Professional Documents
Culture Documents
NO
U R A I A N
VOLUME
SAT.
HARGA
SATUAN
(Rp.)
JUMLAH
(Rp.)
1
I
50.00
Btg
4,500.00
225,000.00
0.20
61,874.40
12,127.38
0.10
319,698.04
31,330.41
0.39
3,500,000.00
1,372,000.00
0.05
6,000,000.00
270,000.00
0.11
4,500,000.00
476,280.00
0.17
6,000,000.00
1,047,600.00
0.12
M3
4,500,000.00
553,500.00
0.17
3,200,000.00
553,190.40
0.20
3,500,000.00
686,000.00
1.00
LS
400,000.00
400,000.00
4.50
M2
20,000.00
90,000.00
10.00
btg
16,000.00
160,000.00
2.00
btg
32,000.00
64,000.00
SUB TOTAL
II
5,941,028.19
PEKERJAAN PAGAR
1 Batako
500.00
bh
700.00
350,000.00
2 Plester
38.52
m2
20,000.00
770,400.00
0.11
M3
4,000,000.00
428,000.00
1,548,400.00
TOTAL
7,489,428.19
A
1
2
3
4
B
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
1 Kayu Pancang (Dolken) d = 6-8 cm, p = 4m
2 Paku
3 Papan Kayu Kelas III
KUANTITAS
BIAYA
SATUAN
( Rp. )
OH
OH
OH
OH
0.00
0.00
0.00
0.00
0.100
0.100
0.010
0.005
0.00
0.00
0.00
0.00
Btg
Kg
78,000.00
24,375.00
2,482,593.75
1.000
0.020
0.007
78,000.00
487.50
17,378.16
0.00
95,865.66
Jumlah
C
Jumlah A + B
Harga Satuan
95,865.66
95,865.66
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
KUANTITAS
BIAYA
SATUAN
( Rp. )
TENAGA
1 Pekerja
2 Mandor
OH
OH
BAHAN
C
D
Jumlah A + B
Harga Satuan
0.00
0.00
0.100
0.050
0.00
0.00
Jumlah
0.00
Jumlah
0.00
0.00
0.00
1m2 Pembuatan Direksi Keet / Gudang Bahan Bangunan dan Alat / Bedeng Pekerja (P.Ps. 04)
HARGA
BIAYA
No.
URAIAN PEKERJAAN
SATUAN
KUANTITAS
SATUAN
SATUAN
( Rp. )
( Rp. )
1
A
1
2
3
4
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
OH
OH
OH
OH
Jumlah
BAHAN
Kayu Pancang (Dolken) d = 10cm, p = 4m
Kayu Kelas III
Paku
Seng Gelombang BJLS 0.20
Triplek 4mm
Jumlah
Jumlah A + B
Harga Satuan
B
1
2
3
4
5
59,062.00
54,468.75
78,750.00
94,500.00
6
2.000
1.000
0.200
0.050
193,067.75
Btg
3
M
Kg
Lbr
Lbr
78,000.00
2,507,700.00
24,375.00
53,700.00
53,800.00
1.250
0.186
0.300
1.500
1.3500
917,492.45
917,492.45
TENAGA
1 Pekerja
2 Mandor
SATUAN
HARGA
SATUAN
( Rp. )
KUANTITAS
BIAYA
SATUAN
( Rp. )
OH
OH
BAHAN
Jumlah A + B
Harga Satuan
97,500.00
466,432.20
7,312.50
80,550.00
72,630.00
724,424.70
No.
118,124.00
54,468.75
15,750.00
4,725.00
0.00
0.00
0.400
0.040
0.00
0.00
Jumlah
0.00
Jumlah
0.00
0.00
0.00
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
KUANTITAS
BIAYA
SATUAN
( Rp. )
TENAGA
1 Pekerja
2 Mandor
BAHAN
C
D
Jumlah A + B
Harga Satuan
OH
OH
0.00
0.00
0.192
0.019
0.00
0.00
Jumlah
0.00
Jumlah
0.00
0.00
0.00
URAIAN PEKERJAAN
TENAGA
1 Pekerja
2 Mandor
SATUAN
HARGA
SATUAN
( Rp. )
KUANTITAS
BIAYA
SATUAN
( Rp. )
OH
OH
0.00
0.00
0.300
0.010
0.00
0.00
0.00
Jumlah
B
BAHAN
1 Pasir Urug
117,812.50
1.250
C
D
147,265.63
147,265.63
Jumlah
Jumlah A + B
Harga Satuan
147,265.63
147,265.63
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - W. 1
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
KUANTITAS
BIAYA
SATUAN
( Rp. )
1
A
1
2
3
4
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
54,468.75
59,062.00
78,750.00
94,500.00
1.500
0.600
0.060
0.075
128,952.83
Jumlah
B
BAHAN
1 Batu Belah 10-15 cm
2 Semen Portland
3 Pasir
Jumlah
C
D
M
Kg
3
M
349,375.00
2,437.50
117,812.50
1.100
202.000
0.485
1,062,779.39
1,062,779.39
SATUAN
HARGA
SATUAN
( Rp. )
KUANTITAS
BIAYA
SATUAN
( Rp. )
1
A
1
2
3
4
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
54,468.75
59,062.00
78,750.00
94,500.00
1.500
0.600
0.060
0.075
BAHAN
1 Batu Belah 10-15 cm
2 Semen Portland
3 Pasir
M
Kg
Jumlah
C
D
349,375.00
2,437.50
117,812.50
1.100
163.000
0.520
971,840.33
971,840.33
A
1
2
3
4
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
3
OH
OH
OH
OH
KUANTITAS
BIAYA
SATUAN
( Rp. )
54,468.75
59,062.00
78,750.00
94,500.00
1.650
0.250
0.025
0.080
BAHAN
1 Semen Portland
2 Pasir
Kg
3
2,437.50
117,812.50
218.000
0.520
1,137,500.00
0.870
Jumlah A + B
Harga Satuan
1,696,430.19
A
1
2
3
4
989,625.00
1,696,430.19
531,375.00
61,262.50
1,582,262.50
Jumlah
C
D
89,873.44
14,765.50
1,968.75
7,560.00
114,167.69
Jumlah
B
384,312.50
397,312.50
61,262.50
842,887.50
Jumlah A + B
Harga Satuan
81,703.13
35,437.20
4,725.00
7,087.50
128,952.83
Jumlah
B
384,312.50
492,375.00
57,139.06
933,826.56
Jumlah A + B
Harga Satuan
No.
81,703.13
35,437.20
4,725.00
7,087.50
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Jumlah
BAHAN
1 Semen Portland
2 Pasir
3 Batu Belah 0,5 - 1 (Kerikil)
Jumlah
C
Jumlah A + B
D
Harga Satuan
3
OH
OH
OH
OH
4
54,468.75
59,062.00
78,750.00
94,500.00
BIAYA
SATUAN
( Rp. )
6
2.000
0.350
0.035
1.000
108,937.50
20,671.70
2,756.25
94,500.00
226,865.45
Kg
M
3
M
2,437.50
117,812.50
1,137,500.00
336.000
0.540
0.810
819,000.00
63,618.75
921,375.00
1,803,993.75
2,030,859.20
2,030,859.20
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
KUANTITAS
BIAYA
SATUAN
( Rp. )
1
A
1
2
3
4
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
Jumlah
BAHAN
1 Besi Beton (polos/ulir)
2 Kawat Ikat Beton (bendrat)
Jumlah
C
Jumlah A + B
54,468.75
59,062.00
78,750.00
94,500.00
0.007
0.007
0.0007
0.0003
381.28
413.43
55.13
28.35
878.19
Kg
Kg
21,125.00
23,400.00
1.050
0.015
22,181.25
351.00
22,532.25
23,410.44
23,410.44
Harga Satuan
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
KUANTITAS
BIAYA
SATUAN
( Rp. )
1
A
1
2
3
4
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
Jumlah
BAHAN
1 Papan Mal (Kayu Kelas III)
2 Paku 2" - 5"
3 Minyak Bekesting
Jumlah
C
Jumlah A + B
54,468.75
59,062.00
78,750.00
94,500.00
0.300
0.260
0.026
0.005
16,340.63
15,356.12
2,047.50
472.50
34,216.75
M
Kg
Lt
2,482,593.75
24,375.00
17,296.50
0.040
0.300
0.100
108,345.90
142,562.65
142,562.65
Harga Satuan
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
KUANTITAS
BIAYA
SATUAN
( Rp. )
1
A
1
2
3
4
99,303.75
7,312.50
1,729.65
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
Jumlah
BAHAN
1 Papan Mal (Kayu Kelas III)
2 Paku 2" - 5"
3 Minyak Bekesting
Jumlah
C
Jumlah A + B
54,468.75
59,062.00
78,750.00
94,500.00
0.300
0.260
0.026
0.005
16,340.63
15,356.12
2,047.50
472.50
34,216.75
M3
Kg
Lt
2,482,593.75
24,375.00
17,296.50
0.045
0.300
0.100
120,758.87
154,975.61
154,975.61
Harga Satuan
URAIAN PEKERJAAN
A
1
2
3
4
B
1
2
3
4
C
D
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
BAHAN
Paku 2" - 5"
Minyak Bekesting
Papan Mal
Cerucuk 6 - 8cm / 4m
Jumlah
Jumlah A + B
Harga Satuan
SATUAN
3
HARGA
SATUAN
( Rp. )
KUANTITAS
BIAYA
SATUAN
( Rp. )
OH
OH
OH
OH
54,468.75
59,062.00
78,750.00
94,500.00
0.300
0.330
0.033
0.006
Kg
Lt
M3
Btg
24,375.00
17,296.50
2,482,593.75
16,900.00
0.200
0.200
0.040
2.000
A
1
2
3
4
B
1
2
3
4
5
C
D
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
BAHAN
Paku 2" - 5"
Minyak Bekesting
Balok Kayu Kelas III
Papan Mal
Cerucuk 6 - 8cm / 4m
Jumlah
Jumlah A + B
Harga Satuan
4,875.00
3,459.30
99,303.75
33,800.00
141,438.05
180,434.89
180,434.89
16,340.63
19,490.46
2,598.75
567.00
38,996.84
No.
111,716.72
7,312.50
1,729.65
SATUAN
3
HARGA
SATUAN
( Rp. )
KUANTITAS
BIAYA
SATUAN
( Rp. )
OH
OH
OH
OH
54,468.75
59,062.00
78,750.00
94,500.00
0.320
0.330
0.033
0.006
Kg
Lt
M3
M3
Btg
24,375.00
17,296.50
2,507,700.00
2,482,593.75
16,900.00
0.200
0.200
0.018
0.040
2.000
17,430.00
19,490.46
2,598.75
567.00
40,086.21
4,875.00
3,459.30
45,138.60
99,303.75
33,800.00
186,576.65
226,662.86
226,662.86
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
KUANTITAS
BIAYA
SATUAN
( Rp. )
1
A
1
2
3
4
B
1
2
3
4
5
C
D
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
Jumlah
BAHAN
Paku 2" - 5"
Minyak Bekesting
Balok Kayu Kelas III uk. 4/6
Papan Mal
Cerucuk 6 - 8cm / 4m
Jumlah
Jumlah A + B
Harga Satuan
54,468.75
59,062.00
78,750.00
94,500.00
0.320
0.330
0.033
0.006
40,086.21
Kg
Lt
M3
M3
Btg
24,375.00
17,296.50
2,507,700.00
2,482,593.75
16,900.00
0.400
0.200
0.015
0.040
6.000
291,614.76
291,614.76
SATUAN
HARGA
SATUAN
( Rp. )
KUANTITAS
BIAYA
SATUAN
( Rp. )
1
A
1
2
3
4
9,750.00
3,459.30
37,615.50
99,303.75
101,400.00
251,528.55
No.
