat Dasar Kayu
Cat Kilat Penutup 2 Kali

3
OH
OH
OH
OH

54,468.75
59,062.00
78,750.00
94,500.00

6
0.070
0.009
0.006
0.0025

3,812.81
531.56
472.50
236.25

5,053.12
Kg
Kg
Kg
Kg

37,900.00
19,987.50
54,437.50
46,312.50

0.200
0.150
0.170
0.260

7,580.00
2,998.13
9,254.38
12,041.25

31,873.75
C
D

Jumlah A + B
Harga Satuan

36,926.87

36,926.87

Acuan : ABK Bangunan Gedung dan Perumahan - 6.8

1m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Dengan Cat Mutu Baik. (P.Ct. 11)
HARGA
BIAYA
No.
URAIAN PEKERJAAN
SATUAN
KUANTITAS
SATUAN
SATUAN
( Rp. )
( Rp. )
1

A
1
2
3
4
B

TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Jumlah
BAHAN
1 Plamur (dempul tembok)
2 Cat Dasar tembok
3 Cat Tembok Penutup 2 x

OH
OH
OH
OH

54,468.75
59,062.00
78,750.00
94,500.00

Kg
Kg
Kg

19,987.50
54,437.50
113,750.00

6
0.020
0.063
0.0063
0.0025

1,089.38
3,720.91
496.13
236.25

5,542.66
0.100
0.120
0.260

1,998.75
6,532.50
29,575.00

38,106.25
C
D

Jumlah A + B
Harga Satuan

Acuan : ABK Bangunan Gedung dan Perumahan - 6.14

43,648.91

43,648.91

RENCANA ANGGARAN BIAYA


Satuan Kerja
Nama Kegiatan
Lokasi
Tahun Anggaran

: Dinas Kehewanan dan Peternakan Provinsi Kalimantan Barat


: Pembangunan Jalan Lingkungan Rabat Beton Camp 1: 2 : 3
: Pontianak
: 2010
84.50

No

Uraian Pekerjaan

Volume
Nilai
Sat

Harga

Jumlah

Satuan

Harga

( Rp )

( Rp )

I Pekerjaan Persiapan
1 Mobilisasi/demobilisasi
1 Pembersihan Lokasi
2 Pengukuran

1.00

Lsm

7,500,000.00

7,500,000.00

380.25
84.50

m2
m'

95,865.66

8,100,647.95

81.12
54.08

m3
m3

61,874.40

3,346,167.55

II Pekerjaan struktur
1 Galian tanah/perataan
2 Pasir urug tebal 20 cm
3 Cerucuk dia 10 - 400 cm
3 Cor beton 1: 2 : 3 Tebal 20 cm
4 penulangan

1,190.00
50.70
37.44

batang
m3
kg

7,500.00

8,925,000.00

319,698.04

16,208,690.55

14,430.00

540,259.20

Jumlah
1 m'
Dibulatkan

Satuan Kerja
Nama Kegiatan
Lokasi
Tahun Anggaran

: Dinas Kehewanan dan Peternakan Provinsi Kalimantan Barat


: Pembuatan Turap Batu Pecah
: Pontianak
: 2010
106.50

No

Uraian Pekerjaan

m'

Volume
Nilai
Sat

Harga

Jumlah

Satuan

Harga

( Rp )

( Rp )

I Pekerjaan Persiapan
1 Pembersihan Lokasi
2 Pengukuran/Pasang Patok

123.000
106.500

m2
m'

68,535.00

7,298,977.50

79.875

m3

II Pekerjaan Turap
1 Galian tanah
2 Urugan Tanah kembali
2 Cerucuk dia 10 -400 cm
3 Urugan pasir 20 cm
4 Lantai kerja tebal 5 cm camp. 1:3:5
5 Turap pas. Batu pecah camp. 1:3
6 Plesteran dinding turap camp 1 :3, tbl 1,5 cm
Jumlah
1 m'
Dibulatkan

18.638

m3

112.000

btg

7,500.00

840,000.00

39.937

m3

61,874.40

2,471,077.91

7.988

m3

1,203.33

9,611.62

101.175

m3

230,716.67

23,342,758.59

95.850

m2

1,203.33

115,339.49

CANA ANGGARAN BIAYA

Sub
Total
( Rp )

15,600,647.95

29,020,117.30
44,620,765.25
1,482,000.00
1,482,000.00

Sub
Total
( Rp )

7,298,977.50

26,778,787.62
34,077,765.12
1,010,000.00
1,010,000.00

DAFTAR HARGA MATERIAL BANGUNAN

NO.

JENIS BAHAN / MATERIAL

SATUAN

HARGA SATUAN
DGN JASA & PAJAK

1
I.
1
2
3
4
4
5
6
7
8
9
10
11
II.
1
2
III.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
IV.
1
2
V.
1
2
VI.
1
2
3
4
5
VII.
1
2
3

(Rp.)
4

BAHAN PASIR, BATU & TANAH


Pasir Urug
Pasir Pasang
Pasir Beton
Kerikil Sungai Royalti
Batu Belah ukuran
10 - 15 cm
Batu pecah ukuran
7 - 10 cm
Batu pecah ukuran
5 - 7 cm
Batu pecah ukuran
3 - 5 cm
Batu pecah ukuran
2 - 3 cm
Batu pecah ukuran
1 - 2 cm
Batu pecah ukuran
0,5 - 1 cm
Batako Cetak ukuran
7 x 15 x 30 cm
BAHAN SEMEN, KAPUR, ASPAL
Semen PC
Semen Warna / Oker
BAHAN KAYU
Kayu belian Tidak Ketam
Kayu belian Ketam
Kayu Klas I (tidak Ketam)
Kayu Klas I (Ketam)
Kayu Klas II ketam
Kayu Klas II tidak ketam
Papan Kayu Klas I
Papan Kayu Klas I (Ketam)
Papan Kayu Klas II
Papan Bekisting/Mal Kayu Klas III
Kayu Cerucuk (Dolken) diameter 6
p = 4.00 m
Kayu Cerucuk (Dolken) diameter 12
p = 4.00 m
Kayu Cerucuk (Dolken) diameter 10
p = 4.00 m
Kayu Kelas III
Balok Kayu Klas III
List Kayu Profil
List Pintu/Jendela
BAHAN LANTAI & UBIN
Keramik Porselin uk. 20 x 20 polos
Keramik Porselin uk. 30 x 30 polos
BAHAN LANGIT-LANGIT
Gypsum Board t = 9 mm
GRC Board
BAHAN ATAP
Atap Metal Uk.
uk. 1.32 x 0.42 M2, t = 0.35 mm
Nok Genteng Metal Warna Polos
uk. 1.00 x 0.91 M2, t = 0.35 mm
Seng Datar BJLS 0,20
Seng Datar BJLS 0,30
Seng Gelombang BJLS 0,30
BAHAN KACA
Kaca Bening 3 mm
Kaca Bening 5 mm
Kaca Rayban 5 mm

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Buah

51,562.00
63,333.33
150,000.00
200,000.00
266,666.67
291,666.67
350,000.00
400,000.00
367,647.06
2,000.00

50 Kg/Zak
Kg
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Batang
Batang
Batang
m3

7,400,000.00
7,650,000.00
4,100,000.00
4,500,000.00
3,625,000.00
3,750,000.00
4,900,000.00
3,525,000.00
1,200,000.00
5,000.00
70,000.00
7,500.00

M3
M1
M1
Kotak
Kotak

50,000.00
50,000.00

M2
M2
Lembar
Lembar
Lembar
Lembar
lembar

85,000.00
52,000.00
80,000.00
750,000.00

M2
M2
M2

85,000.00
120,000.00
145,000.00

NO.

JENIS BAHAN / MATERIAL

SATUAN

HARGA SATUAN
DGN JASA & PAJAK

1
VIII.
1
2
3
4
5
6
7
8
9
10
IX.
1
2
3
4
5
6
7
X.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
XI.
1
2
3
XII.
1
2
XIII.
1
2
3
4
5
XIII.
1
2
3
4

(Rp.)
4

BAHAN CAT
Amplas Kayu/Besi/Tembok
D e m p u l 4kg
Cat Dasar Tembok
Meni Besi
Cat Kilat
P l a m u r 4 kg
Pelitur
Cat Tembok
Minyak Cat
Teer/Residu
BAHAN BESI, ALUMINIUM & KAWAT
Besi Beton Polos
Besi Beton Ulir
Kawat Ikat Beton
Baja Konstruksi
Kawat Las
Kawat Simpai
Besi Plat t = 1.00 mm L = 2 cm (Besi Strip)
BAHAN PENGGANTUNG, KUNCI & PEREKAT
Paku campuran
Paku Atap Seng/Paku Payung
Paku Gypsum
Paku Tripleks
Baut
Kunci KM / WC
Kunci Pintu Biasa 2 Slaag
Kunci Selot Jendela
Engsel
3"
Engsel
4"
Kait Angin
Pegangan Pintu/Jendela (Handle)
Lem Kayu / Tripleks
Seal Tape
BAHAN SANITAIR
Kloset Jongkok Merk Setara TOTO
Kran Air Merk Setara San- Ei
Floor Drain Merk Setara SES
BAHAN SANITAIR
Pipa PVC Type AW dia. 3/4"
Pipa PVC Type AW dia. 1"
BAHAN ELEKTRIKAL ( Electrical, Cables, Lamps )
Fitting Duduk Brocco
Lampu SL Merk ( Philips ) 20 Watt
Saklar Tunggal inbow Merk Broco
Saklar Double Inbow Merk Broco
Stop Kontak Inbow Merk Broco
BAHAN BAKAR
Minyak Tanah
Bensin Premium
Minyak Pelumas
Minuak diesel/solar SPBU

Lembar
Kg
Kg
Kaleng
Kg
Kg
Kg
Kg
Liter
Liter

25,000.00
50,000.00
30,000.00
18,000.00
25,000.00
27,000.00
33,000.00
30,000.00
20,000.00
10,000.00

Kg
Kg
Kg
Kg
Btg
Kg
lembar

12,000.00
13,500.00
17,000.00

Kg
Kg
Kg
Kg
Bh
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Kg
Buah
Buah
Buah
Buah
M'
M'
Buah
Buah
Buah
Buah
Buah
Ltr
Ltr
Ltr
Ltr

5,500.00
18,000.00
1,500,000.00
18,000.00
18,500.00
17,000.00
35,000.00

DAFTAR HARGA UPAH


NO.

JENIS UPAH KERJA

SATUAN

HARGA SATUAN
DGN JASA & PAJAK
(Rp.)
4

I
1

Pekerja

3
Org / Hari

Mandor

Org / Hari

Kepala Tukang

Org / Hari

Tukang

Org / Hari

Tukang Kepala

Org / Hari

CV KARYA ENDAH LESTARI

H TEGUH BUDHIRAHARDJO
DIREKTUR

RENCANA ANGGARAN BIAYA


(RAB)

NO

U R A I A N

VOLUME

SAT.

KODE ANALISA

HARGA
SATUAN
(Rp.)

JUMLAH
(Rp.)

Ls

8,040.00

PSi.02

68,535.00

1
I

PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi
2 Pengukuran & Pemasangan Bouwplank

702.00

89.60

M'

SUB TOTAL
II

6,140,736.00
11,784,816.00

PEKERJAAN PONDASI
1 Galian Tanah Pondasi

114.44

PT.01

2 Pancang Cerucuk dia 10cm - 200 cm

384.00

Btg

PK.48

70,000.00

26,880,000.00

PT.08

61,874.40

429,408.34

PBe.02

352,786.27

610,320.25

3 Urugan Pasir di bawah Pondasi t. 10 cm

6.94

4 Lantai Kerja Beton Tumbuk t. 5 cm K 175

1.73

M3

5 Pelat pondasi Beton Betulang K225

6.39

G.Sub.A

3,962,334.04

25,319,314.51

6 Kolom Pondasi uk. 25x25 cm Beton Bertulang K225

2.55

M3

G.Sub.G

6,780,258.04

17,289,658.00

7 Sloof Pondasi uk. 15x50 cm Beton Bertulang K225

16.13

M3

G.Sub.C

4,896,654.94

78,983,044.16

8 Urugan Kembali Tanah Galian

96.84

M3

PT.05

SUB TOTAL
III

5,644,080.00

149,511,745.25

PEKERJAAN STRUKTUR BETON BERTULANG K225


1 Balok Induk 15/40 Beton

11.94

M3

G.Sub.E

4,009,342.24

47,871,546.33

2 Balok Anak 15/30 Beton

9.21

M3

G.Sub.F

3,436,638.04

31,651,436.33

3 Listplank uk. 10x80 cm

1.97

G.Sub.L

2,942,148.04

5,796,031.64

4 Kolom LT. 1 uk. 25x25 cm

6.00

G.Sub.G

6,780,258.04

40,681,548.23

5 Kolom LT. 2 uk. 25x25 cm

5.25

M3

G.Sub.H

3,798,375.04

19,941,468.95

6 Pelat Lantai 1, t =10 cm

43.38

M3

G.Sub.J

1,117,677.04

48,484,829.93

7 Pelat Lantai 2, t = 10 cm

37.68

G.Sub.K

2,947,656.04

111,067,679.53

8 Kolom Praktis

0.38

M3

G.Sub.I

4,209,903.04

1,599,763.15

9 Ring Balok uk. 15/25

5.25

M3

G.Sub.F

3,707,993.14

19,466,963.98

- Tangga N/T

7.51

M3

G.Sub.M

3,006,171.34

22,576,346.75

- Tangga Teras Depan

1.75

G.Sub.J

1,117,677.04

1,955,934.82

10 Tangga Beton
M

SUB TOTAL
IV

351,093,549.63

PEKERJAAN RANGKA KUDA-KUDA DAN ATAP


1 Kuda-kuda Kayu Klas II

4.48

M3

PK.33

2 Gording, Nok + Ikatan Angin Kayu Klas II

3.41

M3

PK.17

3 Rangka Atap Kayu Klas II

542.32

M2

4 Atap Genteng Metal

542.32

M2

5 Perabung Atap Metal 0.30

19.00

M'

PPA.11'

900.00

17,100.00

6 Jurai

25.16

M'

55,000.00

1,383,800.00

110.68

M'

PK.20

88.00

Bh

7 Listplank Kayu Klas I


8 Beugel
9 Baut
10 Tebing Layar (GRC)

#REF!

