ADDRESS: Freyssinet Segment 10 Project, PNR compound, Caloocan city (near UE Caloocan)
Engr. Herman Matias ( 0942-555-2943)
Frey-Fil Corporation,
9th Floor Espana Tower.
2203 Espana Ave. Corner Josefina St.
Sampaloc, Manila. Philippines
t: (+632) 310 4931 to 33
f: (+632) 310 4934
steel@randyork.com
Danielle@randyork.co.za
F.F CRUZ & CO., INC.
800 EDSA, Quezon City, Philippines
Attention : Sofronio Concepcion
Eddie AVILA/Cedric LEPAYSAN
Unit 5B-9, The Pearlbank Centre,
146 Valero St., Salcedo Village
Makati City,Philippines 1227
t: (02) 779- 8368
f: (02) 893-1781
two way slab design excel sheet by scribd
ACI CODE for two way slab
Design for RCC Slabs - A Ready Reckoner
BS8110 Part1 1985 Structural Use of Concrete
coordinate between consultants, external agencies, contractors, property owners and other utility services for assigned projects.
Supervise office staff for all administrative works that include processing and reviewing of progress payments for contractors.
Coordinate, review and assess contract submittals.
Review and process construction for project design submittals and ensure forms as per existing standards.
Administer contractor’s work and ensure compliance with submitted contract documents.
Inspect work sites, monitor project budget and schedule and check project plans and drawings to verify authenticity of office plans.
Analyze and recommend changes to contracts and prepare necessary amendments in contract document.
Manage and submit all reviewed contract document to contract administrators for further approval.
Prepare correspondence and documents related to assigned projects and facilitate in internal RTD scanning and archiving in line with closet procedure.
Provide assistance to project manager and supervise office engineering construction.
Perform inspection and prepare documents for entire contract work projects.
Ensure all contract works in compliance with contract documents.
Prepare project records with details such as field progress, field conditions, equipment use and corrective actions.
Prepare monthly report on progress of assigned project with assistance of schedules, costs spreadsheets and perform analysis on same.
Ensure bid packets contain relevant engineering drawings, designs and specification for of bid document.
I am a 26-year-old girl and am planning to have sex with my boyfrined. Recently I found out that there is a safe period to have sex, where you do not get pregnant. Is this true? What is the safe period to have sex?
If you are planning to have sex for the first time it is best you use a condom as the prefered method of contraception. That being said the eight to twenty first day of your menstrual cycle, counting from first day, is considered as the fertile period or the UNSAFE period.
Days other than this are considered SAFE, that is, the 1st-7th day of the cycle and then again from the 22nd to the 28th day.
But this may not exactly be correct for all women. It depends on the length of your menstrual cycle (it should be exactly a 28 day cycle or little less) and if you have a regular periods cycle. If the cycle is longer than 28 days that, this time frame isn’t reliable.
Opting to have sex during the ‘safe period’ isn’t fool-proof though. Using condoms along with other contraceptive methods like the oral pills are advised to prevent unwanted pregnancies. Here is a woman’s guide to choose the right lubricant to make sex more pleasurable for her.
Dear Eddie,
Request quotation for the following materials for the above stated subject.
Prestressed Concrete Girder (AASHTO Type VI) Length=41m 13 ea.
Prestressed Concrete Girder (AASHTO Type VI) Length=45m 11 ea.
S 80 Multiflex Expansion Joint 135 lm
E
Original Title
PO094-FIMI-REP001-20150224 - AYALA - PAREX GROUP 2015 02 24
ADDRESS: Freyssinet Segment 10 Project, PNR compound, Caloocan city (near UE Caloocan)
Engr. Herman Matias ( 0942-555-2943)
Frey-Fil Corporation,
9th Floor Espana Tower.
2203 Espana Ave. Corner Josefina St.
Sampaloc, Manila. Philippines
t: (+632) 310 4931 to 33
f: (+632) 310 4934
steel@randyork.com
Danielle@randyork.co.za
F.F CRUZ & CO., INC.
800 EDSA, Quezon City, Philippines
Attention : Sofronio Concepcion
Eddie AVILA/Cedric LEPAYSAN
Unit 5B-9, The Pearlbank Centre,
146 Valero St., Salcedo Village
Makati City,Philippines 1227
t: (02) 779- 8368
f: (02) 893-1781
two way slab design excel sheet by scribd
ACI CODE for two way slab
Design for RCC Slabs - A Ready Reckoner
BS8110 Part1 1985 Structural Use of Concrete
coordinate between consultants, external agencies, contractors, property owners and other utility services for assigned projects.