17,430.00
19,490.46
2,598.75
567.00
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
Jumlah
BAHAN
1 Batako 15/30/7 (cetak mesin)
2 Semen Portland
3 Pasir Beton / Pasang
Jumlah
C
Jumlah A + B
54,468.75
59,062.00
78,750.00
94,500.00
0.32
0.10
0.01
0.015
17,430.00
5,906.20
787.50
1,417.50
25,541.20
Bh
Kg
3
M
1,950.00
2,437.50
117,812.50
22.000
7.500
0.027
64,362.19
89,903.39
89,903.39
Harga Satuan
URAIAN PEKERJAAN
A
1
2
3
4
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
SATUAN
3
OH
OH
OH
OH
HARGA
SATUAN
( Rp. )
KUANTITAS
BIAYA
SATUAN
( Rp. )
54,468.75
59,062.00
78,750.00
94,500.00
0.200
0.150
0.015
0.010
BAHAN
1 Semen Portland
2 Pasir
Kg
M3
2,437.50
117,812.50
6.480
0.019
15,795.00
2,238.44
18,033.44
Jumlah
C
D
10,893.75
8,859.30
1,181.25
945.00
21,879.30
Jumlah
B
42,900.00
18,281.25
3,180.94
Jumlah A + B
Harga Satuan
39,912.74
39,912.74
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
KUANTITAS
BIAYA
SATUAN
( Rp. )
1
A
TENAGA
1 Pekerja
OH
54,468.75
0.620
33,770.63
2 Tukang Batu
OH
59,062.00
0.350
20,671.70
3 Kepala Tukang
OH
78,750.00
0.035
2,756.25
4 Mandor
OH
94,500.00
0.030
2,835.00
60,033.58
Jumlah
BAHAN
1 Ubin Keramik 20 x 20cm Polos
Bh
1,960.00
25.000
49,000.00
2 Semen Portland
Kg
2,437.50
11.380
27,738.75
3 Pasir Pasang
117,812.50
0.042
4,948.13
81,686.88
C
Jumlah A + B
Harga Satuan
141,720.45
141,720.45
A
1
2
3
4
B
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
BAHAN
1 Ubin Keramik 30 x 30cm Polos
2 Semen Portland
3 Pasir Pasang
3
OH
OH
OH
OH
4
54,468.75
59,062.00
78,750.00
94,500.00
KUANTITAS
BIAYA
SATUAN
( Rp. )
6
0.260
0.125
0.0125
0.013
14,161.88
7,382.75
984.38
1,228.50
23,757.50
Bh
Kg
3
6,594.44
2,437.50
117,812.50
11.870
10.000
0.0215
78,276.00
24,375.00
2,532.97
105,183.97
C
D
Jumlah A + B
Harga Satuan
128,941.47
128,941.47
URAIAN PEKERJAAN
A
1
2
3
4
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1
2
3
4
Jumlah
BAHAN
Keramik 20 x 20 cm
Semen
Pasir Pasang
Semen Pengisi Nat Keramik
SATUAN
3
OH
OH
OH
OH
HARGA
SATUAN
( Rp. )
KUANTITAS
BIAYA
SATUAN
( Rp. )
54,468.75
59,062.00
78,750.00
94,500.00
0.600
0.450
0.045
0.030
32,681.25
26,577.90
3,543.75
2,835.00
65,637.90
Bh
Kg
M3
Kg
2,100.00
2,437.50
117,812.50
1,700.00
25.000
9.300
0.018
0.200
52,500.00
22,668.75
2,120.63
340.00
77,629.38
C
D
Jumlah A + B
Harga Satuan
143,267.28
143,267.28
1m Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, 2Lapis Cat Penutup) (P.Ct. 04)
HARGA
BIAYA
No.
URAIAN PEKERJAAN
SATUAN
KUANTITAS
SATUAN
SATUAN
( Rp. )
( Rp. )
1
A
1
2
3
4
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
1
2
3
4
Jumlah
BAHAN
Cat Meni
Plamur (dempul kayu)
Cat Dasar Kayu
Cat Kilat Penutup 2 Kali
3
OH
OH
OH
OH
54,468.75
59,062.00
78,750.00
94,500.00
6
0.070
0.009
0.006
0.0025
3,812.81
531.56
472.50
236.25
5,053.12
Kg
Kg
Kg
Kg
37,900.00
19,987.50
54,437.50
46,312.50
0.200
0.150
0.170
0.260
7,580.00
2,998.13
9,254.38
12,041.25
31,873.75
C
D
Jumlah A + B
Harga Satuan
36,926.87
36,926.87
1m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Dengan Cat Mutu Baik. (P.Ct. 11)
HARGA
BIAYA
No.
URAIAN PEKERJAAN
SATUAN
KUANTITAS
SATUAN
SATUAN
( Rp. )
( Rp. )
1
A
1
2
3
4
B
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Jumlah
BAHAN
1 Plamur (dempul tembok)
2 Cat Dasar tembok
3 Cat Tembok Penutup 2 x
OH
OH
OH
OH
54,468.75
59,062.00
78,750.00
94,500.00
Kg
Kg
Kg
19,987.50
54,437.50
113,750.00
6
0.020
0.063
0.0063
0.0025
1,089.38
3,720.91
496.13
236.25
5,542.66
0.100
0.120
0.260
1,998.75
6,532.50
29,575.00
38,106.25
C
D
Jumlah A + B
Harga Satuan
43,648.91
43,648.91
No
Uraian Pekerjaan
Volume
Nilai
Sat
Harga
Jumlah
Satuan
Harga
( Rp )
( Rp )
I Pekerjaan Persiapan
1 Mobilisasi/demobilisasi
1 Pembersihan Lokasi
2 Pengukuran
1.00
Lsm
7,500,000.00
7,500,000.00
380.25
84.50
m2
m'
95,865.66
8,100,647.95
81.12
54.08
m3
m3
61,874.40
3,346,167.55
II Pekerjaan struktur
1 Galian tanah/perataan
2 Pasir urug tebal 20 cm
3 Cerucuk dia 10 - 400 cm
3 Cor beton 1: 2 : 3 Tebal 20 cm
4 penulangan
1,190.00
50.70
37.44
batang
m3
kg
7,500.00
8,925,000.00
319,698.04
16,208,690.55
14,430.00
540,259.20
Jumlah
1 m'
Dibulatkan
Satuan Kerja
Nama Kegiatan
Lokasi
Tahun Anggaran
No
Uraian Pekerjaan
m'
Volume
Nilai
Sat
Harga
Jumlah
Satuan
Harga
( Rp )
( Rp )
I Pekerjaan Persiapan
1 Pembersihan Lokasi
2 Pengukuran/Pasang Patok
123.000
106.500
m2
m'
68,535.00
7,298,977.50
79.875
m3
II Pekerjaan Turap
1 Galian tanah
2 Urugan Tanah kembali
2 Cerucuk dia 10 -400 cm
3 Urugan pasir 20 cm
4 Lantai kerja tebal 5 cm camp. 1:3:5
5 Turap pas. Batu pecah camp. 1:3
6 Plesteran dinding turap camp 1 :3, tbl 1,5 cm
Jumlah
1 m'
Dibulatkan
18.638
m3
112.000
btg
7,500.00
840,000.00
39.937
m3
61,874.40
2,471,077.91
7.988
m3
1,203.33
9,611.62
101.175
m3
230,716.67
23,342,758.59
95.850
m2
1,203.33
115,339.49
Sub
Total
( Rp )
15,600,647.95
29,020,117.30
44,620,765.25
1,482,000.00
1,482,000.00
Sub
Total
( Rp )
7,298,977.50
26,778,787.62
34,077,765.12
1,010,000.00
1,010,000.00
NO.
SATUAN
HARGA SATUAN
DGN JASA & PAJAK
1
I.
1
2
3
4
4
5
6
7
8
9
10
11
II.
1
2
III.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
IV.
1
2
V.
1
2
VI.
1
2
3
4
5
VII.
1
2
3
(Rp.)
4
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Buah
51,562.00
63,333.33
150,000.00
200,000.00
266,666.67
291,666.67
350,000.00
400,000.00
367,647.06
2,000.00
50 Kg/Zak
Kg
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Batang
Batang
Batang
m3
7,400,000.00
7,650,000.00
4,100,000.00
4,500,000.00
3,625,000.00
3,750,000.00
4,900,000.00
3,525,000.00
1,200,000.00
5,000.00
70,000.00
7,500.00
M3
M1
M1
Kotak
Kotak
50,000.00
50,000.00
M2
M2
Lembar
Lembar
Lembar
Lembar
lembar
85,000.00
52,000.00
80,000.00
750,000.00
M2
M2
M2
85,000.00
120,000.00
145,000.00
NO.
SATUAN
HARGA SATUAN
DGN JASA & PAJAK
1
VIII.
1
2
3
4
5
6
7
8
9
10
IX.
1
2
3
4
5
6
7
X.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
XI.
1
2
3
XII.
1
2
XIII.
1
2
3
4
5
XIII.
1
2
3
4
(Rp.)
4
BAHAN CAT
Amplas Kayu/Besi/Tembok
D e m p u l 4kg
Cat Dasar Tembok
Meni Besi
Cat Kilat
P l a m u r 4 kg
Pelitur
Cat Tembok
Minyak Cat
Teer/Residu
BAHAN BESI, ALUMINIUM & KAWAT
Besi Beton Polos
Besi Beton Ulir
Kawat Ikat Beton
Baja Konstruksi
Kawat Las
Kawat Simpai
Besi Plat t = 1.00 mm L = 2 cm (Besi Strip)
BAHAN PENGGANTUNG, KUNCI & PEREKAT
Paku campuran
Paku Atap Seng/Paku Payung
Paku Gypsum
Paku Tripleks
Baut
Kunci KM / WC
Kunci Pintu Biasa 2 Slaag
Kunci Selot Jendela
Engsel
3"
Engsel
4"
Kait Angin
Pegangan Pintu/Jendela (Handle)
Lem Kayu / Tripleks
Seal Tape
BAHAN SANITAIR
Kloset Jongkok Merk Setara TOTO
Kran Air Merk Setara San- Ei
Floor Drain Merk Setara SES
BAHAN SANITAIR
Pipa PVC Type AW dia. 3/4"
Pipa PVC Type AW dia. 1"
BAHAN ELEKTRIKAL ( Electrical, Cables, Lamps )
Fitting Duduk Brocco
Lampu SL Merk ( Philips ) 20 Watt
Saklar Tunggal inbow Merk Broco
Saklar Double Inbow Merk Broco
Stop Kontak Inbow Merk Broco
BAHAN BAKAR
Minyak Tanah
Bensin Premium
Minyak Pelumas
Minuak diesel/solar SPBU
Lembar
Kg
Kg
Kaleng
Kg
Kg
Kg
Kg
Liter
Liter
25,000.00
50,000.00
30,000.00
18,000.00
25,000.00
27,000.00
33,000.00
30,000.00
20,000.00
10,000.00
Kg
Kg
Kg
Kg
Btg
Kg
lembar
12,000.00
13,500.00
17,000.00
Kg
Kg
Kg
Kg
Bh
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Kg
Buah
Buah
Buah
Buah
M'
M'
Buah
Buah
Buah
Buah
Buah
Ltr
Ltr
Ltr
Ltr
5,500.00
18,000.00
1,500,000.00
18,000.00
18,500.00
17,000.00
35,000.00
SATUAN
HARGA SATUAN
DGN JASA & PAJAK
(Rp.)
4
I
1
Pekerja
3
Org / Hari
Mandor
Org / Hari
Kepala Tukang
Org / Hari
Tukang
Org / Hari
Tukang Kepala
Org / Hari
H TEGUH BUDHIRAHARDJO
DIREKTUR
NO
U R A I A N
VOLUME
SAT.
KODE ANALISA
HARGA
SATUAN
(Rp.)
JUMLAH
(Rp.)