#REF!

4,023,500.00

13,720,135.00

PK.18

46,200.00

25,055,184.00

PPA.03'

141,300.00

76,629,816.00

118.00

Bh

18.90

M2

PL.02"

450.00

49,806.00

5,000.00

440,000.00

85,245.00

SUB TOTAL
V

1,611,130.50
#REF!

PEKERJAAN LANTAI DAN DINDING


149.13

M3

2 Dinding Batako Pres Mesin

1,385.30

2 Plesteran Dinding, Kolom & Balok

3,137.42

1 Urugan Pasir di Bawah Lantai

PT.08

61,874.40

9,227,329.27

PPBC.05

46,394.00

64,269,608.03

M2

PPs.05

1,203.33

3,775,361.87

42.46

M2

PPs.05

1,203.33

51,093.53

4 Keramik Lantai uk. 30 x 30 cm Lt. 01

399.38

M2

PPLD.01"

52,660.00

21,031,350.74

5 Keramik Lantai uk. 30 x 30 cm Lt. 02

376.76

M2

PPLD.01"

52,660.00

19,840,181.55

60.24

M2

PPLD.01"

52,660.00

3,172,238.39

3 Plesteran Tangga camp. 1:3

6 Keramik Tangga uk. 30 x 30 cm

NO

U R A I A N

VOLUME

7 Keramik Lantai & Dinding Toilet uk. 20 x 20 cm

SAT.
4

64.43

KODE ANALISA
5

PPLD.01'

HARGA
SATUAN
(Rp.)

JUMLAH
(Rp.)

52,660.00

SUB TOTAL
VI

3,392,883.79
124,760,047.17

PEKERJAAN KUSEN, PINTU, JENDELA DAN VENTILASI


3

1 Kusen Kayu Klas I

1.93

2 Pintu Lapis Double Teakwood

5.00

Unit

3 Pintu Panel Kayu Klas I

19.40

PK.14
SNI.3434-6.8

4,950,000.00

9,553,500.00

450,000.00

2,250,000.00

5 Pintu Folding Gate

70.50

500,000.00

35,250,000.00

6 Jendela Kaca Jungkit

32.00

SNI.3434.6,10

72,540.00

2,321,280.00

3.92

F.37.c

160,025.00

627,298.00

23.85

195,000.00

4,650,750.00

7 Ventilasi Kaca Mati (Kaca Rayban t. 5 mm)


8 Ventilasi Kaca Silang
SUB TOTAL

54,652,828.00

NO

U R A I A N

VOLUME

SAT.

KODE ANALISA

HARGA
SATUAN
(Rp.)

JUMLAH
(Rp.)

1
VII

PEKERJAAN PLAFOND
2

1 Plafond Gypsum t. 9 mm Lt. 1

354.73

2 List Pafond Gypsum Lt. 1

150.00

M'

3 Plafond Gypsum t. 9 mm Lt. 2

375.00

4 List Pafond Gypsum Lt. 2

200.00

M'

5 Plafond GRC t. 9 mm (Kaki Atap + Toliet + teras)

161.39

PL.02'

106,556.25

15,000.00

2,250,000.00

PL.02'

106,556.25

39,958,593.75

15,000.00

3,000,000.00

PL.02"

85,245.00

13,757,690.55

SUB TOTAL

37,798,698.56

96,764,982.86

VIII PEKERJAAN INSTALASI LISTRIK


1 Instalasi Titik Lampu

66.00

Ttk

125,000.00

8,250,000.00

1.00

Unit

4,500,000.00

4,500,000.00

3 Lampu SL 20 Watt Merk Philip

50.00

Bh

4 Fitting Lampu Merk Broco

50.00

Bh

5 Saklar Tunggal Merk Broco

10.00

Bh

6 Saklar Double Inbow Broco

10.00

Bh

8 Stop Kontak Inbow Broco

15.00

Bh

2 Panel Box/Lengkap Stut MCB, Lampu Indikator, Ohm Saklar

SUB TOTAL
IX

12,750,000.00

PEKERJAAN PENGECATAN
1 Cat Kilat

217.97

M2

K23+K30

2 Cat Teer

108.66

M2

SUPL.SNI.PC-6.12

3,500.00

5.00

M2

PC.05

17,226.00

86,130.00

4,535.85

M2

K23+K30b

11,070.00

50,211,859.50

3 Cat Pelitur
4 Cat Tembok

#REF!

#REF!

SUB TOTAL
X

380,310.00

#REF!

PEKERJAAN PENGGANTUNG DAN PENGUNCI


1 Kunci Pintu 2 Slag

15.00

Bh

PKK.01

2 Engsel Pintu uk. 4 "

60.00

Bh

PKK.06

3 Engsel Jendela uk. 4"

92.00

Bh

PKK.07

4 Slot Jendela uk. 3"

46.00

Bh

PKK.10

5 Kait Jendela

92.00

Bh

PKK.08

6 Handle Jendela

92.00

Bh

PKK.11

SUB TOTAL
XI

PEKERJAAN SANITAIR
1 Kloset Jongkok Merk TOTO

5.00

Bh

PSa.02

633.33

2 Floor Drain Merk Setara SES

5.00

Bh

PSa.08

3 Kran Air Merk Setara San- Ei

5.00

Bh

PSa.06

3 Septic Tank

3.00

Unit

4 Instalasi Air Bersih PVC Type AW

5.00

Unit

5 Instalasi Air Kotor PVC Type AW

5.00

Unit

3,000,000.00

9,000,000.00

250,000.00

1,250,000.00

1,500,000.00

SUB TOTAL
XII

3,166.67

7,500,000.00
17,753,166.67

PEKERJAAN SALURAN
1 Galian Tanah

34.96

M3

PT.01

2 Urugan Kembali Tanah Gal;ian

22.72

M3

PT.05

3 Saluran Cor Beton Tumbuk camp. 1:2:3

12.24

M3

PBe.03

319,698.04

122.36

M2

PPs.05

1,203.33

4 Plesteran Saluran
SUB TOTAL

3,913,103.99
147,239.86
4,060,343.85

XIII PEKERJAAN LAIN-LAIN


1 Reiling Tangga N/T Pipa Holo

226.62

M'

400,000.00

90,648,000.00

2 Ornamen/Plesteran Variasi Dinding

116.13

PPs.05

1,203.33

139,743.09

PBe.03

319,698.04

3 Ornamen/Cor Variasi Kolom


SUB TOTAL
TOTAL

0.62

198,212.78
90,985,955.88
#REF!

REKAPITULASI
RENCANA ANGGARAN BIAYA
NO

U R A I A N

JUMLAH
(Rp.)

PEKERJAAN PERSIAPAN

11,784,816.00

II

PEKERJAAN PONDASI

149,511,745.25

III

PEKERJAAN STRUKTUR BETON BERTULANG K225

351,093,549.63

IV

PEKERJAAN RANGKA KUDA-KUDA DAN ATAP

#REF!

PEKERJAAN LANTAI DAN DINDING

124,760,047.17

VI

PEKERJAAN KUSEN, PINTU, JENDELA DAN VENTILASI

54,652,828.00

VII

PEKERJAAN PLAFOND

96,764,982.86

VIII

PEKERJAAN INSTALASI LISTRIK

12,750,000.00

IX

PEKERJAAN PENGECATAN

PEKERJAAN PENGGANTUNG DAN PENGUNCI

XI

PEKERJAAN SANITAIR

XII

PEKERJAAN SALURAN

4,060,343.85

XIII

PEKERJAAN LAIN-LAIN

90,985,955.88

#REF!
17,753,166.67

JUMLAH

#REF!

PEMBULATAN

#REF!

Pemasangan Lantai Keramik ukuran 30 x 30 cm ( m


No.
1
A
1
2
3
4
B
1
2
3
4
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Batu/Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Keramik uk. 30 x 30 cm
Semen Portland
Pasir Beton/Pasang
Semen Warna
Jumlah
Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PPLD.01"
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.350
0.620
0.035
0.030

Ktk
Kg

50,000.00
63,333.33
-

1.000
11.380
0.042
0.100

50,000.00
2,660.00
52,660.00
52,660.00
52,660.00

M3
Kg

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Lantai & Dinding - 6. 44

Pemasangan Lantai Keramik ukuran 20 x 20 cm Polos ( m


No.
1
A
1
2
3
4
B
1
2
3
4
C
D

URAIAN PEKERJAAN
2
TENAGA
Tukang Batu/Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Keramik uk. 20 x 20 cm Polos
Semen Portland
Pasir Beton/Pasang
Semen Warna
Jumlah
Jumlah A + B
Harga Satuan

)
SATUAN
3

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PPLD.01'
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.350
0.620
0.035
0.030

Ktk
Kg

50,000.00
63,333.33
-

1.000
11.380
0.042
0.100

50,000.00
2,660.00
52,660.00
52,660.00
52,660.00

M
Kg

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Lantai & Dinding - 6. 44

DIREKTORAT JENDERAL BEA DAN CUKAI


KANTOR WILAYAH KALIMANTAN BARAT
KANTOR PENGAWASAN DAN PELAYANAN
TIPE A4 ENTIKONG

ANALISA BIAYA PERALATAN

PROPINSI :

KODE

KABUPATEN

KODE

KALIMANTAN BARAT

61

SANGGAU

03

Jenis Alat

Tenaga

Harga

Umur Kerja

KODE

E.080

DISIAPKAN TANGGAL :

ROLLER, 3 WHEELED
51
Rp.

550,000,000
10

HP
Juta
Tahun

15000 Jam

( 1 Tahun : 300 Hari Kerja )


1 Tahun =

Atau :

Faktor (CRF) :

0.18062

( Pada 12,5% )
1500.00 Jam

A. BIAYA PEMILIKAN (OWNERSHIP COST) : (Rp./jam)


1. Depresiasi :

90%

Harga Alat

(CRF)

1
Jam/Tahun

0.90

550,000,000.00

0.18062

= Rp.

59,604.60

= Rp.

12,100.00

= Rp.

71,704.60

1,500.00
2. Lain-lain

Asuransi 3%/Th. + PPn 10%

3.30%

Harga
Jam/thn

0.033

550,000,000.00
1,500.00

Sub Total
B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam)
Kebutuhan Bahan Bakar dan pelumas tiap HP :

Harga :

Diesel

0.160 Liter/HP/Jam

Bensin

0.170 Liter/HP/Jam

Pelumas

0.006 Liter/HP/Jam

Solar

Bensin
Pelumas

6,875.00

/ Liter

7,500.00

/ Liter

33,750.00

/ Liter

Bahan Bakar

0.160 x

51

Rp.

6,875.00

= Rp.

56,100.00

Pelumas

0.006 x

51

Rp.

33,750.00

= Rp.

10,327.50

Perbaikan dan Spareparts

0.600 x

59,604.60

= Rp.

35,762.76

= Rp.

102,190.26

( 60% x depresiasi )
Sub Total

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT PER JAM


A + B

Rp.

71,704.60

Rp.

102,190.26

= Rp.

173,894.86

DIREKTORAT JENDERAL BEA DAN CUKAI


KANTOR WILAYAH KALIMANTAN BARAT
KANTOR PENGAWASAN DAN PELAYANAN
TIPE A4 ENTIKONG

ANALISA BIAYA PERALATAN

PROPINSI :

KODE

KABUPATEN

KODE

KALIMANTAN BARAT

61

SANGGAU

03

Jenis Alat

Tenaga

Harga

Umur Kerja

KODE

E.084

DISIAPKAN TANGGAL :

ROLLER, PNEUMATIC
95
Rp.

1,040,000,000
10

HP
Juta
Tahun

15000 Jam

( 1 Tahun : 300 Hari Kerja )


1 Tahun =

Atau :

Faktor (CRF) :

0.18062

( Pada 12,5% )
1500.00 Jam

A. BIAYA PEMILIKAN (OWNERSHIP COST) : (Rp./jam)


1. Depresiasi :

90%

Harga Alat

(CRF)

1
Jam/Tahun

0.90

1,040,000,000.00

0.18062

= Rp.

112,706.88

= Rp.

22,880.00

= Rp.

135,586.88

1,500.00
2. Lain-lain

Asuransi 3%/Th. + PPn 10%

3.30%

Harga
Jam/thn

0.033

1,040,000,000.00
1,500.00

Sub Total
B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam)
Kebutuhan Bahan Bakar dan pelumas tiap HP :

Harga :

Diesel

0.160 Liter/HP/Jam

Bensin

0.170 Liter/HP/Jam

Pelumas

0.006 Liter/HP/Jam

Solar

Bensin
Pelumas

6,875.00

/ Liter

7,500.00

/ Liter

33,750.00

/ Liter

Bahan Bakar

0.160 x

95

Rp.

6,875.00

= Rp.

104,500.00

Pelumas

0.006 x

95

Rp.

33,750.00

= Rp.

19,237.50

Perbaikan dan Spareparts

0.600 x

112,706.88

= Rp.

67,624.13

= Rp.

191,361.63

( 60% x depresiasi )
Sub Total

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT PER JAM


A + B

Rp.

135,586.88

Rp.

191,361.63

= Rp.

326,948.51

DIREKTORAT JENDERAL BEA DAN CUKAI


KANTOR WILAYAH KALIMANTAN BARAT
KANTOR PENGAWASAN DAN PELAYANAN
TIPE A4 ENTIKONG

ANALISA BIAYA PERALATAN

PROPINSI :

KODE

KABUPATEN

KODE

KALIMANTAN BARAT

61

SANGGAU

03

Jenis Alat

Tenaga

Harga

Umur Kerja

KODE

E.153

DISIAPKAN TANGGAL :

SPRAYER SELF PROP


7
Rp.

65,953,578
6

HP
Juta
Tahun

4500 Jam

( 1 Tahun : 300 Hari Kerja )


1 Tahun =

Faktor (CRF) :

0.24668

( Pada 12,5% )

Atau :

750 Jam

A. BIAYA PEMILIKAN (OWNERSHIP COST) : (Rp./jam)


1. Depresiasi :

90%

Harga Alat

(CRF)

1
Jam/Tahun

0.90

65,953,578.00

0.24668

= Rp.