Supervise office staff for all administrative works that include processing and reviewing of progress payments for contractors.
Coordinate, review and assess contract submittals.
Review and process construction for project design submittals and ensure forms as per existing standards.
Administer contractor’s work and ensure compliance with submitted contract documents.
Inspect work sites, monitor project budget and schedule and check project plans and drawings to verify authenticity of office plans.
Analyze and recommend changes to contracts and prepare necessary amendments in contract document.
Manage and submit all reviewed contract document to contract administrators for further approval.
Prepare correspondence and documents related to assigned projects and facilitate in internal RTD scanning and archiving in line with closet procedure.
Provide assistance to project manager and supervise office engineering construction.
Perform inspection and prepare documents for entire contract work projects.
Ensure all contract works in compliance with contract documents.
Prepare project records with details such as field progress, field conditions, equipment use and corrective actions.
Prepare monthly report on progress of assigned project with assistance of schedules, costs spreadsheets and perform analysis on same.
Ensure bid packets contain relevant engineering drawings, designs and specification for of bid document.
I am a 26-year-old girl and am planning to have sex with my boyfrined. Recently I found out that there is a safe period to have sex, where you do not get pregnant. Is this true? What is the safe period to have sex?
If you are planning to have sex for the first time it is best you use a condom as the prefered method of contraception. That being said the eight to twenty first day of your menstrual cycle, counting from first day, is considered as the fertile period or the UNSAFE period.
Days other than this are considered SAFE, that is, the 1st-7th day of the cycle and then again from the 22nd to the 28th day.
But this may not exactly be correct for all women. It depends on the length of your menstrual cycle (it should be exactly a 28 day cycle or little less) and if you have a regular periods cycle. If the cycle is longer than 28 days that, this time frame isn’t reliable.
Opting to have sex during the ‘safe period’ isn’t fool-proof though. Using condoms along with other contraceptive methods like the oral pills are advised to prevent unwanted pregnancies. Here is a woman’s guide to choose the right lubricant to make sex more pleasurable for her.
Dear Eddie,
Request quotation for the following materials for the above stated subject.
Prestressed Concrete Girder (AASHTO Type VI) Length=41m 13 ea.
Prestressed Concrete Girder (AASHTO Type VI) Length=45m 11 ea.
S 80 Multiflex Expansion Joint 135 lm
E
ADDRESS: Freyssinet Segment 10 Project, PNR compound, Caloocan city (near UE Caloocan)
Engr. Herman Matias ( 0942-555-2943)
Frey-Fil Corporation,
9th Floor Espana Tower.
2203 Espana Ave. Corner Josefina St.
Sampaloc, Manila. Philippines
t: (+632) 310 4931 to 33
f: (+632) 310 4934
steel@randyork.com
Danielle@randyork.co.za
F.F CRUZ & CO., INC.
800 EDSA, Quezon City, Philippines
Attention : Sofronio Concepcion
Eddie AVILA/Cedric LEPAYSAN
Unit 5B-9, The Pearlbank Centre,
146 Valero St., Salcedo Village
Makati City,Philippines 1227
t: (02) 779- 8368
f: (02) 893-1781
two way slab design excel sheet by scribd
ACI CODE for two way slab
Design for RCC Slabs - A Ready Reckoner
BS8110 Part1 1985 Structural Use of Concrete
coordinate between consultants, external agencies, contractors, property owners and other utility services for assigned projects.
Supervise office staff for all administrative works that include processing and reviewing of progress payments for contractors.
Coordinate, review and assess contract submittals.
Review and process construction for project design submittals and ensure forms as per existing standards.
Administer contractor’s work and ensure compliance with submitted contract documents.
Inspect work sites, monitor project budget and schedule and check project plans and drawings to verify authenticity of office plans.
Analyze and recommend changes to contracts and prepare necessary amendments in contract document.
Manage and submit all reviewed contract document to contract administrators for further approval.
Prepare correspondence and documents related to assigned projects and facilitate in internal RTD scanning and archiving in line with closet procedure.
Provide assistance to project manager and supervise office engineering construction.
Perform inspection and prepare documents for entire contract work projects.
Ensure all contract works in compliance with contract documents.
Prepare project records with details such as field progress, field conditions, equipment use and corrective actions.
Prepare monthly report on progress of assigned project with assistance of schedules, costs spreadsheets and perform analysis on same.