Ls
8,040.00
PSi.02
68,535.00
1
I
PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi
2 Pengukuran & Pemasangan Bouwplank
702.00
89.60
M'
SUB TOTAL
II
6,140,736.00
11,784,816.00
PEKERJAAN PONDASI
1 Galian Tanah Pondasi
114.44
PT.01
384.00
Btg
PK.48
70,000.00
26,880,000.00
PT.08
61,874.40
429,408.34
PBe.02
352,786.27
610,320.25
6.94
1.73
M3
6.39
G.Sub.A
3,962,334.04
25,319,314.51
2.55
M3
G.Sub.G
6,780,258.04
17,289,658.00
16.13
M3
G.Sub.C
4,896,654.94
78,983,044.16
96.84
M3
PT.05
SUB TOTAL
III
5,644,080.00
149,511,745.25
11.94
M3
G.Sub.E
4,009,342.24
47,871,546.33
9.21
M3
G.Sub.F
3,436,638.04
31,651,436.33
1.97
G.Sub.L
2,942,148.04
5,796,031.64
6.00
G.Sub.G
6,780,258.04
40,681,548.23
5.25
M3
G.Sub.H
3,798,375.04
19,941,468.95
43.38
M3
G.Sub.J
1,117,677.04
48,484,829.93
7 Pelat Lantai 2, t = 10 cm
37.68
G.Sub.K
2,947,656.04
111,067,679.53
8 Kolom Praktis
0.38
M3
G.Sub.I
4,209,903.04
1,599,763.15
5.25
M3
G.Sub.F
3,707,993.14
19,466,963.98
- Tangga N/T
7.51
M3
G.Sub.M
3,006,171.34
22,576,346.75
1.75
G.Sub.J
1,117,677.04
1,955,934.82
10 Tangga Beton
M
SUB TOTAL
IV
351,093,549.63
4.48
M3
PK.33
3.41
M3
PK.17
542.32
M2
542.32
M2
19.00
M'
PPA.11'
900.00
17,100.00
6 Jurai
25.16
M'
55,000.00
1,383,800.00
110.68
M'
PK.20
88.00
Bh
#REF!
#REF!
4,023,500.00
13,720,135.00
PK.18
46,200.00
25,055,184.00
PPA.03'
141,300.00
76,629,816.00
118.00
Bh
18.90
M2
PL.02"
450.00
49,806.00
5,000.00
440,000.00
85,245.00
SUB TOTAL
V
1,611,130.50
#REF!
M3
1,385.30
3,137.42
PT.08
61,874.40
9,227,329.27
PPBC.05
46,394.00
64,269,608.03
M2
PPs.05
1,203.33
3,775,361.87
42.46
M2
PPs.05
1,203.33
51,093.53
399.38
M2
PPLD.01"
52,660.00
21,031,350.74
376.76
M2
PPLD.01"
52,660.00
19,840,181.55
60.24
M2
PPLD.01"
52,660.00
3,172,238.39
NO
U R A I A N
VOLUME
SAT.
4
64.43
KODE ANALISA
5
PPLD.01'
HARGA
SATUAN
(Rp.)
JUMLAH
(Rp.)
52,660.00
SUB TOTAL
VI
3,392,883.79
124,760,047.17
1.93
5.00
Unit
19.40
PK.14
SNI.3434-6.8
4,950,000.00
9,553,500.00
450,000.00
2,250,000.00
70.50
500,000.00
35,250,000.00
32.00
SNI.3434.6,10
72,540.00
2,321,280.00
3.92
F.37.c
160,025.00
627,298.00
23.85
195,000.00
4,650,750.00
54,652,828.00
NO
U R A I A N
VOLUME
SAT.
KODE ANALISA
HARGA
SATUAN
(Rp.)
JUMLAH
(Rp.)
1
VII
PEKERJAAN PLAFOND
2
354.73
150.00
M'
375.00
200.00
M'
161.39
PL.02'
106,556.25
15,000.00
2,250,000.00
PL.02'
106,556.25
39,958,593.75
15,000.00
3,000,000.00
PL.02"
85,245.00
13,757,690.55
SUB TOTAL
37,798,698.56
96,764,982.86
66.00
Ttk
125,000.00
8,250,000.00
1.00
Unit
4,500,000.00
4,500,000.00
50.00
Bh
50.00
Bh
10.00
Bh
10.00
Bh
15.00
Bh
SUB TOTAL
IX
12,750,000.00
PEKERJAAN PENGECATAN
1 Cat Kilat
217.97
M2
K23+K30
2 Cat Teer
108.66
M2
SUPL.SNI.PC-6.12
3,500.00
5.00
M2
PC.05
17,226.00
86,130.00
4,535.85
M2
K23+K30b
11,070.00
50,211,859.50
3 Cat Pelitur
4 Cat Tembok
#REF!
#REF!
SUB TOTAL
X
380,310.00
#REF!
15.00
Bh
PKK.01
60.00
Bh
PKK.06
92.00
Bh
PKK.07
46.00
Bh
PKK.10
5 Kait Jendela
92.00
Bh
PKK.08
6 Handle Jendela
92.00
Bh
PKK.11
SUB TOTAL
XI
PEKERJAAN SANITAIR
1 Kloset Jongkok Merk TOTO
5.00
Bh
PSa.02
633.33
5.00
Bh
PSa.08
5.00
Bh
PSa.06
3 Septic Tank
3.00
Unit
5.00
Unit
5.00
Unit
3,000,000.00
9,000,000.00
250,000.00
1,250,000.00
1,500,000.00
SUB TOTAL
XII
3,166.67
7,500,000.00
17,753,166.67
PEKERJAAN SALURAN
1 Galian Tanah
34.96
M3
PT.01
22.72
M3
PT.05
12.24
M3
PBe.03
319,698.04
122.36
M2
PPs.05
1,203.33
4 Plesteran Saluran
SUB TOTAL
3,913,103.99
147,239.86
4,060,343.85
226.62
M'
400,000.00
90,648,000.00
116.13
PPs.05
1,203.33
139,743.09
PBe.03
319,698.04
0.62
198,212.78
90,985,955.88
#REF!
REKAPITULASI
RENCANA ANGGARAN BIAYA
NO
U R A I A N
JUMLAH
(Rp.)
PEKERJAAN PERSIAPAN
11,784,816.00
II
PEKERJAAN PONDASI
149,511,745.25
III
351,093,549.63
IV
#REF!
124,760,047.17
VI
54,652,828.00
VII
PEKERJAAN PLAFOND
96,764,982.86
VIII
12,750,000.00
IX
PEKERJAAN PENGECATAN
XI
PEKERJAAN SANITAIR
XII
PEKERJAAN SALURAN
4,060,343.85
XIII
PEKERJAAN LAIN-LAIN
90,985,955.88
#REF!
17,753,166.67
JUMLAH
#REF!
PEMBULATAN
#REF!
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Batu/Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Keramik uk. 30 x 30 cm
Semen Portland
Pasir Beton/Pasang
Semen Warna
Jumlah
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PPLD.01"
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.350
0.620
0.035
0.030
Ktk
Kg
50,000.00
63,333.33
-
1.000
11.380
0.042
0.100
50,000.00
2,660.00
52,660.00
52,660.00
52,660.00
M3
Kg
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Lantai & Dinding - 6. 44
URAIAN PEKERJAAN
2
TENAGA
Tukang Batu/Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Keramik uk. 20 x 20 cm Polos
Semen Portland
Pasir Beton/Pasang
Semen Warna
Jumlah
Jumlah A + B
Harga Satuan
)
SATUAN
3
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PPLD.01'
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.350
0.620
0.035
0.030
Ktk
Kg
50,000.00
63,333.33
-
1.000
11.380
0.042
0.100
50,000.00
2,660.00
52,660.00
52,660.00
52,660.00
M
Kg
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Lantai & Dinding - 6. 44
PROPINSI :
KODE
KABUPATEN
KODE
KALIMANTAN BARAT
61
SANGGAU
03
Jenis Alat
Tenaga
Harga
Umur Kerja
KODE
E.080
DISIAPKAN TANGGAL :
ROLLER, 3 WHEELED
51
Rp.
550,000,000
10
HP
Juta
Tahun
15000 Jam
Atau :
Faktor (CRF) :
0.18062
( Pada 12,5% )
1500.00 Jam
90%
Harga Alat
(CRF)
1
Jam/Tahun
0.90
550,000,000.00
0.18062
= Rp.
59,604.60
= Rp.
12,100.00
= Rp.
71,704.60
1,500.00
2. Lain-lain
3.30%
Harga
Jam/thn
0.033
550,000,000.00
1,500.00
Sub Total
B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam)
Kebutuhan Bahan Bakar dan pelumas tiap HP :
Harga :
Diesel
0.160 Liter/HP/Jam
Bensin
0.170 Liter/HP/Jam
Pelumas
0.006 Liter/HP/Jam
Solar
Bensin
Pelumas
6,875.00
/ Liter
7,500.00
/ Liter
33,750.00
/ Liter
Bahan Bakar
0.160 x
51
Rp.
6,875.00
= Rp.
56,100.00
Pelumas
0.006 x
51
Rp.
33,750.00
= Rp.
10,327.50
0.600 x
59,604.60
= Rp.
35,762.76
= Rp.
102,190.26
( 60% x depresiasi )
Sub Total
Rp.
71,704.60
Rp.
102,190.26
= Rp.
173,894.86
PROPINSI :
KODE
KABUPATEN
KODE
KALIMANTAN BARAT
61
SANGGAU
03
Jenis Alat
Tenaga
Harga
Umur Kerja
KODE
E.084
DISIAPKAN TANGGAL :
ROLLER, PNEUMATIC
95
Rp.
1,040,000,000
10
HP
Juta
Tahun
15000 Jam
Atau :
Faktor (CRF) :
0.18062
( Pada 12,5% )
1500.00 Jam
90%
Harga Alat
(CRF)
1
Jam/Tahun
0.90
1,040,000,000.00
0.18062
= Rp.
112,706.88
= Rp.
22,880.00
= Rp.
135,586.88
1,500.00
2. Lain-lain
3.30%
Harga
Jam/thn
0.033
1,040,000,000.00
1,500.00
Sub Total
B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam)
Kebutuhan Bahan Bakar dan pelumas tiap HP :
Harga :
Diesel
0.160 Liter/HP/Jam
Bensin
0.170 Liter/HP/Jam
Pelumas
0.006 Liter/HP/Jam
Solar
Bensin
Pelumas
6,875.00
/ Liter
7,500.00
/ Liter
33,750.00
/ Liter
Bahan Bakar
0.160 x
95
Rp.
6,875.00
= Rp.
104,500.00
Pelumas
0.006 x
95
Rp.
33,750.00
= Rp.
19,237.50
0.600 x
112,706.88
= Rp.
67,624.13
= Rp.
191,361.63
( 60% x depresiasi )
Sub Total
Rp.
135,586.88
Rp.
191,361.63
= Rp.
326,948.51
PROPINSI :
KODE
KABUPATEN
KODE
KALIMANTAN BARAT
61
SANGGAU
03
Jenis Alat
Tenaga
Harga
Umur Kerja
KODE
E.153
DISIAPKAN TANGGAL :
65,953,578
6
HP
Juta
Tahun
4500 Jam
Faktor (CRF) :
0.24668
( Pada 12,5% )
Atau :
750 Jam
90%
Harga Alat
(CRF)
1
Jam/Tahun
0.90
65,953,578.00
0.24668
= Rp.
19,523.31
= Rp.
2,901.96
= Rp.
22,425.27
7,700.00
750.00
2. Lain-lain
3.30%
Harga
Jam/thn
0.033
65,953,578.00
750.00
Sub Total
B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam)
Kebutuhan Bahan Bakar dan pelumas tiap HP :
Harga :
Diesel
0.160 Liter/HP/Jam
Bensin
0.170 Liter/HP/Jam
Pelumas
0.006 Liter/HP/Jam
Solar
Bensin
Pelumas
6,875.00
/ Liter
7,500.00
/ Liter
33,750.00
/ Liter
Bahan Bakar
0.160 x
Rp.
6,875.00
= Rp.
Pelumas
0.006 x
Rp.
33,750.00
= Rp.
1,417.50
0.600 x
19,523.31
= Rp.