19,523.31

= Rp.

2,901.96

= Rp.

22,425.27

7,700.00

750.00
2. Lain-lain

Asuransi 3%/Th. + PPn 10%

3.30%

Harga
Jam/thn

0.033

65,953,578.00
750.00

Sub Total
B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam)
Kebutuhan Bahan Bakar dan pelumas tiap HP :

Harga :

Diesel

0.160 Liter/HP/Jam

Bensin

0.170 Liter/HP/Jam

Pelumas

0.006 Liter/HP/Jam

Solar

Bensin
Pelumas

6,875.00

/ Liter

7,500.00

/ Liter

33,750.00

/ Liter

Bahan Bakar

0.160 x

Rp.

6,875.00

= Rp.

Pelumas

0.006 x

Rp.

33,750.00

= Rp.

1,417.50

Perbaikan dan Spareparts

0.600 x

19,523.31

= Rp.

11,713.99

= Rp.

20,831.49

( 60% x depresiasi )
Sub Total
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT PER JAM

A + B

Rp.

22,425.27

Rp.

20,831.49

= Rp.

43,256.76

DIREKTORAT JENDERAL BEA DAN CUKAI


KANTOR WILAYAH KALIMANTAN BARAT
KANTOR PENGAWASAN DAN PELAYANAN
TIPE A4 ENTIKONG

ANALISA BIAYA PERALATAN

PROPINSI :

KODE

KABUPATEN

KODE

KALIMANTAN BARAT

61

SANGGAU

03

Jenis Alat

Tenaga

Harga

Umur Kerja

KODE

E.154

DISIAPKAN TANGGAL :

ASPHALT SPRAYER TOWED


6
Rp.

176,928,000
6

HP
Juta
Tahun

4500 Jam

( 1 Tahun : 300 Hari Kerja )


1 Tahun =

Faktor (CRF) :

0.24668

( Pada 12,5% )

Atau :

750 Jam

A. BIAYA PEMILIKAN (OWNERSHIP COST) : (Rp./jam)


1. Depresiasi :

90%

Harga Alat

(CRF)

1
Jam/Tahun

0.90

176,928,000.00

0.24668

= Rp.

52,373.52

= Rp.

7,784.83

= Rp.

60,158.35

6,600.00

750.00
2. Lain-lain

Asuransi 3%/Th. + PPn 10%

3.30%

Harga
Jam/thn

0.033

176,928,000.00
750.00

Sub Total
B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam)
Kebutuhan Bahan Bakar dan pelumas tiap HP :

Harga :

Diesel

0.160 Liter/HP/Jam

Bensin

0.170 Liter/HP/Jam

Pelumas

0.006 Liter/HP/Jam

Solar

Bensin
Pelumas

6,875.00

/ Liter

7,500.00

/ Liter

33,750.00

/ Liter

Bahan Bakar

0.160 x

Rp.

6,875.00

= Rp.

Pelumas

0.006 x

Rp.

33,750.00

= Rp.

1,215.00

Perbaikan dan Spareparts

0.600 x

52,373.52

= Rp.

31,424.11

= Rp.

39,239.11

( 60% x depresiasi )
Sub Total
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT PER JAM

A + B

Rp.

60,158.35

Rp.

39,239.11

= Rp.

99,397.46

DIREKTORAT JENDERAL BEA DAN CUKAI


KANTOR WILAYAH KALIMANTAN BARAT
KANTOR PENGAWASAN DAN PELAYANAN
TIPE A4 ENTIKONG

ANALISA BIAYA PERALATAN

PROPINSI :

KODE

KABUPATEN

KODE

KALIMANTAN BARAT

61

SANGGAU

03

Jenis Alat

Tenaga

Harga

Umur Kerja

KODE

E.212

DISIAPKAN TANGGAL :

DUMP TRUCK 5 TON


145
Rp.

523,260,000
6

HP
Juta
Tahun

9000 Jam

( 1 Tahun : 300 Hari Kerja )


1 Tahun =

Atau :

Faktor (CRF) :

0.24668

( Pada 12,5% )
1500.00 Jam

A. BIAYA PEMILIKAN (OWNERSHIP COST) : (Rp./jam)


1. Depresiasi :

90%

Harga Alat

(CRF)

1
Jam/Tahun

0.90

523,260,000.00

0.24668

= Rp.

77,446.67

= Rp.

11,511.72

= Rp.

88,958.39

1,500.00
2. Lain-lain

Asuransi 3%/Th. + PPn 10%

3.30%

Harga
Jam/thn

0.033

523,260,000.00
1,500.00

Sub Total
B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam)
Kebutuhan Bahan Bakar dan pelumas tiap HP :

Harga :

Diesel

0.160 Liter/HP/Jam

Bensin

0.170 Liter/HP/Jam

Pelumas

0.006 Liter/HP/Jam

Solar

Bensin
Pelumas

6,875.00

/ Liter

7,500.00

/ Liter

33,750.00

/ Liter

Bahan Bakar

0.160 x

145

Rp.

6,875.00

= Rp.

159,500.00

Pelumas

0.006 x

145

Rp.

33,750.00

= Rp.

29,362.50

Perbaikan dan Spareparts

0.600 x

77,446.67

= Rp.

46,468.00

= Rp.

235,330.50

( 60% x depresiasi )
Sub Total

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT PER JAM


A + B

Rp.

88,958.39

Rp.

235,330.50

= Rp.

324,288.89

DIREKTORAT JENDERAL BEA DAN CUKAI

KODE

KANTOR WILAYAH KALIMANTAN BARAT


KANTOR PENGAWASAN DAN PELAYANAN
TIPE A4 ENTIKONG
PROPINSI :
KALIMANTAN BARAT

:
:

Jenis Alat
Tenaga
Harga
Umur Kerja

KODE
61
:
:
:
:

ANALISA BIAYA PERALATAN


KABUPATEN
SANGGAU

:
:

KODE
03

E.221

DISIAPKAN TANGGAL :

FLATBED TRUCK 4 TON


Rp.

80
289,560,000
6

HP
Juta
Tahun
( 1 Tahun : 300 Hari Kerja )
1 Tahun =
Atau :

9000 Jam

Faktor (CRF) :
( Pada 12,5% )

0.24668

1500.00 Jam

A. BIAYA PEMILIKAN (OWNERSHIP COST) : (Rp./jam)


1. Depresiasi :

2. Lain-lain

90%

Harga Alat

0.90

289,560,000.00
1,500.00

3.30%

0.033

(CRF)

1
Jam/Tahun

0.24668

= Rp.

42,857.20

= Rp.

6,370.32

= Rp.

49,227.52

= Rp.
= Rp.
= Rp.

88,000.00
16,200.00
25,714.32

= Rp.

129,914.32

= Rp.

179,141.83

Asuransi 3%/Th. + PPn 10%

Harga
Jam/thn
289,560,000.00
1,500.00

Sub Total
B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam)
Kebutuhan Bahan Bakar dan pelumas tiap HP :
Diesel
=
0.160 Liter/HP/Jam
Bensin
=
0.170 Liter/HP/Jam
Pelumas
=
0.006 Liter/HP/Jam
Harga :

Solar
Bensin
Pelumas

=
=
=

Bahan Bakar
Pelumas
Perbaikan dan Spareparts
( 60% x depresiasi )

6,875.00
7,500.00
33,750.00

=
=
=

/ Liter
/ Liter
/ Liter

0.160 x
0.006 x
0.600 x

80
80
42,857.20

x
x

Rp.
Rp.

Sub Total

6,875.00
33,750.00

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT PER JAM


A + B

Rp.

49,227.52

Rp.

129,914.32

DIREKTORAT JENDERAL BEA DAN CUKAI

KODE

KANTOR WILAYAH KALIMANTAN BARAT


KANTOR PENGAWASAN DAN PELAYANAN
TIPE A4 ENTIKONG
PROPINSI :
KALIMANTAN BARAT

:
:

Jenis Alat
Tenaga
Harga
Umur Kerja

KODE
61
:
:
:
:

ANALISA BIAYA PERALATAN


KABUPATEN
SANGGAU

:
:

KODE
03

E.253

DISIAPKAN TANGGAL :

FLATBED TRUCK 4 TON


Rp.

20
146,479,310
5

HP
Juta
Tahun
( 1 Tahun : 300 Hari Kerja )
1 Tahun =
Atau :

7500 Jam

Faktor (CRF) :
( Pada 12,5% )

0.28085

1500.00 Jam

A. BIAYA PEMILIKAN (OWNERSHIP COST) : (Rp./jam)


1. Depresiasi :

2. Lain-lain

90%

Harga Alat

0.90

146,479,310.00
1,500.00

3.30%

0.033

(CRF)

1
Jam/Tahun

0.28085

= Rp.

24,683.23

= Rp.

3,222.54

= Rp.

27,905.77

= Rp.
= Rp.
= Rp.

22,000.00
4,050.00
14,809.94

= Rp.

40,859.94

= Rp.

68,765.71

Asuransi 3%/Th. + PPn 10%

Harga
Jam/thn
146,479,310.00
1,500.00

Sub Total
B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam)
Kebutuhan Bahan Bakar dan pelumas tiap HP :
Diesel
=
0.160 Liter/HP/Jam
Bensin
=
0.170 Liter/HP/Jam
Pelumas
=
0.006 Liter/HP/Jam
Harga :

Solar
Bensin
Pelumas

=
=
=

Bahan Bakar
Pelumas
Perbaikan dan Spareparts
( 60% x depresiasi )

6,875.00
7,500.00
33,750.00

=
=
=

/ Liter
/ Liter
/ Liter

0.160 x
0.006 x
0.600 x

20
20
24,683.23

x
x

Rp.
Rp.

Sub Total

6,875.00
33,750.00

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT PER JAM


A + B

Rp.

27,905.77

Rp.

40,859.94

DIREKTORAT JENDERAL BEA DAN CUKAI

KODE

KANTOR WILAYAH KALIMANTAN BARAT


KANTOR PENGAWASAN DAN PELAYANAN
TIPE A4 ENTIKONG
PROPINSI :
KALIMANTAN BARAT

:
:

Jenis Alat
Tenaga
Harga
Umur Kerja

KODE
61
:
:
:
:

ANALISA BIAYA PERALATAN


KABUPATEN
SANGGAU

:
:

KODE
03

E.341

DISIAPKAN TANGGAL :

PUMP. WATER (5CM)


Rp.

8
20,230,440
4

HP
Juta
Tahun
( 1 Tahun : 300 Hari Kerja )
1 Tahun =
Atau :

3000 Jam

Faktor (CRF) :
( Pada 12,5% )

0.33271

750.00 Jam

A. BIAYA PEMILIKAN (OWNERSHIP COST) : (Rp./jam)


1. Depresiasi :

2. Lain-lain

90%

Harga Alat

0.90

20,230,440.00
750.00

3.30%

Harga
Jam/thn

0.033

20,230,440.00
750.00

(CRF)

1
Jam/Tahun

0.33271

= Rp.

8,077.04

= Rp.

890.14

= Rp.

8,967.18

= Rp.
= Rp.
= Rp.

8,800.00
1,620.00
4,846.23

= Rp.

15,266.23

= Rp.

24,233.41

Asuransi 3%/Th. + PPn 10%

Sub Total
B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam)
Kebutuhan Bahan Bakar dan pelumas tiap HP :
Diesel
=
0.160 Liter/HP/Jam
Bensin
=
0.170 Liter/HP/Jam
Pelumas
=
0.006 Liter/HP/Jam
Harga :

Solar
Bensin
Pelumas

=
=
=

Bahan Bakar
Pelumas
Perbaikan dan Spareparts
( 60% x depresiasi )

6,875.00
7,500.00
33,750.00

=
=
=

/ Liter
/ Liter
/ Liter

0.160 x
0.006 x
0.600 x

8
8
8,077.04

x
x

Rp.
Rp.

Sub Total

6,875.00
33,750.00

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT PER JAM


A + B

Rp.

8,967.18

Rp.

15,266.23

Rekapitulasi Harga Sewa Peralatan Per jam


Propinsi

: Kalimantan Barat

( 61 )

Kabupaten

: Sanggau

( 03 )

No

Jenis / Kapasitas Alat

Kode

Harga Pokok

Jarak Angkut
ke Lokasi
( KM )

Ongkos
Angkut
( Rp. )

Total
Harga
(Rp.)

Biaya Operasi
Per Jam
(Rp.)

7=4+6

E.080
E.084
E.153
E.154
E.212
E.221
E.253
E.341

550,000,000.00
1,040,000,000.00
65,953,578.00
176,928,000.00
523,260,000.00
289,560,000.00
146,479,310.00
20,230,440.00

120
120
120
120
120
120
120
120

1
2
3
4
5
6
7
8

Roller, 3 Wheeled
Roller, Pneumatic
Spayer, Self Prop
Aspalt Sprayer Towed
Dump Truck 5 Ton
Flatbed Truck 4 Ton
Conc. Mixer 0.50 M3
Pump, Water (5 Cm)

TABEL B.2 FAKTOR BIAYA


PENGEMBALIAN MODAL (CRF)

51
95
7
6
145
80
20
8

HP
HP
HP
HP
HP
HP
HP
HP

550,000,000.00
1,040,000,000.00
65,953,578.00
176,928,000.00
523,260,000.00
289,560,000.00
146,479,310.00
20,230,440.00

NILAI N
FAKTOR BIAYA PENGEMBALIAN MODAL
UMUR
10%
12.5%
PEMAKAIAN
Umur 12 Tahun
0.14676
0.16519
Umur 11 Tahun
0.15396
0.17211
Umur 10 Tahun
0.16275
0.18062
Umur 9 Tahun
0.17364
0.19126
Umur 8 Tahun
0.18744
0.20483
Umur 7 Tahun
0.20541
0.22260
Umur 6 Tahun
0.22961
0.24668
Umur 5 Tahun
0.26300
0.28085
Umur 4 Tahun
0.31547
0.33271
Umur 3 Tahun
0.40211
0.41993
Umur 2 Tahun
0.57619
0.59559
Umur 1 Tahun
1.10000
0.12500

15%
0.18448
0.19107
0.19925
0.20957
0.22285
0.24036
0.26424
0.29832
0.35027
0.43798
0.61512
0.15000
#REF!
#REF!
#REF!

