Acknowledgement
I am very thankful to LARSEN & TOUBRO CONSTRUCTIONS BUILDING &
FACTORIES INDIPENDENT COMPANY (L&T CONSTRUCTION, B&F IC) for
having given me the opportunity to undertake my summer training at their prestigious NTCB,
Project. It was a very good learning experience for me to have worked at this site as this
project involved many unique construction practices and challenges. I would like to convey
my heartiest thanks to Mr. A.J. Purooshotam, L&T construction, Bangalore Cluster, MED
head, who heartily gave me this opportunity for my M.Tech project.
I would also like to give my heart-felt thanks to Mr. Madhusoodhan, MEP Head, NTCB
Project, Mr. Alen Crasta, Manager piping work, NTCB Project, who guided and encouraged
me all through the summer training and imparted in-depth knowledge of the project.
I would like to thank all the department heads of L&T Construction, B&F IC, for giving their
precious time and valuable guidance during my internship programme.
Last but not least, I would like to thank all the staff at NTCB Project, L&T Construction,
B&F IC, for being so helpful during this internship.

Name: Harlal Choudhary


Date: 26th June 2015

CONTENTS
1. About Organization..
2. Project Details..
2.1 General Information...
2.2 Scope of project.
3. M.TECH Project Information.
3.1 Cold Metal Transfer Welding (CMT)...
3.2 CMT Advantages..
3.3 CMT Applications.
3.4 Objective
3.5 Methodology..
4. Pump Room.
4.1 Ground Floor.
4.2 One Unit of Chiller Pump
4.3 Accessories installed on chiller unit
4.3.1 Chilled water supply.
4.3.2 Chilled water return..
4.3.3 Cooling water supply.
4.3.4 Cooling water return..
4.4 Accessories installed on pump unit..
4.4.1 Suction Pipe
4.4.2 Discharge pipe
4.5 WBS of one chiller pump unit
4.6 Gantt chart..
4.7 Resource Identification.
4.8 Status of Pump Room Ground Floor
5. Piping Work.
5.1 Scope of Work..
5.2 Method Statement.
5.3 Method Statement for NTCB piping work..
5.4 Codes, Standards and Rules..
5.5 Welding & Inspection Procedure
5.6 Direction of Flow..
5.7 Insulation Specification
6. Utility Building..
6.1 Pressure Vessel Specification..
6.2 P & I Diagram for CA.
7. Welding Specification & Procedure.
7.1 Introduction.
7.2 Applicable Codes and Standards.
7.3 Welding Techniques Used
7.3.1 TIG
7.3.2 MIG..
7.3.3 Arc Welding.
7.4 Types of Materials Joined at NTCB..
7.5 Inspection and Testing
7.5.1 Visual Inspection..
7.5.2 Radiographic Examination
7.5.3 Advantage and Disadvantage of RT.
4

8. Conclusion
9. References.