11,713.99
= Rp.
20,831.49
( 60% x depresiasi )
Sub Total
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT PER JAM
A + B
Rp.
22,425.27
Rp.
20,831.49
= Rp.
43,256.76
PROPINSI :
KODE
KABUPATEN
KODE
KALIMANTAN BARAT
61
SANGGAU
03
Jenis Alat
Tenaga
Harga
Umur Kerja
KODE
E.154
DISIAPKAN TANGGAL :
176,928,000
6
HP
Juta
Tahun
4500 Jam
Faktor (CRF) :
0.24668
( Pada 12,5% )
Atau :
750 Jam
90%
Harga Alat
(CRF)
1
Jam/Tahun
0.90
176,928,000.00
0.24668
= Rp.
52,373.52
= Rp.
7,784.83
= Rp.
60,158.35
6,600.00
750.00
2. Lain-lain
3.30%
Harga
Jam/thn
0.033
176,928,000.00
750.00
Sub Total
B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam)
Kebutuhan Bahan Bakar dan pelumas tiap HP :
Harga :
Diesel
0.160 Liter/HP/Jam
Bensin
0.170 Liter/HP/Jam
Pelumas
0.006 Liter/HP/Jam
Solar
Bensin
Pelumas
6,875.00
/ Liter
7,500.00
/ Liter
33,750.00
/ Liter
Bahan Bakar
0.160 x
Rp.
6,875.00
= Rp.
Pelumas
0.006 x
Rp.
33,750.00
= Rp.
1,215.00
0.600 x
52,373.52
= Rp.
31,424.11
= Rp.
39,239.11
( 60% x depresiasi )
Sub Total
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT PER JAM
A + B
Rp.
60,158.35
Rp.
39,239.11
= Rp.
99,397.46
PROPINSI :
KODE
KABUPATEN
KODE
KALIMANTAN BARAT
61
SANGGAU
03
Jenis Alat
Tenaga
Harga
Umur Kerja
KODE
E.212
DISIAPKAN TANGGAL :
523,260,000
6
HP
Juta
Tahun
9000 Jam
Atau :
Faktor (CRF) :
0.24668
( Pada 12,5% )
1500.00 Jam
90%
Harga Alat
(CRF)
1
Jam/Tahun
0.90
523,260,000.00
0.24668
= Rp.
77,446.67
= Rp.
11,511.72
= Rp.
88,958.39
1,500.00
2. Lain-lain
3.30%
Harga
Jam/thn
0.033
523,260,000.00
1,500.00
Sub Total
B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam)
Kebutuhan Bahan Bakar dan pelumas tiap HP :
Harga :
Diesel
0.160 Liter/HP/Jam
Bensin
0.170 Liter/HP/Jam
Pelumas
0.006 Liter/HP/Jam
Solar
Bensin
Pelumas
6,875.00
/ Liter
7,500.00
/ Liter
33,750.00
/ Liter
Bahan Bakar
0.160 x
145
Rp.
6,875.00
= Rp.
159,500.00
Pelumas
0.006 x
145
Rp.
33,750.00
= Rp.
29,362.50
0.600 x
77,446.67
= Rp.
46,468.00
= Rp.
235,330.50
( 60% x depresiasi )
Sub Total
Rp.
88,958.39
Rp.
235,330.50
= Rp.
324,288.89
KODE
:
:
Jenis Alat
Tenaga
Harga
Umur Kerja
KODE
61
:
:
:
:
:
:
KODE
03
E.221
DISIAPKAN TANGGAL :
80
289,560,000
6
HP
Juta
Tahun
( 1 Tahun : 300 Hari Kerja )
1 Tahun =
Atau :
9000 Jam
Faktor (CRF) :
( Pada 12,5% )
0.24668
1500.00 Jam
2. Lain-lain
90%
Harga Alat
0.90
289,560,000.00
1,500.00
3.30%
0.033
(CRF)
1
Jam/Tahun
0.24668
= Rp.
42,857.20
= Rp.
6,370.32
= Rp.
49,227.52
= Rp.
= Rp.
= Rp.
88,000.00
16,200.00
25,714.32
= Rp.
129,914.32
= Rp.
179,141.83
Harga
Jam/thn
289,560,000.00
1,500.00
Sub Total
B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam)
Kebutuhan Bahan Bakar dan pelumas tiap HP :
Diesel
=
0.160 Liter/HP/Jam
Bensin
=
0.170 Liter/HP/Jam
Pelumas
=
0.006 Liter/HP/Jam
Harga :
Solar
Bensin
Pelumas
=
=
=
Bahan Bakar
Pelumas
Perbaikan dan Spareparts
( 60% x depresiasi )
6,875.00
7,500.00
33,750.00
=
=
=
/ Liter
/ Liter
/ Liter
0.160 x
0.006 x
0.600 x
80
80
42,857.20
x
x
Rp.
Rp.
Sub Total
6,875.00
33,750.00
Rp.
49,227.52
Rp.
129,914.32
KODE
:
:
Jenis Alat
Tenaga
Harga
Umur Kerja
KODE
61
:
:
:
:
:
:
KODE
03
E.253
DISIAPKAN TANGGAL :
20
146,479,310
5
HP
Juta
Tahun
( 1 Tahun : 300 Hari Kerja )
1 Tahun =
Atau :
7500 Jam
Faktor (CRF) :
( Pada 12,5% )
0.28085
1500.00 Jam
2. Lain-lain
90%
Harga Alat
0.90
146,479,310.00
1,500.00
3.30%
0.033
(CRF)
1
Jam/Tahun
0.28085
= Rp.
24,683.23
= Rp.
3,222.54
= Rp.
27,905.77
= Rp.
= Rp.
= Rp.
22,000.00
4,050.00
14,809.94
= Rp.
40,859.94
= Rp.
68,765.71
Harga
Jam/thn
146,479,310.00
1,500.00
Sub Total
B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam)
Kebutuhan Bahan Bakar dan pelumas tiap HP :
Diesel
=
0.160 Liter/HP/Jam
Bensin
=
0.170 Liter/HP/Jam
Pelumas
=
0.006 Liter/HP/Jam
Harga :
Solar
Bensin
Pelumas
=
=
=
Bahan Bakar
Pelumas
Perbaikan dan Spareparts
( 60% x depresiasi )
6,875.00
7,500.00
33,750.00
=
=
=
/ Liter
/ Liter
/ Liter
0.160 x
0.006 x
0.600 x
20
20
24,683.23
x
x
Rp.
Rp.
Sub Total
6,875.00
33,750.00
Rp.
27,905.77
Rp.
40,859.94
KODE
:
:
Jenis Alat
Tenaga
Harga
Umur Kerja
KODE
61
:
:
:
:
:
:
KODE
03
E.341
DISIAPKAN TANGGAL :
8
20,230,440
4
HP
Juta
Tahun
( 1 Tahun : 300 Hari Kerja )
1 Tahun =
Atau :
3000 Jam
Faktor (CRF) :
( Pada 12,5% )
0.33271
750.00 Jam
2. Lain-lain
90%
Harga Alat
0.90
20,230,440.00
750.00
3.30%
Harga
Jam/thn
0.033
20,230,440.00
750.00
(CRF)
1
Jam/Tahun
0.33271
= Rp.
8,077.04
= Rp.
890.14
= Rp.
8,967.18
= Rp.
= Rp.
= Rp.
8,800.00
1,620.00
4,846.23
= Rp.
15,266.23
= Rp.
24,233.41
Sub Total
B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam)
Kebutuhan Bahan Bakar dan pelumas tiap HP :
Diesel
=
0.160 Liter/HP/Jam
Bensin
=
0.170 Liter/HP/Jam
Pelumas
=
0.006 Liter/HP/Jam
Harga :
Solar
Bensin
Pelumas
=
=
=
Bahan Bakar
Pelumas
Perbaikan dan Spareparts
( 60% x depresiasi )
6,875.00
7,500.00
33,750.00
=
=
=
/ Liter
/ Liter
/ Liter
0.160 x
0.006 x
0.600 x
8
8
8,077.04
x
x
Rp.
Rp.
Sub Total
6,875.00
33,750.00
Rp.
8,967.18
Rp.
15,266.23
: Kalimantan Barat
( 61 )
Kabupaten
: Sanggau
( 03 )
No
Kode
Harga Pokok
Jarak Angkut
ke Lokasi
( KM )
Ongkos
Angkut
( Rp. )
Total
Harga
(Rp.)
Biaya Operasi
Per Jam
(Rp.)
7=4+6
E.080
E.084
E.153
E.154
E.212
E.221
E.253
E.341
550,000,000.00
1,040,000,000.00
65,953,578.00
176,928,000.00
523,260,000.00
289,560,000.00
146,479,310.00
20,230,440.00
120
120
120
120
120
120
120
120
1
2
3
4
5
6
7
8
Roller, 3 Wheeled
Roller, Pneumatic
Spayer, Self Prop
Aspalt Sprayer Towed
Dump Truck 5 Ton
Flatbed Truck 4 Ton
Conc. Mixer 0.50 M3
Pump, Water (5 Cm)
51
95
7
6
145
80
20
8
HP
HP
HP
HP
HP
HP
HP
HP
550,000,000.00
1,040,000,000.00
65,953,578.00
176,928,000.00
523,260,000.00
289,560,000.00
146,479,310.00
20,230,440.00
NILAI N
FAKTOR BIAYA PENGEMBALIAN MODAL
UMUR
10%
12.5%
PEMAKAIAN
Umur 12 Tahun
0.14676
0.16519
Umur 11 Tahun
0.15396
0.17211
Umur 10 Tahun
0.16275
0.18062
Umur 9 Tahun
0.17364
0.19126
Umur 8 Tahun
0.18744
0.20483
Umur 7 Tahun
0.20541
0.22260
Umur 6 Tahun
0.22961
0.24668
Umur 5 Tahun
0.26300
0.28085
Umur 4 Tahun
0.31547
0.33271
Umur 3 Tahun
0.40211
0.41993
Umur 2 Tahun
0.57619
0.59559
Umur 1 Tahun
1.10000
0.12500
15%
0.18448
0.19107
0.19925
0.20957
0.22285
0.24036
0.26424
0.29832
0.35027
0.43798
0.61512
0.15000
#REF!
#REF!
#REF!
#REF!
#REF!
173,894.86
326,948.51
43,256.76
99,397.46
324,288.89
179,141.83
68,765.71
24,233.41
KODE
K.020.A
KODE
KABUPATEN
KODE
KALIMANTAN BARAT
( 61 )
SANGGAU
03
PROSES
DISIAPKAN OLEH :
TANGGAL :
ANGGAPAN :
1.
2.
3.
penghamparan
4. Hasil produksi dimuat dalam dump truk 5 ton dan dikirim ke tempat pekerjaan
5. Rata-rata umur alat bantu 1 sebulan/orang/set
PEKERJA
VOL
HARI
KODE
TOTAL VOL
UPAH
BIAYA
SUB TOTAL
(org/hari)
(Rp./org/hari)
(Rp.)
(Rp.)
E
K
Mandor Lapangan
5.00
1.00
L 061
5.00
#REF!
#REF!
Supir Material/truck
4.00
1.00
L 091
4.00
#REF!
#REF!
83.00
1.00
L 101
83.00
#REF!
#REF!
6.00
1.00
L 103
6.00
#REF!
#REF!
6.00
1.00
L 082
6.00
#REF!
#REF!
PEKERJA
MATERIAL
JUMLAH
SATUAN
KODE
#REF!
TOTAL
HARGA
BIAYA
SUB TOTAL
VOL
(Rp./Unit)
(Rp.)
(Rp.)
A
T
M3
M 041
45.00
Aspal bitumen
Kg
M 061
9000.00
63,333.33
Semen
50 Kg
M 080
70.40
Kayu bakar
M3
M 070
90.00
#REF!
#REF!
Alat bantu
Set
M 170
3.00
#REF!
#REF!
Stonedust
M3
7.50
#REF!
#REF!
2,849,999.85
#REF!