#REF!
#REF!

173,894.86
326,948.51
43,256.76
99,397.46
324,288.89
179,141.83
68,765.71
24,233.41

DIREKTORAT JENDERAL BEA DAN CUKAI

ANALISA HARGA SATUAN

KODE

MEMPRODUKSI CAMPURAN LATASIR


(MENGGUNAKAN BURUH)

K.020.A

KANTOR WILAYAH KALIMANTAN BARAT KANTOR


PENGAWASAN DAN PELAYANAN
TIPE A4
ENTIKONG
PROPINSI :

KODE

KABUPATEN

KODE

KALIMANTAN BARAT

( 61 )

SANGGAU

03

PROSES

DISIAPKAN OLEH :

TANGGAL :

ANGGAPAN :

1.

Semua material dikirim oleh leveransir

1. Latasir dihasilkan secara manual produksi 100 t/hari

2.

Mempergunakan tenaga orang produksi campuran 100t/ hari

2. Aspal bitumen dipanaskan agar tersedia pada waktunya

3.

Hasil produksi diangkut dengan Dump Truck ke lokasi

3. Hasil produksi termasuk pengangkutan s/d 10 km dari tempat penggorengan

penghamparan

4. Hasil produksi dimuat dalam dump truk 5 ton dan dikirim ke tempat pekerjaan
5. Rata-rata umur alat bantu 1 sebulan/orang/set

6. Sesuai spesifikasi BM Nomor : 12/PT/B/1983

PEKERJA

VOL

HARI

KODE

TOTAL VOL

UPAH

BIAYA

SUB TOTAL

(org/hari)

(Rp./org/hari)

(Rp.)

(Rp.)

E
K

Mandor Lapangan

5.00

1.00

L 061

5.00

#REF!

#REF!

Supir Material/truck

4.00

1.00

L 091

4.00

#REF!

#REF!

Buruh Lapangan Tak Terlatih

83.00

1.00

L 101

83.00

#REF!

#REF!

Buruh Lapangan Agak Terlatih

6.00

1.00

L 103

6.00

#REF!

#REF!

Operator Semi terlatih

6.00

1.00

L 082

6.00

#REF!

#REF!

PEKERJA
MATERIAL

JUMLAH

SATUAN

KODE

#REF!

TOTAL

HARGA

BIAYA

SUB TOTAL

VOL

(Rp./Unit)

(Rp.)

(Rp.)

A
T

Pasir ayak untuk beton

M3

M 041

45.00

Aspal bitumen

Kg

M 061

9000.00

63,333.33

Semen

50 Kg

M 080

70.40

Kayu bakar

M3

M 070

90.00

#REF!

#REF!

Alat bantu

Set

M 170

3.00

#REF!

#REF!

Stonedust

M3

7.50

#REF!

#REF!

2,849,999.85
#REF!

#REF!
MATERIAL

PEKERJA

JUMLAH

HARI
KERJA

KODE

#REF!

JAM

HARGA

BIAYA

SUB TOTAL

KERJA

(Rp./Jam)

(Rp.)

(Rp.)

E
R

Dumptruk 5 ton/145 HP

4.00

1.00

E 212

24.00

324,288.89

7,782,933.26

Alat pengaduk beton 0,5 M3/20 HP

3.00

1.00

E 253

15.00

68,765.71

1,031,485.66

L
A
T
A
N

VOLUME :

100.00

SATUAN :

Ton

HARGA SATUAN

Rp.

PERALATAN

8,814,418.91

TOTAL (Rp.)

#REF!

#REF!

per

Ton

DIREKTORAT JENDERAL BEA DAN CUKAI

ANALISA HARGA SATUAN

KANTOR WILAYAH KALIMANTAN BARAT KANTOR


PENGAWASAN DAN PELAYANAN
TIPE A4
ENTIKONG

KONSTRUKSI LAPIS PONDASI BAWAH (LPB) TELPORD

K.516

(MENGGUNAKAN BURUH)

PROPINSI :

KODE

KABUPATEN

KODE

KALIMANTAN BARAT

( 61 )

SANGGAU

03

URAIAN :

KODE

DISIAPKAN OLEH :

TANGGAL :

ANGGAPAN :

1. Material disiapkan dilokasi pekerjaan

1. Menggunakan tenaga manusia 400 m2 per hari

2. Menghampar pasir setebal 5 cm

2. Material-material dikirim ke tempat pekerjaan oleh leveransir

Batu pecah berukuran besar (10-15 cm)

3. Batu sudah dipecah

disusun berdiri

4. Tanah dasar sudah disiapkan

3. Batu pecah yang lebih kecil mengisi rongga

5. Dipadatkan sampai setebal 20 cm

diatasnya sehingga rata kemudian


dipadatkan/digilas dengan mesin gilas

PEKERJA

VOL

HARI

KODE

TOTAL VOL
(org.hari)

UPAH

BIAYA

SUB TOTAL

(Rp./org/hari)

(Rp.)

(Rp.)

E
K

Mandor Lapangan

3.00

1.00

L 061

3.00

#REF!

#REF!

Operator Telatih

1.00

1.00

L 081

1.00

#REF!

#REF!

Buruh Lapangan Tak Terlatih

99.00

1.00

L 101

99.00

#REF!

#REF!

J
A
PEKERJA
MATERIAL

JUMLAH

SATUAN

KODE

#REF!

TOTAL

HARGA

BIAYA

SUB TOTAL

VOL

(Rp./Unit)

(Rp.)

(Rp.)

A
T

Batu Belah 10/15

M3

M 020

50.00

200,000.00

10,000,000.00

Batu Pecah 5-7 cm

M3

M 022

20.00

266,666.67

5,333,333.40

Pasir Urug / Timbun

M3

M 040

30.00

51,562.00

1,546,860.00

Alat Bantu

Set

M 170

4.00

#REF!

JAM

HARGA

BIAYA

SUB TOTAL

KERJA

(Rp./Jam)

(Rp.)

(Rp.)

#REF!

A
L
MATERIAL
PEKERJA

JUMLAH

HARI
KERJA

KODE

#REF!

E
R

Mesin Gilas 3 Roda

51 HP

1.00

1.00

E 080

5.00

173,894.86

869,474.30

A
L
A
T
A
N
PERALATAN

869,474.30
#REF!

TOTAL (Rp.)

VOLUME :

80.00

SATUAN :

M3

HARGA SATUAN

Rp.

#REF!

per

M3

DIREKTORAT JENDERAL BEA DAN CUKAI


KANTOR WILAYAH KALIMANTAN BARAT KANTOR
PENGAWASAN DAN PELAYANAN
TIPE A4
ENTIKONG

ANALISA HARGA SATUAN

KODE

LAPIS PENETRASI MACADAM 5 CM (LAPEN)


(MENGGUNAKAN BURUH)

K.618

PROPINSI :

KODE

KABUPATEN

KODE

KALIMANTAN BARAT

( 61 )

SANGGAU

03

URAIAN :

DISIAPKAN OLEH :

TANGGAL :

ANGGAPAN :

1. Semprotkan Aspal Bitumen Tack coat 0,8 l/m3

1. Menggunakan tenaga buruh

2. Hamparkan agregat pokok 3-5,25 m2/m3 dan padatkan

2. Harga material (agregat pokok, agregat pengunci, agregat penutup, aspal bitumen)

3. Hamparkan split 2-3; 45 m2/m3 dan padatkan

adalah harga dilokasi proyek

4. Semprotkan Aspal Bitumen (2,5 kg/m2)

3.Volume aspal bitumen cair untuk tack coat/prime coat 0,8 lt/m2

5. Hamparkan Agregat pengunci split 1 2; 90 m2/m3 dan padatkan

4. Tebal lapisan penetrasi kurang lebih 5 cm

6. Semprotkan Aspal Bitumen 1,5 kg/m & gilas

5. Agregat dikirim sampai tempat pekerjaan oleh leveransir

7. Taburkan pasir rata-rata 400 m2/m3

PEKERJA

VOL

HARI

KODE

TOTAL VOL

UPAH

BIAYA

SUB TOTAL

(org.hari)

(Rp./org/hari)

(Rp.)

(Rp.)

E
K

Mandor Lapangan

2.00

3.00

L 061

6.00

#REF!

#REF!

Operator Terlatih

2.00

3.00

L 081

6.00

#REF!

#REF!

Sopir

1.00

3.00

L 091

1.00

#REF!

#REF!

Buruh Lapangan Tak Terlatih

66.00

3.00

L 101

198.00

#REF!

#REF!

Buruh Lapangan Terlatih

2.00

3.00

L 106

6.00

#REF!

#REF!

PEKERJA
MATERIAL

JUMLAH

SATUAN

KODE

#REF!

TOTAL

HARGA

BIAYA

SUB TOTAL

VOL

(Rp./Unit)

(Rp.)

(Rp.)

A
T

Batu pecah 3-5 cm

M3

M 023

56.00

291,666.67

16,333,333.52

Batu pecah 2-3 cm

M3

M 024

31.00

350,000.00

10,850,000.00

Batu pecah 1-2 cm

M3

M 025

15.50

400,000.00

6,200,000.00

Pasir ayak untuk beton

M3

M 041

3.50

63,333.33

221,666.66

Aspal bitumen

Kg

M 061

6270.00

#REF!

#REF!

Minyak tanah

Lt

M 065

450.00

Set

M 170

8.10

#REF!

JAM

HARGA

BIAYA

SUB TOTAL

KERJA

(Rp./Jam)

(Rp.)

(Rp.)

Alat Bantu

#REF!
MATERIAL

PEKERJA

JUMLAH

HARI
KERJA

KODE

#REF!

E
R

Mesin Gilas 3 Roda 51 HP

1.00

1.00

E 080

15.00

173,894.86

Sprayer 7 HP

1.00

1.00

E 153

15.00

43,256.76

648,851.41

Dump Truck (4 T/80 HP)

1.00

1.00

E 221

15.00

179,141.83

2,687,127.52

2,608,422.90

A
T
A
N

VOLUME :

1400.00

SATUAN :

M2

HARGA SATUAN

Rp.

PERALATAN

5,944,401.82

TOTAL (Rp.)

#REF!

#REF!

per

M2

DIREKTORAT JENDERAL BEA DAN CUKAI

ANALISA HARGA SATUAN

KODE

LAPIS TIPIS ASPAL PASIR 20 MM (LATASIR)


(MENGGUNAKAN BURUH)

K.638

KANTOR WILAYAH KALIMANTAN BARAT KANTOR


PENGAWASAN DAN PELAYANAN
TIPE A4
ENTIKONG
PROPINSI :

KODE

KABUPATEN

KODE

KALIMANTAN BARAT

( 61 )

SANGGAU

03

URAIAN :

DISIAPKAN OLEH :

TANGGAL :

ANGGAPAN :

1.

Memberikan permukaan aspal bitumen lama

1. Menggunakan tenaga manusia (1600 m2/hari)

2.

Melapisi dengan Tack Coat

2. Campuran dikirim ke tempat pekerjaan oleh leveransir

3.

Hamparkan pasir aspal bitumen dengan tenaga manusia

3. BJ padat 1,9 t/m3

4.

Digilas sampai padat

4. Tack Coat 0,6 l/m2


5. Menurut spec BM No. 02/PT/B/1983

PEKERJA

VOL

HARI

KODE

TOTAL VOL

UPAH

BIAYA

SUB TOTAL

(org.hari)

(Rp./org/hari)

(Rp.)

(Rp.)

E
K

Mandor Lapangan

1.00

1.00

L 061

1.00

#REF!

#REF!

Operator Terlatih

3.00

1.00

L 081

3.00

#REF!

#REF!

Buruh Lapangan Tak Terlatih

10.00

1.00

L 101

10.00

#REF!

#REF!

Buruh Lapangan Agak Terlatih

8.00

1.00

L 103

8.00

#REF!

#REF!

Sopir

1.00

1.00

L 091

1.00

#REF!

#REF!

PEKERJA
MATERIAL

JUMLAH

SATUAN

KODE

#REF!

TOTAL

HARGA

BIAYA

SUB TOTAL

VOL

(Rp./Unit)

(Rp.)

(Rp.)

#REF!

#REF!

A
T

Aspal Bitumen

Kg

M 061

480.00

Minyak Tanah

Ltr

M 065

480.00

Alat Bantu

Set

M 170

4.00

#REF!

#REF!

Campuran LATASIR

Tonne

K 020 A

60.00

#REF!

#REF!

Kayu Bakar

M3

M 070

4.48

#REF!

#REF!

JAM

HARGA

BIAYA

SUB TOTAL

KERJA

(Rp./Jam)

(Rp.)

(Rp.)

L
MATERIAL
PEKERJA

JUMLAH

HARI
KERJA

KODE

#REF!

E
R
A

Mesin Gilas Roda Karet 8 - 15 T

1.00

1.00

E 084

5.00

326,948.51

1,634,742.54

Sprayer Aspal 200 T

1.00

1.00

E 154

5.00

99,397.46

496,987.31

A
T
A
N

VOLUME :

1600.00

SATUAN :

M2

HARGA SATUAN

Rp.

PERALATAN

2,131,729.85

TOTAL (Rp.)

#REF!