Ensure bid packets contain relevant engineering drawings, designs and specification for of bid document.
I am a 26-year-old girl and am planning to have sex with my boyfrined. Recently I found out that there is a safe period to have sex, where you do not get pregnant. Is this true? What is the safe period to have sex?
If you are planning to have sex for the first time it is best you use a condom as the prefered method of contraception. That being said the eight to twenty first day of your menstrual cycle, counting from first day, is considered as the fertile period or the UNSAFE period.
Days other than this are considered SAFE, that is, the 1st-7th day of the cycle and then again from the 22nd to the 28th day.
But this may not exactly be correct for all women. It depends on the length of your menstrual cycle (it should be exactly a 28 day cycle or little less) and if you have a regular periods cycle. If the cycle is longer than 28 days that, this time frame isn’t reliable.
Opting to have sex during the ‘safe period’ isn’t fool-proof though. Using condoms along with other contraceptive methods like the oral pills are advised to prevent unwanted pregnancies. Here is a woman’s guide to choose the right lubricant to make sex more pleasurable for her.
Dear Eddie,
Request quotation for the following materials for the above stated subject.
Prestressed Concrete Girder (AASHTO Type VI) Length=41m 13 ea.
Prestressed Concrete Girder (AASHTO Type VI) Length=45m 11 ea.
S 80 Multiflex Expansion Joint 135 lm
E
Page
FREYSSINET INTERNATIONAL MANILA, INC.
PURCHASE ORDER
Purchase Order Number to be
referenced on all correspondences:
P0084-FIMI-REPOO1-20150224
‘ine Peta Over sha ema he Sse
[Parex Group
100 oan Fx i Bepon tog 1804 Pasig City
Ptscines
[Bama seepage 2 cet
‘nso ne aC va Sao in
‘Sen Marcelino S.Cor Cab! Stata NACA BRIDGE REFRBTTTATION
[osinen date AT-THE LATEST lseron : AYALA
“The ellowing day upon recived purchase order ae
he proposal wi aan i oo Ferre spas alow]
Fhe contracts! documenta, node of precedence
“ns prchaeo ore frm,
Gears! Condos of Purchaae, GCP Row 5,2 pags on demand
Tar DESIGNATION | U [Wat ice |] Tal Pee
et us. VAT ue. VAT
Fre nezulLANKO 70% Clave 25k) 0 eos} aot.or aassas7
TOT APH ToT) a
ie ie in tobe undertoed TOTAL PUPA ing VAT)
Net often PHP
Fim and nt sje o ay ecalatn for whssoeereason
luting pod tty
Iluka reused catizaes se documents
foci ar ag ora es EePepe 28
FreyssineT PURCHASE ORDER N°
PO094-FIMI-REPOO1-20150224
eave eS
siwpeng ime:
‘er roceptin otha Purchase Order
by Payment Condens
coo
ANIC GUARANTEES
Net Aopicabe
NOTA: The Bank Gusrnte wae krevoeble and uncondons
waReanmies:
Not Aopeabe
IwseEoTiON
FREYSSINET ar he cert (or uy-apptedrpresarstves) an Inspct ny phase inte execton ofthe Supls
(Seve covered bythe Purchase Orde
Notapplcabie
NotApplesble
‘SOMPLIANCE WITH TIME LIMITS = DELAY PENALTIES
‘Shervance of tre tvs an ssenal condo fh Phase Order. nd he dale of dvery making ihe
estore spcos tne PO max be sty ahore a
Inthe ovr of lay de fo te unpre supa: sabe oa able to pay he Purchaser, ules expres pled
‘thors ne Purchase Ore, pnaty of meg pnt wo spor cot (025) o etl amount ach cele spent
tf tox or extra an te pat oe supp
[Ary olga andr esos elay may bo cored bythe Purchaser
“andcause De PO to be ermiraea ough he Suppers fut
‘The osses de othe delay ofthe pucaser wl be bone by isl
breach 36 roves hess,Freyssiner
Not Artiste
Retapheabe
PURCHASE ORDER N°: PO094-FIMI-REPOO1-20150224
SMPPING MARKS : Nt Arpeate
‘SOMNG WTO :O8CE af the PO
‘ie oder come fro at rcepton by Mot
Oe sgn bythe supe wos resaree
(chaser
ese W,Carro Tak: 69922960405
prorore By
ne Maree
Renae —
opscn
SSS
Se = =|
=a
Ls alin... eee lg | seem
E ie et
a ‘semester,
mee
See 4S =
AYALA BEIGE tha