#REF!
MATERIAL
PEKERJA
JUMLAH
HARI
KERJA
KODE
#REF!
JAM
HARGA
BIAYA
SUB TOTAL
KERJA
(Rp./Jam)
(Rp.)
(Rp.)
E
R
Dumptruk 5 ton/145 HP
4.00
1.00
E 212
24.00
324,288.89
7,782,933.26
3.00
1.00
E 253
15.00
68,765.71
1,031,485.66
L
A
T
A
N
VOLUME :
100.00
SATUAN :
Ton
HARGA SATUAN
Rp.
PERALATAN
8,814,418.91
TOTAL (Rp.)
#REF!
#REF!
per
Ton
K.516
(MENGGUNAKAN BURUH)
PROPINSI :
KODE
KABUPATEN
KODE
KALIMANTAN BARAT
( 61 )
SANGGAU
03
URAIAN :
KODE
DISIAPKAN OLEH :
TANGGAL :
ANGGAPAN :
disusun berdiri
PEKERJA
VOL
HARI
KODE
TOTAL VOL
(org.hari)
UPAH
BIAYA
SUB TOTAL
(Rp./org/hari)
(Rp.)
(Rp.)
E
K
Mandor Lapangan
3.00
1.00
L 061
3.00
#REF!
#REF!
Operator Telatih
1.00
1.00
L 081
1.00
#REF!
#REF!
99.00
1.00
L 101
99.00
#REF!
#REF!
J
A
PEKERJA
MATERIAL
JUMLAH
SATUAN
KODE
#REF!
TOTAL
HARGA
BIAYA
SUB TOTAL
VOL
(Rp./Unit)
(Rp.)
(Rp.)
A
T
M3
M 020
50.00
200,000.00
10,000,000.00
M3
M 022
20.00
266,666.67
5,333,333.40
M3
M 040
30.00
51,562.00
1,546,860.00
Alat Bantu
Set
M 170
4.00
#REF!
JAM
HARGA
BIAYA
SUB TOTAL
KERJA
(Rp./Jam)
(Rp.)
(Rp.)
#REF!
A
L
MATERIAL
PEKERJA
JUMLAH
HARI
KERJA
KODE
#REF!
E
R
51 HP
1.00
1.00
E 080
5.00
173,894.86
869,474.30
A
L
A
T
A
N
PERALATAN
869,474.30
#REF!
TOTAL (Rp.)
VOLUME :
80.00
SATUAN :
M3
HARGA SATUAN
Rp.
#REF!
per
M3
KODE
K.618
PROPINSI :
KODE
KABUPATEN
KODE
KALIMANTAN BARAT
( 61 )
SANGGAU
03
URAIAN :
DISIAPKAN OLEH :
TANGGAL :
ANGGAPAN :
2. Harga material (agregat pokok, agregat pengunci, agregat penutup, aspal bitumen)
3.Volume aspal bitumen cair untuk tack coat/prime coat 0,8 lt/m2
PEKERJA
VOL
HARI
KODE
TOTAL VOL
UPAH
BIAYA
SUB TOTAL
(org.hari)
(Rp./org/hari)
(Rp.)
(Rp.)
E
K
Mandor Lapangan
2.00
3.00
L 061
6.00
#REF!
#REF!
Operator Terlatih
2.00
3.00
L 081
6.00
#REF!
#REF!
Sopir
1.00
3.00
L 091
1.00
#REF!
#REF!
66.00
3.00
L 101
198.00
#REF!
#REF!
2.00
3.00
L 106
6.00
#REF!
#REF!
PEKERJA
MATERIAL
JUMLAH
SATUAN
KODE
#REF!
TOTAL
HARGA
BIAYA
SUB TOTAL
VOL
(Rp./Unit)
(Rp.)
(Rp.)
A
T
M3
M 023
56.00
291,666.67
16,333,333.52
M3
M 024
31.00
350,000.00
10,850,000.00
M3
M 025
15.50
400,000.00
6,200,000.00
M3
M 041
3.50
63,333.33
221,666.66
Aspal bitumen
Kg
M 061
6270.00
#REF!
#REF!
Minyak tanah
Lt
M 065
450.00
Set
M 170
8.10
#REF!
JAM
HARGA
BIAYA
SUB TOTAL
KERJA
(Rp./Jam)
(Rp.)
(Rp.)
Alat Bantu
#REF!
MATERIAL
PEKERJA
JUMLAH
HARI
KERJA
KODE
#REF!
E
R
1.00
1.00
E 080
15.00
173,894.86
Sprayer 7 HP
1.00
1.00
E 153
15.00
43,256.76
648,851.41
1.00
1.00
E 221
15.00
179,141.83
2,687,127.52
2,608,422.90
A
T
A
N
VOLUME :
1400.00
SATUAN :
M2
HARGA SATUAN
Rp.
PERALATAN
5,944,401.82
TOTAL (Rp.)
#REF!
#REF!
per
M2
KODE
K.638
KODE
KABUPATEN
KODE
KALIMANTAN BARAT
( 61 )
SANGGAU
03
URAIAN :
DISIAPKAN OLEH :
TANGGAL :
ANGGAPAN :
1.
2.
3.
4.
PEKERJA
VOL
HARI
KODE
TOTAL VOL
UPAH
BIAYA
SUB TOTAL
(org.hari)
(Rp./org/hari)
(Rp.)
(Rp.)
E
K
Mandor Lapangan
1.00
1.00
L 061
1.00
#REF!
#REF!
Operator Terlatih
3.00
1.00
L 081
3.00
#REF!
#REF!
10.00
1.00
L 101
10.00
#REF!
#REF!
8.00
1.00
L 103
8.00
#REF!
#REF!
Sopir
1.00
1.00
L 091
1.00
#REF!
#REF!
PEKERJA
MATERIAL
JUMLAH
SATUAN
KODE
#REF!
TOTAL
HARGA
BIAYA
SUB TOTAL
VOL
(Rp./Unit)
(Rp.)
(Rp.)
#REF!
#REF!
A
T
Aspal Bitumen
Kg
M 061
480.00
Minyak Tanah
Ltr
M 065
480.00
Alat Bantu
Set
M 170
4.00
#REF!
#REF!
Campuran LATASIR
Tonne
K 020 A
60.00
#REF!
#REF!
Kayu Bakar
M3
M 070
4.48
#REF!
#REF!
JAM
HARGA
BIAYA
SUB TOTAL
KERJA
(Rp./Jam)
(Rp.)
(Rp.)
L
MATERIAL
PEKERJA
JUMLAH
HARI
KERJA
KODE
#REF!
E
R
A
1.00
1.00
E 084
5.00
326,948.51
1,634,742.54
1.00
1.00
E 154
5.00
99,397.46
496,987.31
A
T
A
N
VOLUME :
1600.00
SATUAN :
M2
HARGA SATUAN
Rp.
PERALATAN
2,131,729.85
TOTAL (Rp.)
#REF!
#REF!
per
M2
KODE
K.810
PROPINSI :
KODE
KABUPATEN
KODE
KALIMANTAN BARAT
( 61 )
SANGGAU
03
URAIAN :
DISIAPKAN OLEH :
TANGGAL :
ANGGAPAN :
1.
1. Dilakukan untuk pekerjaan gorong-gorong, jembatan, dinding penahan tanah dan struktur lainnya
2.
3.
PEKERJA
VOL
HARI
KODE
TOTAL VOL
UPAH
BIAYA
SUB TOTAL
(org.hari)
(Rp./org/hari)
(Rp.)
(Rp.)
E
K
Mandor Lapangan
1.00
1.00
L 061
1.00
#REF!
#REF!
Tukang
4.00
1.00
L. 079
4.00
#REF!
#REF!
12.00
1.00
L 101
12.00
#REF!
#REF!
J
A
PEKERJA
MATERIAL
JUMLAH
SATUAN
KODE
#REF!
TOTAL
HARGA
BIAYA
SUB TOTAL
VOL
(Rp./Unit)
(Rp.)
(Rp.)
#REF!
A
T
M3
M 010
5.00
#REF!
M3
M 041
1.25
63,333.33
Semen
50 Kg
M 080
15.20
Alat Bantu
Tonne
M 170
0.75
#REF!
JAM
HARGA
BIAYA
SUB TOTAL
KERJA
(Rp./Jam)
(Rp.)
(Rp.)
79,166.66
#REF!
A
L
MATERIAL
PEKERJA
JUMLAH
HARI
KERJA
KODE
#REF!
E
R
A
1.00
1.00
E 341
2.00
24,233.41
48,466.82
L
A
T
A
N
PERALATAN
48,466.82
#REF!
TOTAL (Rp.)
VOLUME :
5.00
SATUAN :
M3
HARGA SATUAN
Rp.
#REF!
per
M3
No
1
2
Jenis Pekerjaan
MEMPRODUKSI CAMPURAN LATASIR
KONSTRUKSI LAPIS PONDASI BAWAH (LPB) KLAS TELFORD
( MENGGUNAKAN BURUH )
( MENGGUNAKAN BURUH )
( MENGGUNAKAN BURUH )
( MENGGUNAKAN BURUH )
( MENGGUNAKAN BURUH )
Satuan
Kode
Harga Satuan
(Rp.)
TONNE
K. 020 A
#REF!
K. 516
#REF!
K. 618
#REF!
K. 638
#REF!
K. 810
#REF!
M
M
M
M
#REF!
#REF!
#REF!
#REF!
#REF!
Satuan Kerja
Nama Kegiatan :
Lokasi
: Pontianak
No
Uraian Pekerjaan
Volume
Nilai
Sat
Harga
Jumlah
Sub
Satuan
Harga
Total
( Rp )
( Rp )
( Rp )
I STANDAR
1 Pembangunan Rumah Type B
2 Pagar Keliling
120.00
m2
3,217,000.00
386,040,000.00
84.50
m'
1,297,000.00
109,596,500.00
84.50
m'
1,482,000.00
125,229,000.00
106.50
m'
1,010,000.00
107,565,000.00
II NON STANDAR
1 Pembangunan Jalan Lingkungan
Rabat Beton Campuran 1: 2 : 3
2 Pembuatan Turap Batu Pecah
Jumlah
728,430,500.00
Dibulatkan
728,430,000.00
Terbilang
: Tujuh ratus dua puluh delapan juta empat ratus tiga puluh ribu rupiah
Pontianak,
Mengetahui
Kepala Dinas Kehewanan Dan Peternakan
Propinsi Kalimantan Barat
Maret 2009
Dibuat oleh :
Konsultan Perencana
CV KARYA ENDAH LESTARI
H TEGUH BUDIRAHARDJO
DIREKTUR
Nama Kegiatan :
Lokasi
: Pontianak
Tahun Anggaran : 2010
Pengukuran dan Pemasangan Bouwplank ( m' )
HARGA
NO.
1
A
1
2
3
4
B
1
2
3
C
D
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kayu Kelas II
Paku
Papan Kayu Kelas II
Jumlah
Jumlah A + B
Harga Satuan
KUANTITAS
SATUAN
( Rp. )
4
PSi.02
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.100
0.100
0.010
0.005
M3
Kg
3,625,000.00
18,000.00
3,525,000.00
0.012
0.020
0.007
43,500.00
360.00
24,675.00
68,535.00
68,535.00
68,535.00
M3
Pembuatan Direksi Keet, Gudang Bahan Bangunan dan Alat, dan/atau Bedeng Pekerjaan (m )
HARGA
NO.