#REF!

per

M2

DIREKTORAT JENDERAL BEA DAN CUKAI


KANTOR WILAYAH KALIMANTAN BARAT KANTOR
PENGAWASAN DAN PELAYANAN
TIPE A4
ENTIKONG

ANALISA HARGA SATUAN

KODE

PENGHAMPARAN DAN PEMADATAN LATASTON


(MENGGUNAKAN ALAT)

K.810

PROPINSI :

KODE

KABUPATEN

KODE

KALIMANTAN BARAT

( 61 )

SANGGAU

03

URAIAN :

DISIAPKAN OLEH :

TANGGAL :

ANGGAPAN :

1.

Material ditimbun dilokasi pekerjaan oleh pemasok

1. Dilakukan untuk pekerjaan gorong-gorong, jembatan, dinding penahan tanah dan struktur lainnya

2.

Pekerja membawa batu pecah ke tempat tukang kepala pekerja

3.

Tukang kepala memasang batu pecah dengan adukan pasir semen

yang menggunakan konstruksi pasangan batu


2. Material-material dikirim ke tempat pekerjaan oleh pemasok
3. Tidak termasuk galian/timbunan
4. Biaya alat bantu tambahan sudah termasuk biaya kira-kira ekivalen dari bambu untuk lubang drainase

PEKERJA

VOL

HARI

KODE

TOTAL VOL

UPAH

BIAYA

SUB TOTAL

(org.hari)

(Rp./org/hari)

(Rp.)

(Rp.)

E
K

Mandor Lapangan

1.00

1.00

L 061

1.00

#REF!

#REF!

Tukang

4.00

1.00

L. 079

4.00

#REF!

#REF!

Buruh Lapangan Tak Terlatih

12.00

1.00

L 101

12.00

#REF!

#REF!

J
A

PEKERJA
MATERIAL

JUMLAH

SATUAN

KODE

#REF!

TOTAL

HARGA

BIAYA

SUB TOTAL

VOL

(Rp./Unit)

(Rp.)

(Rp.)

#REF!

A
T

Batu Gunung atau Quary

M3

M 010

5.00

#REF!

Pasir ayak untuk beton

M3

M 041

1.25

63,333.33

Semen

50 Kg

M 080

15.20

Alat Bantu

Tonne

M 170

0.75

#REF!

JAM

HARGA

BIAYA

SUB TOTAL

KERJA

(Rp./Jam)

(Rp.)

(Rp.)

79,166.66

#REF!

A
L
MATERIAL
PEKERJA

JUMLAH

HARI
KERJA

KODE

#REF!

E
R
A

Pompa Air (dia. 50 mm) 30 m3/jam

1.00

1.00

E 341

2.00

24,233.41

48,466.82

L
A
T
A
N
PERALATAN

48,466.82
#REF!

TOTAL (Rp.)

VOLUME :

5.00

SATUAN :

M3

HARGA SATUAN

Rp.

#REF!

per

M3

Rekapitulasi Daftar Harga Analisa Biaya

No
1
2

Jenis Pekerjaan
MEMPRODUKSI CAMPURAN LATASIR
KONSTRUKSI LAPIS PONDASI BAWAH (LPB) KLAS TELFORD

( MENGGUNAKAN BURUH )
( MENGGUNAKAN BURUH )

LAPIS PENETRASI MAKADAM 5 CM (LAPEN)

( MENGGUNAKAN BURUH )

LAPIS TIPIS ASPAL PASIR 20 mm (LATASIR)

( MENGGUNAKAN BURUH )

KONSTRUKSI PASANGAN BATU

( MENGGUNAKAN BURUH )

Satuan

Kode

Harga Satuan
(Rp.)

TONNE

K. 020 A

#REF!

K. 516

#REF!

K. 618

#REF!

K. 638

#REF!

K. 810

#REF!

M
M
M
M

#REF!
#REF!
#REF!

#REF!
#REF!

RENCANA DAFTAR USULAN KEGIATAN

Satuan Kerja

: Dinas Kehewanan dan Peternakan Provinsi Kalimantan Barat

Nama Kegiatan :
Lokasi

: Pontianak

Tahun Anggaran : 2010

No

Uraian Pekerjaan

Volume
Nilai
Sat

Harga

Jumlah

Sub

Satuan

Harga

Total

( Rp )

( Rp )

( Rp )

I STANDAR
1 Pembangunan Rumah Type B
2 Pagar Keliling

120.00

m2

3,217,000.00

386,040,000.00

84.50

m'

1,297,000.00

109,596,500.00

84.50

m'

1,482,000.00

125,229,000.00

106.50

m'

1,010,000.00

107,565,000.00

II NON STANDAR
1 Pembangunan Jalan Lingkungan
Rabat Beton Campuran 1: 2 : 3
2 Pembuatan Turap Batu Pecah
Jumlah

728,430,500.00

Dibulatkan

728,430,000.00

Terbilang

: Tujuh ratus dua puluh delapan juta empat ratus tiga puluh ribu rupiah

Pontianak,
Mengetahui
Kepala Dinas Kehewanan Dan Peternakan
Propinsi Kalimantan Barat

Drh. H. ABDUL MANAF MUSTAFA


NIP. 080 067 459

Maret 2009

Dibuat oleh :
Konsultan Perencana
CV KARYA ENDAH LESTARI

H TEGUH BUDIRAHARDJO
DIREKTUR

DAFTAR ANALISA HARGA SATUAN PEKERJAAN


Satuan Kerja

: Dinas Kehewanan dan Peternakan Provinsi Kalimantan Barat

Nama Kegiatan :
Lokasi
: Pontianak
Tahun Anggaran : 2010
Pengukuran dan Pemasangan Bouwplank ( m' )
HARGA
NO.
1
A
1
2
3
4
B
1
2
3
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kayu Kelas II
Paku
Papan Kayu Kelas II
Jumlah
Jumlah A + B
Harga Satuan

KUANTITAS

SATUAN
( Rp. )
4

PSi.02
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.100
0.100
0.010
0.005

M3
Kg

3,625,000.00
18,000.00
3,525,000.00

0.012
0.020
0.007

43,500.00
360.00
24,675.00
68,535.00
68,535.00
68,535.00

M3

Acuan : SNI.2835.a - 6.4


2

Pembuatan Direksi Keet, Gudang Bahan Bangunan dan Alat, dan/atau Bedeng Pekerjaan (m )
HARGA
NO.
URAIAN PEKERJAAN
SATUAN
SATUAN
( Rp. )
1
2
3
4
A
TENAGA
1 Tukang Kayu
OH
2 Pekerja
OH
3 Kepala Tukang
OH
4 Mandor
OH
Jumlah
B
BAHAN
1 Kayu Cerucuk (Dolken) d=10, p=4 m
Btg
7,500.00
2 Kayu Kelas III
M3
3 Paku
Kg
18,000.00
4 Paku Payung
Kg
18,500.00
5 Seng Gelombang BJLS 0.20
Lbr
750,000.00
6 Papan Kayu Kelas III
1,200,000.00
M3
Jumlah
C
Jumlah A + B
D
Harga Satuan

KUANTITAS
5

PSi.04
BIAYA
SATUAN
( Rp. )
6

2.000
1.000
0.200
0.050

1.250
0.186
0.150
0.150
1.500
0.07776

9,375.00
2,700.00
2,775.00
1,125,000.00
93,312.00
1,233,162.00
1,233,162.00
1,233,162.00

Acuan : SNI.2835.a - 6.9

Plesteran t = 1,5 cm, camp.1 PC : 3 Ps ( m2 )


No.
1

A
1
2
3
4
B
1
2
C
D

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS

TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Semen Portland
Pasir Beton/Pasang
Jumlah
Jumlah A + B
Harga Satuan

PPs.05
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.150
0.200
0.015
0.010

Kg

63,333.33

6.480
0.019

1,203.33
1,203.33
1,203.33
1,203.33

M3

Acuan : SNI.2837.b - 6.3

Galian Tanah Biasa Sedalam 1 meter ( m 3 )


NO.
1
A
1
2
B

TENAGA
Pekerja
Mandor
Jumlah
BAHAN

C
D

Jumlah
Jumlah A + B
Harga Satuan

PT.01

URAIAN PEKERJAAN

SATUAN

3
OH
OH

Acuan : SNI.2835.b - 6.6

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5
-

0.400
0.040

BIAYA
SATUAN
( Rp. )
6
-

Urugan Kembali Tanah Galian ( m 3 )


NO.
1
A
1
2

TENAGA
Pekerja
Mandor

BAHAN

C
D

Jumlah
Jumlah A + B
Harga Satuan

PT.05

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )
4

OH
OH

KUANTITAS
5
-

BIAYA
SATUAN
( Rp. )
6

0.192
0.0192

Jumlah

Acuan : A.16

Urugan Pasir di Bawah Lantai Bangunan, Terhitung Penyiramannya ( m 3 )

PT.08
HARGA

NO.
1
A
1
2
B
1
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Pekerja
Mandor
Jumlah
BAHAN
Pasir Urug
Jumlah
Jumlah A + B
Harga Satuan

KUANTITAS

SATUAN
( Rp. )
4

BIAYA
SATUAN
( Rp. )
6

OH
OH

0.300
0.010

51,562.00

1.200

61,874.40
61,874.40
61,874.40
61,874.40

Acuan : SNI.2835.b - 6.11

Pasangan Batu Kali uk.10 - 15 cm, camp. 1 PC : 3 Ps ( m 3 )

PPBC.11
HARGA

BIAYA

No.

URAIAN PEKERJAAN

SATUAN

SATUAN
( Rp. )

KUANTITAS

SATUAN
( Rp. )
6

TENAGA

Tukang Batu

OH

0.600

Pekerja

OH

1.500

Kepala Tukang

OH

0.060

Mandor

OH

0.075

Jumlah

BAHAN

Semen Portland

Kg

202.000

Pasir Beton/Pasang

63,333.33

0.485

30,716.67

Batu Belah 10 -15 cm

M3

200,000.00

1.000

Jumlah
C
D

200,000.00
230,716.67

Jumlah A + B
Harga Satuan

230,716.67
230,716.67

Acuan : G.26 + G.32.i

Pekerjaan Pembesian dengan Besi Polos atau Besi Ulir ( kg )


No.
1
A
1
2
3
4
B
1
2
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Besi Beton (Polos/Ulir)
Kawat Ikat Beton
Jumlah
Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PBe.04
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.007
0.007
0.0007
0.0003

Kg
Kg

13,500.00
17,000.00

1.050
0.015

14,175.00
255.00
14,430.00
14,430.00
14,430.00

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.25

Pekerjaan Beton Bertulang, camp. 1 PC : 2 Ps : 3 Kr ( m3 )


No.
1
A
1
2
3
4
B
1
2
3
C
D

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Semen Portland
Pasir Beton/Pasang
Batu Belah 0,5 - 1
Jumlah
Jumlah A + B
Harga Satuan

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PBe.03
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.250
1.650
0.025
0.080

Kg

63,333.33
367,647.06

323.000
0.520
0.780

32,933.33
286,764.71
319,698.04
319,698.04
319,698.04

M3
M3

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.5

Galian Tanah Biasa Sedalam 1 meter ( m


NO.
1
A
1
2

PT.01

URAIAN PEKERJAAN

SATUAN

TENAGA
Pekerja
Mandor
Jumlah
BAHAN

C
D
E

Jumlah
Jumlah A + B
Harga Satuan
Galian sedalam > 1 meter

HARGA
SATUAN
( Rp. )
4

OH
OH

KUANTITAS
5
-

BIAYA
SATUAN
( Rp. )
6

0.400
0.040

1.315

Acuan : SNI.2835.b - 6.1

Urugan Kembali Tanah Galian ( m


NO.
1
A
1
2
B

TENAGA
Pekerja
Mandor
Jumlah
BAHAN

C
D

Jumlah
Jumlah A + B
Harga Satuan

PT.05

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )
4

OH
OH

KUANTITAS
5
-

BIAYA
SATUAN
( Rp. )
6

0.192
0.0192

Acuan : SNI.2835.b - 6.9

Urugan Pasir di Bawah Lantai Bangunan, Terhitung Penyiramannya ( m 3 )


NO.
1
A
1
2
B
1
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Pekerja
Mandor
Jumlah
BAHAN
Pasir Urug
Jumlah
Jumlah A + B
Harga Satuan
Acuan : SNI.2835.b - 6.11

PT.08
HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

OH
OH

0.300
0.010

M3

51,562.00

1.200

61,874.40
61,874.40
61,874.40
61,874.40

Pasangan Batako tebal 1/2 bata, camp. 1 PC : 3 Ps ( m


No.
1
A
1
2
3
4
B
1
2
3
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Bata Merah
Semen Portland
Pasir Beton/Pasang
Jumlah
Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PPBC.05
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.150
0.450
0.015
0.0225

Bh
Kg

2,000.00
63,333.33

22.000
15.750
0.0378

44,000.00
2,394.00
46,394.00
46,394.00
46,394.00

Acuan : G.33.i

Pasangan Batu Kali uk.10 - 15 cm, camp. 1 PC : 3 Ps ( m

PPBC.11
BIAYA

)
HARGA

No.

URAIAN PEKERJAAN

SATUAN

KUANTITAS

SATUAN
( Rp. )

SATUAN
( Rp. )

TENAGA

Tukang Batu

OH

0.600

Pekerja

OH

1.500

Kepala Tukang

OH

0.060

Mandor

OH

0.075

Jumlah
B

BAHAN

Semen Portland

Kg

202.000

63,333.33

0.485

30,716.67

200,000.00

1.000

200,000.00

Pasir Beton/Pasang

Batu Belah 10 -15 cm

M3

Jumlah A + B

230,716.67

Harga Satuan

230,716.67

Jumlah

Acuan : G.26 + G.32.i

230,716.67

No.

