Quotation Details

Plant Room (150*60=9000 SQ FT)


Sr.No.
Description
1 Earthwork in excavataion in foundation
2 Sand filling in foundation & Plinth
3 Soiling in Foundation, Plint Etc
4 Cement Concrete
5 First Class Brick Work- Foundation & Plinth
6 First Class Brick Work- Sand Mortar
7 Reinforced Cement Works
8 Reinforcement of RCC Works
9 Hire & Labour Charges for Shuttering
10 Inside Wall Plaster
11 Outside Wall Plaster
12 4" Pipe fitting & Fixing
13 3" Pipe fitting & Fixing
14 GI Sheet Fitting- Wall
15 GI Sheet Fitting- Roof
Total Cost of Plant Room
Store (50*60=3000 SQ FT)
Sr.No.
Description
1 Earthwork in excavataion in foundation
2 Sand filling in foundation & Plinth
3 Soiling in Foundation, Plint Etc
4 Cement Concrete
5 First Class Brick Work- Foundation & Plinth
6 First Class Brick Work- Sand Mortar
7 Reinforced Cement Works
8 Reinforcement of RCC Works
9 Hire & Labour Charges for Shuttering
10 Inside Wall Plaster
11 Outside Wall Plaster
12 4" Pipe fitting & Fixing
13 3" Pipe fitting & Fixing
14 GI Sheet Fitting- Wall
15 GI Sheet Fitting- Roof
Total Cost of Store
Electrical Room (65*15=975 SQ FT)
Sr.No.
Description
1 Earthwork in excavataion in foundation
2 Sand filling in foundation & Plinth
3 Soiling in Foundation, Plint Etc
4 Cement Concrete
5 First Class Brick Work- Foundation & Plinth
6 First Class Brick Work- Sand Mortar
7 Brick Work
8 Reinforced Cement Works
9 Reinforcement of RCC Works

Quantity Rate(Rs.)
211.80
120.47
1,036.78
544.95
211.33
340.00
16.09
4,271.00
40.26
4,557.00
96.48
5,155.00
57.16
5,159.00
2.64 68,359.00
L.S.
433.88
166.00
433.88
193.00
2,520.00
92.00
3,003.04
98.00
585.50
675.00
836.43
675.00

Quantity Rate(Rs.)
155.73
120.47
345.48
544.95
312.21
340.00
6.68
4,271.00
40.26
4,557.00
56.84
5,155.00
43.67
5,159.00
2.01 68,359.00
L.S.
166.22
166.00
166.22
193.00
1,260.00
92.00
1,501.51
98.00
122.68
675.00
278.81
675.00

Quantity Rate(Rs.)
79.63
120.47
12.30
509.28
171.38
278.00
6.14
4,744.00
27.03
4,557.00
35.84
5,380.00
49.05
714.00
34.57
5,063.00
1.60 68,359.00