URAIAN PEKERJAAN
SATUAN
SATUAN
( Rp. )
1
2
3
4
A
TENAGA
1 Tukang Kayu
OH
2 Pekerja
OH
3 Kepala Tukang
OH
4 Mandor
OH
Jumlah
B
BAHAN
1 Kayu Cerucuk (Dolken) d=10, p=4 m
Btg
7,500.00
2 Kayu Kelas III
M3
3 Paku
Kg
18,000.00
4 Paku Payung
Kg
18,500.00
5 Seng Gelombang BJLS 0.20
Lbr
750,000.00
6 Papan Kayu Kelas III
1,200,000.00
M3
Jumlah
C
Jumlah A + B
D
Harga Satuan
KUANTITAS
5
PSi.04
BIAYA
SATUAN
( Rp. )
6
2.000
1.000
0.200
0.050
1.250
0.186
0.150
0.150
1.500
0.07776
9,375.00
2,700.00
2,775.00
1,125,000.00
93,312.00
1,233,162.00
1,233,162.00
1,233,162.00
A
1
2
3
4
B
1
2
C
D
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
KUANTITAS
TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Semen Portland
Pasir Beton/Pasang
Jumlah
Jumlah A + B
Harga Satuan
PPs.05
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.150
0.200
0.015
0.010
Kg
63,333.33
6.480
0.019
1,203.33
1,203.33
1,203.33
1,203.33
M3
TENAGA
Pekerja
Mandor
Jumlah
BAHAN
C
D
Jumlah
Jumlah A + B
Harga Satuan
PT.01
URAIAN PEKERJAAN
SATUAN
3
OH
OH
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
-
0.400
0.040
BIAYA
SATUAN
( Rp. )
6
-
TENAGA
Pekerja
Mandor
BAHAN
C
D
Jumlah
Jumlah A + B
Harga Satuan
PT.05
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
4
OH
OH
KUANTITAS
5
-
BIAYA
SATUAN
( Rp. )
6
0.192
0.0192
Jumlah
Acuan : A.16
PT.08
HARGA
NO.
1
A
1
2
B
1
C
D
URAIAN PEKERJAAN
SATUAN
TENAGA
Pekerja
Mandor
Jumlah
BAHAN
Pasir Urug
Jumlah
Jumlah A + B
Harga Satuan
KUANTITAS
SATUAN
( Rp. )
4
BIAYA
SATUAN
( Rp. )
6
OH
OH
0.300
0.010
51,562.00
1.200
61,874.40
61,874.40
61,874.40
61,874.40
PPBC.11
HARGA
BIAYA
No.
URAIAN PEKERJAAN
SATUAN
SATUAN
( Rp. )
KUANTITAS
SATUAN
( Rp. )
6
TENAGA
Tukang Batu
OH
0.600
Pekerja
OH
1.500
Kepala Tukang
OH
0.060
Mandor
OH
0.075
Jumlah
BAHAN
Semen Portland
Kg
202.000
Pasir Beton/Pasang
63,333.33
0.485
30,716.67
M3
200,000.00
1.000
Jumlah
C
D
200,000.00
230,716.67
Jumlah A + B
Harga Satuan
230,716.67
230,716.67
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Besi Beton (Polos/Ulir)
Kawat Ikat Beton
Jumlah
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PBe.04
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.007
0.007
0.0007
0.0003
Kg
Kg
13,500.00
17,000.00
1.050
0.015
14,175.00
255.00
14,430.00
14,430.00
14,430.00
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Semen Portland
Pasir Beton/Pasang
Batu Belah 0,5 - 1
Jumlah
Jumlah A + B
Harga Satuan
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PBe.03
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.250
1.650
0.025
0.080
Kg
63,333.33
367,647.06
323.000
0.520
0.780
32,933.33
286,764.71
319,698.04
319,698.04
319,698.04
M3
M3
PT.01
URAIAN PEKERJAAN
SATUAN
TENAGA
Pekerja
Mandor
Jumlah
BAHAN
C
D
E
Jumlah
Jumlah A + B
Harga Satuan
Galian sedalam > 1 meter
HARGA
SATUAN
( Rp. )
4
OH
OH
KUANTITAS
5
-
BIAYA
SATUAN
( Rp. )
6
0.400
0.040
1.315
TENAGA
Pekerja
Mandor
Jumlah
BAHAN
C
D
Jumlah
Jumlah A + B
Harga Satuan
PT.05
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
4
OH
OH
KUANTITAS
5
-
BIAYA
SATUAN
( Rp. )
6
0.192
0.0192
URAIAN PEKERJAAN
SATUAN
TENAGA
Pekerja
Mandor
Jumlah
BAHAN
Pasir Urug
Jumlah
Jumlah A + B
Harga Satuan
Acuan : SNI.2835.b - 6.11
PT.08
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
BIAYA
SATUAN
( Rp. )
6
OH
OH
0.300
0.010
M3
51,562.00
1.200
61,874.40
61,874.40
61,874.40
61,874.40
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Bata Merah
Semen Portland
Pasir Beton/Pasang
Jumlah
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PPBC.05
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.150
0.450
0.015
0.0225
Bh
Kg
2,000.00
63,333.33
22.000
15.750
0.0378
44,000.00
2,394.00
46,394.00
46,394.00
46,394.00
Acuan : G.33.i
PPBC.11
BIAYA
)
HARGA
No.
URAIAN PEKERJAAN
SATUAN
KUANTITAS
SATUAN
( Rp. )
SATUAN
( Rp. )
TENAGA
Tukang Batu
OH
0.600
Pekerja
OH
1.500
Kepala Tukang
OH
0.060
Mandor
OH
0.075
Jumlah
B
BAHAN
Semen Portland
Kg
202.000
63,333.33
0.485
30,716.67
200,000.00
1.000
200,000.00
Pasir Beton/Pasang
M3
Jumlah A + B
230,716.67
Harga Satuan
230,716.67
Jumlah
230,716.67
No.
A
1
2
3
4
B
1
2
3
4
5
C
D
TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Semen Portland
Pasir Beton/Pasang
Besi Simpai Kawat
Papan Mal Kayu Kls.III
Paku
Jumlah
Jumlah A + B
Harga Satuan
KUANTITAS
PPs.01
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.120
0.360
0.012
0.018
Kg
1,180.00
63,333.33
12,000.00
1,200,000.00
18,000.00
13.055
0.0388
-
15,404.90
2,457.33
17,862.23
17,862.23
17,862.23
M3
Kg
M3
Kg
Acuan : G.51.h
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
A
1
2
3
4
B
1
2
C
D
TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Semen Portland
Pasir Beton/Pasang
Jumlah
Jumlah A + B
Harga Satuan
KUANTITAS
5
PPs.05
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.150
0.200
0.015
0.010
Kg
63,333.33
6.480
0.019
1,203.33
1,203.33
1,203.33
1,203.33
M3
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
HARGA
SATUAN
( Rp. )
4
Jumlah
BAHAN
Kaca Rayban t = 5 mm
List Kayu Profil
Paku Tripleks
C
D
Jumlah A + B
Harga Satuan
M2
M'
Kg
5
-
2.000
0.500
0.200
0.025
145,000.00
35,000.00
1.100
8.000
0.015
159,500.00
525.00
OH
OH
OH
OH
B
1
2
3
KUANTITAS
Jumlah
No.
1
A
1
2
3
4
B
1
2
3
4
C
D
160,025.00
160,025.00
160,025.00
KUANTITAS
5
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
TENAGA
1
2
3
4
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
B
1
2
3
4
Jumlah
BAHAN
Papan Kayu Kelas I (Ketam)
List Pintu/Jendela
Kaca Rayban tebal 5 mm
Paku
C
D
Jumlah
Jumlah A + B
Harga Satuan
OH
OH
OH
OH
SNI.3434.6,10
BIAYA
SATUAN
( Rp. )
6
2.000
0.800
0.200
0.040
0.035
8.000
0.600
0.030
72,000.00
540.00
72,540.00
72,540.00
72,540.00
F.37.c
BIAYA
SATUAN
( Rp. )
6
KUANTITAS
5
SNI.3434-6,10
BIAYA
SATUAN
( Rp. )
6
2.000
0.800
0.200
0.040
M3
M'
M2
Kg
120,000.00
18,000.00
0.035
8.000
0.600
0.030
72,000.00
540.00
72,540.00
72,540.00
72,540.00
PK.14
No.
1
A
1
2
3
4
B
1
C
D
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kayu Kelas I (Ketam)
Jumlah
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
18.000
6.000
2.000
0.300
4,500,000.00
1.100
4,950,000.00
4,950,000.00
4,950,000.00
4,950,000.00
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
A
1
2
3
4
B
1
C
D
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Kelas I (Ketam), t = 2 cm
Jumlah
Jumlah A + B
Harga Satuan
KUANTITAS
5
SNI.3434-6.8
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
2.500
1.000
0.250
0.050
M3
0.040
Pemasangan Pintu dan Jendela Kaca , Ventilasi dari Rangka Kayu Kelas I ( m )
2
2
Setiap Luas 1 M Bidang, Luas Kacanya adalah 0.60 M
No.
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
A
1
2
3
4
B
1
2
3
4
C
D
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Kelas I (Ketam), t = 2 cm
List Pintu/Jendela
Kaca Polos tebal 5 mm
Paku
Jumlah
Jumlah A + B
Harga Satuan
Acuan : SNI.3434 - 6.10
KUANTITAS
5
SNI.3434-6.10
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
2.000
0.800
0.200
0.040
M3
M'
120,000.00
18,000.00
0.035
8.000
0.600
0.030
72,000.00
540.00
72,540.00
72,540.00
72,540.00
M2
Kg
Pemasangan Pintu dan Jendela Kaca , Ventilasi dari Rangka Kayu Kelas I ( m )
Setiap Luas 1 M2 Bidang, Luas Kacanya adalah 0.60 M2
No.
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
A
1
2
3
4
B
1
2
3
4
C
D
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Kelas I (Ketam), t = 2 cm
List Pintu/Jendela
Kaca Rayban tebal 5 mm
Paku
Jumlah
Jumlah A + B
Harga Satuan
Acuan : SNI.3434 - 6.10
KUANTITAS
5
SNI.3434-6.10'
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
2.000
0.800
0.200
0.040
145,000.00
18,000.00
0.035
8.000
0.600
0.030
87,000.00
540.00
87,540.00
87,540.00
87,540.00
M
M'
M
Kg
PK.23
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kaca Polos t = 5 mm
List Kayu Profil
Paku Tripleks
Jumlah
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
OH
OH
OH
OH
M2
M'
Kg
KUANTITAS
5
BIAYA
SATUAN
( Rp. )
6
0.150
0.015
0.015
0.00075
120,000.00
35,000.00
1.100
8.000
0.015
132,000.00
525.00
132,525.00
132,525.00
132,525.00
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci dan Kaca - 6.16
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kaca Rayban t = 5 mm
List Kayu Profil
Paku Tripleks
Jumlah
Jumlah A + B
Harga Satuan
PK.23'
HARGA
SATUAN
( Rp. )
4
OH
OH
OH
OH
M2
M'
Kg
KUANTITAS
5
BIAYA
SATUAN
( Rp. )
6
0.150
0.015
0.015
0.00075
145,000.00
35,000.00
1.100
8.000
0.015
159,500.00
525.00
160,025.00
160,025.00
160,025.00
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci dan Kaca - 6.16
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
List Kayu
Kaca Polos t = 5 mm
Paku Tripleks
Jumlah
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
F.37c
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
2.000
0.500
0.200
0.025
M'
120,000.00
35,000.00
8.000
0.600
0.050
72,000.00
1,750.00
73,750.00
73,750.00
73,750.00
M2
Kg
Acuan : F.37.c
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
List Kayu
Kaca Rayban t = 5 mm
Paku Tripleks
Jumlah
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
F.37c'
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
2.000
0.500
0.200
0.025
M'
145,000.00
35,000.00
8.000
0.600
0.050
87,000.00
1,750.00
88,750.00
88,750.00
88,750.00
M
Kg
Acuan : F.37.c
2
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kayu Kelas II
Besi Strip
Baut
Paku
Jumlah
Jumlah A + B
Harga Satuan
( Rp. )
4
PK.33
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
18.000
6.000
1.800
0.300
M3
Btg
Bh
Kg
3,625,000.00
#REF!
18,000.00
1.100
15.000
41.000
0.800
3,987,500.00
#REF!
14,400.00
#REF!
#REF!
#REF!