Dinding Plesteran Simpai t = 3 cm, Simpai Kawat, camp.1 PC : 3 Ps ( m2 )


HARGA
URAIAN PEKERJAAN
SATUAN
SATUAN
( Rp. )

A
1
2
3
4
B
1
2
3
4
5
C
D

TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Semen Portland
Pasir Beton/Pasang
Besi Simpai Kawat
Papan Mal Kayu Kls.III
Paku
Jumlah
Jumlah A + B
Harga Satuan

KUANTITAS

PPs.01
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.120
0.360
0.012
0.018

Kg

1,180.00
63,333.33
12,000.00
1,200,000.00
18,000.00

13.055
0.0388
-

15,404.90
2,457.33
17,862.23
17,862.23
17,862.23

M3
Kg
M3
Kg

Acuan : G.51.h

Plesteran t = 1,5 cm, camp.1 PC : 3 Ps ( m2 )


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

A
1
2
3
4
B
1
2
C
D

TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Semen Portland
Pasir Beton/Pasang
Jumlah
Jumlah A + B
Harga Satuan

KUANTITAS
5

PPs.05
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.150
0.200
0.015
0.010

Kg

63,333.33

6.480
0.019

1,203.33
1,203.33
1,203.33
1,203.33

M3

Acuan : SNI.2837.b - 6.3

Pemasangan Ventilasi Kaca ( m )


2
2
Setiap luas 1 m bidang daun ventilasi, luas kacanya adalah 0,60 m
No.
1
A
1
2
3
4

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

Jumlah
BAHAN
Kaca Rayban t = 5 mm
List Kayu Profil
Paku Tripleks

C
D

Jumlah A + B
Harga Satuan

M2
M'
Kg

5
-

2.000
0.500
0.200
0.025

145,000.00
35,000.00

1.100
8.000
0.015

159,500.00
525.00

OH
OH
OH
OH

B
1
2
3

KUANTITAS

Jumlah

No.
1
A
1
2
3
4
B
1
2
3
4
C
D

160,025.00
160,025.00
160,025.00

Pemasangan Pintu dan Jendela Kaca ( Hidup ) dari Kayu Kelas I ( m 2 )


2
2
Setiap luas 1 m bidang daun pintu atau jendela, luas kacanya adalah 0.60 m
HARGA
URAIAN PEKERJAAN
SATUAN
SATUAN
( Rp. )
2
3
4
TENAGA
Tukang Kayu
OH
Pekerja
OH
Kepala Tukang
OH
Mandor
OH
Jumlah
BAHAN
3
M
Papan Kayu Kelas I (Ketam), t = 2 cm
List Pintu/Jendela
M'
M2
Kaca Rayban tebal 5 mm
120,000.00
Paku
Kg
18,000.00
Jumlah
Jumlah A + B
Harga Satuan

KUANTITAS
5

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

TENAGA

1
2
3
4

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

B
1
2
3
4

Jumlah
BAHAN
Papan Kayu Kelas I (Ketam)
List Pintu/Jendela
Kaca Rayban tebal 5 mm
Paku

C
D

Jumlah
Jumlah A + B
Harga Satuan

Pemasangan Kusen Pintu dan Jendela Kayu Kelas I ( m3 )

OH
OH
OH
OH

SNI.3434.6,10
BIAYA
SATUAN
( Rp. )
6

2.000
0.800
0.200
0.040

0.035
8.000
0.600
0.030

72,000.00
540.00
72,540.00
72,540.00
72,540.00

Pemasangan Pintu dan Jendela Kaca Kayu Klas I (Hidup) ( m2)


No.

F.37.c
BIAYA
SATUAN
( Rp. )
6

KUANTITAS
5

SNI.3434-6,10
BIAYA
SATUAN
( Rp. )
6

2.000
0.800
0.200
0.040

M3
M'
M2
Kg

120,000.00
18,000.00

0.035
8.000
0.600
0.030

72,000.00
540.00
72,540.00
72,540.00
72,540.00

PK.14

No.
1
A
1
2
3
4
B
1
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kayu Kelas I (Ketam)
Jumlah
Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

18.000
6.000
2.000
0.300

4,500,000.00

1.100

4,950,000.00
4,950,000.00
4,950,000.00
4,950,000.00

Acuan : SNI.3434 - 6.2

Pemasangan Pintu Panel Kayu Kelas I ( m )


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

A
1
2
3
4
B
1
C
D

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Kelas I (Ketam), t = 2 cm
Jumlah
Jumlah A + B
Harga Satuan

KUANTITAS
5

SNI.3434-6.8
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

2.500
1.000
0.250
0.050

M3

0.040

Acuan : SNI.3434 - 6.8

Pemasangan Pintu dan Jendela Kaca , Ventilasi dari Rangka Kayu Kelas I ( m )
2
2
Setiap Luas 1 M Bidang, Luas Kacanya adalah 0.60 M
No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

A
1
2
3
4
B
1
2
3
4
C
D

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Kelas I (Ketam), t = 2 cm
List Pintu/Jendela
Kaca Polos tebal 5 mm
Paku
Jumlah
Jumlah A + B
Harga Satuan
Acuan : SNI.3434 - 6.10

KUANTITAS
5

SNI.3434-6.10
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

2.000
0.800
0.200
0.040

M3
M'

120,000.00
18,000.00

0.035
8.000
0.600
0.030

72,000.00
540.00
72,540.00
72,540.00
72,540.00

M2
Kg

Pemasangan Pintu dan Jendela Kaca , Ventilasi dari Rangka Kayu Kelas I ( m )
Setiap Luas 1 M2 Bidang, Luas Kacanya adalah 0.60 M2
No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

A
1
2
3
4
B
1
2
3
4
C
D

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Kelas I (Ketam), t = 2 cm
List Pintu/Jendela
Kaca Rayban tebal 5 mm
Paku
Jumlah
Jumlah A + B
Harga Satuan
Acuan : SNI.3434 - 6.10

KUANTITAS
5

SNI.3434-6.10'
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

2.000
0.800
0.200
0.040

145,000.00
18,000.00

0.035
8.000
0.600
0.030

87,000.00
540.00
87,540.00
87,540.00
87,540.00

M
M'

M
Kg

Pemasangan Jendela Kaca ( Mati ) dengan Kaca Polos t = 5 mm ( m )


No.
1
A
1
2
3
4
B
1
2
3
C
D

PK.23

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kaca Polos t = 5 mm
List Kayu Profil
Paku Tripleks
Jumlah
Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

M2
M'
Kg

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.150
0.015
0.015
0.00075

120,000.00
35,000.00

1.100
8.000
0.015

132,000.00
525.00
132,525.00
132,525.00
132,525.00

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci dan Kaca - 6.16

Pemasangan Jendela Kaca ( Mati ) dengan Kaca Rayban t = 5 mm ( m )


No.
1
A
1
2
3
4
B
1
2
3
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kaca Rayban t = 5 mm
List Kayu Profil
Paku Tripleks
Jumlah
Jumlah A + B
Harga Satuan

PK.23'
HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

M2
M'
Kg

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.150
0.015
0.015
0.00075

145,000.00
35,000.00

1.100
8.000
0.015

159,500.00
525.00
160,025.00
160,025.00
160,025.00

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci dan Kaca - 6.16

Pemasangan Ventilasi Kaca ( m2 )


Setiap Luas 1 M2 Bidang Daun Ventilasi, Luas Kacanya adalah 0,60 m2
No.
1
A
1
2
3
4
B
1
2
3
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
List Kayu
Kaca Polos t = 5 mm
Paku Tripleks
Jumlah
Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

F.37c
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

2.000
0.500
0.200
0.025

M'

120,000.00
35,000.00

8.000
0.600
0.050

72,000.00
1,750.00
73,750.00
73,750.00
73,750.00

M2
Kg

Acuan : F.37.c

Pemasangan Ventilasi Kaca ( m )


Setiap Luas 1 M2 Bidang Daun Ventilasi, Luas Kacanya adalah 0,60 m2
No.
1
A
1
2
3
4
B
1
2
3
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
List Kayu
Kaca Rayban t = 5 mm
Paku Tripleks
Jumlah
Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

F.37c'
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

2.000
0.500
0.200
0.025

M'

145,000.00
35,000.00

8.000
0.600
0.050

87,000.00
1,750.00
88,750.00
88,750.00
88,750.00

M
Kg

Acuan : F.37.c

Pekerjaan Konstruksi Rangka Kuda-kuda dengan Bentangan > 7 meter ( m3 )


Untuk memasang kembali kuda-kuda bongkaran, harga satuan pekerjaan diambil 1/3 dari analisa ini
HARGA
No.
URAIAN PEKERJAAN
SATUAN
KUANTITAS
SATUAN
1
A
1
2
3
4
B
1
2
3
4
C
D

2
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kayu Kelas II
Besi Strip
Baut
Paku
Jumlah
Jumlah A + B
Harga Satuan

( Rp. )
4

PK.33
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

18.000
6.000
1.800
0.300

M3
Btg
Bh
Kg

3,625,000.00
#REF!
18,000.00

1.100
15.000
41.000
0.800

3,987,500.00
#REF!
14,400.00
#REF!
#REF!
#REF!

Acuan : F.23

Pemasangan Kuda-Kuda Kayu Klas II ( m2)


No.
1

TENAGA

1
2
3
4

Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah

B
1
2

BAHAN
Kayu Kelas II
Besi Strip

Baut

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS
5

PK.33
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

18.000
6.000
1.800
0.300

M3
Btg

3,625,000.00
1,500,000.00

1.100
15.000

3,987,500.00
22,500,000.00

Bh

#REF!

41.000

#REF!

Paku

C
D

Jumlah
Jumlah A + B
Harga Satuan
Acuan : F.23

Kg

18,000.00

0.800

14,400.00
#REF!
#REF!
#REF!

Pemasangan Gording, Nok, Ikatan Angin ( m )


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

A
1
2
3
4
B
1
2
C
D

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kayu Kelas II
Paku
Jumlah
Jumlah A + B
Harga Satuan

KUANTITAS
5

PK.17
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

18.000
6.000
1.800
0.300

3,625,000.00
18,000.00

1.100
2.000

3,987,500.00
36,000.00
4,023,500.00
4,023,500.00
4,023,500.00

M
Kg

Acuan : F.22.a

Pemasangan Kasau + Reng ( m2 )


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

A
1
2
3
4
B
1
2
C
D

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kayu Kelas II
Paku
Jumlah
Jumlah A + B
Harga Satuan

KUANTITAS
5

PK.18
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.100
0.100
0.010
0.005

M3
Kg

3,625,000.00
18,000.00

0.012
0.150

43,500.00
2,700.00
46,200.00
46,200.00
46,200.00

Acuan : F.17

Pemasangan Listplang uk.2 x ( 2 x 20 ) cm, Kayu Kelas I ( m' )


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

A
1
2
3
4
B
1
2
C
D

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Kelas I (Ketam)
Paku
Jumlah
Jumlah A + B
Harga Satuan

KUANTITAS
5

PK.20
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.100
0.100
0.010
0.050

M3
Kg

18,000.00

0.010
0.025

450.00
450.00
450.00
450.00

Acuan : SNI.3434 - 6.52

Pekerjaan Cerucuk diameter 10 cm, p = 2 meter ( batang )


Memasukkan kayu cerucuk kedalam tanah dengan menggunakan alat bantu

PK.48

HARGA
No.

URAIAN PEKERJAAN

SATUAN

BIAYA
KUANTITAS

No.

URAIAN PEKERJAAN

SATUAN

KUANTITAS

SATUAN
( Rp. )

SATUAN
( Rp. )

TENAGA

Tukang Kayu

OH

0.900

Pekerja

OH

0.300

Kepala Tukang

OH

0.090

Mandor

OH

0.015

Jumlah
B

BAHAN

Kayu Cerucuk diam.10, p = 2 m


Jumlah

Btg

70,000.00

1.000

70,000.00
70,000.00

Jumlah A + B

70,000.00

Harga Satuan

70,000.00

Acuan : F.60

Uraian Pekerjaan
Pembersihan Lokasi
Pengukuran & Pemasangan Bouwplank

Volume
Sat
375.00
M2
80
M'
158.4
384.00
9.6
2.7
9.99
3.672
16.13
132.438

M3
Btg
M3
M3
M3
M3
M3
M3

15.824
12.23
16.20
6.3
75

M3
M3
M3
M3
M3
M3

Urugan Pasir Bawah Lantai t. 35 cm


Dinding Pas. Batako
Plesteran Sloof + Balok Tepi
Plesteran Dinding & Kolom
Pas. Keramik Lantai uk. 30 x 30 cm
Keramik Lantai & Dinding Toilet 20 x 20 cm

136
1,385.30

729.5
51.57

M3
M2
M2
M2
M2
M2

Kusen Kayu Klas I


Pintu Panel Kayu Klas I
Pintu Folding Gate
Jendela Kaca Jungkit
Ventilasi Kaca Mati (Kaca Rayban t. 5 mm)
Ventilasi Kaca Silang

1.75
19.40
70.5
32.00
3.92
23.85

M3
M2
M2
M2
M2
M2

729.5
729.5
123.89

M2
M2
M2

Galian Tanah Pondasi


Pancang Cerucuk Jongger dia 10cm - 200 cm
Urugan Pasir Bawah Pondasi t. 10 cm
Lantai Kerja t. 5 cm camp.1:3:5
Plat Pondasi Beton Bertulang camp. 1:2:3
Kolom Pondasi 30/30 Beton Bertulang camp. 1:2:3
Sloof Pondasi15/50 Beton Bertulang camp. 1:2:3
Urugan Kembali Tanah Galian

Balok Induk 20/40 Beton Bertulang camp. 1:2:3


Balok Anak 15/40 Beton Bertulang camp. 1:2:3
Kolom 30/30 Beton Bertulang camp. 1:2:3
Ring Balok 15/30 Beton Bertulang camp. 1:2:3
Plat Lantai Beton Bertulang camp. 1:2:3
Tangga Beton Bertulang K225

24.00

215.00

197.80
203.75
140.00

1,490.00

25.93

729.50
51.57
J1

Rangka Plafond Kayu Klas II


Plafond Gypsum t. 9 mm
Plafond GRC (toilet+kaki atap)
Cat Kilat
Cat Tembok
Cat Pelitur
Cat Teer

M2
M2
M2
M2

Kunci Pintu 2 Slaag


Kunci Pintu 1 Slaag
Engsel Pintu

Bh
Bh
Bh

1.75
19.40

78.25

32.00

14.95

23.85

4.60

729.50
13.13

110.76

Engsel Jendela
Kait Jendela
Handle Jendela
Slot Jendela
Kloset Jongkok
Kran Air
Floor Drain
Bak Air Batako
Septic Tank
Instalasi Air Bersih Pipa PVC type AW
Instalasi Air Kotor Pipa PVC type AW