10 Hire & Labour Charges for Shuttering


L.S.
11 Ceiling Plaster
104.82
131.00
12 Inside Wall Plaster
303.38
161.00
13 Outside Wall Plaster
85.08
161.00
14 A.S.F. Flooring on Floor
148.70
278.00
Total Cost of Electrical Room
Temple (10*10=100 SQ FT)
Sr.No.
Description
Quantity Rate(Rs.)
1 Earthwork in excavataion in foundation
18.91
73.77
2 Sand filling in foundation & Plinth
13.40
404.50
3 Soiling on Floor
21.18
237.87
4 Cement Concrete
1.61
3,829.00
5 First Class Brick Work- Foundation & Plinth
6.04
3,743.74
6 First Class Brick Work- Sand Mortar
8.77
3,891.72
7 Reinforced Cement Works
12.68
5,170.48
8 Reinforcement of RCC Works
0.59 56,819.00
9 Hire & Labour Charges for Shuttering
L.S.
10 Ceiling Plaster
55.76
92.21
11 Inside Wall Plaster
37.79
117.61
12 Outside Wall Plaster
37.79
100.36
13 Flooring on Floor
9.29
2,279.00
14 Wood Works in Doors & Windows
0.04 44,569.80
15 Panel Shutter for Doors & Windows
2.44
1,784.00
16 Clamps
8.00
28.00
17 Hinges
6.00
21.00
18 Tower Bolt
1.00
82.00
19 Ornamental Grill
579.71
34.00
20 Synthetic Enamel Painting- Doors & Windows
115.06
43.00
21 Synthetic Enamel Painting- Grills
54.34
40.75
22 Exterior Painting
647.05
28.60
Total Cost of Temple
Security Room (10*10=100 SQ FT)
Sr.No.
Description
Quantity Rate(Rs.)
1 Earthwork in excavataion in foundation
7.24
120.47
2 Sand filling in foundation & Plinth
0.90
509.28
3 Soiling in Foundation
5.94
278.00
4 Cement Concrete
0.23
3,829.00
5 Brick Work
14.49
518.31
6 Reinforced Cement Works
0.93
5,063.00
7 Reinforcement of RCC Works
0.05 68,359.00
8 Hire & Labour Charges for Shuttering
L.S.
9 A.S.F. with neat finishing at Top
4.64
254.00
10 Inside Wall Plaster
16.91
166.00
11 Wood Works in Doors & Windows
0.09 44,569.80
12 Panel Shutter for Doors & Windows
4.71
5.12
13 Clamps
5.00
28.00
14 Hinges
10.00
21.00
15 Tower Bolt
2.00
82.00

16 Synthetic Enamel Painting- Doors & Windows


15.80
43.00
17 Synthetic Enamel Painting- Grills
21.65
40.75
Total Cost of Security Room
Office Building (50*18=900 SQ FT)- Ground Floor
Sr.No.
Description
Quantity Rate(Rs.)
1 Earthwork in excavataion in foundation
30.03
120.47
2 Sand filling in foundation & Plinth
48.40
509.28
3 Soiling in Foundation & Plinth
83.00
278.00
4 Cement Concrete
8.00
4,744.00
5 Brick Work
8.50
4,557.00
6 Reinforced Cement Works
15.78
4,930.00
7 Reinforcement of RCC Works
1.36 68,359.00
8 Hire & Labour Charges for Shuttering
L.S.
9 Brick Work in Cement Mortar
37.56
5,380.00
10 Brick Work in Cement Mortar
26.26
714.00
11 Reinforced Cement Works
24.47
5,063.00
12 Reinforcement of RCC Works
2.11 68,359.00
13 Hire & Labour Charges for Shuttering
L.S.
14 A.S.F. Flooring on Floor
62.00
278.00
15 Wood Works in Doors & Windows
0.65 93,265.00
16 Shutters in Door Window & Gammar
22.15
2,433.97
17 Clamps
L.S.
18 Plaster in Ceiling
62.00
131.00
19 Plaster in Inner & Outer Walls
491.22
166.00
20 Priming One Coat to timber & Steel
84.82
41.00
21 Painting on Steel Surface
52.72
89.00
22 Painting on Steel Surface
32.10
41.00
23 Ornamental Grill
16.04
89.00
24 Snowcem
221.13
89.00
25 Dry Distrempering
331.70
89.00
Total Cost for Office Building- Ground Floor
Office Building (50*18=900 SQ FT)- First Floor
Sr.No.
Description
Quantity Rate(Rs.)
1 Brick Work in Cement Mortar
37.56
5,492.00
2 Brick Work in Cement Mortar
26.26
726.00
3 Reinforced Cement Works
24.47
5,159.00
4 Reinforcement of RCC Works
2.11 68,799.00
5 Hire & Labour Charges for Shuttering
L.S.
6 A.S.F. Flooring on Floor
62.00
282.00
7 Wood Works in Doors & Windows
0.65 93,665.00
8 Shutters in Door Window & Gammar
22.15
2,633.97
9 Clamps
10 Plaster in Ceiling
62.00
135.00
11 Plaster in Inner & Outer Walls
491.22
170.00
12 Priming One Coat to timber & Steel
84.82
41.00
13 Painting on timber surface
52.72
89.00
14 Painting on Steel Surface
32.10
41.00
15 Ornamental Grill
16.04
89.00