Acuan : F.23
TENAGA
1
2
3
4
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
B
1
2
BAHAN
Kayu Kelas II
Besi Strip
Baut
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
KUANTITAS
5
PK.33
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
18.000
6.000
1.800
0.300
M3
Btg
3,625,000.00
1,500,000.00
1.100
15.000
3,987,500.00
22,500,000.00
Bh
#REF!
41.000
#REF!
Paku
C
D
Jumlah
Jumlah A + B
Harga Satuan
Acuan : F.23
Kg
18,000.00
0.800
14,400.00
#REF!
#REF!
#REF!
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
A
1
2
3
4
B
1
2
C
D
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kayu Kelas II
Paku
Jumlah
Jumlah A + B
Harga Satuan
KUANTITAS
5
PK.17
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
18.000
6.000
1.800
0.300
3,625,000.00
18,000.00
1.100
2.000
3,987,500.00
36,000.00
4,023,500.00
4,023,500.00
4,023,500.00
M
Kg
Acuan : F.22.a
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
A
1
2
3
4
B
1
2
C
D
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kayu Kelas II
Paku
Jumlah
Jumlah A + B
Harga Satuan
KUANTITAS
5
PK.18
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.100
0.100
0.010
0.005
M3
Kg
3,625,000.00
18,000.00
0.012
0.150
43,500.00
2,700.00
46,200.00
46,200.00
46,200.00
Acuan : F.17
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
A
1
2
3
4
B
1
2
C
D
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Kelas I (Ketam)
Paku
Jumlah
Jumlah A + B
Harga Satuan
KUANTITAS
5
PK.20
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.100
0.100
0.010
0.050
M3
Kg
18,000.00
0.010
0.025
450.00
450.00
450.00
450.00
PK.48
HARGA
No.
URAIAN PEKERJAAN
SATUAN
BIAYA
KUANTITAS
No.
URAIAN PEKERJAAN
SATUAN
KUANTITAS
SATUAN
( Rp. )
SATUAN
( Rp. )
TENAGA
Tukang Kayu
OH
0.900
Pekerja
OH
0.300
Kepala Tukang
OH
0.090
Mandor
OH
0.015
Jumlah
B
BAHAN
Btg
70,000.00
1.000
70,000.00
70,000.00
Jumlah A + B
70,000.00
Harga Satuan
70,000.00
Acuan : F.60
Uraian Pekerjaan
Pembersihan Lokasi
Pengukuran & Pemasangan Bouwplank
Volume
Sat
375.00
M2
80
M'
158.4
384.00
9.6
2.7
9.99
3.672
16.13
132.438
M3
Btg
M3
M3
M3
M3
M3
M3
15.824
12.23
16.20
6.3
75
M3
M3
M3
M3
M3
M3
136
1,385.30
729.5
51.57
M3
M2
M2
M2
M2
M2
1.75
19.40
70.5
32.00
3.92
23.85
M3
M2
M2
M2
M2
M2
729.5
729.5
123.89
M2
M2
M2
24.00
215.00
197.80
203.75
140.00
1,490.00
25.93
729.50
51.57
J1
M2
M2
M2
M2
Bh
Bh
Bh
1.75
19.40
78.25
32.00
14.95
23.85
4.60
729.50
13.13
110.76
Engsel Jendela
Kait Jendela
Handle Jendela
Slot Jendela
Kloset Jongkok
Kran Air
Floor Drain
Bak Air Batako
Septic Tank
Instalasi Air Bersih Pipa PVC type AW
Instalasi Air Kotor Pipa PVC type AW
Bh
Bh
Bh
Bh
5
5
5
11.6
5
5
5
Bh
Bh
Bh
M2
Unit
Unit
Unit
M'
M2
M3
Unit
11.60
6.00
13.05
J2
77.40
J3
26.20
11.76
3.92
5.29
P1
33.20
9.20
P2
P3
34.2
10.20
P4
5.6
V1
62.00
V2
19.00
V3
13.5
9.20
2.36
1.978
70.50
1.84
1.84
2.04
349.35
URAIAN PEKERJAAN
2
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Genteng Metal Warna Polos
Paku
Jumlah
Jumlah A + B
Harga Satuan
SATUAN
3
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
OH
OH
OH
OH
0.100
0.200
0.010
0.001
Bh
Kg
85,000.00
18,000.00
1.620
0.200
137,700.00
3,600.00
141,300.00
141,300.00
141,300.00
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Bumbungan/Nok Genteng Metal Warna Polos
Paku
Jumlah
Jumlah A + B
Harga Satuan
Acuan :SNI.3436 - 6.36
PPA.03'
BIAYA
SATUAN
( Rp. )
6
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PPA.11'
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.150
0.250
0.015
0.013
M'
Kg
18,000.00
1.100
0.050
900.00
900.00
900.00
900.00
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Semen Portland
Pasir Beton/Pasang
Kerikil Sungai
Jumlah
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
OH
OH
OH
OH
0.250
1.650
0.025
0.080
Kg
63,333.33
150,000.00
218.000
0.520
0.870
32,933.33
130,500.00
163,433.33
163,433.33
163,433.33
M
3
M
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Semen Portland
Pasir Beton/Pasang
Batu Belah 0,5 - 1
Jumlah
Jumlah A + B
Harga Satuan
PBe.01
BIAYA
SATUAN
( Rp. )
6
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PBe.02
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.250
1.650
0.025
0.080
Kg
63,333.33
367,647.06
218.000
0.520
0.870
32,933.33
319,852.94
352,786.27
352,786.27
352,786.27
M
M3
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Semen Portland
Pasir Beton/Pasang
Batu Belah 0,5 - 1
Jumlah
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PBe.03
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.250
1.650
0.025
0.080
Kg
63,333.33
367,647.06
323.000
0.520
0.780
32,933.33
286,764.71
319,698.04
319,698.04
319,698.04
M3
M3
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Besi Beton (Polos/Ulir)
Kawat Ikat Beton
Jumlah
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PBe.04
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.007
0.007
0.0007
0.0003
Kg
Kg
13,500.00
17,000.00
1.050
0.015
14,175.00
255.00
14,430.00
14,430.00
14,430.00
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Bekisting
Paku
Minyak Bekisting
Jumlah
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PBe.06
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.260
0.300
0.026
0.005
M3
Kg
Ltr
1,200,000.00
18,000.00
15,000.00
0.040
0.300
0.100
48,000.00
5,400.00
1,500.00
54,900.00
54,900.00
54,900.00
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Bekisting
Paku
Minyak Bekisting
Jumlah
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PBe.06.A
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.260
0.300
0.026
0.005
1,200,000.00
18,000.00
15,000.000
0.040
0.300
0.100
48,000.00
5,400.00
1,500.00
54,900.00
54,900.00
54,900.00
M
Kg
Ltr
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Bekisting
Paku
Minyak Bekisting
Jumlah
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PBe.06.B
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.260
0.300
0.026
0.005
M3
Kg
Ltr
1,200,000.00
18,000.00
15,000.000
0.045
0.300
0.100
54,000.00
5,400.00
1,500.00
60,900.00
60,900.00
60,900.00
URAIAN PEKERJAAN
2
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Bekisting
Paku
Minyak Bekisting
Cerucuk dia. 6 - 8 cm / 4 m
Jumlah
Jumlah A + B
Harga Satuan
SATUAN
3
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PBe.06.C
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.330
0.300
0.033
0.006
M3
Kg
Ltr
Btg
1,200,000.00
18,000.00
15,000.000
7,500.00
0.040
0.200
0.200
2.000
48,000.00
3,600.00
3,000.00
15,000.00
69,600.00
69,600.00
69,600.00
URAIAN PEKERJAAN
2
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Bekisting
Paku
Minyak Bekisting
Balok Kayu Kleas III uk. 4/6
Cerucuk dia. 6 - 8 cm / 4 m
Jumlah
Jumlah A + B
Harga Satuan
SATUAN
3
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PBe.06.D
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.330
0.320
0.033
0.006
M3
Kg
Ltr
1,200,000.00
18,000.00
15,000.000
7,500.00
0.040
0.200
0.200
0.018
2.000
48,000.00
3,600.00
3,000.00
15,000.00
69,600.00
69,600.00
69,600.00
M3
Btg
URAIAN PEKERJAAN
2
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Papan Kayu Bekisting
Paku
Minyak Bekisting
Balok Kayu Kleas III uk. 4/6
Cerucuk dia. 6 - 8 cm / 4 m
SATUAN
3
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PBe.06.E
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.330
0.320
0.033
0.006
M3
Kg
Ltr
1,200,000.00
18,000.00
15,000.000
7,500.00
0.040
0.400
0.200
0.015
6.000
48,000.00
7,200.00
3,000.00
45,000.00
M3
Btg
C
D
Jumlah
Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.29
103,200.00
103,200.00
103,200.00
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
BIAYA
SATUAN
( Rp. )
6
M
2
M
Kg
319,698.04
54,900.00
14,430.00
1.000
0.640
250.000
319,698.04
35,136.00
3,607,500.00
3,962,334.04
M
M2
Kg
319,698.04
60,900.00
14,430.00
1.000
17.330
161.670
319,698.04
1,055,397.00
2,332,898.10
3,707,993.14
M
M2
Kg
319,698.04
60,900.00
14,430.00
1.000
2.112
308.270
319,698.04
128,620.80
4,448,336.10
4,896,654.94
M
M2
Kg
319,698.04
69,600.00
14,430.00
1.000
15.830
179.340
319,698.04
1,101,768.00
2,587,876.20
4,009,342.24
M
M2
Kg
319,698.04
69,600.00
14,430.00
1.000
16.670
135.600
319,698.04
1,160,232.00
1,956,708.00
3,436,638.04
M
M2
Kg
319,698.04
69,600.00
14,430.00
1.000
1.600
440.000
319,698.04
111,360.00
6,349,200.00
6,780,258.04
M3
M2
Kg
319,698.04
69,600.00
14,430.00
1.000
16.000
163.900
319,698.04
1,113,600.00
2,365,077.00
3,798,375.04
No.
1
G.Sub.I
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
M
M2
Kg
319,698.04
54,900.00
14,430.00
1.000
20.000
193.500
319,698.04
1,098,000.00
2,792,205.00
4,209,903.04
M
Kg
319,698.04
14,430.00
1.000
55.300
319,698.04
797,979.00
1,117,677.04
M
2
M
Kg
319,698.04
103,200.00
14,430.00
1.000
10.000
110.600
319,698.04
1,032,000.00
1,595,958.00
2,947,656.04
M3
2
M
Kg
319,698.04
69,600.00
14,430.00
1.000
21.300
79.000
319,698.04
1,482,480.00
1,139,970.00
2,942,148.04
319,698.04
69,600.00
14,430.00
1.000
17.470
101.910
319,698.04
1,215,912.00
1,470,561.30
3,006,171.34
M
M2
Kg
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Besi Konstruksi
Pekerja
Kepala Tukang
Jumlah
BAHAN
Baja Konstruksi
Kawat Las
Jumlah
Jumlah A + B
Harga Satuan
BIAYA
SATUAN
( Rp. )
6
HARGA
SATUAN
( Rp. )
4
OH
OH
OH
Kg
Kg
#REF!
KUANTITAS
5
-
0.00375
0.015
0.0225
1.100
0.020
PBA.01
BIAYA
SATUAN
( Rp. )
6
#REF!
#REF!
#REF!
#REF!