Bh
Bh
Bh
Bh
5
5
5
11.6
5
5
5

Bh
Bh
Bh
M2
Unit
Unit
Unit

Reiling Tangga N/T Pipa Holo


Ornamen/Plesteran Variasi Dinding

M'
M2

Ornamen/Cor Variasi Dinding


Ornamen Variasi Kolom

M3
Unit

11.60

6.00

13.05

J2
77.40

J3
26.20

11.76
3.92

5.29

P1
33.20
9.20

P2

P3
34.2
10.20

P4
5.6

V1
62.00

V2
19.00

V3
13.5

9.20

2.36

1.978

70.50

1.84

1.84

2.04

lisplank + konsul + kusen + pintu panel kayu + ventilasi ram kayu +


tembok + plafond+ list plafond
plafond renglat + Pintu Lapis Double Teakwood + Kaca Polos

349.35

Pemasangan Atap Genteng Metal Warna Polos ( m )


No.
1
A
1
2
3
4
B
1
2
C
D

URAIAN PEKERJAAN
2
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Genteng Metal Warna Polos
Paku
Jumlah
Jumlah A + B
Harga Satuan

SATUAN
3

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

0.100
0.200
0.010
0.001

Bh
Kg

85,000.00
18,000.00

1.620
0.200

137,700.00
3,600.00
141,300.00
141,300.00
141,300.00

Pemasangan Bubungan / Nok Atap Genteng Metal Polos ( m 1 )


No.
1
A
1
2
3
4
B
1
2
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Bumbungan/Nok Genteng Metal Warna Polos
Paku
Jumlah
Jumlah A + B
Harga Satuan
Acuan :SNI.3436 - 6.36

PPA.03'
BIAYA
SATUAN
( Rp. )
6

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PPA.11'
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.150
0.250
0.015
0.013

M'
Kg

18,000.00

1.100
0.050

900.00
900.00
900.00
900.00

Pekerjaan Beton Tumbuk, camp. 1 PC : 3 Ps : 5 Kr Kerikil ( m3 )


No.
1
A
1
2
3
4
B
1
2
3
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Semen Portland
Pasir Beton/Pasang
Kerikil Sungai
Jumlah
Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

0.250
1.650
0.025
0.080

Kg

63,333.33
150,000.00

218.000
0.520
0.870

32,933.33
130,500.00
163,433.33
163,433.33
163,433.33

M
3
M

Pekerjaan Beton Tumbuk, camp. 1 PC : 3 Ps : 5 Kr Batu Pecah ( m )


No.
1
A
1
2
3
4
B
1
2
3
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Semen Portland
Pasir Beton/Pasang
Batu Belah 0,5 - 1
Jumlah
Jumlah A + B
Harga Satuan

PBe.01
BIAYA
SATUAN
( Rp. )
6

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PBe.02
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.250
1.650
0.025
0.080

Kg

63,333.33
367,647.06

218.000
0.520
0.870

32,933.33
319,852.94
352,786.27
352,786.27
352,786.27

M
M3

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.4

Pekerjaan Beton Bertulang, camp. 1 PC : 2 Ps : 3 Kr ( m3 )


No.
1
A
1
2
3
4
B
1
2
3
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Semen Portland
Pasir Beton/Pasang
Batu Belah 0,5 - 1
Jumlah
Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PBe.03
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.250
1.650
0.025
0.080

Kg

63,333.33
367,647.06

323.000
0.520
0.780

32,933.33
286,764.71
319,698.04
319,698.04
319,698.04

M3
M3

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.5

Pekerjaan Pembesian dengan Besi Polos atau Besi Ulir ( kg )


No.
1
A
1
2
3
4
B
1
2
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Besi Beton (Polos/Ulir)
Kawat Ikat Beton
Jumlah
Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PBe.04
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.007
0.007
0.0007
0.0003

Kg
Kg

13,500.00
17,000.00

1.050
0.015

14,175.00
255.00
14,430.00
14,430.00
14,430.00

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.25

Pemasangan Bekisting / Cetakan Beton ( m2 )


No.
1
A
1
2
3
4
B
1
2
3
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Bekisting
Paku
Minyak Bekisting
Jumlah
Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PBe.06
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.260
0.300
0.026
0.005

M3
Kg
Ltr

1,200,000.00
18,000.00
15,000.00

0.040
0.300
0.100

48,000.00
5,400.00
1,500.00
54,900.00
54,900.00
54,900.00

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.28

Pemasangan Bekisting untuk Pondasi ( m2 )


No.
1
A
1
2
3
4
B
1
2
3
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Bekisting
Paku
Minyak Bekisting
Jumlah
Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PBe.06.A
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.260
0.300
0.026
0.005

1,200,000.00
18,000.00
15,000.000

0.040
0.300
0.100

48,000.00
5,400.00
1,500.00
54,900.00
54,900.00
54,900.00

M
Kg
Ltr

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.29

Pemasangan Bekisting untuk Sloof ( m2 )


No.
1
A
1
2
3
4
B
1
2
3
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Bekisting
Paku
Minyak Bekisting
Jumlah
Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PBe.06.B
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.260
0.300
0.026
0.005

M3
Kg
Ltr

1,200,000.00
18,000.00
15,000.000

0.045
0.300
0.100

54,000.00
5,400.00
1,500.00
60,900.00
60,900.00
60,900.00

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.29

Pemasangan Bekisting untuk Kolom ( m2 )


No.
1
A
1
2
3
4
B
1
2
3
4
C
D

URAIAN PEKERJAAN
2
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Bekisting
Paku
Minyak Bekisting
Cerucuk dia. 6 - 8 cm / 4 m
Jumlah
Jumlah A + B
Harga Satuan

SATUAN
3

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PBe.06.C
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.330
0.300
0.033
0.006

M3
Kg
Ltr
Btg

1,200,000.00
18,000.00
15,000.000
7,500.00

0.040
0.200
0.200
2.000

48,000.00
3,600.00
3,000.00
15,000.00
69,600.00
69,600.00
69,600.00

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.29

Pemasangan Bekisting untuk Balok ( m )


No.
1
A
1
2
3
4
B
1
2
3
4
4
C
D

URAIAN PEKERJAAN
2
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Bekisting
Paku
Minyak Bekisting
Balok Kayu Kleas III uk. 4/6
Cerucuk dia. 6 - 8 cm / 4 m
Jumlah
Jumlah A + B
Harga Satuan

SATUAN
3

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PBe.06.D
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.330
0.320
0.033
0.006

M3
Kg
Ltr

1,200,000.00
18,000.00
15,000.000
7,500.00

0.040
0.200
0.200
0.018
2.000

48,000.00
3,600.00
3,000.00
15,000.00
69,600.00
69,600.00
69,600.00

M3
Btg

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.29

Pemasangan Bekisting untuk Lantai ( m2 )


No.
1
A
1
2
3
4
B
1
2
3
4
4

URAIAN PEKERJAAN
2
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Bekisting
Paku
Minyak Bekisting
Balok Kayu Kleas III uk. 4/6
Cerucuk dia. 6 - 8 cm / 4 m

SATUAN
3

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PBe.06.E
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.330
0.320
0.033
0.006

M3
Kg
Ltr

1,200,000.00
18,000.00
15,000.000
7,500.00

0.040
0.400
0.200
0.015
6.000

48,000.00
7,200.00
3,000.00
45,000.00

M3
Btg

C
D

Jumlah
Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.29

103,200.00
103,200.00
103,200.00

Pekerjaan Beton Bertulang (G.Sub / M3)


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

G.Sub.A Pondasi Beton Bertulang (M )


3
Beton camp. 1:2:3 (PBe. 03 / M )
2
Bekisting (PBe.06.A x 10 M )
Pembesian (PBe. 04 / Kg)
Jumlah
G.Sub.B Ring Balok 15/25 Beton Bertulang (M3)
3

Beton camp. 1:2:3 (PBe. 03 / M )


Bekisting (PBe.06.B x 10 M2)
Pembesian (PBe. 04 / Kg)
Jumlah
G.Sub.C Sloof 10/15 Beton Bertulang (M3)
3
Beton camp. 1:2:3 (PBe. 03 / M )
2
Bekisting (PBe.06.B x 10 M )
Pembesian (PBe. 04 / Kg)
Jumlah
G.Sub.E Balok Induk 15/40 Beton Bertulang (M3)
3

Beton camp. 1:2:3 (PBe. 03 / M )


Bekisting (PBe.06.D x 10 M2)
Pembesian (PBe. 04 / Kg)
Jumlah
G.Sub.F Balok Anak15/30 Beton Bertulang (M3)
3
Beton camp. 1:2:3 (PBe. 03 / M )
2
Bekisting (PBe.06.D x 10 M )
Pembesian (PBe. 04 / Kg)
Jumlah
G.Sub.G Kolom 15/15 Beton Bertulang (M3)
3

Beton camp. 1:2:3 (PBe. 03 / M )


Bekisting (PBe.06.C x 10 M2)
Pembesian (PBe. 04 / Kg)
Jumlah
G.Sub.H Kolom Lt. 2 25/25 Beton Bertulang (M3)
Beton camp. 1:2:3 (PBe. 03 / M3)
Bekisting (PBe.06.C x 10 M2)
Pembesian (PBe. 04 / Kg)
Jumlah

M
2
M
Kg

319,698.04
54,900.00
14,430.00

1.000
0.640
250.000

319,698.04
35,136.00
3,607,500.00
3,962,334.04

M
M2
Kg

319,698.04
60,900.00
14,430.00

1.000
17.330
161.670

319,698.04
1,055,397.00
2,332,898.10
3,707,993.14

M
M2
Kg

319,698.04
60,900.00
14,430.00

1.000
2.112
308.270

319,698.04
128,620.80
4,448,336.10
4,896,654.94

M
M2
Kg

319,698.04
69,600.00
14,430.00

1.000
15.830
179.340

319,698.04
1,101,768.00
2,587,876.20
4,009,342.24

M
M2
Kg

319,698.04
69,600.00
14,430.00

1.000
16.670
135.600

319,698.04
1,160,232.00
1,956,708.00
3,436,638.04

M
M2
Kg

319,698.04
69,600.00
14,430.00

1.000
1.600
440.000

319,698.04
111,360.00
6,349,200.00
6,780,258.04

M3
M2
Kg

319,698.04
69,600.00
14,430.00

1.000
16.000
163.900

319,698.04
1,113,600.00
2,365,077.00
3,798,375.04

No.
1
G.Sub.I

URAIAN PEKERJAAN

SATUAN

Kolom Praktis Beton Bertulang (M3)


3
Beton camp. 1:2:3 (PBe. 03 / M )
Bekisting (PBe.06 x 10 M2)
Pembesian (PBe. 04 / Kg)
Jumlah

G.Sub.J Plat Lantai Dasar Beton Bertulang (M3)


3
Beton camp. 1:2:3 (PBe. 03 / M )
Pembesian (PBe. 04 / Kg)
Jumlah
G.Sub.K Plat Lantai 2 Beton Bertulang (M3)
3

Beton camp. 1:2:3 (PBe. 03 / M )


2
Bekisting (PBe.06.E x 10 M )
Pembesian (PBe. 04 / Kg)
Jumlah
G.Sub.L Listplank Beton Bertulang (M3)
Beton camp. 1:2:3 (PBe. 03 / M3)
2
Bekisting (PBe.06.D x 10 M )
Pembesian (PBe. 04 / Kg)
Jumlah
G.Sub.M Tangga Beton Bertulang (M3)
3

Beton camp. 1:2:3 (PBe. 03 / M )


Bekisting (PBe.06.D x 10 M2)
Pembesian (PBe. 04 / Kg)
Jumlah

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

M
M2
Kg

319,698.04
54,900.00
14,430.00

1.000
20.000
193.500

319,698.04
1,098,000.00
2,792,205.00
4,209,903.04

M
Kg

319,698.04
14,430.00

1.000
55.300

319,698.04
797,979.00
1,117,677.04

M
2
M
Kg

319,698.04
103,200.00
14,430.00

1.000
10.000
110.600

319,698.04
1,032,000.00
1,595,958.00
2,947,656.04

M3
2
M
Kg

319,698.04
69,600.00
14,430.00

1.000
21.300
79.000

319,698.04
1,482,480.00
1,139,970.00
2,942,148.04

319,698.04
69,600.00
14,430.00

1.000
17.470
101.910

319,698.04
1,215,912.00
1,470,561.30
3,006,171.34

M
M2
Kg

Pekerjaan Konstruksi Baja ( kg )


No.
1
A
1
2
3
B
1
2
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Besi Konstruksi
Pekerja
Kepala Tukang
Jumlah
BAHAN
Baja Konstruksi
Kawat Las
Jumlah
Jumlah A + B
Harga Satuan

BIAYA
SATUAN
( Rp. )
6

HARGA
SATUAN
( Rp. )
4

OH
OH
OH

Kg
Kg

#REF!

KUANTITAS
5
-

0.00375
0.015
0.0225

1.100
0.020

PBA.01
BIAYA
SATUAN
( Rp. )
6
#REF!
#REF!
#REF!
#REF!