16 Snowcem
221.13
89.00
17 Dry Distrempering
331.70
89.00
Total Cost for Office Building- First Floor
Labour Quarter (60*15=900 SQ FT)- Ground Floor
Sr.No.
Description
Quantity Rate(Rs.)
1 Earthwork in excavataion in foundation
21.04
120.47
2 Sand filling in foundation & Plinth
33.91
509.28
3 Soiling in Foundation & Plinth
58.15
278.00
4 Cement Concrete
5.60
4,744.00
5 Brick Work
5.96
4,557.00
6 Reinforced Cement Works
11.05
4,930.00
7 Reinforcement of RCC Works
0.95 68,359.00
8 Hire & Labour Charges for Shuttering
L.S.
9 Brick Work in Cement Mortar
26.31
5,380.00
10 Brick Work in Cement Mortar
18.40
714.00
11 Reinforced Cement Works
17.14
5,063.00
12 Reinforcement of RCC Works
1.48 68,359.00
13 Hire & Labour Charges for Shuttering
L.S.
14 A.S.F. Flooring on Floor
43.44
278.00
15 Wood Works in Doors & Windows
0.46 93,265.00
16 Shutters in Door Window & Gammar
15.52
2,433.97
17 Clamps
18 Plaster in Ceiling
43.44
131.00
19 Plaster in Inner & Outer Walls
344.15
166.00
20 Priming One Coat to timber & Steel
59.42
41.00
21 Painting on Steel Surface
36.94
89.00
22 Painting on Steel Surface
22.49
41.00
23 Ornamental Grill
11.25
89.00
24 Snowcem
154.93
89.00
25 Dry Distrempering
232.39
89.00
Total Cost for Labour Quarter- Ground Floor
Labour Quarter (60*15=900 SQ FT)- First Floor
Sr.No.
Description
Quantity Rate(Rs.)
1 Brick Work in Cement Mortar
26.31
5,492.00
2 Brick Work in Cement Mortar
18.40
726.00
3 Reinforced Cement Works
17.14
5,159.00
4 Reinforcement of RCC Works
1.48 68,799.00
5 Hire & Labour Charges for Shuttering
L.S.
6 A.S.F. Flooring on Floor
43.44
282.00
7 Wood Works in Doors & Windows
0.46 93,665.00
8 Shutters in Door Window & Gammar
15.52
2,633.97
9 Clamps
10 Plaster in Ceiling
43.44
135.00
11 Plaster in Inner & Outer Walls
344.15
170.00
12 Priming One Coat to timber & Steel
59.42
41.00
13 Painting on timber surface
36.94
89.00
14 Painting on Steel Surface
22.49
41.00
15 Ornamental Grill
11.24
89.00

16 Snowcem
154.93
17 Dry Distrempering
232.39
Total Cost for Labour Quarter- First Floor
Grand Total for Civil Construction

89.00
89.00

Unit
Cum
Cum
Sqm
Cum
Cum
Cum
Cum
MT
Sqm
Sqm
M
M
Sqm
Sqm

Unit
Cum
Cum
Sqm
Cum
Cum
Cum
Cum
MT
Sqm
Sqm
M
M
Sqm
Sqm

Unit
Cum
Cum
Sqm
Cum
Cum
Cum
Sqm
Cum
MT

Amount
25,516.00
564,993.00
71,852.00
68,720.00
183,465.00
497,354.00
294,888.00
180,468.00
300,000.00
72,024.00
83,739.00
231,840.00
294,298.00
395,214.00
564,591.00
3,828,962.00
Amount
18,761.00
188,269.00
106,151.00
28,530.00
183,465.00
293,010.00
225,294.00
137,402.00
250,000.00
27,593.00
32,080.00
115,920.00
147,148.00
82,807.00
188,197.00
2,024,627.00
Amount
9,593.00
6,264.00
47,644.00
29,128.00
123,176.00
192,819.00
35,022.00
175,028.00
109,374.00