A
1
2
3
4
B
1
2
3
C
D
E
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kayu Kelas II
Gypsum Board t = 9 mm
Paku Gypsum
Jumlah
Jumlah A + B
Harga Satuan
Harga Satuan
KUANTITAS
OH
OH
OH
OH
0.400
0.270
0.040
0.0135
M3
2
M
Bh
3,625,000.00
17,000.00
0.023
0.364
0.110
83,375.00
1,870.00
85,245.00
85,245.00
85,245.00
106,556.25
1.250
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
A
1
2
3
4
B
1
2
3
C
D
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kayu Kelas II
GRC Board
Paku
Jumlah
Jumlah A + B
Harga Satuan
Acuan : SNI.2838 - 6.24
PL.02'
BIAYA
SATUAN
( Rp. )
KUANTITAS
5
PL.02"
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.400
0.270
0.040
0.0135
3,625,000.00
17,000.00
0.023
0.364
0.110
83,375.00
1,870.00
85,245.00
85,245.00
85,245.00
M
M2
Bh
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor
HARGA
SATUAN
( Rp. )
4
OH
OH
OH
OH
Jumlah
BAHAN
Kloset Duduk / Monoblok
Perlengkapan
Jumlah
Jumlah A + B
Harga Satuan
Bh
Ls
KUANTITAS
5
-
#REF!
#REF!
PSa.01
BIAYA
SATUAN
( Rp. )
6
1.100
3.300
0.001
0.160
1.000
6% Harga Kloset
#REF!
#REF!
#REF!
#REF!
#REF!
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.1
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kloset Jongkok Standar
Semen Portland
Pasir Beton / Pasang
Jumlah
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PSa.02
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
1.500
1.000
1.500
0.160
Bh
Kg
63,333.33
1.000
6.000
0.010
633.33
633.33
633.33
633.33
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.2
Pemasangan Urinoir ( bh )
No.
URAIAN PEKERJAAN
SATUAN
1
A
1
2
3
4
TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor
B
1
2
3
4
BAHAN
Urinoir
Perlengkapan
Semen Portland
Pasir Beton / Pasang
C
D
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
OH
OH
OH
OH
KUANTITAS
5
-
1.000
1.000
0.100
0.100
63,333.33
1.000
0.300
6.000
0.010
PSa.03
BIAYA
SATUAN
( Rp. )
6
-
Jumlah
Bh
Ls
Kg
M3
Jumlah
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.2
#REF!
#REF!
#REF!
#REF!
633.33
#REF!
#REF!
#REF!
Pemasangan Wastafel ( bh )
No.
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
A
1
2
3
4
TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor
B
1
2
3
4
BAHAN
Wastafel Keramik
Perlengkapan
Semen Portland
Pasir Beton / Pasang
C
D
Jumlah A + B
Harga Satuan
OH
OH
OH
OH
KUANTITAS
5
PSa.04
BIAYA
SATUAN
( Rp. )
6
1.450
1.200
0.150
0.100
Jumlah
Bh
Ls
Kg
M
Jumlah
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.5
#REF!
#REF!
63,333.33
1.000
12% Harga Wastafel
6.000
0.010
#REF!
#REF!
633.33
#REF!
#REF!
#REF!
PSa.06
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
A
1
2
3
4
TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor
B
1
2
BAHAN
Kran Air
Seal Tape
C
D
Jumlah A + B
Harga Satuan
KUANTITAS
BIAYA
SATUAN
( Rp. )
OH
OH
OH
OH
0.100
0.010
0.010
0.005
Bh
Bh
1.000
0.025
Jumlah
Jumlah
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.35
A
1
2
3
4
TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor
B
1
BAHAN
Floor Drain
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
KUANTITAS
5
PSa.08
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.100
0.010
0.010
0.005
Bh
1.000
Jumlah
Jumlah
C
D
Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.36
A
1
2
3
4
B
1
C
D
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
TENAGA
Tukang Pipa
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Pipa PVC Type AW dia. 3/4"
Jumlah
Jumlah A + B
Harga Satuan
KUANTITAS
5
PPi.02'
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.060
0.036
0.006
0.0018
M'
1.000
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.27
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
KUANTITAS
5
PPi.02"
BIAYA
SATUAN
( Rp. )
6
A
1
2
3
4
B
1
C
D
TENAGA
Tukang Pipa
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Pipa PVC Type AW dia. 1"
Jumlah
Jumlah A + B
Harga Satuan
OH
OH
OH
OH
0.060
0.036
0.006
0.0018
M'
1.000
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.27
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
OH
OH
OH
OH
2.000
0.500
0.200
0.025
M'
M2
Kg
120,000.00
35,000.00
8.000
0.600
0.050
72,000.00
1,750.00
73,750.00
73,750.00
73,750.00
Jumlah
B
BAHAN
1 List Pintu/Jendela
2 Kaca Polos t = 5 mm
3 Paku Tripleks
Jumlah
C
D
Jumlah A + B
Harga Satuan
URAIAN PEKERJAAN
SATUAN
1
A
1
2
3
4
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
B
1
BAHAN
Kunci Pintu 2 slag
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PKK.01
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.600
0.060
0.060
0.003
Bh
1.000
Jumlah
Jumlah
C
D
F.37.c
BIAYA
SATUAN
( Rp. )
6
Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.1
URAIAN PEKERJAAN
SATUAN
1
A
1
2
3
4
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
B
1
BAHAN
Kunci Pintu 1 slag
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
OH
OH
OH
OH
0.500
0.005
0.005
0.0025
Bh
1.000
Jumlah
Jumlah
C
D
PKK.03
BIAYA
SATUAN
( Rp. )
6
Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.3
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
KUANTITAS
PKK.06
BIAYA
SATUAN
( Rp. )
1
A
1
2
3
4
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
B
1
BAHAN
Engsel Pintu
OH
OH
OH
OH
0.150
0.015
0.015
0.00075
Bh
1.000
Jumlah
Jumlah
C
D
Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.5
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
B
1
BAHAN
Engsel Jendela
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
OH
OH
OH
OH
0.100
0.010
0.010
0.0005
Bh
1.000
Jumlah
Jumlah
C
D
PKK.07
BIAYA
SATUAN
( Rp. )
6
Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.6
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Kait Jendela / Ramskar
Jumlah
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PKK.08
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.150
0.015
0.015
0.00075
Bh
1.000
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.9
URAIAN PEKERJAAN
SATUAN
1
A
1
2
3
4
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
B
1
BAHAN
Kunci Selot Jendela
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
OH
OH
OH
OH
0.200
0.020
0.020
0.001
Bh
1.000
Jumlah
Jumlah
C
D
PKK.10
BIAYA
SATUAN
( Rp. )
6
Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.11.a
URAIAN PEKERJAAN
SATUAN
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Pegangan Pintu/Jendela (Handle)
Jumlah
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PKK.11
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.150
0.015
0.015
0.00075
Bh
1.000
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.12
URAIAN PEKERJAAN
SATUAN
1
A
1
2
3
4
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
B
1
BAHAN
Kaca Polos t = 3 mm
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PKK.16
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.150
0.015
0.015
0.00075
85,000.00
1.100
93,500.00
93,500.00
93,500.00
93,500.00
Jumlah
M
Jumlah
C
D
Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.16
PKK.20
HARGA
No.
URAIAN PEKERJAAN
SATUAN
BIAYA
KUANTITAS
SATUAN
( Rp. )
SATUAN
( Rp. )
TENAGA
Tukang Kayu
OH
0.250
Pekerja
OH
0.025
Kepala Tukang
OH
0.025
Mandor
OH
0.00125
Jumlah
B
BAHAN
Kaca Rayban t = 5 mm
C
D
M2
145,000.00
1.100
159,500.00
Jumlah
159,500.00
Jumlah A + B
159,500.00
Harga Satuan
159,500.00
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.19.b
URAIAN PEKERJAAN
SATUAN
2
TENAGA
Tukang Cat
Kepala Tukang
Jumlah
BAHAN
Residu atau Ter
Jumlah
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
SUPL.SNI.PC-6.12
BIAYA
SATUAN
( Rp. )
6
OH
OH
0.100
0.006
Ltr
10,000.00
0.350
3,500.00
3,500.00
3,500.00
3,500.00
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.12
URAIAN PEKERJAAN
SATUAN
2
TENAGA
Tukang Cat
Kepala Tukang
Mandor
Jumlah
BAHAN
Pelitur
Jumlah
Jumlah A + B
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
OH
OH
OH
0.060
0.016
0.0025
Ltr
33,000.00
0.522
17,226.00
17,226.00
17,226.00
17,226.00
URAIAN PEKERJAAN
SATUAN
2
TENAGA
Tukang Cat
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Meni Besi
Minyak Cat/Thinner
Jumlah
Jumlah A + B
Harga Satuan
PC.05
BIAYA
SATUAN
( Rp. )
6
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
PC.07
BIAYA
SATUAN
( Rp. )
6
OH
OH
OH
OH
0.200
0.020
0.020
0.010
Kg
Ltr
18,000.00
20,000.00
0.100
0.0012
1,800.00
24.00
1,824.00
1,824.00
1,824.00
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.20
2 x Mencat Kilat ( 10 m 2 )
No.
1
A
1
2
2K6+K23
URAIAN PEKERJAAN
SATUAN
2
TENAGA
Tukang Cat
Pekerja
3
OH
OH
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
-
0.750
0.500
BIAYA
SATUAN
( Rp. )
6
-
3
4
B
1
2
3
C
D
E
Kepala Tukang
Mandor
Jumlah
BAHAN
Cat Kilat
Minyak Cat
Amplas
Jumlah
Jumlah A + B
Harga Satuan
Harga Satuan
OH
OH
0.075
0.025
Kg
Ltr
Lbr
25,000.00
20,000.00
25,000.00
2.600
0.500
1.000
65,000.00
10,000.00
25,000.00
100,000.00
100,000.00
100,000.00
10,000.00
10 M2
M2
1,5K2+K30+K23
BIAYA
SATUAN
( Rp. )
6
URAIAN PEKERJAAN
SATUAN
2
TENAGA
Tukang Cat
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Cat Dasar Kayu
Dempul
Minyak Cat
Amplas
Jumlah
Jumlah A + B
Harga Satuan
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
OH
OH
OH
OH
0.750
0.500
0.075
0.025
Kg
Kg
Ltr
Lbr
#REF!
50,000.00
20,000.00
25,000.00
2.250
0.800
0.500
2.000
#REF!
40,000.00
10,000.00
50,000.00
#REF!
#REF!
#REF!
#REF!
10 M
M2
URAIAN PEKERJAAN
SATUAN
2
2K6+K23
1,5K2+K30+K23
Jumlah
Harga Satuan
3
M2
M2
M2
HARGA
SATUAN
( Rp. )
4
10,000.00
#REF!
KUANTITAS
5
-
K23+K30
BIAYA
SATUAN
( Rp. )
6
10,000.00
#REF!
#REF!
#REF!
URAIAN PEKERJAAN
SATUAN
2
TENAGA
Tukang Cat
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Cat Tembok
Jumlah
Jumlah A + B
Harga Satuan
Harga Satuan
HARGA
SATUAN
( Rp. )
4
G.54ia
BIAYA
SATUAN
( Rp. )
6
KUANTITAS
5
OH
OH
OH
OH
0.750
0.500
0.075
0.025
Kg
6,000.00
2.600
15,600.00
15,600.00
15,600.00
15,600.00
1,560.00
10 M
2
M
2K6+K23
BIAYA
SATUAN
( Rp. )
6
URAIAN PEKERJAAN
SATUAN
2
TENAGA
Tukang Cat
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Cat Dasar Tembok
Plamur
Minyak Cat
Amplas
Jumlah
Jumlah A + B
Harga Satuan
Harga Satuan
HARGA
SATUAN
( Rp. )
4
KUANTITAS
5
OH
OH
OH
OH
0.750
0.500
0.075
0.025
Kg
Kg
Ltr
Lbr
6,000.00
27,000.00
20,000.00
25,000.00
2.250
0.800
0.500
2.000
13,500.00
21,600.00
10,000.00
50,000.00
95,100.00
95,100.00
95,100.00
9,510.00
10 M2
M2
URAIAN PEKERJAAN
SATUAN
2
G.54ia
2K6+K23
Jumlah
Harga Satuan
3
2
M
M2
HARGA
SATUAN
( Rp. )
4
1,560.00
9,510.00
KUANTITAS
5
-
M2
#REF!
#REF!
#REF!
#REF!
K23+K30b
BIAYA
SATUAN
( Rp. )
6
1,560.00
9,510.00
11,070.00
11,070.00
#REF!