Pemasangan Langit-langit Gypsum Board t = 9 mm + Rangka Kayu Kelas II ( m )


HARGA
No.
URAIAN PEKERJAAN
SATUAN
SATUAN
( Rp. )
1

A
1
2
3
4
B
1
2
3
C
D
E

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kayu Kelas II
Gypsum Board t = 9 mm
Paku Gypsum
Jumlah
Jumlah A + B
Harga Satuan
Harga Satuan

KUANTITAS

OH
OH
OH
OH

0.400
0.270
0.040
0.0135

M3
2
M
Bh

3,625,000.00
17,000.00

0.023
0.364
0.110

83,375.00
1,870.00
85,245.00
85,245.00
85,245.00
106,556.25

1.250

Pemasangan Langit-langit GRC Board t = 9 mm + Rangka Kayu Kelas II ( m )


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

A
1
2
3
4
B
1
2
3
C
D

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kayu Kelas II
GRC Board
Paku
Jumlah
Jumlah A + B
Harga Satuan
Acuan : SNI.2838 - 6.24

PL.02'
BIAYA
SATUAN
( Rp. )

KUANTITAS
5

PL.02"
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.400
0.270
0.040
0.0135

3,625,000.00
17,000.00

0.023
0.364
0.110

83,375.00
1,870.00
85,245.00
85,245.00
85,245.00

M
M2
Bh

Pemasangan Kloset Duduk / Monoblok ( bh )


No.
1
A
1
2
3
4
B
1
2
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

Jumlah
BAHAN
Kloset Duduk / Monoblok
Perlengkapan
Jumlah
Jumlah A + B
Harga Satuan

Bh
Ls

KUANTITAS
5
-

#REF!
#REF!

PSa.01
BIAYA
SATUAN
( Rp. )
6

1.100
3.300
0.001
0.160

1.000
6% Harga Kloset

#REF!
#REF!
#REF!
#REF!
#REF!

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.1

Pemasangan Kloset Jongkok Standar ( bh )


No.
1
A
1
2
3
4
B
1
2
3
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kloset Jongkok Standar
Semen Portland
Pasir Beton / Pasang
Jumlah
Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PSa.02
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

1.500
1.000
1.500
0.160

Bh
Kg

63,333.33

1.000
6.000
0.010

633.33
633.33
633.33
633.33

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.2

Pemasangan Urinoir ( bh )
No.

URAIAN PEKERJAAN

SATUAN

1
A
1
2
3
4

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

B
1
2
3
4

BAHAN
Urinoir
Perlengkapan
Semen Portland
Pasir Beton / Pasang

C
D

Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

KUANTITAS
5
-

1.000
1.000
0.100
0.100

63,333.33

1.000
0.300
6.000
0.010

PSa.03
BIAYA
SATUAN
( Rp. )
6
-

Jumlah
Bh
Ls
Kg
M3
Jumlah

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.2

#REF!
#REF!

#REF!
#REF!
633.33
#REF!
#REF!
#REF!

Pemasangan Wastafel ( bh )
No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

A
1
2
3
4

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

B
1
2
3
4

BAHAN
Wastafel Keramik
Perlengkapan
Semen Portland
Pasir Beton / Pasang

C
D

Jumlah A + B
Harga Satuan

OH
OH
OH
OH

KUANTITAS
5

PSa.04
BIAYA
SATUAN
( Rp. )
6

1.450
1.200
0.150
0.100

Jumlah
Bh
Ls
Kg
M

Jumlah

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.5

#REF!
#REF!
63,333.33

1.000
12% Harga Wastafel

6.000
0.010

#REF!
#REF!
633.33
#REF!
#REF!
#REF!

PSa.06

Pemasangan Kran Air ( bh )


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

A
1
2
3
4

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

B
1
2

BAHAN
Kran Air
Seal Tape

C
D

Jumlah A + B
Harga Satuan

KUANTITAS

BIAYA
SATUAN
( Rp. )

OH
OH
OH
OH

0.100
0.010
0.010
0.005

Bh
Bh

1.000
0.025

Jumlah

Jumlah

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.35

Pemasangan Floor Drain ( bh )


No.
1

A
1
2
3
4

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

B
1

BAHAN
Floor Drain

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS
5

PSa.08
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.100
0.010
0.010
0.005

Bh

1.000

Jumlah

Jumlah
C
D

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.36

Pengadaan & Pemasangan Pipa PVC (AW) dia. 3/4" (M')


No.
1

A
1
2
3
4
B
1
C
D

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

TENAGA
Tukang Pipa
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Pipa PVC Type AW dia. 3/4"
Jumlah
Jumlah A + B
Harga Satuan

KUANTITAS
5

PPi.02'
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.060
0.036
0.006
0.0018

M'

1.000

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.27

Pengadaan & Pemasangan Pipa PVC (AW) dia. 1" (M')


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS
5

PPi.02"
BIAYA
SATUAN
( Rp. )
6

A
1
2
3
4
B
1
C
D

TENAGA
Tukang Pipa
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Pipa PVC Type AW dia. 1"
Jumlah
Jumlah A + B
Harga Satuan

OH
OH
OH
OH

0.060
0.036
0.006
0.0018

M'

1.000

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.27

Pemasangan Ventilasi Kaca ( m )


2
2
Setiap luas 1 m bidang daun ventilasi, luas kacanya adalah 0,60 m
No.
1
A
1
2
3
4

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

2.000
0.500
0.200
0.025

M'
M2
Kg

120,000.00
35,000.00

8.000
0.600
0.050

72,000.00
1,750.00
73,750.00
73,750.00
73,750.00

Jumlah
B

BAHAN
1 List Pintu/Jendela
2 Kaca Polos t = 5 mm
3 Paku Tripleks
Jumlah

C
D

Jumlah A + B
Harga Satuan

Pemasangan Kunci Pintu 2 Slag ( bh )


No.

URAIAN PEKERJAAN

SATUAN

1
A
1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

B
1

BAHAN
Kunci Pintu 2 slag

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PKK.01
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.600
0.060
0.060
0.003

Bh

1.000

Jumlah

Jumlah
C
D

F.37.c
BIAYA
SATUAN
( Rp. )
6

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.1

Pemasangan Kunci Kamar Mandi/Toilet 1 Slaag ( bh )


No.

URAIAN PEKERJAAN

SATUAN

1
A
1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

B
1

BAHAN
Kunci Pintu 1 slag

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

0.500
0.005
0.005
0.0025

Bh

1.000

Jumlah

Jumlah
C
D

PKK.03
BIAYA
SATUAN
( Rp. )
6

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.3

Pemasangan Engsel Pintu ( bh )


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS

PKK.06
BIAYA
SATUAN
( Rp. )

1
A
1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

B
1

BAHAN
Engsel Pintu

OH
OH
OH
OH

0.150
0.015
0.015
0.00075

Bh

1.000

Jumlah

Jumlah
C
D

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.5

Pemasangan Engsel Jendela Kupu-kupu ( bh )


No.
1
A
1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

B
1

BAHAN
Engsel Jendela

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

0.100
0.010
0.010
0.0005

Bh

1.000

Jumlah

Jumlah
C
D

PKK.07
BIAYA
SATUAN
( Rp. )
6

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.6

Pemasangan Kait Jendela / Ramskar ( bh )


No.
1
A
1
2
3
4
B
1
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kait Jendela / Ramskar
Jumlah
Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PKK.08
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.150
0.015
0.015
0.00075

Bh

1.000

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.9

Pemasangan Kunci Selot Jendela ( bh )


No.

URAIAN PEKERJAAN

SATUAN

1
A
1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

B
1

BAHAN
Kunci Selot Jendela

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

0.200
0.020
0.020
0.001

Bh

1.000

Jumlah

Jumlah
C
D

PKK.10
BIAYA
SATUAN
( Rp. )
6

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.11.a

Pemasangan Pegangan Jendela, Handle ( bh )


No.
1
A
1
2
3
4
B
1
C
D

URAIAN PEKERJAAN

SATUAN

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Pegangan Pintu/Jendela (Handle)
Jumlah
Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PKK.11
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.150
0.015
0.015
0.00075

Bh

1.000

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.12

Pemasangan Kaca Polos t = 3 mm ( m 2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A
1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

B
1

BAHAN
Kaca Polos t = 3 mm

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PKK.16
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.150
0.015
0.015
0.00075

85,000.00

1.100

93,500.00
93,500.00
93,500.00
93,500.00

Jumlah
M
Jumlah
C
D

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.16

Pemasangan Kaca Rayban t = 5 mm ( m 2 )

PKK.20
HARGA

No.

URAIAN PEKERJAAN

SATUAN

BIAYA
KUANTITAS

SATUAN
( Rp. )

SATUAN
( Rp. )

TENAGA

Tukang Kayu

OH

0.250

Pekerja

OH

0.025

Kepala Tukang

OH

0.025

Mandor

OH

0.00125

Jumlah
B

BAHAN

Kaca Rayban t = 5 mm

C
D

M2

145,000.00

1.100

159,500.00

Jumlah

159,500.00

Jumlah A + B

159,500.00

Harga Satuan

159,500.00

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.19.b

Pelaburan Bidang Kayu dengan Residu atau Ter ( m 2 )


No.
1
A
1
2
B
1
C
D

URAIAN PEKERJAAN

SATUAN
2

TENAGA
Tukang Cat
Kepala Tukang
Jumlah
BAHAN
Residu atau Ter
Jumlah
Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

SUPL.SNI.PC-6.12
BIAYA
SATUAN
( Rp. )
6

OH
OH

0.100
0.006

Ltr

10,000.00

0.350

3,500.00
3,500.00
3,500.00
3,500.00

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.12

Pelaburan Bidang Kayu dengan Pelitur ( m 2 )


No.
1
A
1
2
3
B
1
C
D

URAIAN PEKERJAAN

SATUAN
2

TENAGA
Tukang Cat
Kepala Tukang
Mandor
Jumlah
BAHAN
Pelitur
Jumlah
Jumlah A + B
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH

0.060
0.016
0.0025

Ltr

33,000.00

0.522

17,226.00
17,226.00
17,226.00
17,226.00

Pengecatan Permukaan Besi/Baja dengan Meni Besi ( m 2 )


No.
1
A
1
2
3
4
B
1
2
C
D

URAIAN PEKERJAAN

SATUAN
2

TENAGA
Tukang Cat
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Meni Besi
Minyak Cat/Thinner
Jumlah
Jumlah A + B
Harga Satuan

PC.05
BIAYA
SATUAN
( Rp. )
6

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

PC.07
BIAYA
SATUAN
( Rp. )
6

OH
OH
OH
OH

0.200
0.020
0.020
0.010

Kg
Ltr

18,000.00
20,000.00

0.100
0.0012

1,800.00
24.00
1,824.00
1,824.00
1,824.00

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.20

2 x Mencat Kilat ( 10 m 2 )
No.
1
A
1
2

2K6+K23

URAIAN PEKERJAAN

SATUAN
2

TENAGA
Tukang Cat
Pekerja

3
OH
OH

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5
-

0.750
0.500

BIAYA
SATUAN
( Rp. )
6
-

3
4
B
1
2
3
C
D
E

Kepala Tukang
Mandor
Jumlah
BAHAN
Cat Kilat
Minyak Cat
Amplas
Jumlah
Jumlah A + B
Harga Satuan
Harga Satuan

OH
OH

0.075
0.025

Kg
Ltr
Lbr

25,000.00
20,000.00
25,000.00

2.600
0.500
1.000

65,000.00
10,000.00
25,000.00
100,000.00
100,000.00
100,000.00
10,000.00

10 M2
M2

1,5K2+K30+K23
BIAYA
SATUAN
( Rp. )
6

Mendempul dan 1 x Cat Dasar (Baru) ( 10 M )


No.
1
A
1
2
3
4
B
1
2
3
4
C
D
E

URAIAN PEKERJAAN

SATUAN
2

TENAGA
Tukang Cat
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Cat Dasar Kayu
Dempul
Minyak Cat
Amplas
Jumlah
Jumlah A + B
Harga Satuan
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

0.750
0.500
0.075
0.025

Kg
Kg
Ltr
Lbr

#REF!
50,000.00
20,000.00
25,000.00

2.250
0.800
0.500
2.000

#REF!
40,000.00
10,000.00
50,000.00
#REF!
#REF!
#REF!
#REF!

10 M
M2

Mendasar, Menggosok 2 x Cat Kilat ( 10 M2 )


No.
1
1
2

URAIAN PEKERJAAN

SATUAN
2

2K6+K23
1,5K2+K30+K23
Jumlah
Harga Satuan

3
M2
M2
M2

HARGA
SATUAN
( Rp. )
4
10,000.00
#REF!

KUANTITAS
5
-

K23+K30
BIAYA
SATUAN
( Rp. )
6
10,000.00
#REF!
#REF!
#REF!

Mencat 2 x dengan Cat Tembok ( 10 m 2 )


No.
1
A
1
2
3
4
B
1
C
D
E

URAIAN PEKERJAAN

SATUAN
2

TENAGA
Tukang Cat
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Cat Tembok
Jumlah
Jumlah A + B
Harga Satuan
Harga Satuan

HARGA
SATUAN
( Rp. )
4

G.54ia
BIAYA
SATUAN
( Rp. )
6

KUANTITAS
5

OH
OH
OH
OH

0.750
0.500
0.075
0.025

Kg

6,000.00

2.600

15,600.00
15,600.00
15,600.00
15,600.00
1,560.00

10 M
2
M

2K6+K23
BIAYA
SATUAN
( Rp. )
6

Pek. Plamur Dinding Tembok dan 1 x Cat Dasar ( 10 M )


No.
1
A
1
2
3
4
B
1
2
3
4
C
D
E

URAIAN PEKERJAAN

SATUAN
2

TENAGA
Tukang Cat
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Cat Dasar Tembok
Plamur
Minyak Cat
Amplas
Jumlah
Jumlah A + B
Harga Satuan
Harga Satuan

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

0.750
0.500
0.075
0.025

Kg
Kg
Ltr
Lbr

6,000.00
27,000.00
20,000.00
25,000.00

2.250
0.800
0.500
2.000

13,500.00
21,600.00
10,000.00
50,000.00
95,100.00
95,100.00
95,100.00
9,510.00

10 M2
M2

Mendasar, Menggosok 2 x Cat Tembok ( 10 M2 )


No.
1
1
2

URAIAN PEKERJAAN

SATUAN
2

G.54ia
2K6+K23
Jumlah
Harga Satuan

3
2

M
M2

HARGA
SATUAN
( Rp. )
4
1,560.00
9,510.00

KUANTITAS
5
-

M2

#REF!
#REF!
#REF!

#REF!

K23+K30b
BIAYA
SATUAN
( Rp. )
6
1,560.00
9,510.00
11,070.00
11,070.00

#REF!