Sqm
Sqm
Sqm
sft

Unit
Cum
Cum
Sqm
Cum
Cum
Cum
Cum
MT
Sqm
Sqm
Sqm
Cum
Sqm
Sqm
Each
Each
Each
KG
Sqm
Sqm
Sqm

Unit
Cum
Cum
Sqm
Cum
Sqm
Cum
MT
Sqm
Sqm
Cum
Sqm
Each
Each
Each

5,000.00
13,731.00
48,844.00
13,698.00
41,339.00
850,660.00
Amount
1,395.00
5,420.00
5,038.00
6,165.00
22,612.00
34,130.00
65,562.00
33,523.00
25,500.00
5,142.00
4,444.00
3,793.00
21,172.00
1,783.00
4,353.00
224.00
126.00
82.00
19,710.00
4,948.00
2,214.00
18,506.00
285,842.00
Amount
872.00
458.00
1,651.00
881.00
7,510.00
4,709.00
3,418.00
10,310.00
1,179.00
2,807.00
3,833.00
24.00
140.00
210.00
164.00

Sqm
Sqm

679.00
882.00
39,727.00

Unit
Cum
Cum
Sqm
Cum
Cum
Cum
MT

Amount
3,618.00
24,651.00
23,074.00
37,952.00
38,735.00
77,790.00
92,679.00
5,500.00
202,060.00
18,749.00
123,897.00
143,948.00
5,000.00
17,236.00
60,981.00
53,922.00
7,500.00
8,122.00
81,543.00
3,478.00
4,692.00
1,316.00
1,428.00
19,681.00
29,521.00
1,087,073.00

Cum
Sqm
Cum
MT
Sqm
Cum
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
KG
Sqm
Sqm

Unit
Cum
Cum
Cum
MT
Sqm
Cum
Cum
Sqm
Sqm
Sqm
Sqm
Sqm
Kg.

Amount
206,267.00
19,064.00
126,247.00
144,875.00
5,000.00
17,484.00
61,243.00
58,353.00
7,500.00
8,370.00
83,508.00
3,478.00
4,692.00
1,316.00
1,428.00

17000
19000
13000
1748000
91000
1700000
1839000
139000
1.39
0.20

100
92
7

200

28.8

Sqm
Sqm

19,681.00
29,521.00
798,027.00

Unit
Cum
Cum
Sqm
Cum
Cum
Cum
MT

Amount
2,534.00
17,271.00
16,166.00
26,589.00
27,137.00
54,499.00
64,931.00
5,500.00
141,563.00
13,136.00
86,802.00
100,850.00
5,000.00
12,076.00
42,723.00
37,778.00
7,500.00
5,690.00
57,129.00
2,436.00
3,287.00
922.00
1,001.00
13,788.00
20,683.00
766,991.00

Cum
Sqm
Cum
MT
Sqm
Cum
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
KG
Sqm
Sqm

Unit
Cum
Cum
Cum
MT
Sqm
Cum
Cum
Sqm
Sqm
Sqm
Sqm
Sqm
Kg.

Amount
144,510.00
13,357.00
88,448.00
101,499.00
5,000.00
12,249.00
42,906.00
40,882.00
7,500.00
5,864.00
58,505.00
2,436.00
3,287.00
922.00
1,001.00

Sqm
Sqm

13,788.00
20,683.00
562,837.00
10,244,746.00

1,152,000.00

Cleaning Section
Sr.No. Description
Quantity Rate(Rs.) Unit Amount
1 REEL-3 NET COMPLETE
2 VIBRO SEPARATOR complete with 2 nos Vibro Motor
3 De-Stoner (Double Deck) with 2 nos Vibro Motor
4 Intensive Scourer Machine
5 Aspiration Channel Scourer
6 Emery Roll Complete, CAP 2.5MT/HR
7 Aspiration Channel for emery
8 Intensive Dampener without flow Meter
9 Aspiration Unit (Airlocks, Cyclone)
10 Aspiration Unit (Airlocks, Cyclone)
11 Elevator-5" bucket and 24' ht avg.
12 Magnet
Screw Conveyor Complete-8" Blade