1- All our cabinets inside shelter works by DC .
2- We get voltage by ve values as when any S.C
happened our cabinet will not be burnt.
3- PBC 6500 get 3 phases A/C from MDP and it give us 24v
or 48v DC or mix between 24,48v
4- its important to get our 3 phases from our 3 bars in
MDP . Why?
5- We connect our cabinets on DOUs 24v or 48v to get
its necessary power.
6- our cabinets which named 2206 will get 24v,
transmission cabinets will power by 48v
2206
Trans-cabinet
cabinet
DC-Box
1- We get power cable which carry 48V DC from our
PBC to that DC-Box which consider a protection for all
transmission.
Review by alarms
Basic troubleshooting till now.
1- Cabinet down power.
We have to check its power source in PBC 6500, may DOU
needs to be changed if you havent DOU, just change its
power source to un-used DOU 24
2- All site down but power exist.
- Check if previous site is work normally or not.
- after reach site, check your link if power reach it or not.
- IF not check its power cable if power reach it or not, if
not.
- check DC-Box if your C.Bs up or not, if yes. Check power
in it if you reads about 54v DC or not . If not
- Check if your PBC6500 get its AC power or not. If yes.
- Check your PSUs, if OK.
- Check your DOU. if not, change it.
- - Check if your PBC6500 get its AC power or not. If not.
Check your power in MDP if exist check your conductor